About this file

IP-2 DTMs

View the file

Other files

File Type Posted
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
16R0011Amendment0003.pdf PDF
IP-1 Lake Channel.dtm —
IP-1 Land Coffer Dam.dtm —
IP-1 Lake S Coffer Dam.dtm —
IP-2 Land Canal Embankment.dtm —
IP-2 ByPass Lake N Plug.dtm —
IP-2 ByPass Lake S Plug.dtm —
IP-1 Land Channel.dtm —
IP-1 Restoration.dtm —
IP-2 Land Cofferdam Phase 4-b.dtm —
IP-2 Land Cofferdam Phase 4-d.dtm —
IP-2 Land Cofferdam Phase 4 a.dtm —
Amendment_0002.pdf PDF
IP-2 Land Cofferdam Phase 4-e.dtm —
IP-2 LandAccess Road.dtm —
IP-2 Excavation.dtm —
civil.xin —
IP-2 Land Cofferdam Phase 4-c.dtm —
IP-1 Lake N Coffer Dam.dtm —
IP-2 Restored.dtm —
civil.xin —
1on3 Excavation with Ramp1on4.dtm —
Read Me S-292 IP-1 InRoad Files-Used for Contractors.doc DOC document
13-078_USACE.dtm —
Amendment_0001_Revised.pdf PDF
16R0011Volume1Specs_Revised_JDV.pdf PDF
16R0011Volume2Specs.pdf PDF
Master_Advertised_S-292.pdf PDF
Master_Advertised_S-290.pdf PDF
P S_GDR_IP-1 2__final_final_version_april_12.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert Hoover Dike Culvert Replacement

S-290 (IP-2), InRoads Files

The following is accurate at 01 March 2016 ProjectWise location:

Documents\C&SF\Herbert Hoover Dike Rehabilitation\03-Culvert Rehabilitation\S-292(IP-1), S-290(IP-2), S-291(IP-3) Culvert Reconstruction\070 - Plans\IP-2\ Project IP-2:

This file is used to load surfaces (DTM’s) used, Alignments used, XIM file.

Surfaces Survey:

Location:

Documents\Survey data\C&SF\Herbert Hoover Dike\13-078 Indian Prairie Canal\13-078_PW Files\INROADS\ 13-078_USACE.dtm:

This surface provides the topo data of the embankment as well as intake and discharge canals Surfaces:

IP-2 Lake N Plug.dtm:

Designed lakeside earthen cofferdam plug. This is built on existing grade (“13-078_USACE.dtm”) to elev. 22.0’ to 23.0’, top width of 10’ with 1:3 lakeside slopes and 1:3 landside slopes.

IP-2 Lake S Plug.dtm Designed lakeside earthen cofferdam plug. This is built on existing grade (“13-078_USACE.dtm”) to elev. 22.0’ to 23.0’, top width of 10’ with 1:3 lakeside slopes and 1:3 landside slopes.

IP-2 LandAccess Road.dtm This is to be used as an access road around construction site. It has a width of to accommodate temporary concrete barriers. 1:3 side slopes interior and exterior.

IP-2 Excavation.dtm:

This surface design excavates the existing Herbert Hoover embankment surface to elevation 2.2 using 1:3 side slopes. This will allow the removal of existing Culvert IP-1 structures and barrels and replace with new. Modeled to intersect “13-078_USACE.dtm” This surface also provides two ramps with 1:4 slopes 16’ wide allowing access into and out of excavated pit. Adjacent to the landside driven pile cofferdam and within the area of excavation there is a bench elevation of 5.0 and bench width of 10’. The side slope begins at 1:4 intersecting the excavation surface or elevation of 2.2, and then slope is steepened to 1:2 after dewatering is completed.

IP-2 Restored.dtm Designed to restore the excavated Herbert Hoover embankment after the construction of new S-290 structure. Crest Width is 16’ wide (12’ Lime rock, 2’ sod each side of lime rock) approaching the structure and 49’ wide at the structure (45’ Lime rock, 2’ sod each side of lime rock). Embankments having a maximum slope of 1V:4H. This surface is restored at several parts and times in Phase IV.

IP-2 Land Canal & Embankment.dtm This surface is the intake channel and the tieback levee. This is used during Phase IV. The Tie back levee of this surface can be constructed at any time during Phase IV. The channel can only be built upon the COR approval and the completion of Phase IV Part I. The channel bottom has a width of 20’ with side slopes that varies and at a max 1:2. The channel bottom elevation is 9.2 8 and at the structure 6.0, upstream the channel ties into existing channel bottom. The tieback levee has a top width of 12’ land side slope to “13-078_USACE.dtm” is 1:3 and the channel side 1:3 to elevation 20.0.

IP-2 Land Cofferdam Phase 4 a.dtm Part “a” is part of Phase IV part I restoration. It ties into a portion of surface “IP-2 Restored.dtm “. Top of embankment is 12’ wide with a elevation 30.5 with 1:3 side slopes designed to “13-078_USACE.dtm”. This will be used as the temporary embankment prior to and during excavation of intake channel.

IP-2 Land Cofferdam

Phase 4-b.dtm Part “b” is part of Phase IV part II restoration. This ties into a portion of surface “IP-2 Restored.dtm “, “IP-2 Land Cofferdam Phase 4 a.dtm “, and “IP-2 Land Canal & Embankment.dtm”. This surface is used after “IP-2 Land Cofferdam Phase 4 a.dtm” is in place and when the intake channel is being constructed “IP-2 Land Canal & Embankment.dtm”.

IP-2 Land Cofferdam Phase 4-c.dtm Part “c” is part of Phase IV part I restoration. It ties “IP-2 Restored.dtm “ Part I into “13-078_USACE.dtm”.

IP-2 Land Cofferdam Phase 4-d.dtm Part “d” is part of phase IV part III. This is the back fill of the original lake side discharge channel. It is designed to elevation 19.0 and slopes to “13-078_USACE.dtm” at 1:3.

IP-2 Land Cofferdam Phase 4-e.dtm Part “e” is part of phase IV part III. This is the back fill of the original land side intake channel. It is designed to elevation 20.0 and slopes 1:3 to “13-078_USACE.dtm”. It is also designed to include bedding stone and riprap as part of the drain creating a flush channel side.

Alignment:

No alignment was used.

XIM:

civil.xin:

This loads InRoad levels, symbology, and preferences.