W912EP-17-B-0009

Jacksonville District

Rio De La Plata – Flood Control Project Dorado Bridge, Channel Widening and Scour Protection (CWSP) Contract

Dorado, Puerto Rico

Construction Solicitation and Specifications Volume 2 of 2

See Volume 1 of 2 for Issue Date

Rio De La Plata - Flood Control Project, Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 33 50 WEATHER AND WATER STAGE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 04 CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 52 10 CONTRACTING OFFICER'S FIELD OFFICE

01 55 26 TRAFFIC CONTROL

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

01 57 50 DRILLING PROGRAM PLAN

01 78 02 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 22 13 VIBRATION CONTROL AND MONITORING

02 23 00 LOAD RATING PROOF TEST

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 31 01 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS

03 35 00 CONCRETE FINISHING

03 39 00 CONCRETE CURING

DIVISION 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 15 CIVIL WORKS FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS

DIVISION 09 - FINISHES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DIVISION 26 - ELECTRICAL

26 05 00 RELOCATION OF POWER AND TELEPHONE LINES

DIVISION 31 - EARTHWORK

PROJECT TABLE OF CONTENTS Page 1

31 05 22 GEOTEXTILES USED AS FILTERS

31 11 00 CLEARING AND GRUBBING

31 23 24 CONTROLLED LOW STRENGTH MATERIAL (CLSM or FLOWABLE FILL)

31 32 11 SOIL SURFACE EROSION CONTROL

31 41 16 METAL SHEET PILING

31 62 13 PRESTRESSED CONCRETE PILES

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 15 00 AGGREGATE SURFACING

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 29 00 DECOMMISSIONING WELLS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 31 19 STONE PROTECTION FOR STRUCTURES

35 31 20 ARTICULATING CONCRETE BLOCK REVETMENTS

35 41 00 EMBANKMENT CONSTRUCTION

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 31 21

CONTROL MONUMENT DESCRIPTIONS

W912EP-17-B-0009 DOCUMENT 00 31 21

15-174_Control_NGS.txt[2/15/2017 8:06:30 AM]

AB9832 ***********************************************************************

AB9832 DESIGNATION - MONTEREY

AB9832 PID - AB9832

AB9832 STATE/COUNTY- PR/VEGA ALTA

AB9832 COUNTRY - US

AB9832 USGS QUAD -

AB9832

AB9832 *CURRENT SURVEY CONTROL

AB9832 ______________________________________________________________________

AB9832* NAD 83(2011) POSITION- 18 25 43.07370(N) 066 19 58.67315(W) ADJUSTED

AB9832* NAD 83(2011) ELLIP HT- 16.082 (meters) (06/27/12) ADJUSTED

AB9832* NAD 83(2011) EPOCH - 2010.00

AB9832* PRVD02 ORTHO HEIGHT - 58.450 (meters) 191.76 (feet) ADJUSTED

AB9832 ______________________________________________________________________

AB9832 GEOID HEIGHT - -42.367 (meters) GEOID12B AB9832 NAD 83(2011) X - 2,429,838.669 (meters) COMP AB9832 NAD 83(2011) Y - -5,543,991.324 (meters) COMP AB9832 NAD 83(2011) Z - 2,003,454.480 (meters) COMP AB9832 LAPLACE CORR - 0.48 (seconds) DEFLEC12B

AB9832 VERT ORDER - FIRST CLASS II

AB9832

AB9832 Network accuracy estimates per FGDC Geospatial Positioning Accuracy AB9832 Standards:

AB9832 FGDC (95% conf, cm) Standard deviation (cm) CorrNE AB9832 Horiz Ellip SD_N SD_E SD_h (unitless)

AB9832 -------------------------------------------------------------------

AB9832 NETWORK 1.92 3.76 0.71 0.85 1.92 -0.03899011

AB9832 -------------------------------------------------------------------

AB9832 Click here for local accuracies and other accuracy information.

AB9832

AB9832

AB9832.The horizontal coordinates were established by GPS observations AB9832.and adjusted by the National Geodetic Survey in June 2012.

AB9832

AB9832.NAD 83(2011) refers to NAD 83 coordinates where the reference frame has AB9832.been affixed to the stable North American tectonic plate. See AB9832.NA2011 for more information.

AB9832

AB9832.The horizontal coordinates are valid at the epoch date displayed above AB9832.which is a decimal equivalence of Year/Month/Day.

AB9832

AB9832.The orthometric height was determined by differential leveling and AB9832.adjusted by the NATIONAL GEODETIC SURVEY AB9832.in April 2003.

AB9832

AB9832.No vertical observational check was made to the station.

AB9832

AB9832.Significant digits in the geoid height do not necessarily reflect accuracy.

AB9832.GEOID12B height accuracy estimate available here.

AB9832

AB9832.Photographs are available for this station.

AB9832

AB9832.The X, Y, and Z were computed from the position and the ellipsoidal ht.

SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS

SECTION 00 31 21 Page 1

AB9832

AB9832.The Laplace correction was computed from DEFLEC12B derived deflections.

AB9832

AB9832.The ellipsoidal height was determined by GPS observations AB9832.and is referenced to NAD 83.

AB9832

AB9832. The following values were computed from the NAD 83(2011) position.

AB9832

AB9832; North East Units Scale Factor Converg.

AB9832;SPC PRVI - 265,891.645 210,603.551 MT 0.99999972 +0 01 53.1

AB9832;UTM 19 - 2,039,682.642 781,731.309 MT 1.00058137 +0 50 37.2

AB9832

AB9832! - Elev Factor x Scale Factor = Combined Factor AB9832!SPC PRVI - 0.99999747 x 0.99999972 = 0.99999719 AB9832!UTM 19 - 0.99999747 x 1.00058137 = 1.00057884

AB9832

AB9832_U.S. NATIONAL GRID SPATIAL ADDRESS: 19QGA8173139682(NAD 83)

AB9832

AB9832 SUPERSEDED SURVEY CONTROL

AB9832

AB9832 NAD 83(2007)- 18 25 43.07264(N) 066 19 58.67815(W) AD(2002.00) 0

AB9832 ELLIP H (02/10/07) 16.068 (m) GP(2002.00)

AB9832 NAD 83(2002)- 18 25 43.07278(N) 066 19 58.67777(W) AD( ) B

AB9832 ELLIP H (10/13/04) 16.103 (m) GP( ) 4 2

AB9832 NAD 83(1997)- 18 25 43.07135(N) 066 19 58.68121(W) AD( ) B

AB9832 ELLIP H (05/12/97) 16.177 (m) GP( ) 4 2

AB9832 NAD 83(1993)- 18 25 43.06894(N) 066 19 58.69102(W) AD( ) B

AB9832 ELLIP H (01/15/97) 16.274 (m) GP( ) 5 2 AB9832 LMSL (01/15/97) 58.5 (m) GEOID96 model used GPS OBS

AB9832

AB9832.Superseded values are not recommended for survey control.

AB9832

AB9832.NGS no longer adjusts projects to the PR datum.

AB9832.See file dsdata.txt to determine how the superseded data were derived.

AB9832

AB9832_MARKER: DD = SURVEY DISK

AB9832_SETTING: 49 = STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)

AB9832_STAMPING: PUERTO RICO GPS CONTROL C.R.I.M. MONTEREY

AB9832_MARK LOGO: CRIM

AB9832_PROJECTION: FLUSH

AB9832_MAGNETIC: I = MARKER IS A STEEL ROD

AB9832_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL

AB9832_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR

AB9832+SATELLITE: SATELLITE OBSERVATIONS - April 02, 2002 AB9832_ROD/PIPE-DEPTH: 3 meters

AB9832

AB9832 HISTORY - Date Condition Report By

AB9832 HISTORY - 1995 MONUMENTED ANDREG

AB9832 HISTORY - 20020402 GOOD NGS

AB9832

AB9832 STATION DESCRIPTION

AB9832

AB9832'DESCRIBED BY ANDREGG INCORPORATED 1995 (DJR)

AB9832'TO REACH THE STATION FROM FORT BUCHANNON IN SAN JUAN, TAKE HIGHWAY PR

SECTION 00 31 21 Page 2

AB9832'22 WEST TOWARD ARECIBO ABOUT 16 MILES (25.7 KM) TO THE TOLLBOOTH AT

AB9832'KIOMETER POST 31.4. GO WEST THROUGH TOLL BOOTH ABOUT 54 METERS (177.2

AB9832'FT) TO THE STATION ON THE RIGHT THE STATION IS LOCATED IN A GRASS

AB9832'ISLAND AT A REST STOP NORTH OF THE TOLL BOOTH, THE STATION IS 3.4

AB9832'METERS (11.2 FT) NORTHEAST OF THE EDGE OF PAVEMENT OF HIGHWAY PR 22,

AB9832'2.6 METERS (8.5 FT) WEST OF EDGE OF PAVEMENT TO ENTRANCE OF REST AREA

AB9832'PARKING, 28 METERS (91.9 FT) SOUTHEAST OF STREET LIGHT STANDARD AND 12

AB9832'METERS (39.4 FT) WESTERLY OF A TELEPHONE SIGN THE STATION IS 1 METER

AB9832'(3.3 FT) SOUTHWEST OF A CARSONITE SURVEY MARKER WITNESS POST THE

AB9832'STATION IS A 3-1/4 INCH BRASS CAP STAMPED CENTRO DE RECAUDACION DE

AB9832'INGRESSOS MUNICIPALES, PUERTO RICO GPS CONTROL, C.R.I.M., UNLAWFUL TO

AB9832'DISTURB, MONTEREY, SET ATOP A 9/16 INCH STAINLESS STEEL ROD DRIVEN TO

AB9832'REFUSAL AND COVERED FLUSH WITH THE GROUND BY AN ALUMINUM COVER EPOXYED

AB9832'ONTO A 6 INCH SCHEDULE 40 PVC PIPE SET IN CONCRETE INSIDE AND OUT

AB9832

AB9832 STATION RECOVERY (2002)

AB9832

AB9832'RECOVERY NOTE BY NATIONAL GEODETIC SURVEY 2002 (JMW)

AB9832'23.8 KM (14.9 MI) EASTERLY ALONG STATE HIGHWAY 22 FROM THE JUNCTION OF

AB9832'STATE HIGHWAY 140 IN BARCELONETA, IN A GRASS MEDIAN ON THE NORTH SIDE

AB9832'OF THE WESTBOUND HIGHWAY AT A TOLL PLAZA, 21.4 M WEST OF KILOMETER

AB9832'POST 31.4, 6.8 M WEST OF THE EAST CURB OF THE MEDIAN, 3.6 M SOUTH OF

AB9832'THE NORTH CURB OF THE MEDIAN, 2.6 M NORTH OF THE NORTH EDGE OF THE

AB9832'HIGHWAY, 1.1 M SOUTH OF A WITNESS POST, AND 0.3 M ABOVE THE LEVEL OF

AB9832'THE HIGHWAY.

AB9832'NOTE--ACCESS TO THE DATUM POINT IS THROUGH A 5-INCH LOGO CAP. THE

AB9832'MARK IS ON THE HIGHWAY RIGHT-OF-WAY.

AB9832'THIS MARK WILL BE DESTROYED BY CONSTRUCTION AT THE TOLL PLAZA IN THE

AB9832'NEAR FUTURE. A NEW MARK, Q 1004, WAS SET ON THE OTHER SIDE OF THE

AB9832'HIGHWAY.

1 National Geodetic Survey, Retrieval Date = FEBRUARY 14, 2017

DE5560 ***********************************************************************

DE5560 DESIGNATION - GUN

DE5560 PID - DE5560

DE5560 STATE/COUNTY- PR/SAN JUAN

DE5560 COUNTRY - US

DE5560 USGS QUAD -

DE5560

DE5560 *CURRENT SURVEY CONTROL

DE5560 ______________________________________________________________________

DE5560* NAD 83(2011) POSITION- 18 28 04.76586(N) 066 07 26.32966(W) ADJUSTED

DE5560* NAD 83(2011) ELLIP HT- -27.367 (meters) (06/27/12) ADJUSTED

DE5560* NAD 83(2011) EPOCH - 2010.00

DE5560* PRVD02 ORTHO HEIGHT - 15.847 (meters) 51.99 (feet) ADJUSTED

DE5560 ______________________________________________________________________

DE5560 GEOID HEIGHT - -43.196 (meters) GEOID12B DE5560 NAD 83(2011) X - 2,449,469.288 (meters) COMP DE5560 NAD 83(2011) Y - -5,533,793.405 (meters) COMP DE5560 NAD 83(2011) Z - 2,007,573.311 (meters) COMP DE5560 LAPLACE CORR - 0.89 (seconds) DEFLEC12B

DE5560 VERT ORDER - FIRST CLASS II

DE5560

DE5560 Network accuracy estimates per FGDC Geospatial Positioning Accuracy DE5560 Standards:

SECTION 00 31 21 Page 3

DE5560 FGDC (95% conf, cm) Standard deviation (cm) CorrNE DE5560 Horiz Ellip SD_N SD_E SD_h (unitless)

DE5560 -------------------------------------------------------------------

DE5560 NETWORK 0.95 2.08 0.40 0.38 1.06 -0.06279368

DE5560 -------------------------------------------------------------------

DE5560 Click here for local accuracies and other accuracy information.

DE5560

DE5560

DE5560.The horizontal coordinates were established by GPS observations DE5560.and adjusted by the National Geodetic Survey in June 2012.

DE5560

DE5560.NAD 83(2011) refers to NAD 83 coordinates where the reference frame has DE5560.been affixed to the stable North American tectonic plate. See DE5560.NA2011 for more information.

DE5560

DE5560.The horizontal coordinates are valid at the epoch date displayed above DE5560.which is a decimal equivalence of Year/Month/Day.

DE5560

DE5560.The orthometric height was determined by differential leveling and DE5560.adjusted by the NATIONAL GEODETIC SURVEY DE5560.in April 2003.

DE5560

DE5560.No vertical observational check was made to the station.

DE5560

DE5560.Significant digits in the geoid height do not necessarily reflect accuracy.

DE5560.GEOID12B height accuracy estimate available here.

DE5560

DE5560.Photographs are available for this station.

DE5560

DE5560.The X, Y, and Z were computed from the position and the ellipsoidal ht.

DE5560

DE5560.The Laplace correction was computed from DEFLEC12B derived deflections.

DE5560

DE5560.The ellipsoidal height was determined by GPS observations DE5560.and is referenced to NAD 83.

DE5560

DE5560. The following values were computed from the NAD 83(2011) position.

DE5560

DE5560; North East Units Scale Factor Converg.

DE5560;SPC PRVI - 270,272.808 232,674.561 MT 1.00000228 +0 05 48.5

DE5560;UTM 19 - 2,044,379.851 803,752.389 MT 1.00074081 +0 54 42.3

DE5560

DE5560! - Elev Factor x Scale Factor = Combined Factor DE5560!SPC PRVI - 1.00000430 x 1.00000228 = 1.00000658 DE5560!UTM 19 - 1.00000430 x 1.00074081 = 1.00074512

DE5560

DE5560_U.S. NATIONAL GRID SPATIAL ADDRESS: 19QHA0375244379(NAD 83)

DE5560

DE5560 SUPERSEDED SURVEY CONTROL

DE5560

DE5560 NAD 83(2007)- 18 28 04.76480(N) 066 07 26.33465(W) AD(2002.00) 0

DE5560 ELLIP H (02/10/07) -27.383 (m) GP(2002.00)

DE5560 NAD 83(2002)- 18 28 04.76490(N) 066 07 26.33452(W) AD( ) A

DE5560 ELLIP H (05/06/04) -27.351 (m) GP( ) 4 1

SECTION 00 31 21 Page 4

DE5560 PRVD02 15.85 (m) 52.0 (f) LEVELING 3

DE5560

DE5560.Superseded values are not recommended for survey control.

DE5560

DE5560.NGS no longer adjusts projects to the PR datum.

DE5560.See file dsdata.txt to determine how the superseded data were derived.

DE5560

DE5560_MARKER: DD = SURVEY DISK

DE5560_SETTING: 36 = SET IN A MASSIVE STRUCTURE

DE5560_SP_SET: FOUNDATION

DE5560_STAMPING: GUN 1984 JAX FLA

DE5560_MARK LOGO: USE

DE5560_MAGNETIC: N = NO MAGNETIC MATERIAL

DE5560_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL

DE5560_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR

DE5560+SATELLITE: SATELLITE OBSERVATIONS - September 21, 2016

DE5560

DE5560 HISTORY - Date Condition Report By

DE5560 HISTORY - 1984 MONUMENTED USE

DE5560 HISTORY - 20020125 GOOD NGS

DE5560 HISTORY - 20020507 GOOD NGS

DE5560 HISTORY - 20040607 GOOD GEOCAC

DE5560 HISTORY - 20060212 GOOD USPSQD

DE5560 HISTORY - 20110314 GOOD USACE

DE5560 HISTORY - 20130505 GOOD PUPR

DE5560 HISTORY - 20160921 GOOD ATKNA

DE5560

DE5560 STATION DESCRIPTION

DE5560

DE5560'DESCRIBED BY NATIONAL GEODETIC SURVEY 2002 (JMW)

DE5560'4.7 KM (2.9 MI) NORTHERLY ALONG STATE HIGHWAY 25 FROM THE JUNCTION OF

DE5560'STATE HIGHWAY 2 IN SAN JUAN, THENCE 1.1 KM (0.7 MI) NORTHERLY AND

DE5560'WESTERLY ALONG NORZAGARAY STREET TO A TURN AROUND AND A WALKWAY

DE5560'LEADING TO EL MORRO CASTLE, THENCE WALK NORTHWESTERLY ACROSS THE

DE5560'GRASS FOR 300 M TO A BUILDING ON THE FURTHEST POINT, IN TOP OF A

DE5560'6.0 M ROUND CONCRETE GUN BASE (GUN REMOVED), 27.0 M WEST OF THE

DE5560'SOUTHWEST CORNER OF THE BUILDING, 2.6 M EAST OF THE WEST EDGE OF THE

DE5560'BASE, AND 1.5 M ABOVE THE GROUND SURFACE. NOTE--THE MARK IS ON

DE5560'PROPERTY OWNED BY THE U.S. DEPARTMENT OF INTERIOR AND THE NATIONAL

DE5560'PARK SERVICE.

DE5560

DE5560 STATION RECOVERY (2002)

DE5560

DE5560'RECOVERY NOTE BY NATIONAL GEODETIC SURVEY 2002 (JMW)

DE5560'RECOVERED AS DESCRIBED.

DE5560

DE5560 STATION RECOVERY (2004)

DE5560

DE5560'RECOVERY NOTE BY GEOCACHING 2004 (GOP)

DE5560'RECOVERED IN GOOD CONDITION.

DE5560

DE5560 STATION RECOVERY (2006)

DE5560

DE5560'RECOVERY NOTE BY US POWER SQUADRON 2006 (JAR)

SECTION 00 31 21 Page 5

DE5560'RECOVERED AS DESCRIBED, DESCRIPTION IS ADEQUATE

DE5560

DE5560 STATION RECOVERY (2011)

DE5560

DE5560'RECOVERY NOTE BY US ARMY CORPS OF ENGINEERS 2011 (JJ)

DE5560'RECOVERED AS DESCRIBED

DE5560

DE5560 STATION RECOVERY (2013)

DE5560

DE5560'RECOVERY NOTE BY POLYTECHNIC UNIVERSITY OF PUERTO RICO 2013 (SGT)

DE5560'RECOVERED AS DESCRIBED

DE5560

DE5560 STATION RECOVERY (2016)

DE5560

DE5560'RECOVERY NOTE BY ATKINS NORTH AMERICA INC 2016 (DWD)

DE5560'THIS STATION WAS RECOVERED IN FURTHERANCE TO A TOPOGRAPHIC SURVEY FOR

DE5560'THE AREA INTERVENING THE ENTRANCE TO THE BAHIA DE SAN JUAN AND THE

DE5560'BASE OF THE WEST WALL FOR CASTILLO DE SAN FELIPE DEL MORRO. 100051927

1 National Geodetic Survey, Retrieval Date = FEBRUARY 14, 2017

DL7810 ***********************************************************************

DL7810 CORS - This is a GPS Continuously Operating Reference Station.

DL7810 DESIGNATION - BAYAMON CORS ARP

DL7810 CORS_ID - PRHL

DL7810 PID - DL7810

DL7810 STATE/COUNTY- PR/BAYAMON

DL7810 COUNTRY - US

DL7810 USGS QUAD -

DL7810

DL7810 *CURRENT SURVEY CONTROL

DL7810 ______________________________________________________________________

DL7810* NAD 83(2011) POSITION- 18 22 48.09108(N) 066 09 12.81219(W) ADJUSTED

DL7810* NAD 83(2011) ELLIP HT- -22.539 (meters) (08/??/11) ADJUSTED

DL7810* NAD 83(2011) EPOCH - 2010.00

DL7810* LMSL ORTHO HEIGHT - **(meters) **(feet)

DL7810 ______________________________________________________________________

DL7810 GEOID HEIGHT - -41.358 (meters) GEOID12B DL7810 NAD 83(2011) X - 2,447,858.093 (meters) COMP DL7810 NAD 83(2011) Y - -5,537,875.846 (meters) COMP DL7810 NAD 83(2011) Z - 1,998,337.475 (meters) COMP

DL7810

DL7810.Formal positional accuracy estimates are not available for this CORS DL7810.because its coordinates were determined in part using modeled DL7810.velocities. Approximate one-sigma accuracies for latitude, longitude, DL7810.and ellipsoid height can be obtained from the short-term time series.

DL7810.Additional information regarding modeled velocities is available on DL7810.the CORS Coordinates and Multi-Year CORS Solution FAQ web pages.

DL7810

DL7810.The coordinates were established by GPS observations DL7810.and adjusted by the National Geodetic Survey in August 2011.

DL7810

DL7810.NAD 83(2011) refers to NAD 83 coordinates where the reference frame has DL7810.been affixed to the stable North American Tectonic Plate.

DL7810

DL7810.The coordinates are valid at the epoch date displayed above

SECTION 00 31 21 Page 6

DL7810.which is a decimal equivalence of Year/Month/Day.

DL7810

DL7810.Significant digits in the geoid height do not necessarily reflect accuracy.

DL7810.GEOID12B height accuracy estimate available here.

DL7810

DL7810.The PID for the CORS L1 Phase Center is DP5868.

DL7810

DL7810.The XYZ, and position/ellipsoidal ht. are equivalent.

DL7810

DL7810.The ellipsoidal height was determined by GPS observations DL7810.and is referenced to NAD 83.

DL7810

DL7810. The following values were computed from the NAD 83(2011) position.

DL7810

DL7810; North East Units Scale Factor Converg.

DL7810;SPC PRVI - 260,531.344 229,565.292 MT 0.99999720 +0 05 15.1

DL7810;UTM 19 - 2,034,588.116 800,779.454 MT 1.00071859 +0 53 53.6

DL7810

DL7810! - Elev Factor x Scale Factor = Combined Factor DL7810!SPC PRVI - 1.00000354 x 0.99999720 = 1.00000074 DL7810!UTM 19 - 1.00000354 x 1.00071859 = 1.00072214

DL7810

DL7810_U.S. NATIONAL GRID SPATIAL ADDRESS: 19QHA0077934588(NAD 83)

DL7810

DL7810 SUPERSEDED SURVEY CONTROL

DL7810

DL7810 NAD 83(CORS)- 18 22 48.09152(N) 066 09 12.81585(W) AD(2002.00) c DL7810 ELLIP H (05/??/10) -22.546 (m) GP(2002.00) c c

DL7810

DL7810.Superseded values are not recommended for survey control.

DL7810

DL7810.NGS no longer adjusts projects to the PR datum.

DL7810.See file dsdata.txt to determine how the superseded data were derived.

DL7810

DL7810_MARKER: STATION IS THE ANTENNA REFERENCE POINT OF THE GPS ANTENNA

DL7810

DL7810 STATION DESCRIPTION

DL7810

DL7810'DESCRIBED BY NATIONAL GEODETIC SURVEY 2011

DL7810'STATION IS A GPS CORS. LATEST INFORMATION INCLUDING POSITIONS AND

DL7810'VELOCITIES ARE AVAILABLE IN THE COORDINATE AND LOG FILES ACCESSIBLE

DL7810'BY ANONYMOUS FTP OR THE WORLDWIDE WEB.

DL7810' ftp://cors.ngs.noaa.gov/cors/README.txt DL7810' ftp://cors.ngs.noaa.gov/cors/coord/coord_08 DL7810' ftp://cors.ngs.noaa.gov/cors/station_log DL7810' http://geodesy.noaa.gov/CORS 1 National Geodetic Survey, Retrieval Date = FEBRUARY 14, 2017

DE5570 ***********************************************************************

DE5570 DESIGNATION - L 1002

DE5570 PID - DE5570

DE5570 STATE/COUNTY- PR/TOA BAJA

DE5570 COUNTRY - US

DE5570 USGS QUAD -

DE5570

SECTION 00 31 21 Page 7

DE5570 *CURRENT SURVEY CONTROL

DE5570 ______________________________________________________________________

DE5570* NAD 83(1986) POSITION- 18 25 12.45 (N) 066 11 29.61 (W) HD_HELD1

DE5570* PRVD02 ORTHO HEIGHT - 33.307 (meters) 109.27 (feet) ADJUSTED

DE5570 ______________________________________________________________________

DE5570 GEOID HEIGHT - -42.145 (meters) GEOID12B

DE5570 VERT ORDER - FIRST CLASS II

DE5570

DE5570.The horizontal coordinates were determined by differentially corrected DE5570.hand held GPS observations or other comparable positioning techniques DE5570.and have an estimated accuracy of +/- 3 meters.

DE5570.

DE5570.The orthometric height was determined by differential leveling and DE5570.adjusted by the NATIONAL GEODETIC SURVEY DE5570.in April 2003.

DE5570

DE5570.No vertical observational check was made to the station.

DE5570

DE5570.Significant digits in the geoid height do not necessarily reflect accuracy.

DE5570.GEOID12B height accuracy estimate available here.

DE5570

DE5570; North East Units Estimated Accuracy DE5570;SPC PRVI - 264,964.0 225,543.8 MT (+/- 3 meters HH1 GPS)

DE5570

DE5570_U.S. NATIONAL GRID SPATIAL ADDRESS: 19QGA9669238966(NAD 83)

DE5570

DE5570 SUPERSEDED SURVEY CONTROL

DE5570

DE5570.No superseded survey control is available for this station.

DE5570

DE5570_MARKER: DV = VERTICAL CONTROL DISK

DE5570_SETTING: 38 = SET IN THE ABUTMENT OR PIER OF A LARGE BRIDGE

DE5570_SP_SET: OVERPASS ABUTMENT

DE5570_STAMPING: L 1002 2002

DE5570_MARK LOGO: NGS

DE5570_MAGNETIC: N = NO MAGNETIC MATERIAL

DE5570_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL

DE5570_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR

DE5570+SATELLITE: SATELLITE OBSERVATIONS - 2002

DE5570

DE5570 HISTORY - Date Condition Report By

DE5570 HISTORY - 2002 MONUMENTED NGS

DE5570

DE5570 STATION DESCRIPTION

DE5570

DE5570'DESCRIBED BY NATIONAL GEODETIC SURVEY 2002 (JMW)

DE5570'9.9 KM (6.15 MI) WESTERLY ALONG STATE HIGHWAY 22 FROM THE JUNCTION

DE5570'OF STATE HIGHWAY 2 IN SAN JUAN, IN TOP OF AND 1.2 M SOUTH OF THE

DE5570'NORTH END OF THE WEST CONCRETE ABUTMENT OF THE HIGHWAY OVERPASS OF

DE5570'STATE HIGHWAY 886, 42.5 M WEST OF KILOMETER POST 15.6, 22.3 M WEST

DE5570'OF THE CENTERLINE OF THE SOUTHBOUND HIGHWAY 886, 9.4 M NORTH OF AND

DE5570'LEVEL WITH THE WESTBOUND HIGHWAY, AND 0.3 M WEST OF THE BRIDGE DECK.

DE5570' NOTE--THE MARK IS ON THE HIGHWAY RIGHT-OF-WAY.

1 National Geodetic Survey, Retrieval Date = FEBRUARY 14, 2017

SECTION 00 31 21 Page 8

DE5571 ***********************************************************************

DE5571 DESIGNATION - Q 1002

DE5571 PID - DE5571

DE5571 STATE/COUNTY- PR/TOA BAJA

DE5571 COUNTRY - US

DE5571 USGS QUAD -

DE5571

DE5571 *CURRENT SURVEY CONTROL

DE5571 ______________________________________________________________________

DE5571* NAD 83(1986) POSITION- 18 25 06.84 (N) 066 15 05.04 (W) HD_HELD1

DE5571* PRVD02 ORTHO HEIGHT - 14.518 (meters) 47.63 (feet) ADJUSTED

DE5571 ______________________________________________________________________

DE5571 GEOID HEIGHT - -42.095 (meters) GEOID12B

DE5571 VERT ORDER - FIRST CLASS II

DE5571

DE5571.The horizontal coordinates were determined by differentially corrected DE5571.hand held GPS observations or other comparable positioning techniques DE5571.and have an estimated accuracy of +/- 3 meters.

DE5571.

DE5571.The orthometric height was determined by differential leveling and DE5571.adjusted by the NATIONAL GEODETIC SURVEY DE5571.in April 2003.

DE5571

DE5571.No vertical observational check was made to the station.

DE5571

DE5571.Significant digits in the geoid height do not necessarily reflect accuracy.

DE5571.GEOID12B height accuracy estimate available here.

DE5571

DE5571; North East Units Estimated Accuracy DE5571;SPC PRVI - 264,784.2 219,221.7 MT (+/- 3 meters HH1 GPS)

DE5571

DE5571_U.S. NATIONAL GRID SPATIAL ADDRESS: 19QGA9036938696(NAD 83)

DE5571

DE5571 SUPERSEDED SURVEY CONTROL

DE5571

DE5571.No superseded survey control is available for this station.

DE5571

DE5571_MARKER: DV = VERTICAL CONTROL DISK

DE5571_SETTING: 38 = SET IN THE ABUTMENT OR PIER OF A LARGE BRIDGE

DE5571_SP_SET: OVERPASS ABUTMENT

DE5571_STAMPING: Q 1002 2002

DE5571_MARK LOGO: NGS

DE5571_MAGNETIC: N = NO MAGNETIC MATERIAL

DE5571_STABILITY: B = PROBABLY HOLD POSITION/ELEVATION WELL

DE5571_SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR

DE5571+SATELLITE: SATELLITE OBSERVATIONS - 2002

DE5571

DE5571 HISTORY - Date Condition Report By

DE5571 HISTORY - 2002 MONUMENTED NGS

DE5571

DE5571 STATION DESCRIPTION

DE5571

DE5571'DESCRIBED BY NATIONAL GEODETIC SURVEY 2002 (JMW)

DE5571'16.7 KM (10.4 MI) WESTERLY ALONG STATE HIGHWAY 22 FROM THE JUNCTION

SECTION 00 31 21 Page 9

DE5571'OF STATE HIGHWAY 2 IN SAN JUAN, IN TOP OF AND 1.0 M SOUTH OF THE

DE5571'NORTH END OF THE EAST CONCRETE ABUTMENT OF THE HIGHWAY OVERPASS OF

DE5571'STATE HIGHWAY 165, 11.7 M NORTH OF AND LEVEL WITH THE CENTER OF THE

DE5571'WESTBOUND HIGHWAY, AND 0.2 M EAST OF THE EAST END OF THE BRIDGE

DE5571'DECK. NOTE--THE MARK IS ON THE HIGHWAY RIGHT-OF-WAY.

OTHER ESTABLISHED PROJECT CONTROL. BRASS USACE DISK WITH DESIGNATION STAMPING

DESIGNATION SPC ZONE 5200 NAD83(2011) METRIC PRVD02 METRIC

NORTHING EASTING ELEVATION

PRG-095 269917.421 219334.832 2.412

13-146-1 269729.207 225852.933 1.813 13-146-2 271286.799 211321.125 13.072 13-146-3 260829.579 219451.042 18.642

SECTION 00 31 21 Page 10

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 33 50

WEATHER AND WATER STAGE DATA

W912EP-17-B-0009 DOCUMENT 00 33 50

SECTION 00 33 50 WEATHER AND WATER STAGE DATA

1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject Plans and Specifications. The following water level datums are provided for information only and are not to be utilized in conjunction with any contract related hydrographic surveying.

a) Water Stages: Water levels in the project area are mainly affected by semi-diurnal tidal fluctuations in the Atlantic Ocean. The project area is also subject to storm surges from hurricanes and tropical storms from June through November. Surges from extra tropical storms may affect the area during any time of the year. In addition, discharges from the La Plata Dam upstream of the project site will also affect the project area. Historical flows recorded at USGS gage at Rio de la Plata at Highway 2 (USGS No. 50046000) for the period of record from January 1960 through July 12, 2017 are provided graphically in Figure 1. A maximum flow of 9,980 cubic feet per second (cfs) was recorded on December 11, 2007.

b) Historic water flows are not necessarily indicative of future levels and discharges. The contractor should be able to obtain hydrometeorological data from the Jacksonville District, Water Management Section’s website, which can be found at:

https://www.saj.usace.army.mil/Missions/Civil-Works/Water-Management/ and USGS’ website, https://www.usgs.gov

c) Elevations of tidal datums in the vicinity of the project area are provided in the following table. All datum elevations in this table are referred to mean lower low water (MLLW). These datums are based on values from a tide station located at San Juan, Puerto, approximately two miles northwest of the project area. This tide station was established by the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS). Additional information on this and other tide and other tide stations in the region is available at this NOAA website:

http://tidesandcurrents.noaa.gov/station_retrieve.shtml?type=Datums&state=Other%20Areas &id1=163&id2=177&id3=182&id4=269&id5=189&id6=975

Tidal datums at SAN JUAN, LA PUNTILLA, SAN JUAN BAY (Station ID: 9755371) based on:

LENGTH OF SERIES: 17 Years

TIME PERIOD: 1/11983 – 12/13/1987: 1/1/1990 – 12/31/2001

TIDAL EOICH: 1983 – 2001

Highest Observed Water Level (21 Sep 1998) =2.78 Feet Mean Higher High Water (MHHW) =1.57 Feet Mean High Water =1.31 Feet Mean Sea Level (MSL) ( approx. equal to PRVD02) =0.77 Feet Mean Tide Level (MTL) =0.76 Feet Mean Low Water (MLW) =0.20 Feet NGVD29 (PR Local Vertical Datum) =0.14 Feet Mean Lower Low Water (MLLW) =0.00 Feet

Rio De La Plata - Flood Control Project, Dorado Bridge

W912EP-17-B-0009 Section 00 33 50 Page 1

Lowest Observed Water Level (20 Dec 1968) =-1.09 Feet

Daily tidal predictions along the coastlines of North and South America, including selected locations on Puerto Rico and the US Virgin Islands can be found in the publication Tide Tables, East Coast of North and South America U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. In addition to daily tidal predictions, this publication provides mean and diurnal tide rangers and mean tide levels. Some astronomical data is also included, such as time of sunrise, sunset, moonrise and moonset. This publication is available through NOAA. Tidal data provided in this publication can also be found at the following NOAA website: http://tidesand currents.oaa.gov/tides10/tpred2.html#BE

SECTION 00 33 50 WEATHER AND WATER STAGE DATA

d) Wind and Wave Data: The following publications include wind and wave information in the vicinity of the project area. These publications are available for review at the following websites, or they may be ordered directly from the agencies indicated.

1. U.S. Coast Pilot Volume 4, Atlantic Coast: Cape Henry to Key West, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service.

This publication supplements the navigational information shown on the NOAA/NOS nautical charts, an also provides miscellaneous meteorological data. This publication can be purchased through NOAA, and is available for review at the following website;

https://nauticalcharts.noaa.gov/nsd/cpdownload.htm

2. U.S. Army Corps of Engineers’ Coastal & Hydraulics Laboratory, Wave Information Study (WIS) Database. This Internet webpage presents wave hindcast data for various stations located along the Atlantic and Gulf of Mexico coastlines within the United States, and includes several stations located around the perimeter of Puerto Rico and the Virgin Islands. The closest of these stations lies approximately 40 miles north of the project site. Available data includes a hindcast time series of wave heights, periods, and directions taken at 1-hour intervals for the 20-year period extending from 1980-1999, at a station located in 999 meters (3300 feet) of water.

This webpage also provides links to WIS summary tables and plots, as well as other sources of wave data. These data products are available at the following website:

http://frf.usace.army.mil/cgi-bin/wis/atl/atl_main.html

3. National Data Buoy Center (NDBC) Website. This Internet website provides a wide range of real-time and archived meteorological and oceanographic data collected at offshore and nearshore stations worldwide. Data provided on this website includes wind speed, wind gusts, atmospheric pressure, air temperature, sea temperature, wave height, and wave period. Gage readings are updated hourly, and archived data is available for most stations. Several

Rio De La Plata - Flood Control Project, Dorado Bridge

W912EP-17-B-0009 Section 00 33 50 Page 2 meteorological stations are located along the coastlines of Puerto Rico and the U.S. Virgin Islands, but the closest deepwater wage gage is location 190 miles to the north of the project site.

The NDBC website address is: https://catalog.data.gov/dataset/national-data-buoy-center-buoy-locations .

c) Weather Conditions. The project area is subject to tropical storms and hurricanes from June through November, and to windy and /or rainy weather during any time of the year. The climate of the area is tropical, and temperatures below freezing do not occur. The project area lies within the “tradewind” zone, resulting in moderate winds from easterly directions the vast majority of the time. The wet season in the project are is from May through October. Most rainfall events are normally of short duration and amounts are spatially variable. The highest amounts of rainfall are usually associated with passing hurricanes or other tropical disturbances, which can occur from June through November.

It shall be the Contractor’s responsibility to obtain information concerning weather conditions in the project area. The publication Local Climatological Data – Monthly Summary published by NOAA’s National Climatic Data Center in Asheville, North Caroline contains climatological and meteorological observations and data relevant to this region. The Annual Summary gives a synopsis of these observations for the period of record. This publication is available at the following webside: http://www.ncdc.noaa.gov/oa/ncdc.html.

2. The average number of days in each calendar month with rain equal to, or greater than 0.5 inches is provided in the following table. This information is based on data obtained from the NOAA rain gage located closest to the project area, at Dorado 2 WNW, Puerto Rico, at latitude 18 28’N, longitude 66 18’W. The data obtained from Climatography of the United States No.

20, Climate Summaries for Selected Sites in Puerto Rico publications by the National Climate Center, NOAA for the period of record from 1981 through 2010.

Average of Days per Month With Precipitation >=0.50 Inches

Gage Name

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Dorado

WNW

2 2 1 2 3 2 3 3 2 3 4 3

3. Potential for Flash Floods. Due to the mountainous terrain in Puerto Rico, rainfall inland has the potential to create flash floods in coastal areas. Weather forecasts as well as actual rainfall

Rio De La Plata - Flood Control Project, Dorado Bridge

W912EP-17-B-0009 Section 00 33 50 Page 3 amounts upstream of locations where personnel, equipment and/or material are with the river channel or floodplain should be continuously monitored. The National Weather Service, San Jan forecast office can be accessed at the following website: http://www.srh.noaa.gov/sju/

W912EP-17-B-0009 Section 00 33 50 Page 4

Figure 1

2,000

4,000

6,000

8,000

10,000

12,000

F lo w cf s)

Average daily flow as measured at USGS Gage no. 50046000 at Rio de la Plata at Highway 2 (January 1960 through July 12, 2017)

A maximum flow of 9,980 cfs was recorded on December 11, 2007

Rio De La Plata - Flood Control Project, Dorado Bridge

W912EP-17-B-0009 Section 00 33 50 Page 5

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.2.3 Sequence of Work

1.2.4 Safety Requirements

1.2.5 Work Performed by Others

1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

1.4 LIQUIDATED DAMAGES - CONSTRUCTION

1.5 PHYSICAL DATA

1.5.1 Physical Conditions

1.5.2 Weather, Water Stage and Tide Data

1.5.3 Contractor Investigation

1.5.4 Maritime Traffic

1.5.5 Obstruction of Channel

1.6 LAYOUT OF WORK

1.6.1 Established Project Control

1.6.2 Layout

1.6.3 Survey

1.7 DAMAGE TO WORK

1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED

1.9 EXISTING WORK

1.10 LOCATION OF UNDERGROUND FACILITIES

1.10.1 Notification Prior to Excavation

1.11 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER (31 OCT 1989)

1.11.1 Schedule of Monthly Anticipated Adverse Weather Delays

1.11.2 Contractor Responsibility

1.12 UNITS OF MEASURE

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

W912EP-17-B-0009 SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

PUERTO RICO HIGHWAY TRANSPORTATION AUTHORITY (PRHTA)

PRHTA Standard Specifications (2005) Standard Specifications for Road and Bridge Construction

U.S. ARMY CORPS OF ENGINEERS (USACE)

GDR Section 00 31 32, Geotechnical Data Report for Channel Widening and Scour Protection, Dorado Bridge, Puerto Rico

EM 385-1-1 Safety and Health Requirements Manual

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The Dorado Bridge Channel Widening and Scour Protection (CWSP) Contract, to be constructed in three (3) phases, includes the construction of a boat ramp, recreation berm, approximately 1,017 meters of channel excavation by temporary construction berm, approximately 910 meters of levee construction with temporary openings and seepage filters, electrical line relocation, scour protection articulating concrete block mat (ACBM) installed using a sheetpile cofferdam) under the Dorado Bridge, and riprap revetment. This work also includes temporary construction crossings in accordance with PRHTA Standard Specifications , excavated material temporary depot areas for processing, material disposal areas, grassing, turf reinforcement matting, erosion and sediment control, traffic control, surface and ground water control, demolition of abandoned structures, and incidental related work along secondary tributary areas. Relocation of electrical and telephone lines shall be completed prior to any channel excavation. Partial notice to proceed (NTP) will be issued for the electrical and telephone line relocation work 15 calendar days after award. Final NTP will be issued for the remaining project work upon completion of the utility relocation and final USACE coordination (finding of ineligibility for listing in the National Register of Historic Places or mitigation of adverse effects) of environmentally sensitive areas as shown on G-05 and V-01. No construction, movement of vehicles or staging shall occur within the environmentally sensitive areas until the second NTP has been issued.

W912EP-17-B-0009 SECTION 01 11 00 Page 2

1.2.2 Location

The work is located in the Municipality of Dorado, Puerto Rico. The project begins at the southern end of the prior construction along La Plata River, and ends approximately 565 meters south of route PR-165R (Dorado) bridge.

1.2.3 Sequence of Work

The contract is broken into construction phases: Phase I - Channel Excavation and ACBM placement, Phase II - Levee Construction, and Phase III - Boat Ramp. The sequence of the phases is mandatory. Each Phase shall be completed to the extent practicable (i.e. all excavation shall be completed to the lines and grades shown in Phase I; all excavated materials moved to disposal or temporary depots areas for processing and drying and then moved to levee placement) prior to beginning the next Phase. The intermediate steps within the phases of the construction sequence are discretionary for bidding purposes only and constructability. The Contractor is responsible for the sequence of work.

It is intended to fulfill the Government requirements of providing scour protection at the earliest possible time, under dry conditions, to the maximum extent possible while maintaining at least the original hydraulic capacity and interior drainage. The Contract assumes maximum use of excavated materials for features for dry placement conditions.

Prior to beginning construction activities, inspect features previously constructed at the site by others in Contract 1A. These features include hauling roads, temporary diversion channels, and excavated material temporary depot areas previously constructed. Coordinate and complete the relocation of electrical lines and telephone lines prior to channel excavation. The clearing, grubbing and stripping of the levee and channel footprints shall be done prior to construction activities in those areas.

Phase I - From STA 25+00 to 22+90, excavate channel and build western construction berm. Store excess material in designated areas and build land area portions of the west levee as shown on (C-03). From STA 22+00 to 21+00, install temporary sheetpile, excavate, dewater and grade areas for ACBM placement on final template. Install permanent sheetpile, ACBM, and channel protection (riprap) in dry conditions as shown on (C-02 and C-14).

Continue to store excess material. Continue channel excavation from STA 22+90 to 17+69 leaving a construction berm to perform work in dry conditions. Install remaining channel protection in dry conditions.

Remove the existing plug near STA 17+69 and install riprap on the channel slopes and where indicated. Required final western slope (4:1) configuration and associated riprap protection from STA 17+69 to STA 19+40 shall be completed during this phase.

Phase II - Construct temporary crossing to excavate channel from STA 25+00 and Rio Cocales vicinity to 27+50. Remove the berm north of Rio Cocales to initiate flow and divert channel. Reuse and place riprap removed from plug near channel STA 17+69 as subbase at rock plug near levee STA's 25+50 and 24+25, and place suitable backfill from excavated material to create plugs to work under dry conditions. Continue constructing land areas of west levee and ramp as shown on (C-03). Maintain hydraulic conveyance for tributary and interior drainage at all times. Dewater and demuck work area within the existing river; backfill with suitable excavated material;

compact, and grade. Excavate west channel slope (4:1) and place riprap protection. Construct berm with suitable excavated material near Levee STA 24+00, enlarge eastern berm and construct any additional berms to

W912EP-17-B-0009 SECTION 01 11 00 Page 3 allow construction in dry conditions. Tie berms into Dorado Bridge ACBM installation area. Dewater and demuck work area; place backfill with suitable excavated material; compact, and grade. Complete levee fill and tie-in at Pier #2 as shown on (C-16 and S-02). Install scour protection (ACBM and riprap) on accessible areas. Excavate west channel slope (4:1) and place riprap protection on the remaining areas of the west channel slope. Construct a plug with suitable excavated material near Levee STA 21+00 and berms around the east side of the levee to tie into land areas (near STA 20+00) to allow construction in dry conditions. Dewater and demuck work area; backfill with suitable excavated material, compact, and grade to complete west levee tie-in. Construct berms from levee STA 21+00 to Dorado Bridge as needed; dewater, backfill and grade levee and recreational berm. Required final west channel slope (4:1) configuration and associated riprap protection from channel STA 19+85 to STA 25+07 can be completed during this phase. Grade slopes and place riprap at opening for the tributary.

Proceed with the installation of the overbuild as designated (C-08A to C-10A) after completion of the levee up to the initial fill grade. Install turf reinforced mat (TRM) in order to prevent erosion gullies on the recreation berm. Once the minimum required grade is reached, place the top soil, seeding, sodding, aggregate surface course and sod on the slopes of the embankment.

Phase III - Construct the boat ramp and excavate levee near STA 21+00 to create opening. Grade slopes and place riprap at opening.

Upon completion of the project all excavated material temporary depot areas, stabilized construction entrances, haul roads, staging areas and temporary fences shall be removed from the job site.

1.2.4 Safety Requirements

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1 .

1.2.5 Work Performed by Others

See paragraph PROJECT COORDINATION of Section 01 30 00 ADMINISTRATIVE

PROCEDURES.

1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.

b. In addition to the above, the following shall apply: The time for completion does not include establishment of grass. Grass shall be established not later than the time stated in the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1 plus the time stated for the establishment of grass as set forth in the paragraph SOD ESTABLISHMENT PERIOD of Section 32 92 23 SODDING.

1.4 LIQUIDATED DAMAGES - CONSTRUCTION

Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.

W912EP-17-B-0009 SECTION 01 11 00 Page 4

1.5 PHYSICAL DATA

Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5.1 Physical Conditions

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in GEOTECHNICAL DATA REPORT ( GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.

1.5.2 Weather, Water Stage and Tide Data

See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.

1.5.3 Contractor Investigation

Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5.4 Maritime Traffic

Channel traffic in the project area consists of pleasure and small recreational vessels of all types and sizes which can be accommodated by existing depths.

1.5.5 Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.

1.6 LAYOUT OF WORK

Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6.1 Established Project Control

The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey

W912EP-17-B-0009 SECTION 01 11 00 Page 5

Notes that must be duplicated if an attempt to recreate the subject survey is desired.

For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.

See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.

1.6.2 Layout

From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.

1.6.3 Survey

The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted from any amounts due or to become due the Contractor.

The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.

1.7 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), W912EP-17-B-0009 SECTION 01 11 00 Page 6 utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.8 DAMAGE TO WORK -- COFFERDAM REQUIRED

a. The responsibility for damage to any part of the work to be performed under this contract shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1.

However, if the cofferdam(s) is constructed in accordance with plans and progress schedules approved by the Contracting Officer, but is overtopped by flood and such…