W912EP18B0006_Amendment_0001.pdf
PDF 1 MB Posted
- Solicitation number
- W912EP18B0006
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract_of_Bids.pdf | ||
| W912EP18B0006_Amendment_0007.pdf | ||
| Amendment_0006.pdf | ||
| W912EP18B0006_0005_SF30.pdf | ||
| SF30.pdf | ||
| Amend_0003_SF30_W912EP18B0006.pdf | ||
| Amend_0002_SF30_W912EP18B0006.pdf | ||
| 18B0006Volume2Specs_RTA.pdf | ||
| Sawpit_-_FY18_GDR_-_Final.pdf | ||
| 180006_Plans_ADVERTISED.pdf | ||
| SF1442_W912EP18B0006.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterw ay, Vicinity of Saw pit Creek, Nassau and Duval Counties, Florida
See SF-30 Continuation Page for Details
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18B0006
X 9B. DATED (SEE ITEM 11)
17-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jul-2018
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterway, Vicinity of Sawpit Creek, Nassau and Duval Counties, Florida
Amendment 0001
W912EP18B0006 SF30 Continuation Page - 2 Amendment 0001
SUMMARY OF CHANGES
Changes to Specifications:
Volume 1 of 2 – Contract Documents
DELETE Clause 52.236-27 and REPLACE with the attached Clause 52.236-27
REMOVE the SF1442 and REPLACE with the attached SF1442.
ADD the attached Section 00010A, Bid Schedule, to Volume I, Contract Documents.
Volume 2 of 2 – Contract Specifications:
No Changes
(End of Summary of Changes)
SF 30 CONTINUATION SHEET
Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterway, Vicinity of Sawpit Creek, Nassau and Duval Counties, Florida
Amendment 0001
W912EP18B0006 SF30 Continuation Page - 2 Amendment 0001
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ
ADAPTATION)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for – August 2, 2018 @ 2:00 PM Local
Time.
(c) Participants will meet at – Location to be provided by the contract administration office via telephone. See (d) below.
(d) Participants should call Geoffrey Klug at (904) 232-3808 to make arrangements.
(e) Core borings are available. (If available, follow the instructions in the Physical
Data paragraph in Section 52.236-4 to make arrangements to inspect the borings.
Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)
(f) (f) After the site visit, a memorandum summarizing the visit will be posted to
FBO.GOV under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.
(End of Provision)
Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterw ay, Vicinity of Saw pit Creek, Nassau and Duval Counties, Florida
Description of Work: Refer to Section 01 11 00 for complete project description.
Draw ings: See DFARs Clause 252.236-7001 in Section 00700
Magnitude of Construction is betw een $5,000,000.00 - $10,000,000.00
This is a Small Business Set-Aside Procurement
A Site Visit Will be held. See Clause 52.236-27 in Section 00100.
You MUST be registered in SAM in order to receive an aw ard f rom this solicitation. The SAM w ebsite is located at w w w .SAM.GOV
X
JOHN D VOHLKEN 904-232-1884
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
17-Jul-2018
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______45 calendar days and complete it w ithin ________256 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Aug 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912EP18B0006 14
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
MAINTENANCE DREDGING, 12-FOOT PROJECT
ATLANTIC INTRACOASTAL WATERWAY, VICINITY OF SAWPIT CREEK
NASSAU AND DUVAL COUNTIES, FLORIDA
W912EP18B0006 00010A-1
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE (CHANNEL, SETTLING BASIN AND AMA-B):
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $_______________
0002 EXCAVATION, UNCLASSIFIED, BEACH PLACEMENT
(ESTIMATED QUANTITY, SEE NOTE 4) 328,000 CUBIC YARD $___________ $_______________
0003 EXCAVATION, UNCLASSIFIED, UPLAND PLACEMENT
IN DMMA DU-2 (ESTIMATED QUANTITY, SEE NOTE 4) 30,000 CUBIC YARD $___________ $_______________
0004 BEACH TILLING (ESTIMATED QUANTITY) 3.0 ACRE $___________ $_______________
0005 TURBIDITY MONITORING 1 JOB $_______________
0006 ENVIRONMENTAL SPECIES MONITORING 1 JOB $_______________
0007 STANDBY TIME
(ESTIMATED QUANTITY, SEE NOTE 5) 24 HOUR $___________ $_______________
0008 LIABILITY INSURANCE (SEE NOTE 6) 1 JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0008) $_______________
OPTION A (CUT-27A RANGE 150 TO RANGE 360):
0009 EXCAVATION, UNCLASSIFIED, BEACH PLACEMENT
(ESTIMATED QUANTITY, SEE NOTE 4) 65,000 CUBIC YARD $___________ $_______________
0010 BEACH TILLING (ESTIMATED QUANTITY) 0.5 ACRE $___________ $_______________
0011 TURBIDITY MONITORING 1 JOB $_______________
0012 ENVIRONMENTAL SPECIES MONITORING 1 JOB $_______________
TOTAL OPTION A (LINE ITEMS 0009 THROUGH 0012) $_______________
TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0012) $_______________
OPTION B (CUT-27A RANGE 360 TO RANGE 520):
0013 EXCAVATION, UNCLASSIFIED, BEACH PLACEMENT
(ESTIMATED QUANTITY, SEE NOTE 4) 62,000 CUBIC YARD $___________ $_______________
0014 BEACH TILLING (ESTIMATED QUANTITY) 0.5 ACRE $___________ $_______________
0015 TURBIDITY MONITORING 1 JOB $_______________
0016 ENVIRONMENTAL SPECIES MONITORING 1 JOB $_______________
TOTAL OPTION B (LINE ITEMS 0013 THROUGH 0016) $_______________
TOTAL BASE PLUS OPTIONS A AND B (LINE ITEMS 0001 THROUGH 0016) $_______________
MAINTENANCE DREDGING, 12-FOOT PROJECT
ATLANTIC INTRACOASTAL WATERWAY, VICINITY OF SAWPIT CREEK
NASSAU AND DUVAL COUNTIES, FLORIDA
W912EP18B0006 00010A-2
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION C (CUT-27A RANGE 520 TO RANGE 740):
0017 EXCAVATION, UNCLASSIFIED, BEACH PLACEMENT
(ESTIMATED QUANTITY, SEE NOTE 4) 64,000 CUBIC YARD $___________ $_______________
0018 BEACH TILLING (ESTIMATED QUANTITY) 0.5 ACRE $___________ $_______________
0019 TURBIDITY MONITORING 1 JOB $_______________
0020 ENVIRONMENTAL SPECIES MONITORING 1 JOB $_______________
TOTAL OPTION C (LINE ITEMS 0017 THROUGH 0020) $_______________
TOTAL BASE PLUS OPTIONS A, B AND C (LINE ITEMS 0001 THROUGH 0020) $_______________
OPTION D (CUT-27A RANGE 740 TO RANGE 1198):
0021 EXCAVATION, UNCLASSIFIED, BEACH PLACEMENT
(ESTIMATED QUANTITY, SEE NOTE 4) 65,000 CUBIC YARD $___________ $_______________
0022 BEACH TILLING (ESTIMATED QUANTITY) 0.5 ACRE $___________ $_______________
0023 TURBIDITY MONITORING 1 JOB $_______________
0024 ENVIRONMENTAL SPECIES MONITORING 1 JOB $_______________
TOTAL OPTION D (LINE ITEMS 0021 THROUGH 0024) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0024) $_______________
NOTES: (1) OFFER MUST PRICE ALL LINE ITEMS.
(2) ACTUAL QUANTITIES MAY VARY.
(3) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.
(4) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEY SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANTITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY
MAY BE EXCEEDED.
SEE NEXT PAGE FOR NOTES 5 AND 6.
MAINTENANCE DREDGING, 12-FOOT PROJECT
ATLANTIC INTRACOASTAL WATERWAY, VICINITY OF SAWPIT CREEK
NASSAU AND DUVAL COUNTIES, FLORIDA
W912EP18B0006 00010A-3
(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION BY REQUEST OF THE CONTRACTING OFFICER OR THE ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER.
STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT
AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(6) PAYMENT WILL BE MADE FOR COST ASSOCIATED WITH THE TEN MILLION-DOLLAR ($10,000,000.00) PROPERTY DAMAGE LIABILITY INSURANCE POLICY. THIS POLICY SHALL MEET ALL THE REQUIREMENTS OF FAR 52.228-5 IN SECTION 00700 CONTRACT CLAUSES AND PARAGRAPH 999.228-4000 IN SECTION 00800 SPECIAL CONTRACT
REQUIREMENTS.
File details come from the government source that posted it.