Amendment 0005

View the file

Other files

File Type Posted
Abstract_of_Bids.pdf PDF
W912EP18B0006_Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
SF30.pdf PDF
Amend_0003_SF30_W912EP18B0006.pdf PDF
Amend_0002_SF30_W912EP18B0006.pdf PDF
W912EP18B0006_Amendment_0001.pdf PDF
18B0006Volume2Specs_RTA.pdf PDF
Sawpit_-_FY18_GDR_-_Final.pdf PDF
180006_Plans_ADVERTISED.pdf PDF
SF1442_W912EP18B0006.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterw ay, Vicinity of Saw pit Creek, Nassau and Duval Counties, Florida

See SF30 Continuatiuon Page for Details

1. CONTRACT ID CODE PAGE OF PAGES

J 1

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP18B0006

X 9B. DATED (SEE ITEM 11)

17-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2018

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterway, Vicinity of Sawpit Creek, Nassau and Duval Counties, Florida

W912EP18B0006 2 Amendment 0005

SUMMARY OF CHANGES

1. CONSTRUCTION SOLICITATION AND SPECIFICATIONS:

VOLUME I – CONTRACT DOCUMENTS

No Changes

VOLUME II - SPECIFICATIONS

DELETE Section 01 30 00 and REPLACE with the attached revised Section 01 30 00.

DELETE Section 01 50 02 and REPLACE with the attached revised Section 01 50 02.

2. DRAWINGS:

No change to drawings.

(End of Summary of Changes)

Maintenance Dredging, 12-Foot Project, Atlantic Intracoastal Waterway Vicinity of Sawpit Creek, Nassau and Duval Counties, Florida

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 30 00

ADMINISTRATIVE PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

1.2 SUBMITTALS

1.3 PROJECT COORDINATION

1.3.1 Resident Management System (RMS)

1.3.2 Access by Others

1.3.3 Inspections by Others

1.4 PROJECT MEETINGS

1.5 PRECONSTRUCTION CONFERENCE

1.5.1 Preconstruction Conference Minutes

1.5.2 Preconstruction Conference Submittals

1.5.2.1 Other Division 01 Submittals

1.5.2.2 Divisions 02 through 48 Submittals

1.6 PARTNERING

1.6.1 Initial Partnering Meeting

1.6.2 Partnering Regroups

1.7 NOTICE TO PROCEED

1.8 COORDINATION MEETING

1.9 PROGRESS MEETINGS

1.9.1 Progress Meeting Participants

1.10 CONTRACTOR PERFORMANCE EVALUATIONS

1.10.1 Training

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL MEETING REQUIREMENTS

3.2 PROGRESS MEETING AGENDA

-- End of Section Table of Contents --

SECTION 01 30 00 Page 1 W912EP18B0006 Amendment 0005

SECTION 01 30 00

ADMINISTRATIVE PROCEDURES

PART 1 GENERAL

1.1 SUMMARY

Manage project and coordinate activities of own employees, subcontractors, suppliers and offsite fabricators. Contractor shall use computers, E-mail, and Internet resources for administrative work. Notify Contracting Officer of important meetings, schedule events and activities. Furnish labor and materials and equipment required to plan and execute project management functions and coordination. Coordinate activities and manage resources to construct project conforming to contract, on time and within budget.

Related Sections are 01 32 01 PROJECT SCHEDULE, and 01 45 05 DREDGING/BEACH

FILL PLACEMENT - CONTRACTOR QUALITY CONTROL.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:

SD-01 Preconstruction Submittals

List of Subcontractors

Documentation of compliance with Clauses SUBCONTRACTS (LABOR STANDARDS) and LIMITATIONS ON SUBCONTRACTING of Section 00700 CONTRACT CLAUSES in Volume 1, and, if included, paragraph

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR

SUBCONTRACTORS of Section 00800 SPECIAL REQUIREMENTS in Volume 1.

As part of the initial project schedule, submit a list of proposed subcontractors with company name, person to contact, street address, mail address, phone number, type of specialty and estimated subcontract quote.

SD-07 Certificates

Signature Authority

Furnish a power of attorney or a notarized letter of authority from Contractor identifying local representatives authorized to sign contract documents.

Drug-Free Work Place Record

Documentation of compliance with Clause DRUG-FREE WORKPLACE of Section 00700 CONTRACT CLAUSES in Volume 1 (see subparagraphs (b)(1) through (b)(7)).

SECTION 01 30 00 Page 2

1.3 PROJECT COORDINATION

1.3.1 Resident Management System (RMS)

Contractor shall use Corps of Engineers' Resident Management System for construction information management. See Section 01 45 00 RESIDENT

MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM).

1.3.2 Access by Others

Maintain access to power poles and other items owned or operated by utility companies. Coordinate with utility companies as required for line marking, hookups, and relocations as needed to perform work. Incoming electrical utilities become the responsibility of Contractor at transformers.

Coordinate emergency incident response with local law enforcement and fire rescue authorities. Notify Contracting Officer in writing of coordination problems encountered affecting work.

1.3.3 Inspections by Others

During construction period, inspection or maintenance work will may be performed by others within the construction limits. The Contractor will be responsible for neatly mowing all grass and vegetation (not to include established trees or other protected vegetation designated as wetland areas) within the construction limits for the duration of the contract.

Areas not accessible to mowers shall be edged or trimmed neatly. Mowing or trimming shall be performed every three weeks or when vegetation exceeds twelve inches in height shall coordinate with others performing on-site work to prevent or minimize conflicts between their work and the project work, and to ensure the safety of non-Contractor personnel .

1.4 PROJECT MEETINGS

Contracting Officer requires following types of project meetings:

-- Preconstruction Conference -- Partnering Meeting -- Partnering Regroup Meetings -- Coordination Meeting -- Preparatory and Initial Phase meeting for each feature of work -- Project Progress Meetings

Project meetings are described in detail in subparts below.

1.5 PRECONSTRUCTION CONFERENCE

Contracting Officer will conduct a Preconstruction Conference for this project in accordance with Clause PRECONSTRUCTION CONFERENCE of Section 00700 CONTRACT CLAUSES in Volume 1. Preconstruction Conference will be held within 30 to 60 calendar days after Notice to Proceed (NTP) acknowledgment. (Refer to subparagraph "Preconstruction Conference Submittals" below.) Contracting Officer will notify Contractor of time, place, and agenda. Contractor shall notify key subcontractors and suppliers to attend. Contracting Officer will discuss contract "ground rules" and general issues including:

-- Lines of Contracting Officer authority -- Lines of Contractor authority

SECTION 01 30 00 Page 3

-- 00700 Contract Clauses -- 00800 Special Contract Requirements -- Contract Administration -- Progress Payment -- Correspondence Procedures -- Project Schedule -- Submittal Register -- Labor requirements -- General Site Safety -- FDEP Permit Requirements

1.5.1 Preconstruction Conference Minutes

Contracting Officer will take detailed minutes of Preconstruction Conference discussions and may use an audio or video tape. Copies of typed minutes will be provided to the Contractor to review for accuracy, sign and return. Signed minutes become part of the contract file. Audio or video tapes if used will be made available for Contractor to review or copy at Area Office.

1.5.2 Preconstruction Conference Submittals

The timing of submission of submittals and completion of the Preconstruction Conference is intended to allow the Contractor and the Government adequate time to prepare for commencement of work. However, should the Contractor fail to submit required items and receive acceptance and/or approval within the times stated, the Contractor will not be permitted to commence work until these requirements have been satisfied.

Any delays attributable to the Contractor's failure to comply with these pre-work requirements shall be at the Contractor's expense and may be cause for remedial action by the Contracting Officer. Submittals required by this Section are described in paragraph SUBMITTALS above.

1.5.2.1 Other Division 01 Submittals

The Contracting Officer reviews submitted draft plans to prepare Coordination Meeting agenda and understand Contractor procedures. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:

-- Project Schedule - See Section 01 32 01 PROJECT SCHEDULE -- Diving Plan - See Section 01 35 25 OWNER SAFETY REQUIREMENTS -

DIVING

-- Accident Prevention Plan - See Section 01 35 26 GOVERNMENTAL

SAFETY REQUIREMENTS

-- Quality Control Plan - See Section 01 45 05 DREDGING/BEACH FILL

PLACEMENT - CONTRACTOR QUALITY CONTROL

-- Temporary Facilities Plan - See Section 01 50 02 TEMPORARY

CONSTRUCTION FACILITIES

-- Environmental Protection Plan - See Section 01 57 20

ENVIRONMENTAL PROTECTION

1.5.2.2 Divisions 02 through 48 Submittals

In addition to the above, bring submittal items for materials, workmanship, plans or events required early in project schedule which are ready for transmittal to Contracting Officer. Prepare transmittal of submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

SECTION 01 30 00 Page 4

1.6 PARTNERING

Contracting Officer wants to have a bilateral project partnership with Contractor that draws on strengths of both organizations to identify and achieve common goals. Typical partnering goals include:

-- Effective and efficient contract performance -- Project completion on time and within budget -- Construction completed according to plans and specifications -- Development of cooperative management teams -- Project success with customer (stakeholders) satisfaction -- Improved Project communication

1.6.1 Initial Partnering Meeting

Contractor, key subcontractors and suppliers shall attend a one-day project "Partnering Meeting". The Partnering Meeting is a project team building workshop facilitated by qualified persons. Contracting Officer attendees and invited persons may include:

Administrative Contracting Officer (Area Engineer) Construction Quality Assurance Representatives Jacksonville District - Construction Branch persons Jacksonville District - Engineering Division Designers Local Sponsor (Owner) - Florida Inland Navigation District (FIND)

Goal of initial Partnering Meeting is to build trust, identify common goals, and understand individual project members' expectations and organizational values. Usual results include better communication between contract parties, shortened project learning curve and a cohesive two party contract partnership. Participants usually sign a voluntary partnering agreement generally describing mutual obligation to cooperate to achieve project goals and maintain effective communication. The Contractor shall pay costs for workshop site rental and facilitator fees. The Contractor shall select the facilitator for the Partnering Meeting and Regroups from an approved list of vendors provided by the Contracting Officer.

1.6.2 Partnering Regroups

After initial Partnering Meeting participation will be voluntary in accordance with a signed Partnering Agreement. Follow on Partnering Regroups will be hosted by the Contractor to include all costs associated with the meetings. It is preferred that the facilitator from the Initial Partnering Meeting be provided for the Partnering Regroups. Partnering Agreements include provisions for Contracting Officer and Contractor to request Partnering Regroups when needed. A Partnering Regroup is usually a short (4 hours - 1 day) informal partnering session where senior level Contractor and Contracting Officer project members and other interested parties review project issues of concern. Issues of conflict are reviewed, attempt to affirm common project goals and understand concerns of other partner.

1.7 NOTICE TO PROCEED

Notice to proceed (NTP) will be issued 15 to 30 calendar days after award or after all required bonds are in place, whichever is later. If the Contractor has failed to submit and receive acceptance and/or approval of specified plans, including, but not limited to, Accident Prevention Plan - Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, Quality Control Plan -

SECTION 01 30 00 Page 5

Section 01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL, and Environmental Protection Plan - Section 01 57 20 ENVIRONMENTAL PROTECTION, or has not yet received the Contracting Officer's conditional approval to work under an interim plan, the Contractor shall not proceed with the work and shall consider the work to be suspended in accordance with the Suspension Of Work clause of the contract. While the Contractor is working under a conditionally accepted interim plan, funds may be retained from progress payments in accordance with the Payments Under Fixed-Price Construction Contracts clause of this contract until such time as the Contractor submits an acceptable plan. If the Contractor does not submit an acceptable plan within a reasonable time, as determined by the Contracting Officer, the Contracting Officer may order the Contractor to suspend work. Any suspension order issued for the Contractor's failure to submit an acceptable plan will not constitute unreasonable delay under the Suspension Of Work clause and the Contractor will not be entitled to an equitable adjustment of either performance period or contract price.

1.8 COORDINATION MEETING

Coordination Meeting is scheduled, convened and conducted by Contracting Officer after a Preconstruction Conference and prior to starting physical construction. Draft plans submitted after NOA (i.e., Quality Control Plan, Environmental Protection Plan and Accident Prevention Program) will have been reviewed. Coordination Meeting is primarily for on-site Contractor Quality Control staff, including subcontractor and supplier employees performing quality control, to meet and discuss the project in detail with Contracting Officer's Quality Assurance Representatives. Purposes of Coordination Meeting are:

-- Achieve mutual understanding with Contractor of required Quality Control

-- Jointly review submitted draft plans; resolve issues of concern -- Discuss project plans and specifications, schedule, documentation -- Establish a good working relationship between the Contractors

Quality Control Staff and Quality Assurance Representatives

1.9 PROGRESS MEETINGS

Schedule, convene and preside over progress meetings as required. As project activities increase ("ramp up"), a minimum of one progress meeting per week is typical of a project of this scope. Convene additional meetings as required, or when requested by Contracting Officer. Notify persons needed to be present to discuss agenda issues. Contracting Officer may direct attendance by key Contractor suppliers, or fabricators as needed. A sample meeting agenda is provided in paragraph GENERAL MEETING REQUIREMENTS below. The Contractor shall take minutes of the meetings and distribute copies of the minutes within three working days after the meetings.

1.9.1 Progress Meeting Participants

Typical participants include:

-- Contracting Officer -- Construction Quality Assurance Representatives -- Contractor's Site Superintendent -- Contractor's Quality Control Manager -- Contractor's Safety Coordinator -- Subcontractors, as appropriate to the agenda

SECTION 01 30 00 Page 6

-- Suppliers, as appropriate to the agenda -- Others as appropriate to the agenda

1.10 CONTRACTOR PERFORMANCE EVALUATIONS

Contractors are given an opportunity to provide and/or enter performance evaluation comments directly into the Contractor Performance Assessment Reporting System (CPARS). The system is a web-enabled application that supports the completion, distribution, and retrieval of contract performance evaluations. Provide to the responsible area office the name and email address of the contractor user that will be accessing CPARS.

1.10.1 Training

Contractor online training is available at the following web site:

https://www.cpars.gov/webtrain.htm. Training will give the student an understanding of the Contractor Representative and Contractor Corporate Senior Management levels of access, the policies and regulations governing CPARS, and the electronic workflow with particular attention to the Contractor comment function.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 GENERAL MEETING REQUIREMENTS

See Section 01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL for Preparatory and Initial Phase meeting checklists. Contractor is responsible for phase and progress meetings to include:

Meeting notification to participants Prepare agenda for meetings Use phase checklists for Preparatory and Initial Phase meetings Physical arrangements for meetings Preside at meetings Record minutes recording proceedings and decisions Copy and send minutes to:

Meeting participants Project parties affected by decisions Contracting Officer (No later than 3 working days)

3.2 PROGRESS MEETING AGENDA

Modify agenda as needed for on-going work.

Review minutes from previous progress meetings Review RMS Contractor Action Item Report Review work progress since previous meeting Review current definable features of work:

-- Identify phases of current features of work -- Identify pending phase changes -- Identify features for discussion in next scheduled meeting

Discuss problem prevention:

-- Field observations -- Deficiencies and tracking -- Procedures working well -- Problems, conflicts -- Methods to improve

SECTION 01 30 00 Page 7

Review construction schedule:

-- Identify delays -- Discuss proposed corrective actions to regain schedule

Submittals and Requests for Information (design interpretation):

-- Review submittal register -- Identify submittals to expedite as required

Review off-site activities:

-- Fabrications -- Material and equipment delivery schedule

Review Testing:

-- Type, Schedule -- Received Results

Review changes to construction schedule:

-- Planned progress during succeeding work period -- Coordination of various schedules -- Effect of changes on construction and completion date

Review site safety Discuss maintaining contract quality for materials and workmanship Discuss pending modifications, changes and substitutions Discuss other business, as appropriate

-- End of Section --

SECTION 01 30 00 Page 8

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 50 02

TEMPORARY CONSTRUCTION FACILITIES

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 EXISTING UTILITIES

1.4.1 Water

1.4.2 Electricity

1.5 BRIDGE-TO-BRIDGE COMMUNICATION

PART 2 PRODUCTS

2.1 CONSTRUCTION PROJECT SIGNS

2.1.1 Haul Road Traffic and Construction Warning Signs

2.2 STORAGE CONTAINERS

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Identification of Employees

3.1.2 Employee Parking

3.1.3 Onsite Information

3.1.4 Janitorial Services

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

3.2.1 Lighting

3.2.2 Heating and Cooling

3.2.3 Water

3.2.4 Fire Extinguisher

3.2.5 Utility Lines

3.2.6 Electric Power

3.3 BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN

3.3.1 Bulletin Board

3.3.2 Project and Safety Signs

3.4 CONTRACTOR'S TEMPORARY FACILITIES

3.4.1 Contractor Field Office

3.4.2 Appearance of Trailer(s)

3.4.3 Storage Area

3.4.3.1 Maintenance of Storage Area

3.4.4 Waste Storage

3.4.5 Fuel Storage and Fueling Operations

3.5 SECURITY PLAN

3.5.1 Visitors

3.6 TEMPORARY PROJECT SAFETY FENCING

3.7 ACCOMMODATIONS AND MEALS FOR INSPECTORS

3.8 CLEANUP

3.9 RESTORATION OF STORAGE AREA

SECTION 01 50 02 Page 1

3.10 CONSTRUCTION FORMS AND DETAILS

-- End of Section Table of Contents --

SECTION 01 50 02 Page 2

SECTION 01 50 02

TEMPORARY CONSTRUCTION FACILITIES

PART 1 GENERAL

1.1 SUMMARY

In addition to Construction Facilities this Section covers:

Temporary Utilities Construction Aids Vehicular Access and Parking Project Identification

See Section 01 57 20 ENVIRONMENTAL PROTECTION for requirements including silt control, trailer placement, fueling restrictions, dust control, solid waste, and cleanup. Upon completion of project, clean up and restore area in accordance with Clause CLEANING UP of Section 00700 CONTRACT CLAUSES in Volume 1.

a. Construction Facilities include, but are not limited to, the following:

(1) Contractor Offices

(2) Information Bulletin Board

(3) Material and Equipment Storage Area

(4) Fueling Area

(5) Secured Storage Area

(6) Employee Parking Area

(7) Debris Container (dumpster)

(8) Construction Signage to include Project Sign; Safety

Sign; and, Construction Warning Signs

b. Temporary Utilities include, but are not limited to, the following:

(1) Water

(2) Electric

(3) Sewage

(4) Communications

(i) Telephone

(ii) Internet (4 Mbps or higher speed)

(5) Lighting

1.2 REFERENCES

The publications listed below form a part of this specification to extent referenced. The publications are referred to in text by basic designation only.

FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT)

FDOT Specifications (2018) Standard Specifications for Road

SECTION 01 50 02 Page 3 and Bridge Construction

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2 (2017) National Electrical Safety Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2018) National Electrical Code

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:

SD-01 Preconstruction Submittals

Mobilization/Demobilization Plan

Plan shall include, but not be limited to, the following:

a. Mobilization Requirements:

(1) Methods, equipment and materials

(2) Connection of utilities

(3) Placement of site facilities and temporary controls

(4) Construction of facilities

b. Demobilization Requirements (methods, equipment and materials required to clean-up and restore site at project conclusion):

(1) Collection, recycle and disposal of solid waste

(2) Contract-generated material

(3) Utility disconnection

(4) Removal of Contractor facilities

(5) Repair and restoration of site (i.e., fences, roads, or permanent facilities)

Security Plan

Prepare a Security Plan for Contracting Officer describing site security as follows:

a. Day and night security

b. Weekend and holiday security

c. General security duties

SD-02 Shop Drawings

Contractor's Temporary Facilities

SECTION 01 50 02 Page 4

General layout sketch of temporary site facilities shall include, but not be limited to, the following:

a. Trailer locations

b. Parking areas

c. Material storage

d. Equipment lay down area

e. Areas for gravel

f. Fuel areas

g. Supplemental or other staging area

h. Temporary well, water supply

i. Septic field or holding tanks, port-a-lets

j. Contaminated water handling

k. Concrete cleaning area and methods of disposal

l. Fences -- location and dimensions, entrance and exit points, and details of installation

m. Utilities (poles, connections and services)

Temporary Electric Drawings

Electricity supply and lighting - from transformer source sketch layout locations, fixtures, and materials, to include outdoor lighting as described in subparagraph "Electric Power" below.

1.4 EXISTING UTILITIES

The Contractor is responsible for investigating the availability of utilities at the project site. Contractor shall provide potable water, sanitary sewer, electricity from transformer, communications and optional utilities the Contractor may require at the project site. Provide internet services with 4 Mbps minimum speed and wireless capabilities to the Contractor's Field Office complex.

1.4.1 Water

In addition to the above, the Contractor shall provide and maintain at his own expense an adequate supply of water for his use for construction, and to install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. The Contractor shall also provide and maintain his own temporary toilet and washing facilities. Toilet and washing facilities shall be installed and maintained in a location approved by the Contracting Officer. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.

1.4.2 Electricity

In addition to the above, all electric current required by the Contractor shall be furnished at his own expense. All temporary lines will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner at his expense prior to completion of the construction. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.

1.5 BRIDGE-TO-BRIDGE COMMUNICATION

In order that radio communication may be made with passing vessels, all dredges/marine equipment engaged in work under this contract shall be equipped with bridge-to-bridge radio telephone equipment. The radio

SECTION 01 50 02 Page 5 equipment shall operate on a single channel very high frequency (VHF), FM, on a frequency of 156.55 MC per second with low power output having a communication range of approximately ten miles. The frequency has been approved by the Federal Communications Commission. Channels #13 and #16 must be monitored at all times.

PART 2 PRODUCTS

2.1 CONSTRUCTION PROJECT SIGNS

Refer to paragraph BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN below and the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below.

2.1.1 Haul Road Traffic and Construction Warning Signs

1/2 inch HDO plywood, or aluminum sheet, conforming to FDOT Specifications Section 700 Uniform Traffic Manual Standard Signs, non-standard signage high visibility orange with black lettering. Orange fabric mesh acceptable for temporary survey crew use.

2.2 STORAGE CONTAINERS

Welded steel construction, locking, shipping containers or equal.

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

3.1.1 Identification of Employees

The Contractor shall be responsible for furnishing to each employee, and for requiring each employee engaged on the work to display, identification as approved and directed by the Contracting officer. Prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon release of any employee. When required, the Contractor shall obtain and provide fingerprints of persons employed on the project. Contractor and subcontractor personnel shall wear identifying markings on hard hats clearly identifying the company for whom the employee works.

3.1.2 Employee Parking

a. Park employee's vehicles in areas designated by Contractor, away from construction traffic, within reasonable walking distance of site.

Maintain area free of ruts, mud holes and puddles. Place gravel where required by deteriorated conditions.

b. Contractor should protect unattended equipment as it may be subject to vandalism.

c. Storage trailers and storage area with Government material should be locking type with lighting.

3.1.3 Onsite Information

Keep copy of contract drawings, specifications, and other contract documents at Contractor's Office onsite, available for use at all times.

SECTION 01 50 02 Page 6

3.1.4 Janitorial Services

a. Daily -- Sweep; empty wastebaskets; service toilets

b. Weekly -- Mop floors; sanitize toilet seats

c. Monthly -- Wash floors, windows (inside and out)

d. Cut grass as needed to keep below 3 inches high

3.2 AVAILABILITY AND USE OF UTILITY SERVICES

Install temporary facilities and utilities in accordance with IEEE C2 , EM 385-1-1 , NFPA 70 . Obtain necessary construction, building, zoning, or soil erosion and sediment control approvals required by local authorities and utility companies. Equip trailer(s) with wind tie downs in accordance with local wind and building code requirements.

3.2.1 Lighting

Electric light, non-glare type luminaries to provide a minimum illumination, level of 30-foot candles at desk height level. Comply with temporary lighting, wiring and Ground Fault Circuit Interrupter (GFCI) requirements found in EM 385-1-1 .

3.2.2 Heating and Cooling

Adequate equipment to maintain internal ambient air temperature of 75 degrees F in 105 degrees F and 70 degrees F in 30 degrees F. Equip trailer(s) with smoke alarms. If bottled gas is used to heat, equip trailer(s) with carbon monoxide alarms.

3.2.3 Water

Non-potable well water may be used to flush toilets, and for dish and hand washing. Provide bulk potable water in storage tanks or bottled water for drinking.

3.2.4 Fire Extinguisher

Refer to EM 385-1-1 . Non-toxic, dry chemical, fire extinguisher meeting Underwriters Laboratories, Inc., approval for Class A, Class B, and Class C fires with a minimum rating of 2A; 10B; and 10C.

3.2.5 Utility Lines

Install, connect and modify temporary lines as coordinated with owning utility. Conform requirements in accordance with IEEE C2 and NFPA 70 for Temporary Electric Lines. Remove temporary line at completion of project.

3.2.6 Electric Power

Provide electrical service and transformers sufficient to operate heating/air conditioning units. Electrical power shall be purchased directly by Contractor.

3.3 BULLETIN BOARD, PROJECT SIGN, AND PROJECT SAFETY SIGN

3.3.1 Bulletin Board

Immediately upon beginning of work, the Contractor shall provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in

SECTION 01 50 02 Page 7 size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. The bulletin board shall be located at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.

Legible copies of the aforementioned data shall be displayed until work is completed. Upon completion of work the bulletin board shall be removed by and remain the property of the Contractor.

3.3.2 Project and Safety Signs

The requirements for the signs, their content, and location shall be as indicated on the web site provided in paragraph CONSTRUCTION FORMS AND DETAILS below. On the Safety Performance Sign, replace the Safety Green First Aid Logo with the Safety Pays Logo indicated on the web site provided in paragraph CONSTRUCTION FORMS AND DETAILS below with the color pattern as shown. The Safety Pays Logo shall have a bottom width of 8 inches, and be placed 2 inches from the top of the sign and centered between Legend Group 1 and the right edge. The signs shall be erected within 15 days after receipt of the Notice to Proceed. The data required by the safety sign shall be corrected daily, with light colored metallic or non-metallic numerals. The Safety Scoreboard sign shall be used on board the dredge in lieu of the safety performance sign. Upon completion of the project, the signs shall be removed from the site.

3.4 CONTRACTOR'S TEMPORARY FACILITIES

The Contractor's field offices, staging areas, stockpile storage, and temporary buildings shall be placed in areas as directed by the Contracting Officer and in accordance with Section 01 57 20 ENVIRONMENTAL PROTECTION.

Temporary movement or relocation of Contractor facilities shall be made when approved by the Contracting Officer.

3.4.1 Contractor Field Office

P If the Contractor elects to use a land-based field office, p rovide on-site field office of sufficient size and staff capability to manage project activities. Provide communications and computer capabilities to manage the work, including implementing RMS, facsimile, electronic mail, reproduction, to track schedule and cost. Contractor's field office should include a conference area with table and chairs to accommodate a minimum of 8 people. Provide handicap access with a 1 on 12 ramp and gravel parking spot marked with handicap parking sign. Provide high-speed internet services (4 Mbps or higher speed rate) and wireless capabilities to the field office facilities/compound to facilitate RMS, SharePoint (file transfer) and visitor usage.

3.4.2 Appearance of Trailer(s)

Trailer(s), used for both office and material storage purposes, shall be clean, neat exterior appearance and in good repair. Trailer(s) requiring exterior painting or maintenance will not be allowed on site until determined satisfactory by Contracting Officer.

3.4.3 Storage Area

Provide temporary six-foot high chain link fence for storage containers, trailers or sheds containing Government property. Fence posts may be driven. Ground chain link fence against lightning. Store Contracting

SECTION 01 50 02 Page 8

Officer's property, owned materials and equipment within fenced storage area. Store small size Government property, equipment, tools, and materials in locked steel containers. No Government property and materials shall be stockpiled outside fence in preparation for next day's work. Park mobile equipment, tractors, wheeled lifting equipment, cranes, trucks, and like equipment, within fenced areas on weekends.

3.4.3.1 Maintenance of Storage Area

Fencing shall be kept in a state of good repair and proper alignment.

Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion. Grass located within the boundaries of the construction site shall be mowed for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers shall be edged or trimmed neatly.

3.4.4 Waste Storage

Provide dumpsters or suitable debris containers. Prevent windblown trash;

cover as needed. Dispose of offsite when needed. Refer to Section 01 57 20

ENVIRONMENTAL PROTECTION.

3.4.5 Fuel Storage and Fueling Operations

Refer to Section 01 57 20 ENVIRONMENTAL PROTECTION. Provide light when fueling at night.

3.5 SECURITY PLAN

Provide site security person at all times when there are no on-site activities. Maintain 24-hour security during weekends and holidays. Site security shall include, but not be limited, to:

a. Limit vehicular access to authorized vehicles and personnel only.

b. Limit public access to travel along access road only. Access road shall be kept closed at all times except for passage of authorized personnel and vehicles.

c. Maintain a list of authorized personnel and subcontractors available at site offices.

d. Maintain a sign-in log documenting visitors, deliveries, and security incidents. Include date, name, address, company, time in and time out for each employee and visitor.

e. Check fenced areas, equipment, trailers on a daily basis. If damage is observed or vandalism is found report to Contracting Officer.

3.5.1 Visitors

No visitors will be allowed on site without knowledge of Contractor and permission of Contracting Officer. Direct visitors to report upon arrival to Contractor's Field Office for site safety and accident prevention briefing. Provide visitors appropriate protective equipment (i.e., ear

SECTION 01 50 02 Page 9 plugs, safety glasses, etc.).

3.6 TEMPORARY PROJECT SAFETY FENCING

As soon as practicable, but not later than 15 days after the date established for commencement of work, the Contractor shall furnish and erect temporary project safety fencing at the work site. The safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, supported and tightly secured to steel posts located on maximum 10 foot centers, constructed at the approved location. The safety fencing shall be maintained by the Contractor during the life of the contract and, upon completion and acceptance of the work, shall become the property of the Contractor and shall be removed from the work site.

3.7 ACCOMMODATIONS AND MEALS FOR INSPECTORS

a. The Contractor shall furnish regularly to inspectors, for office purposes, a suitable separate room on board the dredge or other craft upon which they are employed or, if not available thereon, shall furnish suitable alternate accommodations ashore at a location approved by the Contracting Officer, and furnish suitable transportation between the alternate accommodations and the dredge or other craft upon which they are employed.

b. If the Contractor maintains on this work an establishment for the subsistence of the Contractor's own employees, the Contractor shall, when required, furnish to inspectors employed on the work, and to all Government agents who may visit the work on official business, meals of a quality satisfactory to the Contracting Officer. The meals furnished will be paid for by the Government employees at a rate no greater than the JTR meal rate per person for the county in which work is performed.

3.8 CLEANUP

Construction debris, waste materials, packaging material and the like shall be removed from the work site daily. Any dirt or mud which is tracked onto paved or surfaced roadways shall be cleaned away. Materials resulting from demolition activities which are salvageable shall be stored within the fenced area described above or at the supplemental storage area. Stored material not in trailers, whether new or salvaged, shall be neatly stacked when stored. Refer to Section 01 57 20 ENVIRONMENTAL PROTECTION for solid waste and post construction cleanup.

3.9 RESTORATION OF STORAGE AREA

Upon completion of the project and after removal of trailers, materials, and equipment from within the fenced area, the fence shall be removed and will become the property of the Contractor. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.

3.10 CONSTRUCTION FORMS AND DETAILS

See the "Construction Forms & Details" module at the following web address:

http://www.saj.usace.army.mil/About/Divisions-Offices/Engineering/Design-Branch/ Specifications-Section/

SECTION 01 50 02 Page 10

-- End of Section --

SECTION 01 50 02 Page 11

18B0006Am0005Technical.pdf
18B0006Am0004SF30Cont
01 30 00
01 50 02