Jax_O&M_GDR_2018_13nov2017.pdf
PDF 6 MB Posted
- Solicitation number
- W912EP-18-B-0003
About this file
Jacksonville Harbor GDR 2018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_-_Jacksonville_Harbor,_Maintenance_Dredging,_FY_18_O&M.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amend0002.pdf | ||
| Amendment_0001.pdf | ||
| Site_Visit_Roster.pdf | ||
| 18B0003Volume1Specs.pdf | ||
| 18B0003Volume2Specs.pdf | ||
| JaxHarborMDFY18_Advertised_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 31 32
Geotechnical Data Report for
Jacksonville Harbor Maintenance Dredging
40-foot Project
Cut-8 through Terminal Channel, and Cut G
Prepared by
Geotechnical Branch
Engineering Division
Jacksonville District Corps of Engineers
13 November 2017
GEOTECHNICAL DATA REPORT
Table of Contents
1 SCOPE
2 CHARACTER OF MATERIALS
2.1 The Local Geology
2.2 Materials Encountered
2.2.1 Cut-3 through Cut-45
2.2.2 Cut-G, Cut-55 and Terminal Channel
3 DEFINITIONS
3.1 Definitions of Basic Terms
3.2 Current Logging Terms
3.3 Previous Logging Terms
3.4 Testing and Procedure Methods
4 GEOTECHNICAL DATA
4.1 Summary of Field Investigations
4.2 Summary of Index Testing Data
4.3 Boring Log Notes
4.4 Inspection of Recovered Materials
4.5 Boring Logs
4.6 Laboratory Testing Data
List of Tables
Table 1. Available Boring Data Table 2. Available Vibracore Data Table 3: Index Testing Available for this Project
List of Plates
Plate 1. Vicinity Map Plate 2. Location of Field Investigations Plate 3. Location of Field Investigations Plate 4. Location of Field Investigations Plate 5. Location of Field Investigations Plate 6. Location of Field Investigations Plate 7. Location of Field Investigations
Jacksonville Harbor Maintenance Dredging 2018 40-foot Project - Cut-8 through Terminal Channel, and Cut G
Section 00 31 32-2
GEOTECHNICAL DATA REPORT
1 SCOPE
The information provided in this section encompasses the geotechnical field investigations available for this project. The investigations consist of borings. The associated boring logs and laboratory data are presented in paragraphs 4.5 and 4.6, respectively. A character of materials paragraph is included to provide a comprehensive description of the materials utilizing both recent and historical knowledge of the project area. Also included in this section are definitions of terms and boring log notes, which provide additional explanation of the boring logs and drilling techniques.
Items discussed in the character of materials paragraph may not appear explicitly on the boring logs. Based on historic knowledge of the project area, the character of materials paragraph includes items that supplement the data documented by the boring logs. When reviewing the boring logs, use all of the data on the logs, including the materials description, legend, and blow counts. When evaluating the subsurface conditions, use all of the data, including the character of materials paragraph and boring logs.
During the solicitation period, any questions that pertain to the information provided in this section should be addressed to the contract specialist identified in Block 9 of SF1442. After contract award, questions should be addressed to the appointed ACO/COR, which will coordinate with Geotechnical Branch.
2 CHARACTER OF MATERIALS
2.1 THE LOCAL GEOLOGY
The local geology of the project area is characterized by Pleistocene and Holocene age, marine terrace and beach ridge sediments, which were deposited on an irregular and undulating surface.
The thickness of these deposits can be up to 10 feet in the St. Johns River valley. The deposits are thickest below the ridges and in places where they overlie depressions. The deposits consist primarily of tan to yellow, medium to fine grained quartz sands, which are locally stained rusty brown or red due to iron oxide. Locally thin gray sandy clay beds, which contain occasional mollusk shells, are present, particularly near the coast.
Beneath these sediments follow upper Miocene or Pliocene deposits, consisting of tan or light gray sand, shell, sandy clay, and limestone. Due to the deposition on the irregular surface of the underlying Hawthorn Group, the thickness of the upper Miocene or Pliocene deposits ranges from as little as 10 feet to as much as 130 feet. There are no known exposures of the upper Miocene or Pliocene deposits in Duval County. However, dredge spoil indicates that the river may be incised into the deposits, particularly in east Jacksonville.
The underlying Hawthorn Group, of middle Miocene age, consists mainly of dark gray and olive green sandy to silty clay, clayey sand, clay, sandy limestone, and contains moderate to large amounts of black phosphate sand, granules, and pebbles. The Hawthorn Group ranges in thickness from about 250 feet to as much as 500 feet. Although the formation thickens generally to the northeast, it varies in thickness from place to place because of both an irregular upper and lower surface. The Hawthorn Group is not exposed in Duval County but occurs at depths ranging from approximately 50 to 200 feet below land surface throughout the county.
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-3
2.2 MATERIALS ENCOUNTERED
Jacksonville Harbor has been dredged, historically, multiple times for maintenance and deepening. The last dredging event for Cut-3 through Cut-42 was 2014, and for Cut-41 through Cut-55 and Cut-G, 2016. Cut-55 and the Terminal Channel were last dredged in 2015. Some of the borings included in this GDR were collected prior to 1992, but the majority of the borings were collected in 2003, 2009, and 2014. However, the material presented on the boring logs and sediment gradation curves might have been removed by one of the previous dredging events with subsequent shoaling of similar material. However, the historic boring logs still provide valid information about the materials in and below the dredge template and in the slopes and thus, indicate what type of dredge material can be expected.
Trash and debris may be present in the materials to be dredged and gravel to boulder-sized rocks and stiff clays remaining from the channel deepening are present in the over depth. Any in situ rock, if encountered, is not required to be dredged.
The project site vicinity is depicted on Plate 1. All sampling locations are depicted on Plates 2 through 7 and listed in Table 1 and 2. Laboratory data for the project area is summarized in Table 3.
2.2.1 Cut-3 through Cut-45
The shoaling material shown on the borings logs consists of poorly-graded quartz sand (SP), sand with silt (SP-SM) and silty sand (SM) with varying amounts of sand to gravel-sized shell, including oyster shell and trace organic matter.
2.2.2 Cut-G, Cut-55 and Terminal Channel
The boring logs and historic knowledge indicate that silt , clay, and silty and clayey sand are present.
3 DEFINITIONS
Definitions not explicitly indicated in the sections below are typical industry standard definitions from their respective ASTMs.
3.1 DEFINITIONS OF BASIC TERMS
Carbonate – Soil component that reacts with HCl of an indeterminate origin (shell, rock, etc.).
Fill – Material that has been placed by man, described with all soil characteristics.
Layer – Rock or soil with a thickness of 6 inches or less.
Lens – A geologic deposit of variable thickness, which disappears laterally in all directions and cannot be correlated to adjacent borings.
Rock – A naturally occurring substance composed of one or more minerals bound together. This geologic term includes a range of engineering properties: strength, hardness, permeability, weathering, and discontinuity. These properties are noted or can be inferred from the boring logs as blow counts, penetration rate, RQD, hardness, etc.
Shell – Material composed of predominantly (>75%) coarse-grained sand to gravel-sized whole or broken shell.
3.2 CURRENT LOGGING TERMS
Definition of terms used on boring logs dated since 2000:
Banded - 0.02' (6 mm) to 0.1' (3.0 cm).
Boulder-Sized – Particles greater than 12 inches in diameter.
Cavity - Voids greater than the diameter of the core.
Coarse Grained - Grain diameter greater than 0.079" (2 mm) for sedimentary rocks or 0.197" (5
mm) for igneous or metamorphic rocks.
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-4
Coarse Grained Sand-Sized – Less than 10 percent of fine and medium grained sand sizes are present.
Coarse Gravel-Sized – Particles greater than 3/4 of an inch but less than 3 inches in diameter.
Cobble-Sized – Particles greater than 3 inches but less than 12 inches in diameter.
Decomposed – Applicable to saprolitic rock; rock is essentially reduced to a soil with a relic rock texture; can be molded or crumbled by hand.
Dipping (Dip) - 20 to 45 degrees.
Discontinue – Particles were present within the unit above but are no longer present.
Fine Grained - Grain diameter between 0.004" (0.1 mm) and 0.016" (0.4 mm) for sedimentary rocks or 0.039" (1 mm) for igneous or metamorphic rocks.
Fine Grained Sand-Sized - Less than 10 percent of medium and coarse grained sand sizes are present.
Fine Gravel-Sized – Particles greater than No. 4 sieve but less than 3/4 of an inch in diameter.
Flat (Dip) - 0 to 20 degrees.
Fossiliferous – Greater than 40 percent fossils.
Hard (Hardness) - Difficult to scratch with a knife (cannot be pitted with a geology hammer, but can be chipped with moderate blows of the hammer).
Highly Fractured - Spacing 0.3' (9.1 cm) to 1' (30.5 cm).
Highly Weathered - Entire section is discolored; alteration is greater than 50%; some areas of slightly weathered rock are present; some minerals are leached away; retains only a fraction of its original strength (wet strength usually lower than dry strength).
Intact – Spacing greater than 6' (1.8 m).
Intensely Fractured - Spacing less than 0.3' (9.1 cm).
Massive – Over 3' (0.9 m) thick.
Medium-Bedded - 0.3' (9.1 cm) to 1' (30.5 cm) thick.
Medium Grained - Grain diameters between 0.016" (0.4 mm) to 0.079" (2 mm) for sedimentary rocks or 0.039" (1 mm) to 0.197" (5 mm) for igneous or metamorphic rocks.
Medium Grained Sand-Sized - Less than 10 percent of fine and coarse grained sand sizes are present.
Moderately Fractured - Spacing 1' (30.5 cm) to 3' (0.9 m).
Moderately Hard (Hardness) - Can be scratched easily with a knife, but cannot be scratched by a fingernail (can be pitted with moderate blows of a geology hammer).
Moderately Open (Fracture Aperture) - 0.020" (0.5 mm) to 0.098" (2.5 mm).
Moderately Weathered - Discoloration is evident; surface is pitted and altered, with alterations penetrating well below rock surfaces; 10% to 50% of the rock is altered; strength is noticeably less than unweathered rock.
Non-fossiliferous – No observed fossils.
Open (Fracture Aperture) - 0.098" (2.5 mm) to 0.394" (10 mm).
Pitted - Voids 0.039" (1mm) to 0.236" (6mm) in diameter.
Porous - Voids less than 0.039" (1mm) in diameter.
Slightly Fractured - Spacing 3' (0.9 m) to 6' (1.8 m).
Slightly Weathered - Superficial discoloration, alteration and/or discoloration along discontinuities;
less than 10% of the rock volume is altered; strength is essentially unaffected.
Soft (Hardness) - Can be scratched with a fingernail (cannot be crumbled between fingers, but can be easily pitted with light blows of a geology hammer).
Solid - Absence of voids.
Sparsely Fossiliferous – Less than 40 percent fossils.
Steeply Dipping (Dip) - 45 to 90 degrees.
Thick-Bedded – 1' (30.5 cm) to 3' (0.9 m) thick.
Thin-Bedded - 0.1' (3.0 cm) to 0.3' (9.1 cm) thick.
Thin Parting - Paper thin to 0.002' (0.6 mm).
Tight (Fracture Aperture) - 0.004" (0.1 mm) to 0.020" (0.5 mm).
Unweathered - No evidence of any mechanical or chemical alteration.
Very Fine Grained - Grain diameter less than 0.004" (0.1 mm); individual grains or crystals are too small to be seen with the naked eye.
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-5
Very Hard (Hardness) - Cannot be scratched with a knife (chips can be broken off only with heavy blows of a geology hammer).
Very Soft (Hardness) - Can be deformed by hand (has a rock-like character, but can be easily broken by hand).
Very Tight (Fracture Aperture) - less than 0.004" (0.1 mm).
Very Wide (Fracture Aperture) - 0.394" (10 mm) to 0.984" (25 mm).
Vuggy - Voids 0.236" (6mm) to the diameter of the core.
3.3 PREVIOUS LOGGING TERMS
Definition of terms used on boring logs dated before 2000:
Dense – Equivalent to SPT N-value of 30 to 50.
Incompetent – Rock that disintegrates while coring; weak.
Indurated – Rock or soil hardened or consolidated by pressure or cementation. Very difficult to break by hand.
Poorly-Indurated – See semi-indurated.
Seam – Rock or soil with average thickness of 2 to 3 inches.
Semi-Indurated – Rock or soil with a lesser degree of hardening or consolidation by pressure or cementation. Crumbles with little effort by hand.
3.4 TESTING AND PROCEDURE METHODS
Test/Procedure Method Abrasion Resistance of Large-Size Coarse Aggregate, Los Angeles Machine
ASTM C535
Abrasion Resistance of Small-Size Coarse Aggregate, Los Angeles Machine
ASTM C131
Air Content by the Pressure Method ASTM C231 Air Content by the Volumetric Method ASTM C173 Air-Entraining Admixtures for Concrete ASTM C233 Atterberg Limits, wet preparation method, test method a multipoint ASTM D4318 Bulk Specific Gravity of Bituminous Mixtures ASTM D2726 Capping Cylindrical Concrete Specimens ASTM C617 Carbonate Content ASTM D4373 Compaction: 4" Mold, Modified Proctor ASTM D1557 Compaction: 4" Mold, Standard Proctor ASTM D698 Compaction: 6" Mold, Modified Proctor ASTM D1557 Compaction: 6" Mold, Standard Proctor ASTM D698 Compressive Strength of Cast in Place Concrete Cylinders ASTM C873 Compressive Strength of Cylindrical Concrete Specimens (Set of 4) ASTM C39 Compressive Strength of Lightweight Concrete ASTM C495 Consolidation, each load of rebound increment with complete time ASTM D2435
Density and Water Content of Soil by Nuclear Methods (Minimum 4)
ASTM
D2922/D3017
Density of Bituminous Concrete in Place by Nuclear Methods (Minimum 4)
ASTM D2950
Density of Soil in Place by the Sand-Cone Method ASTM D1556 Direct Shear ASTM D3080 Drilled Cores and Sawed Beams of Concrete ASTM C42 Extraction of Bituminous Paving Mixtures ASTM D2172 Freezing and Thawing (up to 55 cycles) ASTM D5312
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-6
Test/Procedure Method Grain size sieve Analysis ASTM D422 Hydrometer Analysis ASTM D422 Making and Curing Concrete Test Specimens in the Field (Set of 6) ASTM C31 Making and Curing Concrete Test Specimens in the Lab (Set of 4) ASTM C192 Marshall Resistance to Plastic Flow (Set of 3) ASTM D1559 Material Passing No. 200 Sieve ASTM D1140 Modulus of Elasticity ASTM D3148 Moisture Content ASTM D2216
Munsell Color Munsell Soil Color Charts
Organic Content, Test Method C ASTM D2974 Organic Impurities in Fine Aggregate ASTM C40 Permeability: Constant Head Permeability ASTM D2434 Permeability: Falling Head Permeability ASTM D5084 Petrographic Examination ASTM C295 Sampling Aggregate (Minimum 4 hours) ASTM D75 Sampling Freshly Mixed Concrete ASTM C172 Sedimentation Rate No ASTM Sieve Analysis of Aggregate ASTM C136 Slump of Hydraulic-Cement Concrete ASTM C143 Soil Classification (Boring logs) ASTM D 2488 Specific Gravity and Absorption of Fine Aggregate ASTM C128 Specific Gravity for Rock ASTM C127 Specific Gravity for Soil ASTM D854
SPLITTING TENSILE STRENGTH ASTM D3967
Splitting Tensile Strength of Concrete Cylinders ASTM C496 Subsample Preparation ASTM D4220, Group B ASTM D4220, Sulfate Soundness ASTM C88 Total Evaporable Moisture Content ASTM C566 Triaxial Compression Test for Rock with Strain Gages or LVDTs (per confining pressure)
ASTM D2664
Triaxial compression: Consolidated Undrained (CU) Triaxial Compression Test R Test with Pore Pressure Measurements (per confining pressure)
ASTM D4767
Triaxial compression: Unconsolidated Undrained (UU) Triaxial Compression Test Q Test with Pore Pressure Measurements (per confining pressure)
ASTM D2850
Unbonded Caps for Compressive Strength ASTM C1231 Unconfined Compressive Strength for Rock Greater than 9,000 psi with Strain
ASTM D2938
Unconfined Compressive Strength for Rock up to 9,000 psi with Strain
ASTM D2938
Unconfined Compressive Strength for Soil ASTM D2166 Unit Weight and Absorption ASTM C127 Unit Weight of Aggregate ASTM C29 - Visual Percent Shell No ASTM Wetting and Drying ASTM D5313
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-7
4 GEOTECHNICAL DATA
4.1 SUMMARY OF FIELD INVESTIGATIONS
The tables below summarize the field investigations data set available for this project.
Table 1. Available Boring Data
Designation State Plane, FL-East, NAD83
Location Available for Inspection X Y
CB-42-18* 459993 2193891 Cut-55
CB-42-19* 461053 2191622 Terminal Cut
CB-42-29* 507527 2202661 Cut-16
CB-42-50* 511126 2199568 Cut-14/15
CB-42-52* 507545 2202535 Cut-16
CB-42-53* 504927 2203683 Cut-19
CB-42-72* 460255 2193580 Cut-55
CB-42-73* 460715 2189194 Terminal Cut
CB-42-75* 460104 2185162 Terminal Cut
CB-95* 460753 2188550 Terminal Cut
CB-97* 461229 2192272 Terminal Cut
CB-99* 461438 2192996 Cut-56
CB-101* 505072 2203498 Cut-18
CB-J91-16* 461077 2188379 Terminal Cut
CB-J91-18* 460710 2186321 Terminal Cut
CB-R5* 501623 2202313 Cut-39
CB-JHB03-19 459636 2194070 Cut-57
CB-JHB03-20 460383 2193084 Cut-58
CB-JHB03-21 460922 2193084 Cut-59
CB-JHB03-22 460823 2192427 Terminal Cut
CB-JHB03-23 461231 2191174 Terminal Cut
CB-JHB03-24 461037 2190080 Terminal Cut
CB-JHB03-25 460736 2188179 Terminal Cut
CB-JHB03-26 460536 2187485 Terminal Cut
CB-JHB03-27 460634 2186882 Terminal Cut
CB-JHB03-28 459725 2194374 Terminal Cut
CB-JHB03-29 460936 2190069 Cut-55
CB-JHPM09-2 473752 2207242 Cut-45
CB-JHPM09-3 475095 2205811 Cut-46
CB-JHPM09-7 480987 2200720 Cut-42
CB-JHPM09-8 482338 2200810 Cut-43
CB-JHPM09-9 487318 2201495 Cut-44
CB-JHPM09-12 490672 2201783 Cut-45
CB-JHPM09-13 492489 2202538 Cut-46
CB-JHPM09-14 494732 2202376 Cut-47
CB-JHPM09-16 498983 2202272 Cut-41
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-8
Designation State Plane, FL-East, NAD83
Location Available for Inspection X Y
CB-JHPM09-19 503819 2203743 Cut-19
CB-JHPM09-20 506734 2203513 Cut-16
CB-JHPM09-22 509269 2201526 Cut-14/15
CB-JHPM09-24 512584 2198802 Cut-13
CB-JHPM09-25 514028 2198355 Cut-11
CB-JHPM09-26 516172 2199461 Cut-9
CB-JHPM09-27 518015 2200448 Cut-8
CB-JHPM09-28 518631 2202355 Cut-7
CB-JHPM09-42 482007 2201958 Cut-G
CB-JHPM09-43 482520 2203652 Cut-G
CB-JHPM09-44 482897 2205651 Cut-G
CB-JHPM09-45 483557 2207212 Cut-G
CB-JHPM09-46 483768 2208532 Cut-G
CB-JHPM09-47 461739 2191503 Terminal Cut
CB-JH14-027 482969 2200376 Cut-42
CB-JH14-028 483139 2200822 Cut-43
CB-JH14-033 485621 2200854 Cut-44
CB-JH14-036 485847 2201271 Cut-45
CB-JH14-037 486354 2201080 Cut-46
CB-JH14-040 487761 2201222 Cut-47
CB-JH14-048 493699 2202755 Cut-48
CB-JH14-072 507642 2203003 Cut-16
CB-JH14-076 509794 2201052 Cut-14/15
CB-JH14-078 510574 2200569 Cut-14/15
CB-JH14-080 511860 2199644 Cut-13
CB-JH14-084 513455 2198786 Cut-12
CB-JH14-088 516568 2199781 Cut-9
CB-JH14-089 517596 2199850 Cut-8
CB-JH14-092 518379 2200833 Cut-8
CB-JH14-093 518684 2201370 Cut-8
CB-JH14-094 518864 2203166 Cut-7
CB-JH14-095 519116 2203870 Cut-7
CB-JH14-096 519137 2201892 Cut-7
CB-JH14-098 519271 2202404 Cut-7
CB-JH14-099 519706 2203304 Cut-7
CB-JH14-10 475529 2204944 Cut-44
CB-JH14-11 476121 2204749 Cut-45
CB-JH14-12 476377 2204165 Cut-46
CB-JH14-132 495210 2203010 Cut-49
CB-JH14-133 496468 2202899 Cut-41
CB-JH14-134 497907 2202489 Cut-42
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-9
State Plane, FL-East, NAD83
Location Available for Inspection X Y
CB-JH14-135 498604 2201874 Cut-43
CB-JH14-137 502110 2202492 Cut-39
CB-JH14-139 504499 2203911 Cut-18
CB-JH14-140 506116 2203781 Cut-17
CB-JH14-141 507217 2203205 Cut-16
CB-JH14-142 508506 2202181 Cut-14/15
* Coordinates presented were converted and correspond to the project coordinate system and datum
Table 2. Available Vibracore Data
State Plane, FL-East, NAD83
Location Available for Inspection X Y
VB-JHB2014M-15 517591 2200765 Cut-8
VB-JHB2014M-16 516713 2199766 Cut-9
VB-JHB2014M-17 515970 2199461 Cut-9
VB-JHB2014M-18 512933 2198558 Cut-12
VB-JHB2014M-19 509786 2201208 Cut-14/15
VB-JHB2014M-20 504162 2203367 Cut-19
VB-JHB2014M-21 503833 2203285 Cut-19
VB-JHB2014M-22 502694 2202761 Cut-39
4.2 SUMMARY OF INDEX TESTING DATA
The table below summarizes the index testing available for this project.
Table 3: Index Testing Available for this Project
Boring Designation
Sample Number
USCS LL PL PI
Visual Shell
CO3
Munsell Color
CB-J91-16 1 MH
CB-JHB03-24 1 MH
CB-JHB03-24 2 MH
CB-JHB03-28 1 SP-SM
CB-JHPM09-2 1 SP-SM 6 2.5Y 4/3
CB-JHPM09-2 3 SP 0 2.5Y 6/3
CB-JHPM09-2 4 SM 0 5Y 8/2
CB-JHPM09-3 2 SP-SM 0 2.5Y 3/2
CB-JHPM09-3 4 SM 0 2.5Y 5/1
CB-JHPM09-3 5 SP-SM 0 2.5Y 4/1
CB-JHPM09-3 8 SP-SM 0 2.5Y 6/3
CB-JHPM09-8 2 SP-SM 1 2.5Y 5/3
CB-JHPM09-9 1 SP 5 2.5Y 7/2
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-10
Boring
Sample Number
USCS LL PL PI
Visual Shell
CO3
Munsell Color
CB-JHPM09-9 3 MH 0 2.5Y 6/2
CB-JHPM09-12 2 SM 10 5Y 4/4
CB-JHPM09-13 1 SP 25 5Y 5/3
CB-JHPM09-14 1 SP 2 2.5Y 5/2
CB-JHPM09-14 3 SP 0 5Y 6/2
CB-JHPM09-14 4 ML 2 2.5Y 7/2
CB-JHPM09-16 2 SP-SM 20 5Y 6/2
CB-JHPM09-20 4 SP-SM 5Y 6/2
CB-JHPM09-22 1 SP-SM 10 25 5Y 5/1
CB-JHPM09-24 1 SM 10 25 2.5Y 6/2
CB-JHPM09-25 1 SM 5Y 2.5/1
CB-JHPM09-26 2 SP 10 10.9 5Y 5/4
CB-JHPM09-26 5 SP-SM 5 7.1 5Y 3/2
CB-JHPM09-26 7 SP-SM 3 2.5Y 3/2
CB-JHPM09-27 2 SM 1 2.5Y 6/3
CB-JHPM09-28 2 SM 0 16.3 10Y 6/1
CB-JHPM09-28 4 SM 1 2.5Y 7/2
CB-JHPM09-42 1 SM 1 2.5Y 3/1
CB-JHPM09-42 2 SM 2 2.5Y 4/1
CB-JHPM09-43 1 OL 0 5Y 2.5/1
CB-JHPM09-44 2 MH 1 2.5Y 3/2
CB-JHPM09-44 4 SM 0 5Y 3/1
CB-JHPM09-44 6 SM 0 2.5Y 4/3
CB-JHPM09-45 1 MH 4 2.5Y 3/2
CB-JHPM09-46 1 MH 0 2.5Y 3/2
CB-JHPM09-47 1 SM 0 2.5Y 3/1
CB-JHPM09-47 3 SM 1 2.5Y 3/1
CB-JH14-010 1 SC 35 21 14 0.1 2.5Y 3/2
CB-JH14-010 2 SP 0 2.5Y 5/3
CB-JH14-011 1 SC 50 26 24 0.1 2.5Y 3/2
CB-JH14-011 3 SP 0 2.5Y 5/3
CB-JH14-011 4 SP 0.1 2.5Y 6/6
CB-JH14-012 1 SM 1 2.5Y 4/2
CB-JH14-012 2 SP-SM 5.8 5Y 4/3
CB-JH14-012 4 SC 58 29 29 2.8 10Y 4/1
CB-JH14-027 1 SP 0 2.5Y 4/2
CB-JH14-028 1 SP 0 5Y 4/2
CB-JH14-036 1 SP-SM 2 2.5Y 4/2
CB-JH14-037 2 ML 30.9 2.5Y 6/6
CB-JH14-048 1 MH 3 10YR 4/1
CB-JH14-076 2 SP-SM 14 2.5Y 5/3
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-11
Sample Number
USCS LL PL PI
Visual Shell
CO3
Munsell Color
CB-JH14-078 1 SP-SM 35 2.5Y 7/2
CB-JH14-080 1 SM 5Y 4/2
CB-JH14-080 2 SM 0 2.5Y 6/2
CB-JH14-084 1 SP 19 2.5Y 6/2
CB-JH14-084 2 SP-SM 5Y 3/2
CB-JH14-088 2 SP-SM 9.2 2.5Y 6/4
CB-JH14-088 4 SP 29 2.5Y 5/2
CB-JH14-088 6 SP-SM 0 5Y 4/2
CB-JH14-088 8 Limestone 44 19 25 5BG 7/1
CB-JH14-088 10 Limestone 0 5Y 5/3
CB-JH14-089 2 Limestone 0 2.5Y 6/2
CB-JH14-089 3 MH 0 5Y 6/2
CB-JH14-092 2 Limestone 1.8 2.5Y 6/6
CB-JH14-092 4 Limestone 9.8 2.5Y 6/2
CB-JH14-093 1 Sandstone 2.4 2.5Y 7/6
CB-JH14-093 2 Limestone 0 2.5Y 6/4
CB-JH14-094 1 SP 52.4 5Y 4/2
CB-JH14-095 1 SP 25 5Y 5/2
CB-JH14-095 4 MH 2 5Y 6/2
CB-JH14-096 1 SP-SM 31.7 5Y 5/2
CB-JH14-096 2 SM 0 5Y 5/2
CB-JH14-098 1 SP-SM 39.4 2.5Y 4/2
CB-JH14-098 3 SM 1.6 5Y 5/2
CB-JH14-099 1 SW 28.4 2.5Y 5/2
CB-JH14-099 2 SP-SM 0 2.5Y 3/2
CB-JH14-142 2 SP-SM 3.2 2.5Y 5/2
VB-JHB2014M-15 1 SP 57 5Y 6/2
VB-JHB2014M-15 2 SP-SM 0 5Y 7/3
VB-JHB2014M-15 3 SP-SM 1 2.5Y 7/4
VB-JHB2014M-15 4 SP-SM 0 2.5Y 6/4
VB-JHB2014M-15 5 SP-SM 0 5Y 3/2
VB-JHB2014M-16 1 SP 48 5Y 5/2
VB-JHB2014M-16 2 SP 27 5Y 5/2
VB-JHB2014M-16 3 SP 48 5Y 5/2
VB-JHB2014M-16 4 SP 43 5Y 5/2
VB-JHB2014M-17 1 SP 2 10Y 5/1
VB-JHB2014M-17 2 SP 6 10Y 5/1
VB-JHB2014M-17 3 SP 7 10Y 5/1
VB-JHB2014M-17 4 SP 4 10Y 5/1
VB-JHB2014M-17 5 SP 0 5Y 3/1
VB-JHB2014M-19 1 SP 36 5Y 5/2
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-12
Sample Number
USCS LL PL PI
Visual Shell
CO3
Munsell Color
VB-JHB2014M-19 2 SP 23 5Y 5/2
VB-JHB2014M-19 3 SP 34 5Y 4/1
VB-JHB2014M-19 4 SP 3 5Y 4/1
VB-JHB2014M-19 5 SP 2 5Y 4/1
VB-JHB2014M-20 1 SP 34 5Y 5/2
VB-JHB2014M-20 2 SP 24 5Y 5/2
VB-JHB2014M-21 1 SP 7 5Y 4/1
VB-JHB2014M-21 2 SP 34 5Y 4/1
VB-JHB2014M-21 3 SP 34 5Y 4/1
VB-JHB2014M-22 1 SP 1 5Y 4/1
VB-JHB2014M-22 2 SP 6 5Y 4/1
VB-JHB2014M-22 3 SP 6 5Y 4/1
USCS: Unified Soil Classification System; LL: liquid limit; PL: plastic limit; PI: Plastic Index;
CO3%: Carbonate Content
Sedimentation rate curves were obtained for this data set. Test data sheets are included in paragraph 4.6.
4.3 BORING LOG NOTES
Borings of the CB-JHB03-, CB-JHPM09-, CB-JH14- series were driven using the Standard Penetration Test (SPT) procedure with a 140 pound hammer with a 30-inch drop using a 2.0 foot split spoon (1 3/8-inch I.D. and 2-inch O.D.). Borings were advanced in 18-inch intervals, or until refusal was encountered. Refusal is defined as a total of 50 blows of the hammer within any 6-inch increment, a total of 100 blows within any 1-foot increment, or no observed advance of the sampler after 10 successive blows of the hammer. When refusal was encountered, the borings were continued with a 4-inch by 5 1/2-inch diameter core barrel until the rate of penetration indicated softer material, at which point the SPT procedure was resumed.
Borings of the CB-42- series, and CB-95, CB-97, CB-99, CB-101, CB-R5, CB-J91-16, and CB- J91-18 were driven using a 300 pound hammer with a 18-inch drop using a 2.0 foot split spoon similar to the Standard Penetration Test (SPT) procedure. The blow counts indicated are those required for sampling only and do not correlate to the N-values of a
SPT.
Borings of the VB-JHB2014M- series were sampled using an Alpine style, pneumatic vertical hammer, vibracore drilling apparatus having a continuous 20-foot by 3 or 3 1/2-inch core barrel with clear plastic core liner that was advanced until a depth of 20 feet was reached or until refusal was encountered. Refusal is defined as no additional penetration of the vibracore with two minutes of additional effort applied to penetrate through the resistant layer at maximum vibration.
4.4 INSPECTION OF RECOVERED MATERIALS
The material recovered from borings marked with a checkmark in Table 1 and Table 2 is available for inspection by prospective offerors at the Corps of Engineers District warehouse listed below:
Address: 3077 Talleyrand Avenue Jacksonville, 32206 Florida Hours: 7:00 am to 2:30 pm
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-13
The recovered materials will be available for inspection during normal business hours as noted above, except Federal holidays, during the entire bid period. Prospective offerors shall notify the project geologist at 904-232-1890 or Chief, Geology and Explorations Section at 904-232-1617 at least four (4) working days before the visit.
The following information will be required to schedule the visit:
(1) Project title;
(2) Specific borings or entire set which are to be viewed;
(3) Date, time, and duration of the visit;
(4) Name of the person(s) and company to view the borings; and
(5) Point of contact and phone number regarding the visit.
Prospective offerors shall record their material examination visit in a record book maintained at the inspection site.
It is strongly suggested that prospective offerors view the samples before submitting their bid.
Section 00 31 32-14
PLATE 5 PLATE 6 PLATE 7PLATE 4PLATE 3
PLATE 2
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
1BUN
BUN
BUN
15Nov2017
Dsn by:
OVERVIEW MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend Channel Outline
0 2 4 6 81 Miles
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-15
CB-99
CB-97
CB-95
CB-42-75
CB-42-73
CB-42-72
CB-42-19
CB-42-18
CB-J91-18
CB-J91-16
CB-JHB03-29
CB-JHB03-28
CB-JHB03-27
CB-JHB03-26
CB-JHB03-25
CB-JHB03-24
CB-JHB03-23
CB-JHB03-22
CB-JHB03-21
CB-JHB03-20
CB-JHB03-19
CB-JHPM09-47
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
2BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü
T E
R M
IN
A
L C
H A
N N
E L
CUT-55
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-16
CUT-43
C U
T-45
C U
T-44
CB-JH14-12
CB-JH14-11
CB-JH14-10
CB-JHPM09-3
CB-JHPM09-2
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
3BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-17
CUT-42
CUT-43
C U
T- G
CB-JHPM09-9
CB-JHPM09-8
CB-JHPM09-7 CB-JH14-037CB-JH14-033
CB-JH14-028
CB-JH14-027
CB-JHPM09-46
CB-JHPM09-45
CB-JHPM09-44
CB-JHPM09-43
CB-JHPM09-42
CB-JH14-040
CB-JH14-036
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
4BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-18
CUT-42
CUT-41
CUT-40
C B-
JH
-1
C B-
JH
-1
C B-
JH
-1
C B-
JH
-1
C B-
JH
-0
C B-
JH
PM
-1
C B-
JH
PM
-1
C B-
JH
PM
-1
C B-
JH
PM
-1
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
5BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-19
!O
!O!O
!O
CUT-39
CUT-14/15
CUT-16
CUT-17
CUT-18
CUT-19
C B-
C B-
-5
C B-
-5
C B-
JH
-1
C B-
JH
-1
C B-
JH
-1
C B-
JH
-1
C B-
JH
-1
C B-
JH
-0
C B-
JH
-0
C B-
JH
-0
C B-
JH
PM
-2
C B-
JH
PM
-2
C B-
JH
PM
-1
C B-
R
C B-
-5
C B-
-2
VB
-J
H B2
4M
-2
VB
-J
H B2
4M
-2
VB
-J
H B2
4M
-2
VB
-J
H B2
4M
-1
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
6BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
!O Vibracore Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-20
!O
!O
C U
T-
C U
T-
CUT-9
CUT-10
CUT-13
CUT-12
CUT-11
C U
T-
C
B-JH
14-099
C
B-JH
14-096
C
B-JH
14-094 C
B-JH
14-093
C
B-JH
14-092
C
B-JH
14-089
C
B-JH
14-088
C
B-JH
14-084
C
B-JH
14-080
C
B-JH
PM
09-26
C
B-JH
PM
09-25
C
B-JH
14-098
C
B-JH
14-095
C
B-JH
PM
09-28
C
B-JH
PM
09-27
C
B-JH
PM
09-24
VB-JH
B2014M
-17
VB-JH
B2014M -16
VB-JH
B2014M
-15
VB-JH
B2014M
-18
Dwn by:
Ckd by:
Dated:
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
PLATE NO.
7BUN
BUN
BUN
15Nov2017
Dsn by:
BORING LOCATION MAP
JACKSONVILLE HARBOR
MAINTENANCE DREDGING 2018
DUVAL COUNTY, FLORIDA
Legend !. Core Boring Location
!O Vibracore Boring Location
Channel Outline
0 1,000 2,000 3,000 4,000500 Feet
Ü Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-21
4.5 BORING LOGS
Applicable boring logs are presented on the following pages.
The borings presented in this section are available historic borings within the project area. Most of the materials within the project template presented on the boring logs have been removed by previous dredging events with subsequent shoaling of similar materials. The current elevations of the materials at these locations are shown on the contract drawings.
While the Government’s borings are representative of subsurface conditions at their respective locations and vertical reaches, local variations in the characteristics of the subsurface materials of this region are to be expected. Accordingly, prospective offerors shall form their own conclusions from the examination of the recovered materials prior to submission of their offer.
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-22
Section 00 31 32-23
Section 00 31 32-24
Section 00 31 32-25
Hole No CB-42-50 .
DRILLING LOG 1 Ja~,_;sonville District
SHEET I
South Atlantic OF I
• ROJECl 10. SIZE AND TYPE OF BIT See Remarks Jacksonville Harbor H. DA 1 UM FOR ELEVA 1 !ON SHOWN 1 1 oN or NSLJ
. _ ~coor~~t_es o~ station} X 354,897 Y 2199,393
MLW (FEET)
• MANU' ' "' """' 3. ~ILLING. A_:>J:NCY Sprague and Henwood
Corps of Engineers 13. T.OTAL NO: u! OVERBUK~EN SAMPLES TAKt.N . ~~.;';}~l~: .. ~s ~?own on r;u8WifiSJ rme disturbed: 0 undisturbed: 0 8/)d fHe number) CB 42 50
14. TOTAL NUMBER OF CORE BOXES 1/4 6, NAME 0 · uRILLER
C. Mason 15. ELEVATION GROUND WATER TIDAL
6. DIRECTION OF HOlE I'"· uATo ""'" ~;~3"/a"~ ~VERTICAL DINCLlNEO 3/13/67
Ft.
17. ELEVATION TOP OF HOLE 38.6 Ft.
7. THICKNESS OF BURDEN
8. DEPTH DRILLED INTO ROCK 0 Ft.
16. TOTAL CORE RECOVERY FOR BORING 92%
19. SIGNATURE OFGEOLOGIST
9, TOTAL DEPTH OF HOLE 12.0 Ft. J. Knox
ELEV. DEPTH c CLASSIFICATION OF MATERIALS COR_E a: a: ' z UJUJ REMARKS "' UJ {Description) "'"' "'· "'
REC "" Bit or Barrel o-
UJ % ::>:> ~
~ zz "' -38.6 .0 -38.6 f;:i SHELL, sandy, silty, gray
I
-40.1 1.5- -- 3 SAND, silty, slightly clayey, line to medium, greenish gray, quartz, -.: slightly shelly, (SM) 80 2" l.D. SPOON 2 H 2.5
-. shelly, gray from -43.2 to -45.6 -43.6 5 tan below elevation -45.6 3 - 13 1-
- 100 2" I.D. SPOON 9 7.5 -:
-: 4 8 -
-48.2 9.6 38
SAND, fine to medium, quartz, -48.6 I olive brown, (SP)
- 100 5 2·· !.D. SPOON
-50.6 12.0 -50.6
- -I 2.5 300# Hammer with 18" drop used on 2" I.D. Spoon
- I 5
- I 7.5
- 1-
- 20 1-'
- r-
- 1-2 2.5
EN8 F~ 1838 PREVIOUS EDITIONS ARE OBSOLETE.
MAR 7
l PROJECT Jacksonville Harbor
I HOLE NUMBER
CB-42-50
Jacksonville Harbor Maintenance Dredging 2018 40-foot Project - Cut-8 through Terminal Channel, and Cut G
Section 00 31 32-26 k3engsrm Polygonal Line
Hole No CB-42-52 .
DRILLING LOG I SHEET I
South Atlantic Jacksonville District Or I I. PROJECT 10. SIZE AND TYPE OF BIT See Remarks
Jacksonville Harbor 11. DATUM FO~~':;~VATION SHOWN !TB/rl or N::>LJ . ~':'"~ ~ l~': _ '"':~o~~na es or .=ora 10n X 351 316 Y 2202 360
MLW [FEET)
' ' ' "~~.0 i U' UK!LL
3. ORILllr~u _A_:11:;NCY Sprague and Henwood Corps of Engineers 13. TOTAl NO. OF OVERBURDEN SAMPLES TAKEN
. ':~;~}~~---'!'~s !?own Of) araw~n~ rme disturbed: 0 undisturbed: 0 and /He number) CB 42 52
14. TOTAl NUMBER OF CORE BOXES 1/4 5. NAME OF uRILLt.H
C. Mason 15, ELEVATION GROUND WATER TIDAL
6. DIRECTION OF HOLE 16. DAlE KOLE ~~3~~~~
IZJ VERTICAL 0 INCLINED 3/09/67
7. THICKNESS OF BURDEN Ft.
17. ELEVATION TOP OF HOLE 31.0 Ft.
8. DEPTH DRILLED INTO ROCK 0 Ft.
18. TOTAL CORE RECOVERY FOR BORING 83%
19. SIGNATURE urbtulOI.:ilST
9. TOTAl DEPTH OF HOLE 19.0 Ft. J. Knox
ELEV, DEPTH 0
CLASSIFICATION OF MATERIALS COR_E
crcr -z ww REMARKS Vl w (Description) ~~ X.
"' REC Bit or Barrel o-w % ::>::> ~ ~ zz "'
-31.0 ,0 -31.0 SHELL, sandy, silty, gray to tan
4 ISM)
-32.5 1.5- .: 72 I 2" l.D. SPOON 1- LIMESTONE, hard, porous, I fossiliferous, solutioned, gray to
-33.5 - tan
- 55 DIAMOND NX
1-
-35.5
- I-! X :: 85 DIAMOND NX
2.5
-37.5 ~ medium hard from -38.8 to -43.2
- 80 DIAMOND NX -: 7.5
-39.0
44 - -
:5 25
- ~ siltstone layer from -41.0 to I
-42.3 80 2" l.D. SPOON 13
115 I -44.0
-44.5
- / SAND, fine to coarse, quartz, -shell and limestone fragments, tan, (SP) 100 2 2" I. D. SPOON 37
2.5
- I 5
-47.0
T\ 38
- c·.' 100 3 2" I. D. SPOON 43 I 7,5
-50.0 19.0- -50.0 1-
- 300# Hammer with 18" drop i-2 0 used on 2" I.D. Spoon
- 1-
- 1-2 2.5
~ ~?AN t83e PREVIOUS EOITIONS ARE OBSOLETE. I PROJECT Jacksormlle Harbor
I HOLE NUMBER
CB-42-52
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-27
Hole No CB-42-53 .
DRILLING LOG 1 1 mo '"" "v." . SHEET I
South Atlantic Jacksonville D1strict OF I I, PROJECl 10. SIZE AND TYPE OF BIT See Remarks
Jacksonville Harbor 11. DATUM FO ELEVATiON SHOWN fTBM or MS!./
• ~~o~ '. :" • ~··o,amete• "station/
X 348,698 Y 2203,508
MLW (FEET(
I. <OF ORlll
3. DRilLING A~c.NCY Sprague and Henwood
Corps of Eng1neers 13. TOTAl NO. OF OVERBURDEN SAMPLES TAKEN ··~~~~ .. ':'~·.-~!_!?own on arawlflg tme fJhr1 file rwmber) CB 42 53 disturbed: 0 undisturbed: 0
5. NA~7' Or- DRILLER
14. TOTAL NUMBER OF CORE BOXES t/3
C. Mason 16. ELEVATION GROUND WATER TIDAL
e. DIRECTION OF HOlE ('"-"AOC nvco ;;3~~~~
I2J VERTICAL DINCLINED 3/08/67
7. THICKNESS OF BURDEN Ft.
17. ELEVATION TOP OF HOLE 37.7 Ft.
8. DEPTH DRILLED INTO ROCK 0 Ft.
18. TOTAL CORE RECOVERY FOR BORING 55%
19. SIGNATURE OFGEOLOGIST
9. TOTAL DEPTH OF HOLE 13.0 Ft. J. Knox
ELEV. DEPTH 0 CLASSIFICA T!ON OF MATERIALS COR_E """ ' z ww REMARKS "' w (Description) REG ~~ X.
"' Bit or Barrel o-w % =>=> ~
~ zz "' -31.7 .0 37.7
SAND, silty, shelly, fine to 0 coarse, gray, (SM)
-39.0 1.3 40 I 2" !.0. SPOON 1-
SILT, clayey, slightly shelly with 5 hard limestone fragments, dark gray (MH) - -40.2 2.5
-40.9 3.2 LIMESTONE, moderatly hard with
-I I hard layers, fossiliferous, 80 2" I.O. SPOON 1- II porpous, tan, gray, soultioned 37
II hard from -43 to -44.7 _I I 42.1
I I II hard from -43.0 to -44.7
-i I 85 DIAMOND NX 1-I
II -44.7
II
-I I 3 1-7.5 II probable silt filled cavity from ~
II
_I I
-45.5 to -47.7 DROPPE f- I I
II
-i I I 40 2" I.D. SPOON I 0
II 9
II
II !-
II 20
II
-I I 23 I
-50.7 13.0 I I -50.7 2.5
300# Hammer with 18" drop used on 2" I.O. Spoon
- -I 5
- I 7.5
- 20
- -2 2.5
~ FORM 1838 PREVIOUS EDITIONS ARE OBSOLETE.
J PROJECT
Jacksonville Harbor
I HOLE NUMBER
CB-42-53
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-28
Section 00 31 32-29
Section 00 31 32-30
Section 00 31 32-31
Section 00 31 32-32
Section 00 31 32-33
Section 00 31 32-34
Hole ll.ln ~~ '11 DRILLING LOG I South Atlantic -Ja~'~;;~~:lle District SHE~~;
I. ·~~~~c;ONVILLE "•ooeo 38 ft. PROJECT llo. SIZEANDTvPE OF BIT See Remarks
2. 'X"~;~~~~4 J. y,o;;e,~ ~~;tat;on/ I"· ~~~uM ~~;E-Ti < OMUWN I' OH " H~l
13· ~;~~;N~ .. ~<";"' . ;;~·;;~~; &
UOO<ONA ''UN UC UM"C
1•· =~•• oomber/ 'on wawmg mre CB-IOI r or AL NO.: o; ' ,.~~~~, '"<"
I•· ~~";a~~~"'"""
114. TOTAL NUMBER OF CORE BOXES I
115. I ~O_WATER TIDAL
I"· 'OF HOlE po. DATE HOLE 1-0/l;f~~ lOillfl1
~VERTICAL 0 INCLINED
I'· IOFBUROEN Ft.
117. <T0P0FHOLE -30.5 Ft.
Ia. DEPTH DRILLED INTO ROCK 0 Ft.
I 18. TOTAL CORE I FOR BORING 25 %
19. TOTAL DEPTH OF HOLE 19.5 Ft. 119. t::; :~;-
ELEV.
CLASSIFICATION OF MATERIALS ~~~~ ~~~ ' ICC
REMARKS
en
(Description) "'· Bit or Barrel o-
-30.5 .0 .,n_<;
NO RECOVERY
SETTLE
0 2" I.O. Spoon
- :.2.5
-34.5 4.0- __ ,4..<; -
¢ LIMESTONE, massive, DIAMOND NX
-35.5 5.0 ~~~VIiferous, hard, light brown to
D.T. 30 min. :.5
NO RECOVERY 30
H.P. 50 psi.
- 1- : -31.5 7.0 -V.5
- t:0 CLAY, medium stiff, medium to E-7.5 high plasticity, silty, sandy (very I
-39.0 R.S ~ fine). calcareous, gray (CL)
k) SAND, fine to ~edium_q__u~~~:.and 1- 88 r-
-39.1 9.2 ~~ae~~~~~d with (SEj' tone lenses, r 55 f-- 2"1.0. Spoon
II , orav 120
- NO RECOVWRY '"
-41.5 11.0 -4/.S
-H LIMESTONE, moderately hard, DIAMOND NX
1-fossiliferious, sandy in 65 compositition, porous, (can be 10 D.T. 2~"i!iR· Spoon
- H broken by hand), gray 4' n H.P. 50 PSI.
" ::::; NX
D.T. 15 min.
- H 18 H.P. 100 psi.
r-
-4s.n 14 5 I!! I -45.o hard from -45.0 to -46.5
- D.T. 30 min. f-15 O.T. 50 psi.
-46.5 18.0
1lrll!J ;~e~l~-,'ine to medrum quartz and '-41.0 -
:: ·· II, silty, gray (SM)
' .· II
20 3 2"I.D. Spoon 15
-50.0 19.5 ·: ;·: -.son
- ~2o NOTES: 300# Hammer w1th 18" drop I. Set NX casing to -35.0 used on 2" I.D. Spoon
- 2. No measurable water loss -
- :.22.5
~ )'J'RM t83e PREVIOUS EDITIONS ARE OBSOLETE.
1 :J';,"cKsTc 11 c ~ARRno. Js tt. PROJEcT I C:'B~rol""<"
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-35
Section 00 31 32-36
Section 00 31 32-37
REMARKS
Bit or Barrel
WASHED CASING
DIAMOND 4 X 5-I
OlOOO-c74
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-38
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
-50.8
8.0
0.0
0.5
2.5
0.0
H ig h ly
W e a th e re d M o d e ra te ly
W e a th e re d
WOR
BOX
-42.8-42.8
-43.3
-45.3
-50.8
-42.8
-44.3
-45.3
-47.8
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
WOR = Weight of Rods.
DT = Drill Time.
HP = Hydraulic Pressure.
SILT, inorganic-L, nonplastic, very soft, some subrounded fine-grained sand-sized carbonate, few shell, wet, weak cementation, black (ML) CLAY, lean, low plasticity, few limestone up to 1/4", trace subrounded fine-grained sand-sized quartz, light gray/gray (CL)
LIMESTONE, soft, highly weathered, aphanitic, thin bedding, bedding orientation, pitted, light gray At El. -45.8 Ft., moderately hard At El. -46.3 Ft., soft
At El. -47.8 Ft., moderately hard, moderately weathered, thick bedding, bedding orientation
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
SPT Sampler
SPT Sampler
4 x 5-1/2" Diamond Set Bit DT = 15 mins HP = 100 psi
4 x 5-1/2" Diamond Set Bit DT = 13 mins HP = 100 psi
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-19
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-19
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Cut-55
08-06-03
-42.8 Ft.
86 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 459,636 Y = 2,194,070
MLLW
Failing 1500
Corps of Engineers - CESAS
8.0 Ft.
Jacksonville District
08-06-03
N/A
Damon Young, Geologist
JUN 02
SAJ FORM 1836
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-39
SPT Sampler
SPT Sampler
4 x 5-1/2" Diamond Set Bit DT = 15 mins HP = 100 psi
4 x 5-1/2" Diamond Set Bit DT = 30 mins HP = 100 psi
-50.5
7.5
0.00.0
D e co m p o se d
M o d
W e a
BOX
-43.0-43.0
-50.5
-43.0
-44.5
-45.5
-47.5
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
DT = Drill Time.
HP = Hydraulic Pressure.
LIMESTONE, very soft, decomposed, aphanitic, thin bedding, bedding orientation, gray
At El. -49.2 Ft., moderately hard, moderately weathered, thick bedding, bedding orientation, pitted, light gray/gray
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-20
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-20
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Cut-55
07-31-03
-43.0 Ft.
95 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 460,383 Y = 2,193,084
MLLW
Failing 1500
Corps of Engineers - CESAS
7.5 Ft.
Jacksonville District
07-31-03
N/A
Damon Young, Geologist
JUN 02
SAJ FORM 1836
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-40
-53.4
11.5
0.0
3.0
3.5
0.0
D H ig h ly W e a th e re d
BOX
-41.9-41.9
-44.9
-45.4
-53.4
-41.9
-43.4
-44.9
-45.4
-49.4
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
DT = Drill Time.
HP = Hydraulic Pressure.
CLAY, lean, low plasticity, firm, few fines, weak reaction with HCl, moist, weak cementation, gray/dark gray (CL)
At El. -43.4 Ft., hard, trace limestone, trace fines, dry, moderate cementation, gray
LIMESTONE, very soft, decomposed, gray
LIMESTONE, fossiliferous, hard, highly weathered, aphanitic, thick bedding, bedding orientation, pitted, gray
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
SPT Sampler
SPT Sampler
SPT Sampler
4 x 5-1/2" Diamond Set Bit DT = 16 mins HP = 100 psi
4 x 5-1/2" Diamond Set Bit DT = 16 mins HP = 100 psi
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-21
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-21
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Cut-55
07-30-03
-41.9 Ft.
89 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 460,922 Y = 2,193,084
MLLW
Failing 1500
Corps of Engineers - CESAS
11.5 Ft.
Jacksonville District
07-30-03
N/A
Damon Young, Geologist
JUN 02
SAJ FORM 1836
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-41
-50.0
WOR
50/0.2'
8.5
0.00.0
WOR
50/0.3'
-41.5-41.5
64+
-50.0
-41.5
-43.0
-44.3 -44.5
-45.2 -45.5
-46.0
-46.5
-48.0
-49.5
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
WOR = Weight of Rods.
NR = Not Recorded.
NR
CLAY, lean, low plasticity, soft, weak reaction with HCl, moist, weak cementation, gray (CL)
At El. -43.0 Ft., dry
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
SPT Sampler
SPT Sampler
Advanced Boring
SPT Sampler
Advanced Boring
SPT Sampler
Advanced Boring
SPT Sampler
SPT Sampler
SPT Sampler
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-22
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-22
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Cut-55
07-21-03
-41.5 Ft.
59 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 460,823 Y = 2,192,427
MLLW
Failing 1500
Corps of Engineers - CESAS
8.5 Ft.
Jacksonville District
07-21-03
N/A
Gregory Taylor, Geologist
JUN 02
SAJ FORM 1836
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-42
N/A
Damon Young, Geologist
JUN 02
SAJ FORM 1836
-50.5
WOR
WOR
WOR
WOR
WOR
WOR
9.0
0.00.0
WOR
WOR
WOR
WOR
WOR
WOR
WOR
WOR
WOR
WOR
WOR
WOR
-41.5-41.5
-50.5
-41.5
-43.0
-44.5
-46.0
-47.5
-49.0
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
WOR = Weight of Rods.
CLAY, lean, low plasticity, very soft, trace limestone up to 1", trace wood debris, trace fine-grained sand-sized quartz, trace organic matter, wet, weak cementation, gray/dark gray (CL)
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-23
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-23
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Terminal Channel
07-30-03
-41.5 Ft.
100 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 461,231 Y = 2,191,174
MLLW
Failing 1500
Corps of Engineers - CESAS
9.0 Ft.
Jacksonville District
07-30-03
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-43
-50.4
WOR
9.0
0.0
2.5
0.0
WOR
WOR
WOR
WOR
-41.4-41.4
-43.9
-50.4
-41.4
-42.9
-44.4
-45.9
-47.4
-48.9
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
Abbreviations:
WOR = Weight of Rods.
SILT, inorganic-L, nonplastic, very soft, trace fine-grained sand-sized quartz, trace organic matter, weak reaction with HCl, wet, black
(ML)
CLAY, lean, medium plasticity, hard, trace carbonate, trace limestone up to 1/8", dry, light gray/gray (CL)
NOTES:
1. Soils are field visually classified in accordance with the Unified Soils Classification System.
2. Laboratory Testing Results
SAMPLE SAMPLE LABORATORY
ID DEPTH CLASSIFICATION
1 0.0/1.5 MH*
2 1.5/3.0 MH*
*Lab visual classification based on gradation curve. No Atterberg limits.
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
SPT Sampler
CLASSIFICATION OF MATERIALS %
REC.
LE
G
E N
D
ELEV.
B O
X O
R S
A M
P
LE
DEPTH
RQD
OR
UD
B
LO
W S
0.
FT
REMARKS
N -V
A
LU
E
VERTICAL
OF
CB-JHB03-24
UNDISTURBED (UD)
16. ELEVATION TOP OF BORING
BEARING
8. TOTAL DEPTH OF BORING
SHEETS
5. DIRECTION OF BORING
DISTURBED
DEG. FROM
VERTICAL
SHEET
14. ELEVATION GROUND WATER
HORIZONTAL
1. PROJECT
INCLINED
DIVISION INSTALLATION
VERTICAL
CONTRACTOR FILE NO.
11. MANUFACTURER'S DESIGNATION OF DRILL
COMPLETED
18. SIGNATURE AND TITLE OF INSPECTOR
2. BORING DESIGNATION
STARTED
3. DRILLING AGENCY
15. DATE BORING
13. TOTAL NUMBER CORE BOXES
Boring Designation
17. TOTAL RECOVERY FOR BORING
10. COORDINATE SYSTEM/DATUM
MANUAL HAMMER
DRILLING LOG
7. DEPTH DRILLED INTO ROCK
12. TOTAL SAMPLES
9. SIZE AND TYPE OF BIT
6. THICKNESS OF OVERBURDEN
CB-JHB03-24
4. NAME OF DRILLER
AUTO HAMMERLOCATION COORDINATES
South Atlantic
N/A
Danny Hewett
Jacksonville Harbor FL
Terminal Channel
08-01-03
-41.4 Ft.
100 %
N/A
NAD83
See Remarks
State Plane, FLE (U.S. Ft.)
X = 461,037 Y = 2,190,080
MLLW
Failing 1500
Corps of Engineers - CESAS
9.0 Ft.
Jacksonville District
08-01-03
N/A
Damon Young, Geologist
JUN 02
SAJ FORM 1836
Jacksonville Harbor Maintenance Dredging 2018
Section 00 31 32-44
Gregory Taylor, Geologist
JUN 02
SAJ FORM 1836
-50.3
9.0
0.0
8.3
0.0
100/0.3'
BOX
-41.3-41.3
-49.6
-50.3
-41.3
-44.8
-46.3
-47.8
-49.3 -49.6
140# hammer w/30" drop used with 2.0' split spoon (1-3/8" I.D. x 2" O.D.).
CLAY, fat, high plasticity, soft, weak reaction with HCl, wet, green/gray (CH)
At El. -47.8 Ft., little fine to coarse-grained sand-sized sand, strong cementation, gray/white
LIMESTONE, moderately hard, gray
NOTES:
1. Soils are field visually…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.