Read Me S-292 IP-1 InRoad Files-Used for Contractors.doc

DOC document 28 KB Posted

Attached to
Herbert Hoover Dike Rehabilitation, Structure Replacements, S-290 (IP-2) and S-292 (IP-1) Reconstruction, Glades County, Florida
Solicitation number
W912EP-16-R-0011
Issued by

About this file

IP-1 DTMs

View the file

Other files

File Type Posted
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
16R0011Amendment0003.pdf PDF
IP-1 Lake Channel.dtm —
IP-1 Land Coffer Dam.dtm —
IP-1 Lake S Coffer Dam.dtm —
IP-2 Land Canal Embankment.dtm —
IP-2 ByPass Lake N Plug.dtm —
IP-2 ByPass Lake S Plug.dtm —
Read Me S-290 IP-2 InRoad Files.doc DOC document
IP-1 Land Channel.dtm —
IP-1 Restoration.dtm —
IP-2 Land Cofferdam Phase 4-b.dtm —
IP-2 Land Cofferdam Phase 4-d.dtm —
IP-2 Land Cofferdam Phase 4 a.dtm —
Amendment_0002.pdf PDF
IP-2 Land Cofferdam Phase 4-e.dtm —
IP-2 LandAccess Road.dtm —
IP-2 Excavation.dtm —
civil.xin —
IP-2 Land Cofferdam Phase 4-c.dtm —
IP-1 Lake N Coffer Dam.dtm —
IP-2 Restored.dtm —
civil.xin —
1on3 Excavation with Ramp1on4.dtm —
13-078_USACE.dtm —
Amendment_0001_Revised.pdf PDF
16R0011Volume1Specs_Revised_JDV.pdf PDF
16R0011Volume2Specs.pdf PDF
Master_Advertised_S-292.pdf PDF
Master_Advertised_S-290.pdf PDF
P S_GDR_IP-1 2__final_final_version_april_12.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert Hoover Dike Culvert Replacement

S-292 (IP-1), InRoads Files

The following is accurate at 01 March 2016 ProjectWise location:

Documents\C&SF\Herbert Hoover Dike Rehabilitation\03-Culvert Rehabilitation\S-292(IP-1), S-290(IP-2), S-291(IP-3) Culvert Reconstruction\070 - Plans\IP-1\ Project S-292.rwk :

This file is used to load surfaces (DTM’s) used, Alignments used, XIM file.

Surfaces Survey:

Location:

Documents\Survey data\C&SF\Herbert Hoover Dike\13-078 Indian Prairie Canal\13-078_PW Files\INROADS\ 13-078_USACE.dtm:

This surface provides the topo data of the embankment as well as intake and discharge canals Surfaces:

IP-1 Lake N Coffer Dam.dtm:

Designed lakeside earthen cofferdam plug. This is built on existing grade (“13-078_USACE.dtm”) to elev. 22.0’ to 23.0’, top width of 10’ with 1:3 lakeside slopes and 1:3 landside slopes.

IP-1 Lake S Coffer Dam.dtm Designed lakeside earthen cofferdam plug. This is built on existing grade (“13-078_USACE.dtm”) to elev. 22.0’ to 23.0’, top width of 10’ with 1:3 lakeside slopes and 1:3 landside slopes.

IP-1 Land Coffer Dam.dtm This is to be used as an access road around construction site. It has a width of 12’ along the ramps and a bottom with of 16’ to accommodate temporary concrete barriers. 1:3 side slopes interior and exterior.

1on3 Excavation with Ramp1on4.dtm:

This surface design excavates the existing Herbert Hoover embankment surface to elevation 2.2 using 1:3 side slopes. This will allow the removal of existing Culvert IP-1 structures and barrels and replace with new. Modeled to intersect “13-078_USACE.dtm” This surface also provides two ramps with 1:4 slopes 16’ wide allowing access into and out of excavated pit. Adjacent to the landside driven pile cofferdam and within the area of excavation there is a bench elevation of 5.0 and bench width of 10’. The side slope begins at 1:4 intersecting the excavation surface or elevation of 2.2, and then slope is steepened to 1:2 after dewatering is completed.

IP-1 Restoration.dtm:

Designed to restore the excavated Herbert Hoover embankment after the construction of new S-292 structure. Crest Width is 16’ wide (12’ Lime rock, 2’ sod each side of lime rock) approaching the structure and 49’ wide at the structure (45’ Lime rock, 2’ sod each side of lime rock). Embankments having a maximum slope of 1V:4H.

IP-1 Lake Channel.dtm:

Lakeside approach channel at the finished grade or the top of riprap. 9’ wide elevation at structure 6.5 out to match existing.

IP-1 Land Channel.dtm:

Landside approach channel at the finished grade or the top of riprap. 9’ wide elevation at structure. Elevation 6.5 at structure sloping to match existing.

Alignment:

No alignment was used.

XIM:

civil.xin:

This loads InRoad levels, symbology, and preferences.