Amendment 0005 Rio De La Plata W912EP17B0009
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
| Amendment 0007 KI-1 and KI-2 17R0006.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 2 of 2 – Technical Specifications: |
| 2. DRAWINGS: |
| KI-1 S-266 Electrical Amendment 0007.pdf |
| E-05 Amend 007 |
| E-06 Amend 007 |
| E-07 Amend 007 |
| E-08 Amend 007 |
| E-12 Amend 007 |
| E-13 Amend 007 |
| KI-1 S-266 Telecommunications Amend 007.pdf |
| T-03 Amend 007 |
| KI-2 S-265 Electrical Amendment 0007.pdf |
| E-05 Amend 007 |
| E-06 Amend 007 |
| E-07 Amend 007 |
| E-08 Amend 007 |
| E-12 Amend 007 |
| E-13 Amend 007 |
| KI-2 S-265 Telecommunications Amend 007.pdf |
| T-03 Amend 007 |
| 00010A_HHD KI1and2_6-23-17.pdf |
| SHEET 1 |
| KI-1 S-266 Telecommunications Amend 008.pdf |
| T-09 Amend 008 |
| KI-2 S-265 Telecommunications Amend 008.pdf |
| T-09 Amend 008 |
| SF30 Continuaton Sheet for Amendment 0009 KI-1 and KI-2 17R0006 28 jun 207.pdf |
| Herbert Hoover Dike Rehabilitation Structure Replacements S-265 (KI-2) and S-266 (KI-1) Reconstruction, |
| SUMMARY OF CHANGES |
| 1. SPECIFICATIONS: |
| Changes to Specifications: |
| Volume 2 of 2 – Technical Specifications: |
| Section 00100A.pdf |
| SECTION 00100A SOLICITATION PROVISIONS |
| B. SOURCE SELECTION USING LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA) |
| C. EVALUATION FACTORS FOR AWARD |
| Magnitude of Construction: The estimated cost of this project is between U.S. $10,000,000.00 and |
| D. PROPOSAL REQUIREMENTS, AND FORMAT |
| 1. REQUIRED REGISTRATIONS |
| 2. PROPOSAL CONTENT |
| b. VOLUME TWO (Factor 2) – Price (1 Original 1 Copy) Offerors shall verify |
| E. DEBRIEFING OF UN SUCCESSFUL OFFERORS |
| F. BASIS OF AWAR D |
| G. DEFINITIONS: |
| H. EVALUATION FACTORS |
| FACTORS AND SUB-FACTORS TO BE EVALUATED |
| 2. Factor 2 – Price: The Price factor is not rated. It is evaluated for reasonableness. |
| Offerors must receive an overall rating of Acceptable for ALL Sub-Factors and Sub-Elements to receive an overall proposal rating of Technically Acceptable. |
| Sub-Factor 2 – Past Performance |
| FACTOR 2 – PRICE |
| Submission Re quire me nts |
| Evaluation M e tho d: |
| ATTACHMENTS |
| SF-30-AMD0001.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 1 of 2 – Technical Specifications: |
| Volume 2 of 2 – Technical Specifications: |
| 2. DRAWINGS: |
| SF-30-AMD0003.pdf |
| SUMMARY OF CHANGES |
| Changes to Specifications: |
| Volume 1 of 2 – Technical Specifications: |
| Volume 2 of 2 – Technical Specifications: |
| 2. DRAWINGS: |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: 0005 |
| Code[0]: |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: |
| Description[0]: Rio De La Plata – Flood Control Project, Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract, Dorado, Puerto Rico |
The Proposal due date is changed from 30 August 2017 @ 2:00 PM Local Time to 06 September 2017 @ 2:00 PM Local Time.
All other conditions remain unchanged.
| FacilityCode[0]: |
| Code[2]: |
| IssuedBy[0]: USA ENGINEER DISTRICT, JACKSONVILLE |
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE, FL 32207-8175
| NameandAddress[0]: |
| AdministeredBy[0]: SEE ITEM 6 |
| ContractIDCode[0]: J |
| ReqNumber[0]: |
| AmendmentNo[1]: W912EP-17-B-0009 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 1 |
| EffectiveDate[0]: 08/28/2017 |
| Dated9B[0]: 07/31/2017 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: 1 |
| NotExtended[0]: Off |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |