W912EP-18-R-0015
Jacksonville District
Jacksonville Harbor, Construction Dredging, 47-Foot Project Contract B, Cut-7 To Cut-42
Duval County, Florida
Construction Solicitation and Specifications Volume 2 of 2
See Volume 1 of 2 for Issue Date
Jacksonvi l l e Har bor , Const r uct i on Dr edgi ng, 47- Foot Pr oj ect Cont r act B, Cut - 7 To Cut - 42, Duval Count y, Fl or i da
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRI PTI ONS
00 33 50 WEATHER, WATER STAGE AND TI DE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMI NI STRATI VE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 25 OWNER SAFETY REQUI REMENTS - DI VI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 45 05 DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR QUALI TY CONTROL
01 50 02 TEMPORARY CONSTRUCTI ON FACI LI TI ES
01 57 20 ENVI RONMENTAL PROTECTI ON
01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
35 20 26 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SCOW -
ULLAGE PROFI LE
35 20 27 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM PI PELI NE
HYDRAULI C DREDGE
35 20 28 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM HOPPER DREDGE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
Designation: STARK
PID: BBBZ99
Stamping: STARK 1987 JAX FLA Stability:
Setting: Set in top of concrete monument
Description:
Station is located at U.S. Naval Station, Mayport, Duval Co., FL. To reach from the Main Gate of Mayport Naval Station, go east on Main Road 1.5 miles to Carrier Basin. Proceed east 0.5 miles until reaching peninsula that protrudes east toward the Atlantic Ocean and bordered by the St. Johns River to the north and Mayport Entrance Channel to the south. Mark is 21 ft from NE corner of chain-link fence and 31.6 ft from SE corner of chain-link fence which surrounds signal gun emplacement.
Observed: 2010-08-02T21:12:00Z
Source: OPUS - page5 1209.04
SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS
SECTION 00 31 21 Page 1
Designation: CHARLIE TOWER ARP
PID: BBDC09
Stamping: CHARLIE TOWER ARP Setting: Unspecified setting
Description: Station is located at the U.S. Naval Station, Mayport, Duval Co., FL. To reach from the Main Gate of Mayport Naval Station on Mayport Road, go north then east on Main Steet 2.1 miles until reaching the peninsula that protrudes east toward the Atlantic Ocean, bordered by the St. Johns River to the north and Mayport Entrance Channel to the south. Proceed to the lookout tower and station location. Point is the GPS antenna attached to an aluminum pole mounted to the south handrail of C-Tower.
Observed: 2013-06-01T19:00:00Z
SECTION 00 31 21 Page 2
DESIGNATION - 872 0218 A TIDAL
PID - DI9221
STATE/COUNTY- FL/DUVAL
MARKER: FLANGE-ENCASED ROD
SETTING: STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)
STAMPING: 0218 A 1995
MARK LOGO: NOS
PROJECTION: FLUSH
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR
SATELLITE OBSERVATIONS - May 23, 2007 ROD/PIPE-DEPTH: 20.7 meters
HISTORY - Date Condition Report By
HISTORY - 1995 MONUMENTED NOS
HISTORY - 2006 GOOD FLDEP
HISTORY - 20070523 GOOD FLDEP
STATION DESCRIPTION (2007)
TO REACH THE MARK FROM THE OVERPASS OF ATLANTIC BOULEVARD (STATE HIGHWAY
10) AND MAYPORT ROAD (STATE HIGHWAY A1A) ON THE SOUTH SIDE OF MAYPORT, GO
NORTH ON MAYPORT ROAD (STATE HIGHWAY A1A) FOR 2.25 MI TO THE JUNCTION OF
STATE HIGHWAY 101 (MAYPORT ROAD-MAIN STREET) AND STATE HIGHWAY A1A NORTH
(STATE ROAD) ON THE LEFT, TURN LEFT ON STATE HIGHWAY A1A NORTH (STATE
ROAD-OCEAN STREET) AND GO NORTHWEST FOR 3.65 MI TO THE ENTRANCE TO THE
SAINT JOHNS BAR PILOT ASSOCIATION AND THE MARK ON THE LEFT.
MARK IS A STAINLESS STEEL ROD DRIVEN TO REFUSAL AT A DEPTH OF 67.8 FT
WITH A NOS LOGO CAP FLUSH WITH THE GROUND AND LEVEL WITH OCEAN STREET,
THE DATUM POINT IS RECESSED 0.3 FT BELOW THE LEVEL OF THE NOS LOGO CAP.
LOCATED 462.5 FT NORTH OF THE APPROXIMATE CENTERLINE OF OCEAN STREET,
218.5 FT WEST OF THE CENTER OF THE PILOT ASSOCIATION DOCK, 218.0 FT
SOUTHWEST OF THE PILOT ASSOCIATION BUILDING, 122.6 FT WEST OF THE
NORTHWEST CORNER OF THE PILOT ASSOCIATION CLUB, 63.0 FT NORTH-NORTHWEST
OF A POWER POLE WITH TWO LIGHTS ATTACHED AND 1.0 FT SOUTHWEST OF THE
NORTHWEST END OF A 6.0 FT TALL CHAIN LINK FENCE.
NOTE ACCESS TO THE DATUM POINT IS HAD THROUGH A 5-INCH (13 CM) NOS LOGO
CAP.
SECTION 00 31 21 Page 3
Designation: BIMT-101
PID: BBBX61
Stamping: BIMT-101, 2010, JAX DIST Setting: Set in top of concrete monument
Description: To reach from the intersection of Heckscher Dr and the entrance to Blount Island Marine Terminal, proceed southerly for 0.4 miles to entrance road on left leading to the Marine Corps Support Facility. Turn left then right onto Channel View Blvd and proceed to Entry Control Gate. Once through gate proceed on Channel View Blvd 1.0 miles to Sonar Way. Turn right and proceed 0.4 miles to Pierhead Way. Turn left and proceed southerly 0.7 miles to an area known as Navy Point and station location.
Observed: 2010-05-26T14:41:00Z
SECTION 00 31 21 Page 4
SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA
SECTION 00 33 50 Page 1
1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject Plans and Specifications. The following water level datums are provided for information only and are not to be utilized in conjunction with any contract related hydrographic surveying.
2. A technical review has been performed on the following data and this memo, signed by Chief, Water Resources Engineering Branch, signifies EN-W Branch Quality Control Certification.
a) Water Stages. Water levels in the project area are mainly affected by semi-diurnal tidal fluctuations in the Atlantic Ocean, and stormwater runoff in the St Johns River. The project area is also subject to storm surges from hurricanes and tropical storms from June through November. Surges from extratropical storms may affect the area during any time of the year.
Elevations of tidal datums in the vicinity of the project area are provided in the following table.
All datum elevations in this table are referred to mean lower low water (MLLW). These datums are based on field measurements from three tide stations located on the the St. Johns River from the Mayport Ferry Depot to the Marine Corps Terminal. These tide stations were established by the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS).
All tidal stations are based on the 1983-2001 tidal epoch. Additional information on these and other nearby tide stations is available at this NOAA website:
http://tidesandcurrents.noaa.gov/stations.html?type=Datums#Florida
Station ID: 8720220 PUBLICATION DATE: 11/16/2009 Name: MAYPORT (FERRY DEPOT), SAINT JOHNS RIVER, FLORIDA Latitude: 30° 23.6' N Longitude: 81° 25.9' W
Highest Observed Water Level (9/9/1964) = 7.30 Feet Mean Higher High Water (MHHW) = 4.86 Feet Mean High Water (MHW) = 4.60 Feet North American Vertical Datum – 1988 (NAVD) = 3.01 Feet Mean Sea Level (MSL) = 2.41 Feet Mean Tide Level (MTL) = 2.37 Feet Mean Low Water (MLW) = 0.14 Feet Mean Lower Low Water (MLLW) = 0.00 Feet Lowest Observed Water Level (1/24/1940) = -3.40 Feet
Station ID: 8720232 PUBLICATION DATE: 03/25/2010 Name: PABLO CREEK ENTRANCE, FLORIDA Latitude: 30° 22.6' N Longitude: 81° 26.9' W
Mean Higher High Water (MHHW) = 4.20 Feet Mean High Water (MHW) = 3.94 Feet North American Vertical Datum – 1988 (NAVD) = 2.50 Feet Mean Sea Level (MSL) = 2.10 Feet Mean Tide Level (MTL) = 2.02 Feet Mean Low Water (MLW) = 0.10 Feet Mean Lower Low Water (MLLW) = 0.00 Feet http://tidesandcurrents.noaa.gov/stations.html?type=Datums#Florida
SECTION 00 33 50 Page 2
Station ID: 8720221 PUBLICATION DATE: 01/23/2004 Name: FULTON ST JOHNS RIVER, FLORIDA Latitude: 30° 23.4' N Longitude: 81° 30.4' W
Mean Higher High Water (MHHW) = 3.91 Feet Mean High Water (MHW) = 3.71 Feet NAVD88 = 2.36 Feet Mean Sea Level (MSL) = 1.93 Feet Mean Tide Level (MTL) = 1.90 Feet Mean Low Water (MLW) = 0.10 Feet Mean Lower Low Water (MLLW) = 0.00 Feet
Daily tidal predictions at locations along the coastline of North and South America, including locations in the vicinity of the project area can be found in the publication East Coast of North and South America Tide Tables, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service.
In addition to daily tidal predictions, this publication provides mean and spring tide ranges as well as mean tide levels. Some astronomical data is also included, such as time of sunrise, sunset, moonrise, and moonset. This publication is available through NOAA. Tidal data provided in this publication can also be found at the following NOAA website:
http://tidesandcurrents.noaa.gov/.
b) Wind and Wave Data. The following publications include wind and wave information in the vicinity of the project area, and are available for review in the Jacksonville District Office or may be ordered directly from the agencies indicated.
1. U.S. Coast Pilot Volume 4, Atlantic Coast: Cape Henry to Key West, U.S.
Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. This publication supplements the navigational information shown on the NOAA/NOS nautical charts. It also provides miscellaneous meteorological data. This publication is available through NOAA, and is also available at the following website:
http://nauticalcharts.noaa.gov/nsd/cpdownload.htm.
2. U. S. Army Corps of Engineers’ Coastal & Hydraulics Laboratory, Wave Information Study (WIS) Database. This Internet webpage presents wave hindcast data for various stations located along the Atlantic and Gulf of Mexico coastlines within the United States. The closest of these stations (63407) lies approximately 16 miles east of Mayport, Florida. Available data includes a hindcast time series of wave heights, periods, and directions taken at 1-hour intervals for the 24-year period extending from 1980-2004, at a station located in 15 meters (49 feet) of water. This webpage also provides links to WIS summary tables and plots, as well as other sources of wave data. These data products are available at the following website: http://wis.usace.army.mil/ .
http://tidesandcurrents.noaa.gov/ http://nauticalcharts.noaa.gov/nsd/cpdownload.htm http://wis.usace.army.mil/
SECTION 00 33 50 Page 3
3. National Data Buoy Center (NDBC) Website. This Internet website provides a wide range of real-time and archived meteorological and oceanographic data collected at offshore and nearshore stations worldwide. Data provided on this website includes wind speed, wind gusts, atmospheric pressure, air temperature, sea temperature, wave height, and wave period. Gage readings are updated hourly, and archived data is available for most stations. The website address for data relevant to this project site is:
http://www.ndbc.noaa.gov/maps/Florida.shtml.
c) Weather Conditions. The project area is subject to tropical storms and hurricanes from June through November, and to windy and/or rainy weather during any time of the year. The climate of the area is essentially tropical, and temperatures below freezing are rare. The wet season in the project area is from May through October. Rainfall during these months is closely associated with convective activity. These rainfall events are normally of short duration and amounts are spatially variable. In general, the winter months constitute the dry season. Rainfall during the winter months is usually associated with mid-latitude systems (fronts and low pressure systems) and is distributed in a more spatially uniform pattern. Occasionally, daily rainfall in the dry season can be quite heavy as mid-latitude systems penetrate into central Florida. Dangerous thunderstorms can occur in this area at any time of the year.
It shall be the contractor's responsibility to obtain information concerning weather conditions in the project area. The Climate Data Online website http://www.ncdc.noaa.gov/cdo-web/ published by NOAA’s National Centers for Environmental Information (formerly the National Climatic Data Center) in Asheville, North Carolina contains climatological and meteorological observations and data relevant to this region. Available data includes quality controlled daily, monthly, seasonal, and yearly measurements of temperature, precipitation, wind, and degree days as well as radar data and 30-year climate normals.
The Summary of Monthly Normals product available at the following web link provides monthly average values for temperature, precipitation, and other information. The Jacksonville Beach, Florida, NOAA rain gage in proximity to the project location provides a Summary of Monthly Normals over the period of record from 1981 through 2010. This station is located at latitude 30° 17’ N, longitude 81° 24’ W and data can be accessed through: http://www.ncdc.noaa.gov/cdo-web/datatools/normals http://www.ndbc.noaa.gov/maps/Florida.shtml http://www.ncdc.noaa.gov/cdo-web/ http://www.ncdc.noaa.gov/cdo-web/datatools/normals http://www.ncdc.noaa.gov/cdo-web/datatools/normals
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 2 Locat i on
1. 2. 3 Saf et y Requi r ement s
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
1. 5 PHYSI CAL DATA
1. 5. 1 Physi cal Condi t i ons
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
1. 5. 3 Cont r act or I nvest i gat i on
1. 5. 4 Mar i t i me Tr af f i c
1. 5. 5 Obst r uct i on of Channel
1. 5. 6 Hydr ogr aphi c Sur veys
1. 6 LAYOUT OF WORK
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
1. 6. 2 Layout
1. 6. 3 Sur vey
1. 7 DAMAGE TO WORK
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
GDR SECTI ON 00 31 32, Geot echni cal Dat a Repor t f or Jacksonvi l l e Har bor Deepeni ng, 47- f oot Pr oj ect , Cont r act B, Cut - 7 t hr ough Cut - 42
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The aut hor i zed pr oj ect pr ovi des f or t he deepeni ng and st r at egi c wi deni ng of t he Feder al navi gat i on channel f r om t he ent r ance of Bar Cut - 3 t hr ough st at i on 28+18. 43 of Cut - 45 t o a pr oj ect dept h of 47 f eet pl us appl i cabl e over dept hs and Advance Mai nt enance. The compl et i on of t he wor k wi l l t ake pl ace under mul t i pl e cont r act s. Cont r act B wi l l dr edge f r om Cut - 7 St at i on 10+00 t o Cut - 42 St at i on 33+80 t o a r equi r ed dept h of 48 f eet pl us 1 f oot al l owabl e over dept h. I n addi t i on, Advance Mai nt enance Ar eas 2 and 3 i ncor por at e an addi t i onal 2 f eet of r equi r ed dr edgi ng wher e appl i cabl e.
Tot al quant i t y t o be dr edged f r om t he Feder al Channel i s appr oxi mat el y 5. 7 mi l l i on cubi c yar ds ( cy) . Al l dr edged mat er i al wi l l be pl aced i n t he appr oved Ocean Dr edged Mat er i al Di sposal Si t e ( ODMDS) whi ch i s l ocat ed an aver age of 13. 4 naut i cal mi l es f r om t he dr edgi ng l ocat i on. Mat er i al s t o be dr edged consi st of unconsol i dat ed mat er i al s consi st i ng of sand and si l t y sand, occasi onal s i l t , s t i f f c l ay and shel l l ayer s, and r ock var yi ng f r om poor l y i ndur at ed and weat her ed t o har d. Wor k i s di v i ded i nt o a base and one opt i on as i ndi cat ed i n Sect i on 00010A LI NE I TEMS AND PRI CI NG
SCHEDULE.
1. 2. 2 Location
The pr oj ect s i t e i s l ocat ed i n Duval Count y on t he nor t heast coast of Fl or i da i n t he St . Johns Ri ver . The di sposal l ocat i on, Jacksonvi l l e ODMDS, i s l ocat ed i n t he At l ant i c Ocean.
1. 2. 3 Saf et y Requi r ement s
See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and EM 385- 1- 1.
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
a. Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause COMMENCEMENT, SECTI ON 01 11 00 Page 2
PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
b. I n addi t i on t o t he above, t he f ol l owi ng shal l appl y: The phr ase " commence wor k" means commence dr edgi ng" . The commencement t i me i ndi cat ed appl i es unl ess pr ecl uded by i ncl ement weat her as det er mi ned by t he Cont r act i ng Of f i cer .
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
Ref er t o t he Cl ause LI QUI DATED DAMAGES - CONSTRUCTI ON ( FAR 52. 211- 12) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5 PHYSI CAL DATA
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause PHYSI CAL DATA ( FAR
52. 236- 4) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 1 Physi cal Condi t i ons
The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys and/ or by cor e bor i ngs. When t he i ndi cat ed physi cal condi t i ons ar e t he r esul t of s i t e i nvest i gat i ons by cor e bor i ngs, t he cor e bor i ng l ogs and l abor at or y dat a ar e i n Sect i on 00 31 32 GEOTECHNI CAL DATA REPORT ( GDR) and t he cor e bor i ng l ocat i ons ar e shown on t he dr awi ngs. Al so, see t he GDR f or i nst r uct i ons concer ni ng avai l abi l i t y of cor e bor i ngs f or i nspect i on.
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.
1. 5. 3 Cont r act or I nvest i gat i on
Ref er t o t he Cl ause SI TE I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK ( FAR 52. 236- 3) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 4 Mar i t i me Tr af f i c
Channel Tr af f i c i n t he pr oj ect ar ea consi st s of Naval , cr ui se shi ps, commer ci al , pl easur e, and smal l r ecr eat i onal vessel s of al l t ypes and si zes whi ch can be accommodat ed by exi st i ng dept hs.
1. 5. 5 Obst r uct i on of Channel
The Gover nment wi l l not under t ake t o keep t he channel f r ee f r om vessel s or ot her obst r uct i ons, except t o t he ext ent of such r egul at i ons, i f any, as may be pr escr i bed by t he Secr et ar y of t he Ar my, i n accor dance wi t h t he pr ovi s i ons of Sect i on 7 of t he Ri ver and Har bor Act appr oved 8 August 1917. The Cont r act or wi l l be r equi r ed t o conduct t he wor k i n such manner as t o obst r uct navi gat i on as l i t t l e as possi bl e, and i n case t he Cont r act or ' s pl ant so obst r uct s t he channel as t o make di f f i cul t or endanger t he passage of any vessel s, sai d pl ant shal l be pr ompt l y moved on t he appr oach of any vessel t o such an ext ent as may be necessar y t o af f or d a pr act i cabl e passage. Upon compl et i on of t he wor k t he Cont r act or shal l pr ompt l y r emove hi s pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ks pl aced by hi m under t he cont r act i n navi gabl e wat er s or on shor e.
SECTI ON 01 11 00 Page 3
1. 5. 6 Hydr ogr aphi c Sur veys
Hydr ogr aphi c sur veys ar e post ed at t he f ol l owi ng web addr ess:
http://www.saj.usace.army.mil/Missions/CivilWorks/Navigation/HydroSurveys Sur vey number s ar e i ndi cat ed on t he dr awi ngs.
1. 6 LAYOUT OF WORK
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause LAYOUT OF WORK ( FAR
52. 236- 17) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
The Gover nment has est abl i shed monument s al ong t he wor k s i t e( s) . Each monument i s r epr esent ed i n t he cont r act dr awi ngs by a Desi gnat i on and i n most cases, an al phanumer i c Per manent I dent i f i er ( PI D) . I nf or mat i on concer ni ng t he l ocat i on and el evat i ons can be f ound wi t hi n t he Sur vey Not es on t he pl an sheet s. The Sur vey Not es f or each i ncl uded f i el d sur vey wi l l c i t e a par t i cul ar sur vey number , and speci f y t he cont r ol used t o conduct t hat sur vey. Addi t i onal i nf or mat i on i s i ncl uded i n t he Sur vey Not es t hat must be dupl i cat ed i f an at t empt t o r ecr eat e t he subj ect sur vey i s desi r ed.
For navi gat i on channel s, t he Gover nment has est abl i shed t i dal cal i br at i on s i t es f or pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um. Each t i dal cal i br at i on s i t e i s r epr esent ed i n t he pl an sheet dr awi ngs by St at i on I D, and i s c i t ed i n t he Sur vey Not es. Al l pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um shal l be cal i br at ed t o t he St at i on I D speci f i ed i n t he pl an sheet dr awi ngs. I nf or mat i on r egar di ng t he l ocat i on and associ at ed benchmar ks of t he r ef er enced St at i on I D i s i ncl uded i n t he Monument Descr i pt i on sect i on of t hese speci f i cat i ons.
See Sect i on 00 31 21 CONTROL MONUMENT DESCRI PTI ONS.
1. 6. 2 Layout
Fr om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment , t he Cont r act or shal l compl et e t he l ayout of t he wor k and shal l be r esponsi bl e f or al l measur ement s t hat may be r equi r ed f or t he execut i on of t he wor k t o t he l ocat i on and l i mi t mar ks pr escr i bed i n t he speci f i cat i ons or on t he cont r act dr awi ngs, subj ect t o such modi f i cat i ons as t he Cont r act i ng Of f i cer may r equi r e t o meet changed condi t i ons or as a r esul t of necessar y modi f i cat i ons t o t he cont r act wor k.
1. 6. 3 Survey
The Cont r act or shal l f ur ni sh, at hi s own expense, such st akes, t empl at es, pl at f or ms, equi pment , t ool s and mat er i al , and al l l abor as may be r equi r ed i n l ayi ng out any par t of t he wor k f r om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment . I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o mai nt ai n and pr eser ve al l st akes and ot her mar ks est abl i shed by t he Cont r act i ng Of f i cer unt i l aut hor i zed t o r emove t hem, and i f such mar ks ar e dest r oyed by t he Cont r act or or t hr ough hi s negl i gence, pr i or t o t hei r aut hor i zed r emoval , t hey may be r epl aced by t he Cont r act i ng Of f i cer , at hi s di scr et i on, and t he expense of r epl acement wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or .
The Cont r act i ng Of f i cer may r equi r e t hat wor k be suspended at any t i me when l ocat i on and l i mi t mar ks est abl i shed by t he Cont r act or ar e not r easonabl y adequat e t o per mi t checki ng of t he wor k.
SECTI ON 01 11 00 Page 4
1. 7 DAMAGE TO WORK
The r esponsi bi l i t y f or damage t o any par t of t he per manent wor k shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. However , i f , i n t he j udgment of t he Cont r act i ng Of f i cer , any par t of t he per manent wor k per f or med by t he Cont r act or i s damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i ons or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s as or der ed by t he Cont r act i ng Of f i cer and f ul l compensat i on f or such r epai r s wi l l be made at t he appl i cabl e cont r act uni t or l ump sum pr i ces as f i xed and est abl i shed i n t he cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t her e ar e no cont r act uni t or l ump sum pr i ces appl i cabl e t o any par t of such wor k, an equi t abl e adj ust ment pur suant t o Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 wi l l be made as f ul l compensat i on f or t he r epai r s of t hat par t of t he per manent wor k f or whi ch t her e ar e no appl i cabl e cont r act uni t or l ump sum pr i ces. Except as her ei n pr ovi ded, damage t o al l wor k ( i ncl udi ng t empor ar y const r uct i on) , ut i l i t i es, mat er i al s, equi pment and pl ant shal l be r epai r ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer at t he Cont r act or ' s expense, r egar dl ess of t he cause of such damage.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
SECTI ON 01 11 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 1. 1 Ref er ence
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 SUBMI TTALS
1. 4 JOB PAYMENT I TEMS
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0003 and 0010)
1. 4. 3 Endanger ed Speci es Obser ver ( Hopper Dr edge Onl y, Li ne I t ems
0004 and 0011)
1. 4. 4 Dedi cat ed Manat ee Obser ver ( Cl amshel l Dr edgi ng Onl y, Li ne
I t ems 0005 and 0012)
1. 4. 5 Mobi l i zat i on and Demobi l i zat i on f or Sea Tur t l e Tr awl i ng
( Hopper Dr edge Onl y, Li ne I t em 0006)
1. 5 UNI T PRI CE PAYMENT I TEMS
1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002 and 0009)
1. 5. 1. 1 Payment
1. 5. 1. 2 Measur ement
1. 5. 1. 3 Uni t of Measur e
1. 5. 2 Sea Tur t l e Tr awl i ng ( Hopper Dr edge Onl y, Li ne I t ems 0007 and
0013)
1. 5. 2. 1 Payment
1. 5. 2. 2 Measur ement
1. 5. 2. 3 Uni t of Measur e
1. 5. 3 Endanger ed Speci es St andby Ti me ( Li ne I t ems 0008 and 0014)
1. 5. 3. 1 Measur ement and Payment
1. 5. 3. 2 Uni t of Measur e
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 1
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i ct i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 1. 1 Reference
The publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Thi s publ i cat i on i s r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 1110- 2- 1003 ( 2013) Engi neer i ng and Desi gn, Hydr ogr aphi c Sur veyi ng
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or mor e i nf or mat i on on CLI Ns, schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and payment pr ocedur es. The Cont r act or mode user manual wi t h i n- dept h i nst r uct i ons can be downl oaded f r om t he RMS web si t e i ndi cat ed i n Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE
( RMS CM) .
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SECTI ON 01 22 00 Page 2
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of l ump sum i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.
SD- 07 Cer t i f i cat es
Request f or Pr ogr ess Payment ; G, RO
Submi t mont hl y i n accor dance wi t h subpar agr aph " Request i ng Pr ogr ess Payment " bel ow.
1. 4 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act l ump sum payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar l ump sum or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed l ump sum i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The l ump sum pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
Pr ogr ess payment s f or l ump sum CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each l ump sum CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE) . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedul e.
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on and est abl i shment of i ni t i al pr oj ect management and coor di nat i on. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0003 and 0010)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.
SECTI ON 01 22 00 Page 3
1. 4. 3 Endanger ed Speci es Obser ver ( Hopper Dr edge Onl y, Li ne I t ems 0004 and 0011)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o endanger ed speci es obser ver s r equi r ed wi t h t he use of a hopper dr edge. See Sect i on
01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 4. 4 Dedi cat ed Manat ee Obser ver ( Cl amshel l Dr edgi ng Onl y, Li ne I t ems 0005 and 0012)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o dedi cat ed manat ee obser ver s r equi r ed when cl amshel l dr edgi ng. See Sect i on 01 57 20
ENVI RONMENTAL PROTECTI ON.
1. 4. 5 Mobi l i zat i on and Demobi l i zat i on f or Sea Tur t l e Tr awl i ng ( Hopper Dr edge Onl y, Li ne I t em 0006)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he mobi l i zat i on and demobi l i zat i on f or sea t ur t l e t r awl i ng. See Sect i on
01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 5 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .
Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.
1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002 and 0009)
1. 5. 1. 1 Payment
a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o excavat i on, t r anspor t at i on, and di sposal of mat er i al s; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ; noi se cont r ol ; debr i s r emoval ; i nst al l at i on, oper at i on or mai nt enance of t he el ect r oni c t r acki ng syst em f or sur vei l l ance of al l dr edgi ng and di sposal act i v i t i es. See Sect i on 35 20 23 DREDGI NG.
b. I nsof ar as consi st ent wi t h t he par agr aph CONTI NUI TY OF WORK of Section 35 20 23 DREDGI NG, mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by soundi ngs or sweepi ngs per f or med by t he Cont r act or behi nd t he dr edge. The t er m " ar ea desi gnat ed by t he Cont r act i ng Of f i cer " as used i n t he CONTI NUI TY OF WORK par agr aph, i s def i ned as " accept ance sect i on" .
c. Hydr ogr aphi c sur veys f or f i nal measur ement and payment and f or channel c l ear ance wi l l be made by t he Gover nment . Al l sur veys wi l l be per f or med i n accor dance wi t h USACE EM 1110- 2- 1003. Sur vey f r equenci es wi l l be t he same as t hose shown i n t he dr awi ngs and wi l l r emai n consi st ent t hr oughout t he cont r act .
SECTI ON 01 22 00 Page 4
1. 5. 1. 2 Measurement
a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y aver age exi st i ng condi t i ons, but t he dept hs shown t her eon may be ver i f i ed and cor r ect ed by soundi ngs t aken bef or e dr edgi ng. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .
b. The t ot al amount of mat er i al r emoved, and t o be pai d f or under t he cont r act , wi l l be measur ed by t he cubi c yar d i n pl ace. The vol ume comput ed shal l be bet ween t he bot t om sur f ace shown by soundi ngs t aken wi t hi n 3 weeks bef or e dr edgi ng and t he bot t om sur f ace shown by t he soundi ngs t aken wi t hi n 2 weeks af t er t he wor k speci f i ed i n each accept ance sect i on has been compl et ed. The Cont r act or shal l gi ve 10 days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need f or a pr e- dr edgi ng sur vey or af t er - dr edgi ng sur vey f or f i nal accept ance f or each accept ance sect i on. The quant i t y shal l i ncl ude t he vol ume wi t hi n t he l i mi t s of t he s i de sl opes descr i bed i n subpar agr aph " Si de Sl opes" of par agr aph REQUI RED DEPTH, ALLOWABLE OVERDEPTH, AND SI DE SLOPES of Sect i on 35 20 23 DREDGI NG, l ess any deduct i ons t hat may be r equi r ed f or mi spl aced mat er i al descr i bed i n subpar agr aph " Mi spl aced Mat er i al s" of par agr aph DI SPOSAL OF EXCAVATED MATERI AL of Sect i on 35 20 23 DREDGI NG.
1. 5. 1. 3 Uni t of Measur e
Cubi c yar d.
1. 5. 2 Sea Tur t l e Tr awl i ng ( Hopper Dr edge Onl y, Li ne I t ems 0007 and 0013)
1. 5. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he Sea Tur t l e Tr awl i ng. Thi s pr i ce shal l i ncl ude al l cost s f or f ur ni shi ng l abor , equi pment , f uel , oi l , mat er i al s, and suppl i es r equi r ed f or t r awl i ng t o c l ear and/ or r el ocat e sea t ur t l es f r om i n t he v i c i ni t y of t he dr edge, and shal l i ncl ude t he cost of r epor t i ng as speci f i ed. See Sect i on 01 57 20
ENVI RONMENTAL PROTECTI ON.
1. 5. 2. 2 Measurement
Sea Tur t l e Tr awl i ng wi l l be measur ed f or payment based upon t he dur at i on of per f or mance on a dai l y basi s. A day of t r awl i ng i s def i ned as 24 hour s of cont i nuous t r awl i ng. The Cont r act or shal l conduct t r awl i ng as descr i bed i n Par agr aph " Sea Tur t l e Tr awl i ng ( Capt ur e Tr awl i ng and Non- Capt ur e Tr awl Sweepi ng) " i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 5. 2. 3 Uni t of Measur e
Day.
SECTI ON 01 22 00 Page 5
1. 5. 3 Endanger ed Speci es St andby Ti me ( Li ne I t ems 0008 and 0014)
1. 5. 3. 1 Measur ement and Payment
St andby t i me f or dr edgi ng wi l l be pai d f or each hour or par t t her eof t hat t he pl ant i s not i n oper at i on by r equest of t he Cont r act i ng Of f i cer .
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o st andby of t he dr edge pl ant onl y upon i mpl ement at i on of t hi s l i ne i t em. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em. The Cont r act i ng Of f i cer may cease oper at i ons subsequent t o t he i ni t i al 24- hour per i od f ol l owi ng a t ur t l e t ake. However , i f i t i s subsequent l y det er mi ned by t he Gover nment t hat a t ur t l e t ake r esul t ed f r om i mpr oper oper at i onal pr ocedur es, consi der at i on f or t he st andby t i me may be wi t hhel d by t he Gover nment .
1. 5. 3. 2 Uni t of Measur e
Hour.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.
3. 1. 1 Request i ng Pr ogr ess Payment
For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs.
Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment . Submi t a r equest f or pr ogr ess payment mont hl y i n accor dance wi t h Cl ause 52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS of Sect i on 00700 CONTRACT CLAUSES. I n addi t i on t o t he i t ems l i s t ed i n Cl ause
52. 232- 5( b) ( 1) , submi t t he f ol l owi ng i n t he r equest f or pr ogr ess payment :
a. Appr oved const r uct i on schedul e.
b. Up- t o- dat e payr ol l r ecor ds.
c. Cur r ent submi t t al r egi st er .
d. Appr oved submi t t al s on i nst al l ed pr oper t y.
e. QA/ QC def i c i ency t r acki ng l i s t .
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed.
I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.
SECTI ON 01 22 00 Page 6
- - End of Sect i on - -
SECTI ON 01 22 00 Page 7
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 30 00
ADMI NI STRATI VE PROCEDURES
PART 1 GENERAL
1. 1 SUMMARY
1. 2 SUBMI TTALS
1. 3 PROJECT COORDI NATI ON
1. 3. 1 Resi dent Management Syst em ( RMS)
1. 3. 2 Coor di nat i on wi t h Ot her Cont r act s
1. 3. 2. 1 Adj acent Cont r act or
1. 4 PROJECT MEETI NGS
1. 5 PRECONSTRUCTI ON CONFERENCE
1. 5. 1 Pr econst r uct i on Conf er ence Mi nut es
1. 5. 2 Pr econst r uct i on Conf er ence Submi t t al s
1. 5. 2. 1 Ot her Di v i s i on 01 Submi t t al s
1. 5. 2. 2 Di v i s i ons 02 t hr ough 48 Submi t t al s
1. 6 PARTNERI NG
1. 6. 1 I ni t i al Par t ner i ng Meet i ng
1. 6. 2 Par t ner i ng Regr oups
1. 7 NOTI CE TO PROCEED
1. 8 COORDI NATI ON MEETI NG
1. 9 PROGRESS MEETI NGS
1. 9. 1 Pr ogr ess Meet i ng Par t i c i pant s
1. 10 CONTRACTOR PERFORMANCE EVALUATI ONS
1. 10. 1 Tr ai ni ng
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 GENERAL MEETI NG REQUI REMENTS
3. 2 PROGRESS MEETI NG AGENDA
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 30 00 Page 1
SECTI ON 01 30 00
ADMI NI STRATI VE PROCEDURES
PART 1 GENERAL
1. 1 SUMMARY
Manage pr oj ect and coor di nat e act i v i t i es of own empl oyees, subcont r act or s, suppl i er s and of f s i t e f abr i cat or s. Cont r act or shal l use comput er s, E- mai l , and I nt er net r esour ces f or admi ni st r at i ve wor k. Not i f y Cont r act i ng Of f i cer of i mpor t ant meet i ngs, schedul e event s and act i v i t i es. Fur ni sh l abor and mat er i al s and equi pment r equi r ed t o pl an and execut e pr oj ect management f unct i ons and coor di nat i on. Coor di nat e act i v i t i es and manage r esour ces t o const r uct pr oj ect conf or mi ng t o cont r act , on t i me and wi t hi n budget . Rel at ed Sect i ons ar e 01 32 01 PROJECT SCHEDULE, and 01 45 05 DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR
QUALI TY CONTROL.
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days af t er Not i ce t o Pr oceed:
SD- 01 Pr econst r uct i on Submi t t al s
Li st of Subcont r act or s
Document at i on of compl i ance wi t h Cl auses SUBCONTRACTS ( LABOR STANDARDS) and LI MI TATI ONS ON SUBCONTRACTI NG of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1, and, i f i ncl uded, par agr aph
LI MI TATI ONS ON SUBSTI TUTI ONS FOR CERTAI N POSI TI ONS AND/ OR
SUBCONTRACTORS of Sect i on 00800 SPECI AL REQUI REMENTS i n Vol ume 1.
As par t of t he i ni t i al pr oj ect schedul e, submi t a l i s t of pr oposed subcont r act or s wi t h company name, per son t o cont act , st r eet addr ess, mai l addr ess, phone number , t ype of speci al t y and est i mat ed subcont r act quot e.
SD- 07 Cer t i f i cat es
Si gnat ur e Aut hor i t y
Fur ni sh a power of at t or ney or a not ar i zed l et t er of aut hor i t y f r om Cont r act or i dent i f y i ng l ocal r epr esent at i ves aut hor i zed t o s i gn cont r act document s.
Dr ug- Fr ee Wor k Pl ace Recor d
Document at i on of compl i ance wi t h Cl ause DRUG- FREE WORKPLACE of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 ( see subpar agr aphs
SECTI ON 01 30 00 Page 2
( b) ( 1) t hr ough ( b) ( 7) ) .
1. 3 PROJECT COORDI NATI ON
1. 3. 1 Resi dent Management Syst em ( RMS)
Cont r act or shal l use Cor ps of Engi neer s ' Resi dent Management Syst em ( RMS) f or const r uct i on i nf or mat i on management . See Sect i on 01 45 05
DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR QUALI TY CONTROL.
1. 3. 2 Coor di nat i on wi t h Ot her Cont r act s
1. 3. 2. 1 Adj acent Cont r act or
Act i ve dr edgi ng near t he pr oj ect s i t e may i mpact Cont r act or wor k. A separ at e cont r act i s under way f or Jacksonvi l l e Har bor Deepeni ng f r om Bar Cut - 3 St at i on 187+00 t o St at i on 210+00, f r om Bar Cut - 3 St at i on 210+00 t o Cut - 7 St at i on 10+00 and Advance Mai nt enance Ar ea 1, i n whi ch t he cont r act or i s usi ng t he same ODMDS t hat wi l l be used under t hi s cont r act .
Coor di nat e act i v i t i es t o avoi d i mpact t o t he adj acent Cont r act or and pr event pr obl ems f r om t he adj acent cont r act .
1. 4 PROJECT MEETI NGS
Cont r act i ng Of f i cer r equi r es f ol l owi ng t ypes of pr oj ect meet i ngs:
- - Pr econst r uct i on Conf er ence
- - Par t ner i ng Meet i ng
- - Par t ner i ng Regr oup Meet i ngs
- - Coor di nat i on Meet i ng
- - Pr epar at or y and I ni t i al Phase meet i ng f or each f eat ur e of wor k
- - Pr oj ect Pr ogr ess Meet i ngs
Pr oj ect meet i ngs ar e descr i bed i n det ai l i n subpar t s bel ow.
1. 5 PRECONSTRUCTI ON CONFERENCE
Cont r act i ng Of f i cer wi l l conduct a Pr econst r uct i on Conf er ence f or t hi s pr oj ect i n accor dance wi t h Cl ause PRECONSTRUCTI ON CONFERENCE of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Pr econst r uct i on Conf er ence wi l l be 30 cal endar days af t er Not i ce of Awar d ( NOA) or 15 cal endar days af t er Not i ce t o Pr oceed ( NTP) , whi chever i s l at er . ( Ref er t o subpar agr aph " Pr econst r uct i on Conf er ence Submi t t al s" bel ow. ) Cont r act i ng Of f i cer wi l l not i f y Cont r act or of t i me, pl ace, and agenda. Cont r act or shal l not i f y key subcont r act or s and suppl i er s t o at t end. Cont r act i ng Of f i cer wi l l di scuss cont r act " gr ound r ul es" and gener al i ssues i ncl udi ng:
- - Li nes of Cont r act i ng Of f i cer aut hor i t y
- - Li nes of Cont r act or aut hor i t y
- - 00700 Cont r act Cl auses
- - 00800 Speci al Cont r act Requi r ement s
- - Cont r act Admi ni st r at i on
- - Pr ogr ess Payment
- - Cor r espondence Pr ocedur es
- - Pr oj ect Schedul e
- - Submi t t al Regi st er
- - Labor r equi r ement s
- - Gener al Si t e Saf et y
SECTI ON 01 30 00 Page 3
1. 5. 1 Pr econst r uct i on Conf er ence Mi nut es
Cont r act i ng Of f i cer wi l l t ake det ai l ed mi nut es of Pr econst r uct i on Conf er ence di scussi ons and may use an audi o or v i deo t ape. Copi es of t yped mi nut es wi l l be pr ovi ded t o t he Cont r act or t o r evi ew f or accur acy, s i gn and r et ur n. Si gned mi nut es become par t of t he cont r act f i l e. Audi o or v i deo t apes i f used wi l l be made avai l abl e f or Cont r act or t o r evi ew or copy at Ar ea Of f i ce.
1. 5. 2 Pr econst r uct i on Conf er ence Submi t t al s
The t i mi ng of submi ssi on of submi t t al s and compl et i on of t he Pr econst r uct i on Conf er ence i s i nt ended t o al l ow t he Cont r act or and t he Gover nment adequat e t i me t o pr epar e f or commencement of wor k. However , shoul d t he Cont r act or f ai l t o submi t r equi r ed i t ems and r ecei ve accept ance and/ or appr oval wi t hi n t he t i mes st at ed, t he Cont r act or wi l l not be per mi t t ed t o commence wor k unt i l t hese r equi r ement s have been sat i sf i ed.
Any del ays at t r i but abl e t o t he Cont r act or ' s f ai l ur e t o compl y wi t h t hese pr e- wor k r equi r ement s shal l be at t he Cont r act or ' s expense and may be cause f or r emedi al act i on by t he Cont r act i ng Of f i cer . Submi t t al s r equi r ed by t hi s Sect i on ar e descr i bed i n par agr aph SUBMI TTALS above.
1. 5. 2. 1 Ot her Di v i s i on 01 Submi t t al s
The Cont r act i ng Of f i cer r evi ews submi t t ed dr af t pl ans t o pr epar e Coor di nat i on Meet i ng agenda and under st and Cont r act or pr ocedur es. Submi t t he f ol l owi ng, as i ndi cat ed i n t hei r r espect i ve sect i ons, 20 cal endar days af t er awar d or 5 cal endar days af t er Not i ce t o Pr oceed, whi chever i s l at er :
- - Pr oj ect Schedul e - See Sect i on 01 32 01 PROJECT SCHEDULE
- - Di v i ng Pl an - See Sect i on 01 35 25 OWNER SAFETY REQUI REMENTS -
DIVING
- - Acci dent Pr event i on Pl an - See Sect i on 01 35 26 GOVERNMENTAL
SAFETY REQUI REMENTS
- - Qual i t y Cont r ol Pl an - See Sect i on 01 45 05 DREDGI NG/ BEACH FI LL
PLACEMENT - CONTRACTOR QUALI TY CONTROL
- - Tempor ar y Faci l i t i es Pl an - See Sect i on 01 50 02 TEMPORARY
CONSTRUCTI ON FACI LI TI ES
- - Envi r onment al Pr ot ect i on Pl an - See Sect i on 01 57 20
ENVI RONMENTAL PROTECTI ON
1. 5. 2. 2 Di v i s i ons 02 t hr ough 48 Submi t t al s
I n addi t i on t o t he above, br i ng submi t t al i t ems f or mat er i al s, wor kmanshi p, pl ans or event s r equi r ed ear l y i n pr oj ect schedul e whi ch ar e r eady f or t r ansmi…