About this file

Amendment 0003

View the file

Other files

File Type Posted
Bid_Abstract_-_Jacksonville_Harbor,_Maintenance_Dredging,_FY_18_O&M.pdf PDF
Amendment_0004.pdf PDF
Amend0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Roster.pdf PDF
18B0003Volume1Specs.pdf PDF
Jax_O&M_GDR_2018_13nov2017.pdf PDF
18B0003Volume2Specs.pdf PDF
JaxHarborMDFY18_Advertised_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Jacksonville Harbor, Maintenance Dredging, 38- and 40-Foot Projects, Cut-7 Through Cut-45, Cut-55, Cut-G, and The Low er Terminal, Channel, Duval County, Florida

A. See Continuation Sheet for Amendment Details

B. The Proposal Due Date has been changed from 27 March 2018, 2:00 PM Local Time to 03 April 2018, 2:00 PM Local Time.

C. All Other Terms and Conditions Remain Unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP18B0003

X 9B. DATED (SEE ITEM 11)

22-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Mar-2018

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

Jacksonville Harbor, Maintenance Dredging, 38- and 40-Foot Projects, Cut-7 Through Cut-45, Cut-55, Cut-G, and The Lower Terminal Channel, Duval County, Florida

W912EP-18-B-0003 2 Amendment 0003

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.

Changes to Specifications:

DELETE Section 00010A and REPLACE with the attached revised Section 00010A.

DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.

DELETE Section 01 57 25 and REPLACE with the attached revised Section 01 57 25.

2. DRAWINGS:

No drawings.

(End of Summary of Changes)

3. CLAUSES:

DELETE Clause 52.217-7 in Section 00700 and REPLACE with the revised clause 52.217-7 below:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule.

The Contracting Officer anticipates exercising the options as follows:

Option Date

Option A Option B Option C Option D

On or About 6/26/2018 On or About 7/21/2018 On or About 7/31/2018 On or About 8/25/2018

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of Clause)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 38- AND 40-FOOT PROJECTS,

CUT-7 THROUGH CUT-45, CUT-55, CUT-G, AND THE LOWER TERMINAL CHANNEL

DUVAL COUNTY, FLORIDA

W912EP-18-B-0003 00010A-1 Amendment 0003

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $_______________

0002 EXCAVATION, UNCLASSIFIED

CUT-55 STA. 38+00 THROUGH LOWER TERMINAL

CHANNEL STA. 65+00, (ESTIMATED QUANTITY,

SEE NOTE 1) 178,000 CUBIC YARD $____________ $_______________

0003 TURBIDITY MONITORING 1 JOB $_______________

0004 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY) 1 JOB $_______________

0005 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE NON-CAPTURE TRAWL SWEEPING

(HOPPER DREDGES ONLY) 1 JOB $_______________

0006 SEA TURTLE NON-CAPTURE TRAWL SWEEPING

ESTIMATED QUANTITY (HOPPER DREDGES ONLY) 7 DAY $____________ $_______________

0007 DEDICATED MANATEE AND SEA TURTLE

OBSERVER (CLAMSHELL DREDGING ONLY) 1 JOB $_______________

0008 STANDBY TIME (SEE NOTE 2)

(ESTIMATED QUANTITY, SEE NOTE 1) 24 HOUR $_______________

TOTAL BASE (LINE ITEMS 0001 THROUGH 0008) $_______________

OPTION A

0009 EXCAVATION, UNCLASSIFIED

CUT-44 STA.35+00 TO CUT-45 STA. 35+50

(ESTIMATED QUANTITY, SEE NOTE 1) 55,000 CUBIC YARD $____________ $_______________

0010 TURBIDITY MONITORING 1 JOB $_______________

0011 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY) 1 JOB $_______________

0012 SEA TURTLE NON-CAPTURE TRAWL SWEEPING

ESTIMATED QUANTITY (HOPPER DREDGES ONLY) 5 DAY $____________ $_______________

0013 DEDICATED MANATEE AND SEA TURTLE

OBSERVER (CLAMSHELL DREDGING ONLY) 1 JOB $_______________

0014 STANDBY TIME (SEE NOTE 2)

(ESTIMATED QUANTITY, SEE NOTE 1) 24 HOUR $____________ $_______________

TOTAL OPTION A (LINE ITEMS 0009 THROUGH 0014) $_______________

TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0014) $_______________

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 38- AND 40-FOOT PROJECTS,

CUT-7 THROUGH CUT-45, CUT-55, CUT-G, AND THE LOWER TERMINAL CHANNEL

DUVAL COUNTY, FLORIDA

W912EP-18-B-0003 00010A-2 Amendment 0003

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

OPTION B

0015 EXCAVATION, UNCLASSIFIED

CUT-42 STA. 72+00 THROUGH CUT-42 STA. 139+00

AND CUT-G WEST WIDENER FROM STA. 74+20

THROUGH STA. 84+50 (ESTIMATED QUANTITY,

SEE NOTE 1) 192,000 CUBIC YARD $____________ $_______________

0016 TURBIDITY MONITORING 1 JOB $_______________

0017 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY) 1 JOB $_______________

0018 SEA TURTLE NON-CAPTURE TRAWL SWEEPING

ESTIMATED QUANTITY (HOPPER DREDGES ONLY) 25 DAY $____________ $_______________

0019 DEDICATED MANATEE AND SEA TURTLE

OBSERVER (CLAMSHELL DREDGING ONLY) 1 JOB $_______________

0020 STANDBY TIME (SEE NOTE 2)

(ESTIMATED QUANTITY, SEE NOTE 1) 24 HOUR $____________ $_______________

TOTAL OPTION B (LINE ITEMS 0015 THROUGH 0020) $_______________

TOTAL BASE PLUS OPTIONS A AND B (LINE ITEMS 0001 THROUGH 0020) $_______________

OPTION C

0021 EXCAVATION, UNCLASSIFIED

CUT-G STA. 14+50 TO STA. 70+00

(ESTIMATED QUANTITY, SEE NOTE 1) 93,000 CUBIC YARD $____________ $_______________

0022 TURBIDITY MONITORING 1 JOB $_______________

0023 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY) 1 JOB $_______________

0024 SEA TURTLE NON-CAPTURE TRAWL SWEEPING

ESTIMATED QUANTITY (HOPPER DREDGES ONLY) 5 DAY $____________ $_______________

0025 DEDICATED MANATEE AND SEA TURTLE

OBSERVER (CLAMSHELL DREDGING ONLY) 1 JOB $_______________

0026 STANDBY TIME (SEE NOTE 2)

(ESTIMATED QUANTITY, SEE NOTE 1) 24 HOUR $____________ $_______________

TOTAL OPTION C (LINE ITEMS 0021 THROUGH 0026) $_______________

TOTAL BASE PLUS OPTIONS A, B, AND C (LINE ITEMS 0001 THROUGH 0026) $_______________

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 38- AND 40-FOOT PROJECTS,

CUT-7 THROUGH CUT-45, CUT-55, CUT-G, AND THE LOWER TERMINAL CHANNEL

DUVAL COUNTY, FLORIDA

W912EP-18-B-0003 00010A-3 Amendment 0003

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

OPTION D

0027 EXCAVATION, UNCLASSIFIED

CUT-7 STA. 3+00 TO CUT-42 STA. 45+00

(ESTIMATED QUANTITY, SEE NOTE 1) 48,000 CUBIC YARD $____________ $_______________

0028 TURBIDITY MONITORING 1 JOB $_______________

0029 ENDANGERED SPECIES OBSERVERS

(HOPPER DREDGES ONLY) 1 JOB $_______________

0030 SEA TURTLE NON-CAPTURE TRAWL SWEEPING

ESTIMATED QUANTITY (HOPPER DREDGES ONLY) 12 DAY $____________ $_______________

0031 DEDICATED MANATEE AND SEA TURTLE

OBSERVER (CLAMSHELL DREDGING ONLY) 1 JOB $_______________

0032 STANDBY TIME (SEE NOTE 2)

(ESTIMATED QUANTITY, SEE NOTE 1) 48 HOUR $____________ $_______________

0033 MOBILIZATION AND DEMOBILIZATION

FOR OPTION D 1 JOB $_______________

TOTAL OPTION D (LINE ITEMS 0027 THROUGH 0033) $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0033) $_______________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS

SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM

WORK IN EXCESS OF THE TOTAL ESTIMATED QUANTITY GIVEN FOR EACH CLIN WITHOUT PRIOR

APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

MAY BE EXCEEDED. ACTUAL QUANTITIES MAY VARY.

(2) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION BY REQUEST OF THE CONTRACTING OFFICER OR THE ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, BUT NOT DUE TO ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR THE ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00

MEASUREMENT AND PAYMENT AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(3) ALL OFFERS MUST BE FOR THE ENTIRE WORK. EACH BLANK SPACE MUST BE COMPLETED

EXCEPT FOR LINE ITEMS NOT APPLICABLE TO THE TYPE OF DREDGE BIDDER PROPOSES TO USE.

INSERT "N/A" IN THE BLANK SPACE(S) FOR THOSE LINE ITEMS NOT APPLICABLE.

(4) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE

PARAGRAPH 999.214-4018 OF SECTION 00100. SEE CLAUSE 52.214-18 PREPARATION OF BIDS--

CONSTRUCTION OF SECTION 00100.

SEE NEXT PAGE FOR NOTES 5 AND 6.

JACKSONVILLE HARBOR, MAINTENANCE DREDGING, 38- AND 40-FOOT PROJECTS,

CUT-7 THROUGH CUT-45, CUT-55, CUT-G, AND THE LOWER TERMINAL CHANNEL

DUVAL COUNTY, FLORIDA

W912EP-18-B-0003 00010A-4 Amendment 0003

(5) SEA TURTLE NON-CAPTURE TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SUBPARAGRAPH "EXCESSIVE TURTLE TAKE" OF SECTION 01 57 20 ENVIRONMENTAL

PROTECTION.

(6) "JOB" LINE ITEMS ARE THE SAME AS "LUMP SUM" LINE ITEMS IN THE SPECIFICATIONS.

Jacksonville Harbor, Maintenance Dredging 38- and 40-Foot Projects

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Reference

1.2 RESIDENT MANAGEMENT SYSTEM (RMS)

1.2.1 Definition

1.2.2 Instructions

1.3 SUBMITTALS

1.4 JOB PAYMENT ITEMS

1.4.1 Mobilization and Demobilization (Line Item 0001)

1.4.2 Turbidity Monitoring (Line Items 0003, 0010, 0016, 0022 and

0028)

1.4.3 Endangered Species Observers (Hopper Dredges Only, Line Items

0004, 0011, 0017, 0023 and 0029)

1.4.4 Mobilization and Demobilization for Non-Capture Sea Turtle

Trawl Sweeping (Hopper Dredges Only, Line Item 0005)

1.4.5 Dedicated Manatee and Sea Turtle Observer (Clamshell Dredging

Only, Line Items 0007, 0013, 0019, 0025 and 0031)

1.4.6 Mobilization and Demobilization for Option D (Line Item 0033)

1.5 UNIT PRICE PAYMENT ITEMS

1.5.1 Excavation, Unclassified (Line Items 0002, 0009, 0015, 0021 and 0027)

1.5.1.1 Payment

1.5.1.2 Measurement

1.5.1.3 Unit of Measure

1.5.2 Sea Turtle Non-Capture Trawl Sweeping (Hopper Dredges Only) (Line Items 0006, 0012, 0018, 0024 and 0030)

1.5.2.1 Payment

1.5.2.2 Measurement

1.5.2.3 Unit of Measure

1.5.3 Standby Time (Line Items 0008, 0014, 0020, 0026 and 0032)

1.5.3.1 Measurement and Payment

1.5.3.2 Unit of Measure

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

3.1.1 Requesting Progress Payment

3.1.2 Options and Modification CLINS

-- End of Section Table of Contents --

SECTION 01 22 00 Page 1 W912EP-18-B-0003 Amendment 0003

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.

Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.

1.1.1 Reference

The publication listed below forms a part of this specification to the extent referenced. This publication is referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1003 (2013) Hydrographic Surveying

1.2 RESIDENT MANAGEMENT SYSTEM (RMS)

1.2.1 Definition

The terms "Contract Line Item Number (CLIN)" and "Line Item" are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term "CLIN" is a contracting term used in the Resident Management System (RMS) payment data base.

1.2.2 Instructions

See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE

(RMS CM).

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SECTION 01 22 00 Page 2

SD-01 Preconstruction Submittals

Schedule of Values ; G, RO

Provide a breakdown of lump sum items into proposed pay activities. Schedule of Values will become basis for CLIN and Pay Activity data in the RMS payment data base.

1.4 JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit "JOB" and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

Progress payments for lump sum CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit a list of pay activities, (Schedule of Values) to breakdown bid for each lump sum CLIN. The Schedule of Values shall be submitted for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, the Contractor should take into account the amount reserved for contract payments when preparing the construction schedule.

1.4.1 Mobilization and Demobilization (Line Item 0001)

Payment will be made for costs associated with or incidental to mobilization and demobilization and establishment of initial project management and coordination. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.

1.4.2 Turbidity Monitoring (Line Items 0003, 0010, 0016, 0022 and 0028)

Payment will be made for costs associated with or incidental to obtaining, analyzing, and reporting the results of monitoring for turbidity. See Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING.

1.4.3 Endangered Species Observers (Hopper Dredges Only, Line Items 0004, 0011, 0017, 0023 and 0029)

Payment will be made for costs associated with or incidental to endangered species observers required with the use of a hopper dredge. See Section

01 57 20 ENVIRONMENTAL PROTECTION.

1.4.4 Mobilization and Demobilization for Non-Capture Sea Turtle Trawl Sweeping (Hopper Dredges Only, Line Item 0005)

Payment will be made for costs associated with or incidental to

SECTION 01 22 00 Page 3

Jacksonvi l l e Har bor , Mai nt enance Dr edgi ng 38- and 40- Foot Pr oj ect s mobi l i zat i on and demobi l i zat i on f or sea t ur t l e t r awl i ng and r el ocat i on.

See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Al so, see Sect i on 01 57 20 ENVI RONMENTAL

PROTECTION.

1. 4. 5 Dedi cat ed Manat ee and Sea Tur t l e Obser ver ( Cl amshel l Dr edgi ng Onl y, Li ne I t ems 0007, 0013, 0019, 0025 and 0031)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o dedi cat ed manat ee and sea t ur t l e obser ver s r equi r ed when cl amshel l dr edgi ng. See Section 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 4. 6 Mobi l i zat i on and Demobi l i zat i on f or Opt i on D ( Li ne I t em 0033)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on of addi t i onal dr edgi ng equi pment r equi r ed t o execut e wor k under Opt i on D. Payment wi l l not be made under t hi s l i ne i t em f or mobi l i zat i on and demobi l i zat i on cost s al r eady cover ed under t he l i ne i t em " Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001) " above. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 5 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .

Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.

1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002, 0009, 0015, 0021 and 0027)

1. 5. 1. 1 Payment

a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o excavat i on, t r anspor t at i on, and di sposal of mat er i al s; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ;

moni t or i ng of speci es i n t he di sposal ar ea( s) and not pai d f or i n ot her l i ne i t ems; noi se cont r ol ; debr i s r emoval ; i nst al l at i on, oper at i on or mai nt enance of t he el ect r oni c t r acki ng syst em f or sur vei l l ance of al l dr edgi ng and di sposal act i v i t i es. See Sect i on

35 20 23 DREDGI NG.

b. I nsof ar as consi st ent wi t h t he par agr aph CONTI NUI TY OF WORK of Section 35 20 23 DREDGI NG, mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by soundi ngs or sweepi ngs per f or med by t he Cont r act or behi nd t he dr edge. The t er m " ar ea desi gnat ed by t he Cont r act i ng Of f i cer " as used i n t he CONTI NUI TY OF WORK par agr aph, i s def i ned as " accept ance sect i on" .

c. Hydr ogr aphi c sur veys f or f i nal measur ement and payment and f or channel c l ear ance wi l l be made by t he Gover nment . Al l sur veys wi l l be

SECTI ON 01 22 00 Page 4 per f or med i n accor dance wi t h USACE EM 1110- 2- 1003. Sur vey f r equenci es wi l l be t he same as t hose shown i n t he dr awi ngs and wi l l r emai n consi st ent t hr oughout t he cont r act .

1. 5. 1. 2 Measurement

a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS, MAPS, AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y aver age exi st i ng condi t i ons, but t he dept hs shown t her eon may be ver i f i ed and cor r ect ed by soundi ngs t aken bef or e dr edgi ng. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .

b. The t ot al amount of mat er i al r emoved, and t o be pai d f or under t he cont r act , wi l l be measur ed by t he cubi c yar d i n pl ace and quant i t i es det er mi ned by t he aver age end ar ea met hod. The vol ume comput ed shal l be bet ween t he bot t om sur f ace shown by soundi ngs t aken wi t hi n 3 weeks bef or e dr edgi ng and t he bot t om sur f ace shown by t he soundi ngs t aken wi t hi n 3 weeks af t er t he wor k speci f i ed i n each accept ance sect i on i ndi cat ed on t he dr awi ngs has been compl et ed. The Cont r act or shal l gi ve 10 days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need f or a pr e- dr edgi ng sur vey or af t er - dr edgi ng sur vey f or f i nal accept ance f or each accept ance sect i on. The quant i t y shal l i ncl ude t he vol ume wi t hi n t he l i mi t s of t he s i de sl opes descr i bed i n subpar agr aph " Si de Sl opes" of par agr aph REQUI RED DEPTH, ALLOWABLE OVERDEPTH, AND SI DE SLOPES of Section 35 20 23 DREDGI NG, l ess any deduct i ons t hat may be r equi r ed f or mi spl aced mat er i al descr i bed i n subpar agr aph " Mi spl aced Mat er i al s" of par agr aph DI SPOSAL OF EXCAVATED MATERI AL of Sect i on 35 20 23

DREDGING.

1. 5. 1. 3 Uni t of Measur e

Cubi c yar d.

1. 5. 2 Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng ( Hopper Dr edges Onl y) ( Li ne I t ems 0006, 0012, 0018, 0024 and 0030)

1. 5. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng. These pr i ces shal l i ncl ude cost s f or f ur ni shi ng l abor , equi pment , f uel , oi l , mat er i al s, and suppl i es r equi r ed f or t r awl sweepi ng t o c l ear and/ or r el ocat e sea t ur t l es f r om i n v i c i ni t y of t he dr edge, and shal l i ncl ude t he cost s of r epor t i ng as speci f i ed. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 5. 2. 2 Measurement

Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng wi l l be measur ed f or payment based upon t he dur at i on of per f or mance on a dai l y basi s. A day of t r awl sweepi ng i s def i ned as 24 hour s of cont i nuous t r awl i ng. The Cont r act or shal l conduct non- capt ur e t r awl sweepi ng as descr i bed i n par agr aph " Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng" i n Sect i on 01 57 20 ENVI RONMENTAL

PROTECTION.

SECTI ON 01 22 00 Page 5

1. 5. 2. 3 Uni t of Measur e

Day.

1. 5. 3 St andby Ti me ( Li ne I t ems 0008, 0014, 0020, 0026 and 0032)

1. 5. 3. 1 Measur ement and Payment

St andby t i me f or dr edgi ng wi l l be pai d f or each hour or par t t her eof t hat t he pl ant i s not i n oper at i on by r equest of t he Cont r act i ng Of f i cer .

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o st andby of t he dr edge pl ant onl y upon i mpl ement at i on of t hi s l i ne i t em. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em. The Cont r act i ng Of f i cer may cease oper at i ons subsequent t o t he i ni t i al 24- hour per i od f ol l owi ng a t ur t l e t ake. However , i f i t i s subsequent l y det er mi ned by t he Gover nment t hat a t ur t l e t ake r esul t ed f r om i mpr oper oper at i onal pr ocedur es, consi der at i on f or t he st andby t i me may be wi t hhel d by t he Gover nment .

1. 5. 3. 2 Uni t of Measur e

Hour.

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 PAYMENT PROCEDURES

Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.

3. 1. 1 Request i ng Pr ogr ess Payment

For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs.

Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment.

3. 1. 2 Opt i ons and Modi f i cat i on CLI NS

When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed.

I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.

- - End of Sect i on - -

SECTI ON 01 22 00 Page 6

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 57 25

TURBI DI TY AND DI SPOSAL MONI TORI NG

PART 1 GENERAL

1. 1 SCOPE

1. 2 SUBMI TTALS

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 MONI TORI NG REQUI REMENTS

3. 1. 1 Gener al

3. 1. 1. 1 Tur bi di t y Moni t or i ng Equi pment

3. 1. 2 Dr edgi ng and Di sposal Locat i ons

3. 1. 2. 1 St at i on Descr i pt i ons

3. 1. 2. 2 Tur bi di t y Sampl i ng Fr equency

3. 1. 2. 3 Unant i c i pat ed Di schar ge

3. 2 TURBI DI TY TESTS

3. 2. 1 Test i ng

3. 2. 2 Repor t i ng

3. 2. 2. 1 Repor t Cont ent s

3. 2. 2. 2 Not i f i cat i on

3. 3 WORK DELAY

3. 4 CONSTRUCTI ON FORMS AND DETAI LS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 57 25 Page 1

SECTI ON 01 57 25

TURBI DI TY AND DI SPOSAL MONI TORI NG

PART 1 GENERAL

1. 1 SCOPE

The wor k cover ed by t hi s sect i on consi st s of f ur ni shi ng al l l abor , mat er i al s, and equi pment , and per f or mi ng al l wor k r equi r ed t o obt ai n, anal yze, and r epor t t he r esul t s of t ur bi di t y and di sposal moni t or i ng.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Cal i br at i on St andar d

The Cont r act or shal l f ur ni sh t o t he Cont r act i ng Of f i cer a copy of t he oper at i ng i nst r uct i ons and st andar ds used i n cal i br at i ng equi pment used i n col l ect i ng sampl es f or t ur bi di t y.

SD- 06 Test Repor t s

Tur bi di t y Moni t or i ng

Al l r equi r ed dai l y t ur bi di t y t est r epor t s shal l be submi t t ed ( by el ect r oni c mai l i n Excel f or mat ) t o t he Cont r act i ng Of f i cer , wi t hi n 24 hour s af t er compl et i on of each t est .

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 MONI TORI NG REQUI REMENTS

3. 1. 1 General

Near shor e or i nl and wat er sampl es shal l be obt ai ned and anal yzed f or t ur bi di t y. Sampl i ng shal l be conduct ed i n accor dance wi t h t echni ques descr i bed i n t he l at est edi t i on of " St andar d Met hods" publ i shed by t he Amer i can Publ i c Heal t h Associ at i on ( APHA) , Amer i can Wat er Wor ks Associ at i on ( AWWA) , and Wat er Pol l ut i on Cont r ol Feder at i on ( WPCF) , and ot her cur r ent t echni ques r ecogni zed by t he sci ent i f i c communi t y and appr oved by t he Jacksonvi l l e Di st r i ct , Cor ps of Engi neer s. Sampl es obt ai ned f or t ur bi di t y anal ysi s shal l be anal yzed wi t hi n 30 mi nut es of col l ect i on. Sampl es shal l be t aken wi t h a sampl er obt ai ni ng sampl es uncont ami nat ed by wat er f r om any ot her dept h.

SECTI ON 01 57 25 Page 2

3. 1. 1. 1 Tur bi di t y Moni t or i ng Equi pment

Moni t or i ng r equi r ed f or t ur bi di t y shal l be measur ed i n Nephel omet r i c Tur bi di t y Uni t s ( NTU) usi ng a st andar d Nephel omet er . Gl obal Posi t i oni ng Syst em ( GPS) i s al so r equi r ed t o r ecor d sampl i ng st at i ons. The Cont r act or shal l pr ovi de t he Gover nment wi t h a cer t i f i cat i on, at t est i ng t o t he accur acy of hi s t est i ng equi pment and pr ocedur e. The Cont r act or shal l al so pr ovi de t he Cont r act i ng Of f i cer wi t h a dupl i cat e of t he st andar d used t o cal i br at e hi s t est i ng i nst r ument as wel l as a compl et e set of oper at i ng i nst r uct i ons f or t he t ur bi di t y t est i ng equi pment . The Cont r act or and t he Cont r act i ng Of f i cer wi l l use t hi s st andar d t hr oughout t he pr oj ect t o mai nt ai n t he cal i br at i on of t he equi pment .

3. 1. 2 Dr edgi ng and Di sposal Locat i ons

The Cont r act or shal l obt ai n maps and el ect r oni c f i l es ( Shapef i l e, KML, or s i mi l ar ) f or al l Out st andi ng Fl or i da Wat er s ( OFW) wi t hi n t he pr oj ect ar ea.

Maps and el ect r oni c f i l es can be downl oaded f r om t he DEP GI S websi t es at t he f ol l owi ng l i nks: ht t p: / / ca. dep. st at e. f l . us/ mapdi r ect / ?f ocus=st andar d;

ht t p: / / geodat a. dep. st at e. f l . us/ dat aset s/ 681b93ec295f 4003abb5a97cd5b51173 0.

Moni t or i ng shal l occur pr ovi ded sea, wi nd, v i s i bi l i t y , mar i ne t r af f i c and ot her condi t i ons al l ow f or saf e per f or mance of t he act i v i t y. The Cont r act or shal l document al l i nst ances wher e t ur bi di t y moni t or i ng wi t hi n t he bounds of t he above par amet er s coul d not be per f or med. Rout i ne moni t or i ng shal l occur be col l ect ed at sur f ace and mi d- dept h at t he f ol l owi ng l ocat i ons:

3. 1. 2. 1 St at i on Descr i pt i ons

a. St at i on 1 ( Compl i ance Tur bi di t y out si de OFW) : No mor e t han 150 met er s downcur r ent of t he dr edge or poi nt of di schar ge and wi t hi n t he densest por t i on of any pr oj ect - r el at ed t ur bi di t y pl ume.

b. St at i on 2 ( Compl i ance Tur bi di t y wi t hi n OFW) : At l east 600 met er s downcur r ent f r om t he dr edge or poi nt of di schar ge and wi t hi n t he densest por t i on of any pr oj ect r el at ed t ur bi di t y pl ume.

c. St at i on 3 ( Backgr ound Tur bi di t y) : At l east 300 met er s upcur r ent f r om t he dr edge or poi nt of di schar ge and out si de of any t ur bi di t y gener at ed by t he pr oj ect .

3. 1. 2. 2 Tur bi di t y Sampl i ng Fr equency

Sampl es shal l be col l ect ed appr oxi mat el y ever y f our ( 4) hour s dur i ng dayl i ght dr edgi ng, begi nni ng appr oxi mat el y 30 mi nut es af t er t he commencement of dr edgi ng or pl acement act i v i t i es, and al so whenever a subst ant i al pl ume appr oaches t he edge of t he mi xi ng zone ( i . e. , 150 met er s f r om dr edge or 600 met er s f r om dr edge when pl ume ext ends i nt o OFW) such t hat a wat er qual i t y v i ol at i on may exi st .

3. 1. 2. 3 Unant i c i pat ed Di schar ge

The 150 met er s mi xi ng zone onl y appl i es at t he dr edge si t e dur i ng t he t i me of dr edgi ng. Any pr oj ect - associ at ed di schar ge t hat i s obser ved t o ext end beyond t he est abl i shed mi xi ng zone ( e. g. scow l eakage dur i ng t r ansi t t o t he ODMDS) shal l be moni t or ed as c l ose t o t he sour ce as posi bl e unt i l t ur bi di t y l evel s meet t he st at e st andar d, or unt i l ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . When t hi s t ype of unant i c i pat ed di schar ge causes

SECTI ON 01 57 25 Page 3 a t ur bi di t y exceedance, as compar ed t o a cor r espondi ng Backgr ound si t e at l east 300 met er s upcur r ent of t he di schar ge and out si de any obvi ous pl ume, t he cont r act or shal l adher e t o t he t ur bi di t y compl i ance act i ons out l i ned i n Sect i on 3. 2. 2. 2 bel ow.

3. 2 TURBI DI TY TESTS

3. 2. 1 Testing

Whenever t her e i s doubt as t o t he adequacy of t he t est i ng or val i di t y of t he r esul t s, t he Cont r act i ng Of f i cer may di r ect t hat addi t i onal t est s be per f or med at no addi t i onal cost t o t he Gover nment .

3. 2. 2 Reporting

The moni t or i ng dat a shal l be r ecor ded on summar y f or ms, and as a dai l y QC t est i n t he RMS syst em, t hat cont ai n t he per t i nent i nf or mat i on i n t he f ol l owi ng par agr aphs. Exampl e f or ms ar e on t he web si t e i ndi cat ed i n par agr aph CONSTRUCTI ON FORMS AND DETAI LS bel ow. Ot her dat a shal l be submi t t ed i n t he f or m suppl i ed by t he l abor at or y chosen t o do t he anal ysi s. Al l dat a shal l be f or war ded ( el ect r oni cal l y) t o t he Cont r act i ng Of f i cer , Envi r onment al Br anch ( CESAJ- PD- E) , and FDEP wi t hi n 7 days of col l ect i on. El ect r oni c mai l addr esses of t he Cor ps and FDEP per sonnel t o r ecei ve t hese r epor t s ar e pr ovi ded bel ow. Repor t s shal l be pr ovi ded i n Excel Spr eadsheet ( . x l s) f i l es.

NAME ORGANI ZATI ON E- MAI L ADDRESS

To be det er mi ned USACE ACO To be det er mi ned To be det er mi ned CESAJ- PD- E POC To be det er mi ned

JCP Compl i ance Of f i cer FDEP j cpcompl i ance@dep. st at e. f l . us

I nf or mat i on t o be det er mi ned wi l l be pr ovi ded i n t he Pr econst r uct i on Conf er ence. CESAJ- PD- E POC may al so be i ndi cat ed i n t he Envi r onment al Compl i ance Mat r i x ( ECM) . See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

3. 2. 2. 1 Repor t Cont ent s

Repor t s shal l be submi t t ed wi t h a cover l et t er or e- mai l message cont ai ni ng t he f ol l owi ng st at ement : " Thi s i nf or mat i on i s pr ovi ded i n par t i al f ul f i l l ment of t he moni t or i ng r equi r ement s i n Per mi r t No. 0303186- 001- JC f or Jacksonvi l l e Har bor Mai nt enance Dr edgi ng" . The cover l et t er shal l summar i ze any si gni f i cant compl i ance i ssues and t he dat es or moni t or i ng per i od of t he r epor t s. Al so, must be cl ear l y r ef er ence t he per mi t number on each page of t he r epor t s. I n addi t i on t o anal yt i cal r esul t s f or sampl es and qual i t y cont r ol , each r epor t shoul d al so i ncl ude:

a. Ti me of day and dat e sampl es wer e t aken.

b. Dept h of wat er body.

c. Dept h of sampl e.

d. Ant ecedent weat her condi t i ons.

e. Ti dal st age and di r ect i on of f l ow.

f . Wi nd di r ect i on and vel oci t y.

g. A st at ement descr i bi ng t he met hods used i n col l ect i on, handl i ng, st or age and qual i t y cont r ol met hods used.

h. Tur bi di t y met er cal i br at i on i . Sampl i ng r esul t s, t he net di f f er ence bet ween compl i ance and backgr ound r esul t s, and whet er t he t ur bi di t y l evel i s i n compl i ance.

j . A map i ndi cat i ng t he l ocat i on of t he cur r ent const r uct i on act i v i t y, t he sampl i ng l ocat i ons ( backgr ound and compl i ance) , t he

SECTI ON 01 57 25 Page 4 vi s i bl e pl ume pat t er n of t he appl i cabl e mi xi ng zone: and l ocat i on of near by OFW, i f appl i cabl e, and

k. A st at ement by t he i ndi v i dual r esponsi bl e f or i mpl ement at i on of t he sampl i ng pr ogr am concer ni ng t he aut hent i c i t y, pr eci s i on, l i mi t s of det ect i on, and accur acy of t he dat a.

3. 2. 2. 2 Notification

I f t ur bi di t y exceeds backgr ound l evel s by mor e t han 29 NTU out si de of OFW or 6NTU wi t hi n t he OFW, t he Cont r act or shal l i mmedi at el y not i f y Chi ef , Envi r onment al Br anch at 904- 232- 2336 and t he Cont r act i ng Of f i cer , or on t he mor ni ng of t he f ol l owi ng wor k day i f i t occur s af t er nor mal wor k hour s. I n addi t i on, t he Cont r act or must :

a. I mmedi at el y cease al l dr edge or di schar ge oper at i ons t hat may be cont r i but i ng t o t he wat er qual i t y v i ol at i on. Cessat i on of dr edgi ng or di schar ge oper at i ons shal l cont i nue unt i l moni t or i ng i ndi cat es t hat t ur bi di t y l evel s ar e meet i ng t he St andar ds.

b. Modi f y t he wor k pr ocedur es t hat wer e r esponsi bl e f or t he v i ol at i on such as r educi ng t he dr edge r at e and/ or i nst al l i ng addi t i onal BMPs or r epai r i ng any non- f unct i oni ng t ur bi di t y cont ai nment devi ces.

c. Dr edgi ng shal l not r esume unt i l t wo ( 2) moni t or i ng event s conduct ed at l east one hour apar t and conf i r m t hat t ur bi di t y r eadi ngs ar e i n compl i ance wi t h t he St andar d, and

d. Pr ovi de a copy of al l moni t or i ng dat a sheet s t o t he JCP Compl i ance Of f i cer wi t hi n 24 hour s of t he t i me when any suspended dr edge or di schar ge oper at i ons r esume ( emai l accept abl e) .

3. 3 WORK DELAY

Del ays i n wor k due t o t he f aul t or negl i gence of t he Cont r act or or t he Cont r act or ' s f ai l ur e t o compl y wi t h t hi s speci f i cat i on shal l not be compensabl e. Any adj ust ment s t o t he cont r act per f or mance per i od or pr i ce t hat ar e r equi r ed as a r esul t of compl i ance wi t h t hi s sect i on shal l be made i n accor dance wi t h t he pr ovi s i ons of t he Cl ause SUSPENSI ON OF WORK of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

3. 4 CONSTRUCTI ON FORMS AND DETAI LS

See t he " Const r uct i on For ms & Det ai l s" modul e at t he f ol l owi ng web address:

http://www.saj.usace.army.mil/About/Divisions-Offices/Engineering/Design-Branch/ Specifications-Section/

- - End of Sect i on - -

SECTI ON 01 57 25 Page 5

W912EP18B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00010A - LINE ITEMS & PRICING SCHEDULE

SUMMARY OF CHANGES

SECTION 00010A - LINE ITEMS & PRICING SCHEDULE

CLIN 0033 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0033 1 Job

OPTION MOBILIZATION AND DEMOBILIZATION

FFP

FOR OPTION D

FOB: Destination

NET AMT

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer anticipates exercising the options as follows:

Option Date

Option A On or About 6/26/2018 Option B On or About 7/21/2018 Option C On or About 7/31/2018 Option D On or About 8/25/2018

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

SECTION 00800 - SPECIAL REQUIREMENTS

W912EP18B0003

The following Acceptance/Inspection Schedule was added for CLIN 0033:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

(End of Summary of Changes)

18B0003Am0003Technical.pdf
18B0003Am0003SF30Cont
00010A_JaxHarborMDFY18
Bid Sheet
01 22 00
01 57 25

File details come from the government source that posted it.