Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
W912EP-17-B-0009 Amendment 0001
SF 30 CONTINUATION SHEET
Rio De La Plata - Flood Control Project, Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract
Amendment 0001
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where amendments have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.
The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
N/A.
Volume 2 of 2 – Technical Specifications:
DELETE Project Table of Contents and REPLACE with the attached revised Project Table of Contents.
DELETE Submittal Register and REPLACE with the attached revised Submittal Register.
DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.
DELETE Section 01 22 20 and REPLACE with the attached revised Section 01 22 20.
DELETE Section 32 15 00 and REPLACE with the attached revised Section 32 15 00.
DELETE Section 33 29 00 and REPLACE with the attached revised Section 33 29 00.
ADDED Section 33 71 02.
2. DRAWINGS:
DELETE Sheet C-06 and REPLACE with the attached revised Sheet C-06.
DELETE Sheet C-09 and REPLACE with the attached revised Sheet C-09.
DELETE Sheet C-09A and REPLACE with the attached revised Sheet C-09A.
DELETE Sheet C-12 and REPLACE with the attached revised Sheet C-12.
DELETE Sheet C-12A and REPLACE with the attached revised Sheet C-12A.
DELETE Sheet C-20 and REPLACE with the attached revised Sheet C-20.
DELETE Sheet G-05 and REPLACE with the attached revised Sheet G-05.
(End of Summary of Changes)
Rio De La Plata - Flood Control Project, Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 33 50 WEATHER AND WATER STAGE DATA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 52 10 CONTRACTING OFFICER'S FIELD OFFICE
01 55 26 TRAFFIC CONTROL
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
01 57 50 DRILLING PROGRAM PLAN
01 78 02 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 22 13 VIBRATION CONTROL AND MONITORING
02 23 00 LOAD RATING PROOF TEST
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
DIVISION 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
05 50 15 CIVIL WORKS FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING
06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS
DIVISION 09 - FINISHES
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 26 - ELECTRICAL
26 05 00 RELOCATION OF POWER AND TELEPHONE LINES
DIVISION 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 1
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
31 23 24 CONTROLLED LOW STRENGTH MATERIAL (CLSM or FLOWABLE FILL)
31 32 11 SOIL SURFACE EROSION CONTROL
31 41 16 METAL SHEET PILING
31 62 13 PRESTRESSED CONCRETE PILES
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 00 AGGREGATE SURFACING
32 92 19 SEEDING
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 29 00 DECOMMISSIONING WELLS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE PROTECTION FOR STRUCTURES
35 31 20 ARTICULATING CONCRETE BLOCK REVETMENTS
35 41 00 EMBANKMENT CONSTRUCTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 21 PAGES
W912EP-17-B-0009
RDLP FCP Dorado Bridge CWSP Contract
01 22 00 SD-01 Preconstruction Submittals
G ROSchedule of Values
SD-07 Certificates
Utility Invoices
01 30 00 SD-01 Preconstruction Submittals
List of Subcontractors
SD-07 Certificates
Signature Authority
Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
G ROExport File
01 35 25 SD-01 Preconstruction Submittals
G RODive Operations Plan
SD-07 Certificates
G RODive Personnel Qualifications
01 35 26 SD-01 Preconstruction Submittals
1.6 G DOAccident Prevention Plan (APP)
1.7 G DOActivity Hazard Analysis (AHA)
1.6.1 G DOCrane Critical Lift Plan
SD-02 Shop Drawings
1.6.1 G DOStandard Lift Plan (SLP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
01 35 26 SD-06 Test Reports
1.11Notifications and Reports
1.11.1Accident Reports
1.11.2Crane Reports
SD-07 Certificates
1.8Confined Space Entry Permit
1.8Hot work permit
1.13License Certificates
1.5.2.3 G DOCrane Operators
1.11.4Third Party Certification of
Barge-Mounted Mobile Cranes
1.11.3Certificate of Compliance
01 45 04 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
G ROInitial Work Schedule
SD-07 Certificates
3.7.2 G ROLaboratory Qualifications
3.2.2Letter of Authority
01 50 02 SD-01 Preconstruction Submittals
Mobilization/Demobilization Plan
SD-02 Shop Drawings
3.6Security Plan
3.5Contractor's Temporary Facilities
Temporary Electric Drawings
G ROConstruction Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
01 52 10 SD-02 Shop Drawings
2.1Contracting Officer's Field Office
01 55 26 SD-02 Shop Drawings
G ROTraffic Control Plan
01 57 20 SD-01 Preconstruction Submittals
G DOEnvironmental Protection Plan
SD-07 Certificates
G DOPuerto Rico Boa Monitoring
Qualifications
G DOManatee Observer Qualifications
SD-11 Closeout Submittals
Logs/Final Summary Report
Project Environmental Summary
Sheet
01 57 25 SD-03 Product Data
Calibration Standard
SD-06 Test Reports
Turbidity Monitoring
01 57 50 SD-02 Shop Drawings
G DODrilling Program Plan
01 78 02 SD-02 Shop Drawings
G ROAs-Builts
SD-03 Product Data
1.4 G ROFinal Cleaning
02 22 13 SD-01 Preconstruction Submittals
G DOVibration Control Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
02 22 13 G DOVibration Control Specialist
Alternate
G DOVibration Monitoring
Technician(s)
G DOStructural Inspection/Evaluation
Engineer
G DOPre-Construction Structural
Survey
3.3 G DOVibration Control Plan
3.4 G DOMonitoring Plan
SD-06 Test Reports
Vibration Monitoring Report
Daily Instrument Logs
G DOPost-Construction Structural
Survey
02 23 00 SD-05 Design Data
G DOLoad Test Plan
SD-06 Test Reports
1.5 G DOLoad Rating Report
3.2 G DOLoad Rating Report
SD-07 Certificates
1.5 G DOProfessional Structural Engineer
02 41 00 SD-01 Preconstruction Submittals
1.8 G ROExisting Conditions
SD-07 Certificates
G RODemolition Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
03 11 13 SD-02 Shop Drawings
3.1.1 G DOFormwork
SD-03 Product Data
2.2 G DOForm Materials
2.2.4 G DOForm Releasing Agents
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.5Inspection
03 15 00 SD-02 Shop Drawings
2.4 G DOWaterstops
SD-03 Product Data
2.2 G DOPreformed Expansion Joint Filler
2.3 G DOSealant
2.4 G DOWaterstops
2.4.1 G DONon-Metallic Materials
SD-04 Samples
2.3.1Field-Molded Type
2.4Waterstops
2.5.2 G DOSplicing Waterstops
SD-07 Certificates
2.2 G DOPreformed Expansion Joint Filler
2.3 G DOSealant
2.4 G DOWaterstops
03 20 00 SD-02 Shop Drawings
3.1 G DOReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
03 20 00 SD-03 Product Data
G DOMaterials
2.2.1 G DOMechanical Butt-Splices
3.1.3.2.1 G DOMechanical Butt-Splices
SD-06 Test Reports
2.5 G DOTests, Inspections, and
Verifications
SD-07 Certificates
2.2Reinforcing Steel
1.3.1Qualification of Steel Bar
Butt-Splicers
03 31 01 SD-02 Shop Drawings
3.4.2.6.6 G DORandom Sampling Plan
G DOConcrete Placement Plan
SD-03 Product Data
1.2 G DOConcrete Mixture Proportions
2.2 G ROBatch or Ready-Mixed Concrete
Plant Data
2.2.5 G ROConcrete Mixers
2.2.6 G ROConveying Equipment
2.2 G ROPlacing Equipment
3.1.4 G DOConstruction Joint Treatment
3.2.4Hot-Weather Placing
1.4.2 G DOCementitious Materials, Admixtures And Curing Compound
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
03 31 01 2.1.2 G ROAggregates
1.4.2 G ROCementitious Materials, Admixtures, and Curing
Compound
SD-06 Test Reports
3.4.2.3 G DOQuality of Aggregates
3.4.2.10 G ROMixer Uniformity
2.1Tests and Inspections
3.4Tests and Inspections
2.1.4Water
Mill Test Reports
SD-07 Certificates
1.4 G ROConcrete Field Testing
Technicians
1.4 G ROConcrete Construction Inspector
(CCI)
2.1.1 G DOCementitious Materials
2.1.1.6 G DOBlended Hydraulic Cement
G DOAir-Entraining Admixture
G DOOther Chemical Admixtures
2.1.7 G DOEpoxy Resin
2.1.6 G DOLatex Bonding Compound
2.1.5 G DONonshrink Grout
03 35 00 SD-03 Product Data
2.1Latex Bonding Compound
2.2Epoxy Resin
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
03 35 00 SD-04 Samples
1.3.1Slab Panels
03 39 00 SD-03 Product Data
2.1 G DOCuring Materials
SD-06 Test Reports
3.2 G ROTesting and Inspection for CQC
SD-08 Manufacturer’s Instructions
G DOCuring Compound
05 50 14 SD-02 Shop Drawings
G DOQuality Control Plan
1.3.2 G DODetail Drawings
G DOControl Dimensions
SD-03 Product Data
2.2.2.1 G DOWelding of Structural Steel
2.2.2.3 G DOWelding of Stainless Steel
G DOWelding of Aluminum
2.3.4 G DOStructural Steel Welding Repairs
2.1.1Materials Orders
2.1.2Materials List
2.1.3Shipping Bill
G DOTubular Welding Schedule
SD-06 Test Reports
2.3Tests, Inspections, and
Verifications
Fabrication Quality Control
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
05 50 14 SD-07 Certificates
G DOQualification Of Structural Steel
Fabricator
1.3.1Qualification of Welders and
Welding Operators
G DOApplication Qualification for
Stainless Steel Studs
G DOWelding of Aluminum
1.4.1 G DOInspector Qualifications
G DONDT Equipment Calibration
Records
SD-08 Manufacturer’s Instructions
G DOWelding Procedure Specifications
(WPS)
G DONDT Written Practice
05 50 15 SD-02 Shop Drawings
G DOQuality Control Plan
2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
G DOControl Dimensions
SD-03 Product Data
2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
05 50 15 2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
SD-07 Certificates
G DONDT Equipment Calibration
Records
G DOWelder Qualification Records
G DOInspector Qualifications
SD-08 Manufacturer’s Instructions
G DOWelding Procedure Specifications
G DONDT Written Practice
06 73 01 SD-02 Shop Drawings
1.3 G ROCourtesy Boat Dock and
Gangway Design
1.3 G ROInstallation Drawings, Templates, and Directions
SD-03 Product Data
1.3 G ROFRP Grating
1.3 G ROClips and Anchorage
SD-06 Test Reports
2.1.1 G ROBearing Strength Testing
2.1.1 G ROFlexural Properties
2.1.1 G ROUltraviolet Testing
2.1.1 G ROShear Strength
2.1.1 G ROTensile Properties
2.1.1 G ROToxicity Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
06 73 01 2.1.1 G ROCoefficient of Lineal Thermal
Expansion
2.1.1 G ROFlame Spread Testing
SD-07 Certificates
1.3 G ROManufacturer's Sample Warranty
1.3 G ROCertification of Anchorage
System compliance with ASCE 7
G ROProof of Certification from a minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)
SD-08 Manufacturer’s Instructions
1.4 G ROShipping, Handling, Erection
Procedures
1.4 G ROCare and Maintenance
Instructions
SD-09 Manufacturer’s Field
Reports
3.1 G ROManufacturer's Certification of
Installation
SD-11 Closeout Submittals
3.2.1 G ROManufacturer's Warranty
06 82 14 SD-01 Preconstruction Submittals
1.3.1 G ROQualifications of Manufacturer
1.3.1 G ROManufacturer's Sample Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
06 82 14 SD-02 Shop Drawings
G DOInstallation Drawings
SD-03 Product Data
2.1.2 G ROFRP Pipe and Tube
2.1.2 G RORailings/Guards
2.1.2 G ROAnchorage Materials
2.1.2 G ROAdhesives
2.1.2 G ROResins
2.1.2 G ROHardeners
SD-05 Design Data
G DODesign Of Gangway And Floating
Dock
SD-06 Test Reports
2.1.3 G ROUltraviolet Test Reports
2.1.3 G ROThermal Expansion Test Reports
G ROFlame Spread Test Reports
SD-07 Certificates
1.3.2 G ROQualifications Of Engineer Of
Record
SD-08 Manufacturer’s Instructions
3.2.2 G ROManufacturer's Instructions
SD-09 Manufacturer’s Field
Reports
3.1 G ROManufacturer's Certification of
Installation
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
06 82 14 3.2.1 G ROManufacturer's Warranty
09 97 02 SD-02 Shop Drawings
G DOInterpretation of Safety, Health, and Environmental Requirements
1.2.1 G DOSafety Plan
1.2.1.6 G DOConfined Spaces Plan
1.2.1.7 GRespiratory Protection Plan
1.2.2.1 G DOAirborne Sampling Plan
1.2.1 G DOVentilation Assessment Plan
1.2.2 G DOMedical Surveillance Plan
1.2.3 G DOEnvironmental Protection Plan
1.2.3.1 G DOWaste Manifest
1.2.3.1 G DOWaste Classification, Handling, and Disposal Plan
1.2.3.2 G DOVisible Emissions Monitoring Plan
1.2.3.3 G DOPM-10 Monitoring Plan
1.2.3.4 G DOTSP Monitoring Plan
1.2.3.5 G DOWater Quality Plan
SD-03 Product Data
Part 2 G DOManufacturer's Product Data
Sheet
SD-04 Samples
Part 2 G ROProduct Samples
2.1 G ROSpecial Paint Formulas
G ROSolvent and Thinners
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
09 97 02 1.2.3.3 G DOPM-10 Test Report
1.2.3.4 G DOTSP Test Report
3.4 G DOInspection Reports
1.2.2.2 G DOMedical Status Report
1.2.2.3 G DOChange in Medical Status Report
1.2.2.1 G DOAir Monitoring Test Plan
1.2.2.1 G DOAir Monitoring Test Report
G DODaily Inspection Checklist for
Steel Substrates
SD-07 Certificates
1.4.1 G DOCertified EHS Professional
1.4.2.1 G DOSSPC QP 1 Certificate
1.4.2.2 G DOSSPC QP 3 Certificate
1.4.4 G DOCoating Thickness Gage
Qualification
1.4.3 G DOQualified Paint Applicator
26 05 00 SD-01 Preconstruction Submittals
G DORelocation and Demolition Plan
SD-02 Shop Drawings
G RODetail Drawings
31 05 22 SD-07 Certificates
2.1.1 G DOGeotextile
31 11 00 SD-07 Certificates
G RODisposal Permit
31 23 24 SD-01 Preconstruction Submittals
Work Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
31 23 24 SD-05 Design Data
G ROCLSM Mix Design
SD-06 Test Reports
G ROTests And Inspections
SD-07 Certificates
G ROReceipts
G ROQualifications
31 32 11 SD-01 Preconstruction Submittals
1.4 G ROPermanent Erosion Control Plan
SD-02 Shop Drawings
3.1 G DOInstallation Plan
SD-03 Product Data
2.2 G DOTurf Reinforcement Mat
2.3 G DOPercussion Driven Earth Anchors
(PDEA)
2.4 G DOPins
1.4 G DOEquipment
SD-04 Samples
1.9 G DOMaterials
2.3 G DOPercussion Driven Earth Anchors
(PDEA)
2.4 G DOPins
SD-06 Test Reports
3.5 G ROQuality Control Testing
SD-07 Certificates
2.2 G DOTurf Reinforcement Mat
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
31 41 16 SD-02 Shop Drawings
2.1 G DOMetal Sheet Piling
SD-03 Product Data
3.2.2.2 G DODriving
3.2.1 G DOPile Driving Equipment
3.2.5 G DOPulling and Redriving
SD-05 Design Data
1.4 G DOTemporary Sheet Pile or
Alternate Cofferdam System
Design
SD-06 Test Reports
2.3.1 G ROMaterials Tests
SD-07 Certificates
1.7 G DOQualifications
SD-11 Closeout Submittals
3.4Pile Driving Record
31 62 13 SD-02 Shop Drawings
G DOSoil Boring Plan
G DOSite Investigation Report
1.6.1 G DOPrestressed Piles
1.6.3 G DOInstallation
3.1 G DOInstallation
3.1.3 G DOPile Driving
SD-03 Product Data
3.2 G DOPile Driving Equipment
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
31 62 13 G DOQualifications
G DOCalculations
1.6.5 G DOConcrete mix design
SD-06 Test Reports
G DOMaterial Test Reports
2.1.2 G DOAggregates
2.1.6 G DOSilica Fume
2.4.4 G DOCompressive Strength
SD-07 Certificates
2.1.2 G DOAggregates
2.1.1 G DOAdmixtures
1.6.6 G DOSilica fume manufacturer's
representative
2.1.9 G DOPrestressing steel
2.1.3 G DOCement
2.1.4 G DOFly ash and pozzolan
2.1.5 G DOSlag
1.6.4 G DOGeotechnical Consultant
Documentation
SD-08 Manufacturer’s Instructions
1.6.2 G DOQuality Control Procedures
SD-11 Closeout Submittals
G DOPile records
32 15 00 SD-03 Product Data
1.4 G ROPlant, Equipment, and Tools
Waybills And Delivery Tickets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
32 15 00 SD-06 Test Reports
2.3.1 G ROInitial Tests
3.11.1 G ROIn-Place Tests
32 92 19 SD-03 Product Data
1.3.1.2 G ROFertilizer
SD-07 Certificates
1.3.2.1 G ROSeed
32 92 23 SD-03 Product Data
Delivery
Finished Grade and Topsoil
Topsoil
G ROQuantity Check
G ROSod Establishment Period
Maintenance Record
SD-06 Test Reports
Equipment Calibration
Soil Test
SD-07 Certificates
Sod
Topsoil
Fertilizer
33 29 00 SD-02 Shop Drawings
G DOWell Closure Plan
SD-06 Test Reports
G DOPost Construction Well Closure
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
33 29 00 G DOWater Level Summary Report
33 71 02 SD-02 Shop Drawings
1.4.1 G ROPrecast underground structures
SD-03 Product Data
2.4 G ROMedium voltage cable
2.6 G ROMedium voltage cable joints
2.5 G ROMedium voltage cable
terminations
2.7 G ROLive end caps
2.12.2.1 G ROPrecast concrete structures
2.12.2.4Sealing Material
3.4.2Pulling-In Irons
2.12.3 G ROManhole frames and covers
2.13 G ROCable supports
SD-06 Test Reports
2.15.2 G ROMedium voltage cable
qualification and production tests
3.24.1 G ROField Acceptance Checks and
Tests
2.15.1 G ROArc-proofing test
2.15.1 G ROArc-proofing test
3.3 G ROCable Installation Plan and
Procedure
SD-07 Certificates
1.4.2 G ROCable splicer/terminator
1.4.3 G ROCable Installer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
35 31 19 SD-02 Shop Drawings
G DOStone Source
G DOConstruction Methods
SD-05 Design Data
G DOSurvey
SD-06 Test Reports
G DOBulk Specific Gravity
1.6.2 G DOGradation Test
G DOEvaluation Testing of Stone
Report
SD-07 Certificates
1.6.1 G ROWeekly Certificates
G ROWeight Scale Certification
35 31 20 SD-02 Shop Drawings
G DODesign and Work Plan
SD-03 Product Data
G DOArticulating Concrete Block
Mattress (ACBM) Revetment
System
SD-06 Test Reports
G DOAnchor Load Tests
SD-07 Certificates
G DOInstaller's Qualifications
G DOACBM Manufacturer's Field
Representative Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 21 PAGES
RDLP FCP Dorado Bridge CWSP Contract
35 31 20 G DOAnchor Manufacturer's Field
Representative Qualifications
35 41 00 SD-02 Shop Drawings
3.6.1 G DODewatering Work Plan
3.6.5 G DODewatering Work Plan
G DOShoring, Sheeting, and Bracing
Plan
3.7 G DOExcavation
G DOPlan of Operations
SD-06 Test Reports
G DOTest Strips
G RONuclear Density
G ROMeasurement of Fill Material
G ROTesting
SD-07 Certificates
G ROTesting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.2.3 Sequence of Work
1.2.4 Safety Requirements
1.2.5 Work Performed by Others
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
1.5 PHYSICAL DATA
1.5.1 Physical Conditions
1.5.2 Weather, Water Stage and Tide Data
1.5.3 Contractor Investigation
1.5.4 Maritime Traffic
1.5.5 Obstruction of Channel
1.6 LAYOUT OF WORK
1.6.1 Established Project Control
1.6.2 Layout
1.6.3 Survey
1.7 DAMAGE TO WORK
1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED
1.9 EXISTING WORK
1.10 LOCATION OF UNDERGROUND FACILITIES
1.10.1 Notification Prior to Excavation
1.11 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)
1.11.1 Schedule of Monthly Anticipated Adverse Weather Delays
1.11.2 Contractor Responsibility
1.12 UNITS OF MEASURE
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section Table of Contents --
W912EP-17-B-0009 SECTION 01 11 00 Page 1 Amendment 0001
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
PUERTO RICO HIGHWAY TRANSPORTATION AUTHORITY (PRHTA)
PRHTA Standard Specifications (2005) Standard Specifications for Road and Bridge Construction
U.S. ARMY CORPS OF ENGINEERS (USACE)
GDR Section 00 31 32, Geotechnical Data Report for Channel Widening and Scour Protection, Dorado Bridge, Puerto Rico
EM 385-1-1 Safety and Health Requirements Manual
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract, to be constructed in three (3) phases, includes the construction of a boat ramp, recreation berm, approximately 1,017 meters of channel excavation by temporary construction berm, approximately 910 meters of levee construction with temporary openings and seepage filters, electrical line relocation, scour protection articulating concrete block mat (ACBM) installed using a sheetpile cofferdam) under the Dorado Bridge, and riprap revetment. This work also includes temporary construction crossings in accordance with PRHTA Standard Specifications , excavated material temporary depot areas for processing, material disposal areas, grassing, turf reinforcement matting, erosion and sediment control, traffic control, surface and ground water control, demolition of abandoned structures, and incidental related work along secondary tributary areas. Relocation of electrical and telephone lines shall be completed prior to any channel excavation. Partial notice to proceed (NTP) will be issued for the electrical and telephone line relocation work 15 calendar days after award. Final NTP will be issued for the remaining project work upon completion of the utility relocation and final USACE coordination (finding of ineligibility for listing in the National Register of Historic Places or mitigation of adverse effects) of environmentally sensitive areas as shown on G-05 and V-01. No construction, movement of vehicles or staging shall occur within the environmentally sensitive areas until the second NTP has been issued.
W912EP-17-B-0009 SECTION 01 11 00 Page 2 Amendment 0001
1.2.2 Location
The work is located in the Municipality of Dorado, Puerto Rico. The project begins at the southern end of the prior construction along La Plata River, and ends approximately 565 meters south of route PR-165R (Dorado) bridge.
1.2.3 Sequence of Work
The contract is broken into construction phases: Phase I - Channel Excavation and ACBM placement, Phase II - Levee Construction, and Phase III - Boat Ramp. The sequence of the phases is mandatory. Each Phase shall be completed to the extent practicable (i.e. all excavation shall be completed to the lines and grades shown in Phase I; all excavated materials moved to disposal or temporary depots areas for processing and drying and then moved to levee placement) prior to beginning the next Phase. The intermediate steps within the phases of the construction sequence are discretionary for bidding purposes only and constructability. The Contractor is responsible for the sequence of work.
It is intended to fulfill the Government requirements of providing scour protection at the earliest possible time, under dry conditions, to the maximum extent possible while maintaining at least the original hydraulic capacity and interior drainage. The Contract assumes maximum use of excavated materials for features for dry placement conditions.
Prior to beginning construction activities, inspect features previously constructed at the site by others in Contract 1A. These features include hauling roads, temporary diversion channels, and excavated material temporary depot areas previously constructed. Coordinate and complete the relocation of electrical lines and telephone lines prior to channel excavation. The clearing, grubbing and stripping of the levee and channel footprints shall be done prior to construction activities in those areas.
Phase I - From STA 25+00 to 22+90, excavate channel and build western construction berm. Store excess material in designated areas and build land area portions of the west levee as shown on (C-03). From STA 22+00 to 21+00, install temporary sheetpile, excavate, dewater and grade areas for ACBM placement on final template. Install permanent sheetpile, ACBM, and channel protection (riprap) in dry conditions as shown on (C-02 and C-14).
Continue to store excess material. Continue channel excavation from STA 22+90 to 17+69 leaving a construction berm to perform work in dry conditions. Install remaining channel protection in dry conditions.
Remove the existing plug near STA 17+69 and install riprap on the channel slopes and where indicated. Required final western slope (4:1) configuration and associated riprap protection from STA 17+69 to STA 19+40 shall be completed during this phase.
Phase II - Construct temporary crossing to excavate channel from STA 25+00 and Rio Cocales vicinity to 27+50. Remove the berm north of Rio Cocales to initiate flow and divert channel. Reuse and place riprap removed from plug near channel STA 17+69 as subbase at rock plug near levee STA's 25+50 and 24+25, and place suitable backfill from excavated material to create plugs to work under dry conditions. Continue constructing land areas of west levee and ramp as shown on (C-03). Maintain hydraulic conveyance for tributary and interior drainage at all times. Dewater and demuck work area within the existing river; backfill with suitable excavated material;
compact, and grade. Excavate west channel slope (4:1) and place riprap protection. Construct berm with suitable excavated material near Levee STA 24+00, enlarge eastern berm and construct any additional berms to
W912EP-17-B-0009 SECTION 01 11 00 Page 3 Amendment 0001 allow construction in dry conditions. Tie berms into Dorado Bridge ACBM installation area. Dewater and demuck work area; place backfill with suitable excavated material; compact, and grade. Complete levee fill and tie-in at Pier #2 as shown on (C-16 and S-02). Install scour protection (ACBM and riprap) on accessible areas. Excavate west channel slope (4:1) and place riprap protection on the remaining areas of the west channel slope. Construct a plug with suitable excavated material near Levee STA 21+00 and berms around the east side of the levee to tie into land areas (near STA 20+00) to allow construction in dry conditions. Dewater and demuck work area; backfill with suitable excavated material, compact, and grade to complete west levee tie-in. Construct berms from levee STA 21+00 to Dorado Bridge as needed; dewater, backfill and grade levee and recreational berm. Required final west channel slope (4:1) configuration and associated riprap protection from channel STA 19+85 to STA 25+07 can be completed during this phase. Grade slopes and place riprap at opening for the tributary.
Proceed with the installation of the overbuild as designated (C-08A to C-10A) after completion of the levee up to the initial fill grade. Install turf reinforced mat (TRM) in order to prevent erosion gullies on the recreation berm. Once the minimum required grade is reached, place the top soil, seeding, sodding, aggregate surface course and sod on the slopes of the embankment.
Phase III - Construct the boat ramp and excavate levee near STA 21+00 to create opening. Grade slopes and place riprap at opening.
Upon completion of the project all excavated material temporary depot areas, stabilized construction entrances, haul roads, staging areas and temporary fences shall be removed from the job site.
1.2.4 Safety Requirements
See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .
1.2.5 Work Performed by Others
See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE
PROCEDURES.
1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
a. Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.
b. In addition to the above, the following shall apply: The time for completion does not include establishment of grass. Grass shall be established not later than the time stated in the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1 plus the time stated for the establishment of grass as set forth in the paragraph SOD ESTABLISHMENT PERIOD of Section 32 92 23 SODDING.
1.4 LIQUIDATED DAMAGES - CONSTRUCTION
Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.
W912EP-17-B-0009 SECTION 01 11 00 Page 4 Amendment 0001
1.5 PHYSICAL DATA
Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.1 Physical Conditions
The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.
1.5.2 Weather, Water Stage and Tide Data
See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.
1.5.3 Contractor Investigation
Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.5.4 Maritime Traffic
Channel traffic in the project area consists of pleasure and small recreational vessels of all types and sizes which can be accommodated by existing depths.
1.5.5 Obstruction of Channel
The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.
1.6 LAYOUT OF WORK
Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.
1.6.1 Established Project Control
The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey
W912EP-17-B-0009 SECTION 01 11 00 Page 5 Amendment 0001
Notes that must be duplicated if an attempt to recreate the subject survey is desired.
For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.
See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.
1.6.2 Layout
From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.
1.6.3 Survey
The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor.
The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.
1.7 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), W912EP-17-B-0009 SECTION 01 11 00 Page 6 Amendment 0001 utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED
a. The responsibility for damage to any part of the work to be performed under this contract shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.
However, if the cofferdam(s) is constructed in accordance with plans and progress schedules approved by the Contracting Officer, but is overtopped by flood and such flood causes damage to the cofferdam or if any part of the permanent work is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precaution or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs ordered by the Contracting Officer.
The Contractor shall be compensated for any such repairs in accordance with the Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume
1. The equitable adjustment shall be based on the contract unit or…