AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Herbert Hoover Dike Rehabilitation, Structure Replacements, S-290 (IP-2) and S-292 (IP-1) Reconstruction, Glades County, Florida
This Amendment is being issued for the follow ing:
1. Replace Section 26 31 00 of the Technical Specifications
2. Replace multiple draw ings for S-292 (IP-1)
See the continuation sheet for additional information.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP-16-R-0011
X 9B. DATED (SEE ITEM 11)
08-Jul-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Aug-2016
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Herbert Hoover Dike Rehabilitation, Structure Replacements S-290 (IP-2) and S-292 (IP-1) Reconstruction
W912EP-16-R-0011 2 Amendment 0003
SUMMARY OF CHANGES
1. SPECIFICATIONS:
A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.
B. In Volume 2 sections except for Section 00 33 50, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.
Changes to Specifications:
Volume 1 of 2 – Contract Documents:
N/A
Volume 2 of 2 – Technical Specifications:
DELETE Section 26 31 00 and REPLACE with the attached revised Section 26 31 00.
2. DRAWINGS:
S-291 (IP-2) RECONSTRUCTION:
N/A
S-292 (IP-1) RECONSTRUCTION:
DELETE Drawing T-03 and REPLACE with the attached revised Drawing T-03.
DELETE Drawing T-05 and REPLACE with the attached revised Drawing T-05.
DELETE Drawing T-06 and REPLACE with the attached revised Drawing T-06.
3. ADDITIONAL INFORMATION AVAILABLE TO BIDDERS:
N/A
(End of Summary of Changes)
Herbert Hoover Dike Rehabilitation, Structure Replacements W912EP-16-R-0011
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 31 00
SOLAR PHOTOVOLTAIC (PV) COMPONENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 DEFINITIONS
1.4 SUBMITTALS
1.5 MAINTENANCE MATERIAL SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Regulatory Requirements
1.6.2 Installation Drawings
1.6.3 System Operation
1.6.4 Installer
1.6.5 Materials
1.6.5.1 Alternative Qualifications
1.6.5.2 Material and Equipment Manufacturing Date
1.6.6 Operation and Maintenance Data
1.6.6.1 Electrical Systems
1.6.7 Bill of Materials
1.6.8 Spare Parts
1.7 DELIVERY, STORAGE, AND HANDLING
1.8 WARRANTY
1.8.1 Solar Photovoltaic Modules
1.8.2 Solar Controllers
1.8.3 Batteries
PART 2 PRODUCTS
2.1 PHOTOVOLTAIC MODULES
2.2 SOLAR CONTROLLERS
2.2.1 Solar Controller Enclosure
2.2.2 Electrical System
2.2.2.1 Wiring
2.2.2.2 Wire Markers
2.2.3 Solar Enclosure Components
2.2.3.1 Terminal Blocks
2.2.3.2 Switch Action Fuse Blocks
2.2.3.3 Circuit Breakers
2.3 BATTERIES
2.4 ROOF MOUNTING STRUCTURE FOR MODULES (RACKING)
2.4.1 Mounting System Base Supports
2.4.2 Flashing Boot
2.4.3 Base Cap
2.4.4 Base Cap Gasket
2.4.5 Framing
2.4.6 Hardware
2.5 MANUFACTURER'S NAMEPLATE
SECTION 26 31 00 Page 1 Amendment 0003
2.6 GROUNDING AND BONDING
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Solar Array
3.1.2 Array Support Frame
3.1.3 Solar Controller Components
3.2 INSPECTION AND TESTING
3.2.1 Acceptance Testing and Final Inspection
3.3 FIELD TRAINING
-- End of Section Table of Contents --
SECTION 26 31 00 Page 2 Amendment 0003
SECTION 26 31 00
SOLAR PHOTOVOLTAIC (PV) COMPONENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2010; Errata 2011; Supp 1 2013) Minimum Design Loads for Buildings and Other Structures
ASTM INTERNATIONAL (ASTM)
ASTM E772 (2015) Standard Terminology of Solar Energy Conversion
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 1013 (2007) Recommended Practice for Sizing Lead-Acid Batteries for Photovoltaic (PV) Systems
IEEE 928 (1986; R 1991) Recommended Criteria for Terrestrial Photovoltaic Power Systems
IEEE 937 (2007) IEEE Recommended Practice for Installation and Maintenance of Lead-Acid Batteries for Photovoltaic (PV) Systems
IEEE Stds Dictionary (2009) IEEE Standards Dictionary: Glossary of Terms & Definitions
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2012) International Building Code
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 61215 (2005; ED 2.0) Crystalline Silicon Terrestrial Photovoltaic (PV) Modules - Design Qualification and Type Approval
IEC 61853-1 (2011; ED 1.0) Photovoltaic (Pv) Module Performance Testing and Energy Rating – Part 1: Irradiance and Temperature Performance Measurements and Power Rating
SECTION 26 31 00 Page 3 Amendment 0003
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 9001 (2008; Corr 1 2009) Quality Management Systems- Requirements
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA AB 1 (2002) Molded-Case Circuit Breakers, Molded Case Switches, and Circuit-Breaker Enclosures
NEMA FU 1 (2002; R 2007) Low Voltage Cartridge Fuses
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2015) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 1703 (2002; Reprint Nov 2014) UL Standard for Safety Flat-Plate Photovoltaic Modules and Panels
UL 2703 (2015) UL Standard for Safety Mounting Systems, Mounting Devices, Clamping/Retention Devices, And Ground Lugs For Use With Flat-Plate Photovoltaic Modules And Panels
UL 50 (2007; Reprint Apr 2012) Enclosures for Electrical Equipment, Non-environmental Considerations
UL Electrical Constructn (2012) Electrical Construction Equipment Directory
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM apply to this section with additions and modifications specified herein.
1.3 DEFINITIONS
a. Unless otherwise specified or indicated, electrical and electronics terms used in these specifications, and on the drawings, are as defined in the IEEE Stds Dictionary.
b. Unless otherwise specified or indicated, solar energy conversion terms used in these specifications, and on the drawings, are as defined in
ASTM E772.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SECTION 26 31 00 Page 4 Amendment 0003
SD-02 Shop Drawings
Schematic Diagrams; G, DO
Interconnection Diagrams; G, DO
Installation Drawings; G, DO
SD-03 Product Data
Roof Mounting Structure for Modules (Racking); G, DO
Photovoltaic Modules; G, DO
SD-05 Design Data
System Operation; G, DO
SD-06 Test Reports
Field Test Plan; G, DO
Submit a detailed description of the Contractor's proposed procedure for onsite test 20 calendar days prior to testing the installed system. No final field test shall be performed until the test plan is approved. The test plan shall consist of complete field test procedures including test to be performed, test equipment and tolerance limits.
Field Test Reports; G, DO
Provide the information described below. Include a separate section for tests on each solar-powered system.
a. A list of equipment used.
b. A copy of measurements taken.
c. The dates of testing.
d. The equipment and values to be verified.
e. The conditions specified for the test.
f. The test results, signed and dated.
g. A description of adjustments made.
SD-07 Certificates
Installer; G, DO
Materials; G, DO
Warranty; G, DO
SD-08 Manufacturer's Instructions
Installation Instructions; G, DO
SD-10 Operation and Maintenance Data
Electrical Systems, Data Package 5; G, DO
SECTION 26 31 00 Page 5 Amendment 0003
1.5 MAINTENANCE MATERIAL SUBMITTALS
Comply with requirements specified in Section 01 78 02 CLOSEOUT SUBMITTALS.
1.6 QUALITY ASSURANCE
1.6.1 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officers. Provide equipment, materials, installation, and workmanship in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
1.6.2 Installation Drawings
In addition to requirements in Section 01 33 00 SUBMITTAL PROCEDURES, include the following:
a. Submit drawings for government approval prior to equipment construction or integration.
b. Shop drawings may include legible copies of manufacturer's product literature, with selected items and specifications highlighted thereon.
1.6.3 System Operation
Provide a complete description of the function of each component including PV modules, DC wiring, combiner boxes, inverters, AC wiring, AC and DC disconnect switches, and monitoring system. Provide a discussion of the overall system operation.
1.6.4 Installer
Submit NABCEP (North American Board of Certified Energy Practitioners) PV Installation Professional certification, and a resume with references that details least four successful projects that, in aggregate, equal or exceed the size of the proposed project.
1.6.5 Materials
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Submit proof of compliance with requirements of UL, where material or equipment is specified to comply.
The label of or listing in UL Electrical Constructn Directory will be acceptable evidence. In lieu of the label or listing, a written certificate from an approved nationally recognized testing laboratory (NRTL) equipped to perform such services, stating that the items have been tested and conform to the requirements and testing methods of Underwriters Laboratories may be submitted.
1.6.5.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if the manufacturer has been regularly engaged in the design and production
SECTION 26 31 00 Page 6 Amendment 0003 of solar photovoltaic products for a minimum of 5-years. Similar photovoltaic products must have been in satisfactory commercial or industrial use for 5-years prior to bid opening and must have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 5-year period.
1.6.5.2 Material and Equipment Manufacturing Date
Products manufactured more than 1-year prior to date of delivery to site must not be used, unless specified otherwise.
1.6.6 Operation and Maintenance Data
Submit Solar Photovoltaic Systems data package for the following items in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.
a. Troubleshooting guide.
b. Warranty.
c. Operation instructions.
d. Preventive maintenance and inspection data, including a schedule for system operators.
1.6.6.1 Electrical Systems
Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA. In addition to requirements of Data Package 5, include the following for the actual solar photovoltaic (PV) system provided:
a. Service and maintenance information including preventive maintenance, assembly, and disassembly procedures.
b. Complete operation, repair, and maintenance information, detailed to the smallest replaceable unit.
c. Adjustment, trouble-shooting, configuration, tuning, and system calibration instructions.
d. An instruction manual with pertinent items and information highlighted.
e. A layout drawing showing locations as well as views of equipment;
front, top, and side views.
f. A one-line drawing showing all components and interfaces to the electrical system.
g. Date of purchase.
1.6.7 Bill of Materials
Submit a Bill of Materials listing each product being incorporated into the system. Bill of Materials includes a general description of the product, quantity, and exact manufacturer's model number. Where the manufacturer's model number does not fully identify the product, list options, accessories, or custom features by additional descriptions.
SECTION 26 31 00 Page 7 Amendment 0003
1.6.8 Spare Parts
Spare parts shall be furnished as specified below. All spare parts shall be of the same material and workmanship, shall meet the same requirements, and shall be interchangeable with the corresponding original parts.
a. 5 - Fuses of each type and size.
b. 2 - Circuit breakers of each type and size.
c. 1 - Solar controller of each type and size.
d. 1 - Solar module of each type and size.
1.7 DELIVERY, STORAGE, AND HANDLING
a. Store solar PV modules in their original packaging according to the manufacturer's guidance, and do not remove from packaging until day of installation.
b. If a solar PV module is removed from its packaging, store it according to the manufacturer's guidance.
c. Do not store solar PV modules on-site for more than 12 months.
1.8 WARRANTY
The equipment items must be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.8.1 Solar Photovoltaic Modules
Furnish the solar photovoltaic module manufacturer's warranty. The warranty must be a 25-year linear 80 percent (minimum) power warranty (at the end of the 25th year after purchase an actual minimum power output of 80 percent based on the nameplate rating must be achieved) and not less than 10-years for workmanship material and manufacturing defects from the date of manufacture.
The warranty must state that the malfunctioning solar photovoltaic module must be exchanged by the manufacturer and promptly shipped to the using Government facility. The replacement solar module must be identical to, or an improvement upon, the original design of the malfunctioning solar module.
1.8.2 Solar Controllers
Furnish the controller manufacturer's warranty.
1.8.3 Batteries
Furnish the manufacturer's warranty for batteries.
PART 2 PRODUCTS
2.1 PHOTOVOLTAIC MODULES
a. PV modules must be IEC 61215 compliant and listed to UL 1703, and manufactured in an ISO 9001 certified facility.
b. PV modules must be of monocrystalline or polycrystalline technology and
SECTION 26 31 00 Page 8 Amendment 0003 for rack mounting.
c. PV module efficiency must be greater than 15 percent for crystalline technology.
d. PV modules must be of the same manufacturer and model number and consistent sub-components.
e. Submit on cutsheets PV module performance data from the manufacturer that must include a flash test data in accordance with IEC 61853-1, and temperature coefficients at: STC, nominal operating cell temperature (NOCT), low irradiance conditions (LIC), high temperature conditions (HTC), and low temperature conditions (LTC).
e. PV module bypass diodes must be inside the solar PV module's single conductor cable junction box.
f. Photovoltaic wire, wiring methods, and utilization of locking-type connectors must comply with the requirements of NFPA 70. Provide USE-2 or RHH or RHW-2 wire, and sunlight-resistant wire when exposed to sunlight.
2.2 SOLAR CONTROLLERS
The solar controllers shall operate on 12Vdc and shall be rated for the amperage required for each system indicated. The charger shall be voltage regulated and temperature compensated and shall be appropriated for recharging VRLA batteries without causing overcharge. The controllers shall be fully and continuously rated at 70 degrees C. They shall be pulse width modulated with three stage charging: Bulk, PWM regulation and float. The controllers shall be fully protected against reverse polarity, short circuit, overcurrent, lightning and transient surges, high temperature and reverse current. Construction shall be 100 percent solid state, epoxy encapsulated and rated for outdoor use. LEDs shall indicated mode. Grounding for the solar power system shall be in conformance with NFPA 70, the drawings and the specifications herein. Conform to NEMA AB 1, NEMA FU 1, UL 50 and IEEE 928
2.2.1 Solar Controller Enclosure
Enclosures shall be NEMA Type 3R, vented enclosure of white fiberglass reinforced polyester or powder-coated white aluminum, with hinged door, padlock hasp and screw-type door clamps. The interior-mounting panel shall be 12-gage steel. It shall be sized to house the equipment indicated and be of wall-mounted design. Fittings shall be watertight for all conduits entering the enclosure. It shall be sized to allow airflow around the components.
2.2.2 Electrical System
2.2.2.1 Wiring
The wiring shall be NEC type, THHN/THWN wire, rated to 90 degrees C at 600V.
2.2.2.2 Wire Markers
Wire markers shall be hot-stamped tube-type, Brady Ty-grip, Electrovert slip-on Type Z, or Floy Tag FT200C sized for snug fit for wire size.
Identify both ends with the same unique wire number. Assign wire numbers
SECTION 26 31 00 Page 9 Amendment 0003 where specific designations are not indicated.
2.2.3 Solar Enclosure Components
2.2.3.1 Terminal Blocks
Terminal Blocks shall be 125V, section type of nylon or polyamide blocks with tubular clamp contacts. Provide a minimum of 10 percent spare terminals.
2.2.3.2 Switch Action Fuse Blocks
Pull switch shall interrupt circuit before fuse can be removed or installed. Fuse blocks shall be rated 30V, 30A and be sectional type nylon or polyamide blocks with tubular clamp contacts.
2.2.3.3 Circuit Breakers
Use Heineman Series CF, Curve 3 breakers for devices or systems requiring 24Vdc power or less. Trip rating shall be as recommended by the manufacturer of equipment being protected. Provide necessary space on the panel for a minimum of three future circuit breakers. Mount inside control panel in a readily accessible location.
2.3 BATTERIES
The batteries shall be sealed, valve-regulated, deep cycle, lead acid batteries. The case material shall be polypropylene. The batteries shall be rated non-spillable by DOT, ICAO and IATA. Battery capacity shall include 5 days backup in Amp/Hours for equipment being charged. Conform to IEEE 937 and IEEE 1013. The batteries shall be absorbed glass mat (AGM) type batteries and shall power a 12V system. Provide batteries with 50 or greater amp-hours rating.
2.4 ROOF MOUNTING STRUCTURE FOR MODULES (RACKING)
a. Provide racking for array as indicated on the drawings. Provide racking compliant with UL 2703.
b. Racking and PV array, including modules, hardware, and attachments, must withstand wind loads as required by ASCE 7 and ICC IBC.
2.4.1 Mounting System Base Supports
Fabricate with fastening points integral to the mounting structure.
Mounting system supports must be permanently affixed stanchions that are anchored to the building structure. Coordinate height with thickness of roof insulation.
2.4.2 Flashing Boot
Fabricate for precision fit over base support. Coordinate height with base supports.
2.4.3 Base Cap
Fabricate to overlap base support and flashing boot a minimum of 2 inches.
SECTION 26 31 00 Page 10 Amendment 0003
2.4.4 Base Cap Gasket
EPDM with self-adhesive closed cell foam or other gasketing material compatible with the roofing material.
2.4.5 Framing
Provide with wall thickness as determined by structural calculations.
2.4.6 Hardware
Bolts, nuts, washers, and screws must be 18-8 stainless steel.
2.5 MANUFACTURER'S NAMEPLATE
Each item of equipment must have a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable. For PV modules, a label on the back of the module is acceptable.
2.6 GROUNDING AND BONDING
a. Provide properly sized equipment grounding conductors.
b. Provide bonding fittings on concentric/eccentric knockouts with metal conduits for circuits over 250 volts in accordance with NFPA 70.
c. Provide bonding fittings for ferrous metal conduits enclosing grounding electrode conductors in accordance with NFPA 70.
d. Provide grounding lugs for aluminum PV solar module frames of either stainless steel or tin-coated copper.
PART 3 EXECUTION
3.1 INSTALLATION
After delivery of equipment, the Contractor shall furnish one or more field engineers, regularly employed by the equipment manufacturer to supervise the installation of the solar equipment, assist in the performance of the onsite tests, oversee initial operations, and instruct personnel as to the operational and maintenance features of the equipment.
3.1.1 Solar Array
The solar array shall be installed at a 30-degree tilt angle with orientation to the south. Each solar module shall be removable for maintenance repair or replacement.
3.1.2 Array Support Frame
The array support frame shall be installed in accordance with the recommendations of the solar array manufacturer. Structural members requiring welding shall be welded in accordance with Section 05 50 14
STRUCTURAL METAL FABRICATIONS.
SECTION 26 31 00 Page 11 Amendment 0003
3.1.3 Solar Controller Components
The solar controller, fuses, circuit breakers, and disconnecting means shall be installed in an enclosure in accordance with the manufacturer's instructions. Wiring shall be installed in liquidtight flex conduit between the array and the array junction box, and in conduit between the array junction box and the batteries. See Section 26 20 00 INTERIOR
DISTRIBUTION SYSTEM.
3.2 INSPECTION AND TESTING
3.2.1 Acceptance Testing and Final Inspection
After acceptance of the field test plan, the Contractor shall notify the Contracting Officer 7 calendar days prior to the performance and acceptance tests are to be conducted. Tests shall be performed in the presence of the Contracting Officer or ACO. The Contractor shall furnish all instruments and personnel required for the tests. Field test reports of the results of all acceptance tests shall be maintained and submitted in booklet form.
Final acceptance of the solar system will not be given until the Contractor has successfully completed all tests and after all defects in installation, material or operation have been corrected.
3.3 FIELD TRAINING
A field training course for the solar power system shall be provided for operation and maintenance staff members. Training shall be provided by the solar equipment manufacturer's representative for a minimum period of 4 hours of normal working time and shall start after the system is functionally complete but prior to final acceptance tests. The training shall include discussion of the system design and layout, and demonstration of routine operation and maintenance procedures. At a minimum, this training shall include solar module inspection, cleaning and replacement, trouble shooting for the controller, battery inspection, replacement and battery wiring. Notify the Contracting Officer in writing prior to scheduling instructions.
-- End of Section --
SECTION 26 31 00 Page 12 Amendment 0003
V .L
V .L
NOTES:
T-03
T S .D
G N
-H
H D
R C
R
IP
T E
L E
C O
M M
U N
IC
A T
IO
N S
V .L
J .D .H
S .J .P
O C
T O
B E
R
-H
H D
R C
R
IP
S U
T R
O N S
Y S
T E
M C
O M
P O
N E
T S
APPROVED EQUAL."
AND 6F SHALL BE MANUFACTURERS AS SHOWN "OR
2. REFERENCED ITEMS: 1A THRU 2M, 3D, 3J, 5A, 5C, 6A, 6B, 6E,
SUPPRESSION SHALL DISSIPATE 3,000 W/PAIR.
SURGE SUPPRESSION SHALL MEET UL 497B. SURGE
1. PROVIDE SURGE SUPPRESSION FOR ANTENNA CABLES.
A
B /C -4 /6
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T N
O
A
A
A
-A
BATTERY BOX
iNET-II 900
GE
1"-WIRING DUCT
1-1/2" WIRING DUCT
ISR
CISCO 819 MANUFACTURER DESCRIPTION
PART
1-1/2"x1-1/2" WIREWAY
1-1/2" WIREWAY COVER
DIN RAIL
TERMINAL BLOCK
TERMINAL BLOCK END COVER
END CLAMPS
TERMINAL STRIP MARKER
MEASUREMENT AND CONTROL MODULE (DATA LOGGER)
F1.5X1.5LG6
C1.5LG6
08 01 73 3
30 04 36 2
HOFFMAN
PANDUIT
PHOENIX CONTACT
PHOENIX CONTACT
1C
1D
1E
2C
2B
2A
3A
2G
2E
2D
5B
5A
5C
PANDUIT
PHOENIX CONTACT
PHOENIX CONTACT
BURNDY
PHOENIX CONTACT
KC17B1
30 03 02 0
08 00 88 6
08 00 30 7
2F
TYPE SP SERVICE GRD POST CONNECTOR
PHOENIX CONTACT 55 31 72 3 10AMP CIRCUIT BREAKER-1 POLE
30 04 03 2 KNIFE DISCONNECTPHOENIX CONTACT
5D
3/8" DIA. X 1" LONG HYDROPHOBIC FILTER MATERIAL
PRODUCTS #5541
INTERSTATE SPECIALTY
GALVANIZED STEEL CORD GRIP FOR 3/8" CORDCGFP1931B CROUSE HINDS
POREX
3D
3E
3F
2H PHOENIX CONTACT 13 02 21 5 PARTITION PLATE
2I PHOENIX CONTACT 02 03 25 0 FIXED BRIDGE
1F
A-30P24 BACK PANELHOFFMAN1G
3G
4A
4B
4C SUTRON
4D
6411-11624E
6411-15614F
SUTRON
N1186-B DUAL RATED GROUND BARILSCO1H
PANDUIT
1I
1J
PANDUIT 1"x1" WIREWAY
1" WIREWAY COVER
F1X1LG6
C1LG6
3B
SUTRON
SUTRON SATLINK-2 TRANSMITTER
MORNINGSTAR
SUTRON 5000-0081 YAGI GOES SATELLITE ANTENNA
SUTRON 5000-0170 JAM RESISTANT GPS ANTENNA
8111-1113-1 RF COAX LIGHTNING PROTECTOR
LIGHTNING PROTECTORN/A N/A
SUTRON ANTENNA CABLE
SUTRON ANTENNA CABLE
XPERT2
2J
3H N/A N/A GATE POSITION INDICATOR IN GATE ACTUATOR
SUTRON STILLING WELL SDI-12 SHAFT ENCODER
APPLIED GEOMECHANICS
3K N/A N/A
3I
3J
SUTRON ANALOG I/O MODULE
SDI-12 TERMINATION6461-1241
PHOENIX CONTACT
PHOENIX CONTACT
2K
2L
2M
PHOENIX CONTACT
PHOENIX CONTACT
28 56 12 6 PLUGTRAB BASE
28 58 04 3 PLUGTRAB PLUG
28 56 11 3 PLUGTRAB BASE
28 56 03 2 PLUGTRAB PLUG
1A
56-0540
GE GE iNET-II 900 GE iNET-II 900 RADIO OR APPROVED EQUAL
N/A
PHOENIX CONTACT
PHOENIX CONTACT
8080-0003
A604816SSLP, ADP2
N/A
SOLAR CONTROLLER
GATE POSITION INDICATOR IN GATE ACTUATOR
TOYO BATTERY CO. 6GFM55B
5E
6A N/A 3.5AMP CIRCUIT BREAKER-1 POLE
6B
6C
6D
6E A-VK33
6F
55 30 89 2 10 AMP CIRCUIT BKR - 2 POLE W/ AUX CONTACTS
FURNISHED BY CONTRACTOR N/A 4 COND, #14 AWG SIS CONDUCTORS
FURNISHED BY CONTRACTOR N/A 6 COND, #14 AWG SIS CONDUCTORS
HOFFMAN 4" X 4" LOUVER WITH FILTER
WIEGMANN RSC161610 16" X 16" X 10" NEMA 3R ENCLOSURE
N/A N/A
N/A N/A
BP SOLAR BP 350
N/A
5F
50 WATT SOLAR PANELS
12 VOLT 55 AH BATTERIES
SOLAR PANEL ROOF MOUNTING BRACKET
A906-ST-BN-V
N/A
DOOR POCKET, POWDER COAT EXTERIOR WHITE
48H"x36W"x12D" STAINLESS STEEL ENCLOSURE WITH INTERIOR
CISCO C819HG-4G-A-K9 CISCO 819 ISR OR EQUAL
SS-10L
REF
SUTRON SYSTEM COMPONENTS
CLOSE NIPPLE
1/2" RIGID
SCALE: N.T.S.
SUTRON ENCLOSURE LAYOUT
5D
3E
3F
5F 2G
3A
3B
1J1I
4C
3D
2A
5A
4D 4D 4D 4C
1H
4C
2D
6A 2C 2C 2C 2I
2C
1B 1F1C1B
6D
1D 1E
2B
2B
2F 2B
2D 2G
CLOSE NIPPLE
1/2" RIGID
6A
2F
SELECT
FLOODED
OR
SEALED
DISCONNECT
LOAD
BATTERY
FLOODED
WIRE FOR
JUMPER
REMOVE
APPLIED GEOMECHANICS INCLINOMETER OR APPROVED EQUAL
XPERT
SUTRON
000 00
1I 1J
2C
2F 2F
2H
2B 2B
1I 1J2L 2M
2F
2J 2K
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X -2
D
C -S
T
P T
X -B
E
P H
O E
N
IX
C
O N
T A
C T S
P T
X -2
D
C -S
T
P T
X -B
E
S S
LOADSOLAR BATTERY
CHARGING
TEMP SENSE
MORNINGSTAR
PHOTOVOLTAIC CONTROLLER
12 VOLTS
6.5A SOLAR
6.0A LOAD
S A T L I N K 2
LOGGER - TRANSMITTER
100 - 300 - 1200 BPS
WARNING!
Operation of this transmitter must be with permission and assignment of the U.S. Dept.
Transmitter Power w/recommended antennas: 100 / 300 BPS - 8 Watts; 1200 BPS - 16 Watts of Commerce NOAA/NESDIS and must not exceed NESDIS permitted maximum uplink EIRP.
Recommend Antenna: Sutron 5000-0080 or -0081 YAGI Antenna
WWW.SUTRON.COM ISO 9001: 2000
-E
N D P
A N
E L
SUTRON
O U
T P
U T
R F
L E
D
T X F a u lt
S ta tu s
A N
T G
P S
R S
B U
C K
E T
T
IP
P
IN
G S
D I-
G n d B u c k e t
T ip p in g
V
G n d
D a ta
R E
S E
T F S
CABLE ENTRANCE
FOR SOLAR PANEL
ENTRANCE
FOR ANTENNA CABLE
CABLE ENTRANCE
FOR RADIO ANTENNA
ENTRANCE
FOR ANTENNA CABLE
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
C O
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y
N /A
N /A
N /A
A S S
H O
W N
A u g p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
(I P -1 S -2
(I P -2 S -2
(I P -3
C u lv e rt R e c o n s tr u c ti o n \0
P la n s \I P -1 \1
T e le c o m m u n ic a ti o n s \T -0
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T S
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N P
R O J E
C T
S -2
IP
-1
R E
C O
N S
T R
U C
T
IO
N X
X X
X X
X X
X
DETAIL THIS SHEET
SEE BATTERY CABLE
END, NO PINS
RECEPTACLE
PLUG END
NOTES 6 AND 7
BELDEN 5300UI, SEE
OR EQUAL
16-14 AWG CONDUCTOR, 1/4" STUD. T&B
RING TONGUE CRIP TERMINAL FOR
NYLON INSULATED INSULATION GRIP
JACKET
CONDUCTORS - NO
BELDEN 51OOUE
RECEPTACLE END
PLUG END
SEE NOTE 14
SEE NOTE 13
SEE NOTE 4
SEE NOTE 5
SEE NOTE 5
SEE NOTE 11
SEE NOTE 5
SEE DWG T-06
SEE DETAIL THIS SHEET
TO BATTERY BOX
BOX
TO BATTERY
T E
L E
C O
M M
U N
IC
A T
IO
N S
S U
T R
O N P
A N
E L W
IR
IN
G D
IA
G R
A M
S H
E E
T
V .L
-H
H D
R C
R
IP
-T
S .D
G N
T-05
PIN
MALE
TERMINALS
BATTERY
TO
PIN
FEMALE
PIN
MALE
3H 3H 3H
3I 3I3K
3H
3J
CONTINUED FROM SHEET T-04
BLOCK
TERMINAL
BREAKER/
CIRCUIT
TO
BLK
RED
RED
BLK
+ RED
- BLK
MAGNETIC CONTACT
CNTRL BLDG DOOR
G .D
NOTES :
6B
2A
2D
6C
5C 5E
6E
6F
BATTERY CABLE NOTES:
11. PROVIDE IN-LINE FUSE FOR BATTERY CABLE.
CRIMPING.
CONNECTORS SHALL BE SOLDERED AFTER
10. ALL CRIMPED CONNECTIONS IN MOLEX
9. LENGTH OF BATTERY LEADS 8".
8. LENGTH OF BELDEN 5100UE 5'.
PLUG TO PREVENT SHORTING.
RECEPTACLE W/O PINS INSERTED INTO
SPARE CABLE ASSEMBLY SHALL HAVE A
7. FURNISH TWO CABLE ASSEMBLIES, THE
JACKET AND PLUG CONNECTOR.
AFTER ASSY, OVERLAPPING CABLE
6. HEAT SHRINK OVER CABLE/CONNECTOR
5. RECEPTACLE - MOLEX 03-09-1022P
4. PLUG - MOLEX 03-09-2022P
3. FEMALE PINS - MOLEX 02-09-1104-C
2. MALE PINS - MOLEX 02-09-2103-C
1. PINS FOR #14 TO #20 GAUGE WIRE
SEE NOTE 3
ROOF OF CONTROL BLDG
TO SOLAR PANELS ON
BLOCK
TERMINAL
BREAKER/
CIRCUIT
TO
3D
O C
T O
B E
R
J .D .H
SCALE: N.T.S.
PANEL WIRING DIAGRAM
SUTRON
BATTERY BOX DETAIL
SCALE: N.T.S.
BATTERY CABLE DETAIL
16. PROVIDE A 10 AMP KNIFE DISCONNECT FOR EACH SDI DATA LINE.
FOR SYSTEM. MAKE CHANGE AS NECESSARY.
15. VERIFY SOLAR PANELS AND BATTERIES TO HAVE SUFFICIENT AMPS
14. MOUNT DINRAIL WITH 1/4" SS SCREWS AND RIVNUTS.
13. MOUNT BATTERY BOX ON 1" UNITRUST.
12. WIRING DIAGRAM CONTINUES ON SHEET T-04.
· ALL OTHERS - BLUE
· +12VDC - RED
· -12VDC - BLACK
MTW OR SIS INSULATION WITH THE FOLLOWING COLOR CODE
11. ALL CONDUCTORS EXCEPT FOR INSTRUMENT CABLES SHALL HAVE TYPE
POINTS. PART # BRADY DAT-7-292-1 OR EQUAL.
WITH MACHINE PRINTED WRAP AROUND WIRE MARKERS AT TERMINATION
10. ALL CONDUCTORS IN THE PANEL SHALL BE PERMANENTLY IDENTIFIED
ALLOWED WITHOUT WRITTEN REQUEST AND GOVERNMENT APPROVAL.
NUMBERS LISTED IN THE RTU SYSTEM COMPONENTS TABLE ARE
9. NO SUBSTITUTIONS IN REGARDS TO MANUFACTURER AND PART
ELECTRICAL CODE (NEC) AND APPLICABLE LOCAL CODES AND ORDINANCES.
8. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL
ENCLOSURE; ENCLOSURE AND GROUND BAR MOUNTED ON BACK PANEL.
7. FURNISH BONDING JUMPERS, #14 AWG MIN., BETWEEN; DOOR AND
6. FOR COMPONENT CALL OUT, SEE SHEET T-03 FOR DETAILS.
ADHESIVE BACKED CABLE MOUNTS.
5. SECURE ANTENNA CABLE WITHIN SUTRON RTU ENCLOSURE WITH
DRAWINGS.
4. SURGE SUPPRESSION FOR SENSORS SHALL BE LOCATED AS SHOWN ON
T-07.
3. LOCATE SOLAR PANELS ON ROOF, REFERENCE STANDARD DETAIL SHEET
OF PVC ELECTRICAL TAPE TYPE 3M #33+.
RUBBER MASTIC TAPE TYPE 3M 130C. FINISH WITH TOP LAYER OF 3 WRAPS
2. WEATHER SEAL CABLE TO ANTENNA CONNECTION W/2 FULL WRAPS OF
PER MANUFACTURER'S INSTALLATION INSTRUCTIONS.
DIPPED GALVANIZED U-BOLTS TO SECURE MOUNTING BRACKETS TO MAST
T-06. MOUNT WITH BRACKETS FURNISHED WITH ANTENNA. FURNISH HOT
1. LOCATE ANTENNA ON POLE, REFERENCE STANDARD DETAIL SHEET
SCALE: N.T.S.
(TYPICAL)
A
A
A
A
A
A /D -4 /8
R E
V S
IE
D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T N
O
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y
N /A
N /A
N /A
A S S
H O
W N
A u g p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
(I P -1 S -2
(I P -2 S -2
(I P -3
C u lv e rt R e c o n s tr u c ti o n \0
P la n s \I P -1 \1
T e le c o m m u n ic a ti o n s \T -0
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T S
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N P
R O J E
C T
S -2
IP
-1
R E
C O
N S
T R
U C
T
IO
N X
X X
X X
X X
X X
0 0
B L
K
LOADSOLAR BATTERY
CHARGING
TEMP SENSE
MORNINGSTAR
PHOTOVOLTAIC CONTROLLER
12 VOLTS
6.5A SOLAR
6.0A LOAD
SELECT
FLOODED
OR
SEALED
DISCONNECT
LOAD
BATTERY
FLOODED
WIRE FOR
JUMPER
REMOVE
R E
D
R E
D
B L
K
R E
D
B L
K
B L
K
R E
D
R E
D
R E
D
B L
K
B L
K
B L
K B
L K
R E
D
B L
K
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X -2
D
C -S
T
P T
X -B
E
P H
O E
N
IX
C
O N
T A
C T S
P T
X -B
E
P T
X -2
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
SEE NOTE 3
NOTES:
T-06
T E
L E
C O
M M
U N
IC
A T
IO
N S
S O
L A
R P
O W
E R P
A N
E L W
IR
IN
G D
IA
G R
A M
V .L
-H
H D
R C
R
IP
-T
S
J .D .H
J A
N U
A R
Y
S J .P
A
C /D -2 /6
R E
V
IS
E D T
O A
C C
O M
P A
N Y A
M E
N D
M E
N T N
O
A
A
DWG T-05.
3. LOAD WIRING CONNECTIONS ARE NOT SHOWN FOR CLARITY SEE
2. SEE DWG T-07 FOR SOLAR PANEL INSTALLATION DETAIL.
SEE DWG T-01.
1. FOR INSTRUMENTATION NOTES, LEGEND, AND ABBREVIATIONS,
M 1
10A
M 1
10A
M 1
10A
M 1
10A
T B S
P
F U
T B S
P
F U
SR1_SOLAR +
SR1_SOLAR -
SR1_BATT +
SR2_SOLAR -
SR2_BATT +
SR2_SOLAR +
T B S
P
S P
S P
C B -2
T B S
P
S P
C B -2
S P
C B -1
B A
T S
W
B A
T S
R B
A T
T
B A
T S
W
B A
T S
R B
A T
T
C B
C B
50 AH
RTU BATTERY 1
50 AH
RTU BATTERY 2
SELECT
FLOODED
OR
SEALED
6.5A SOLAR
6.0A LOAD
MORNINGSTAR
14 2
11 3 13 1
R T
U B
A T
T
C B -1
R T
U B
A T
T
R T
U B
A T
T
R T
U B
A T
T
BATTERY
FLOODED
WIRE FOR
JUMPER
REMOVE
12 VOLTS SOLAR BATTERY LOAD
PHOTOVOLTAIC CONTROLLER
CHARGING DISCONNECT
LOAD
TEMP SENSE
SWITCH
KNIFE
SW13.5A
FU12
SWITCH
KNIFE
SW2
3.5A
FU13
12 4 14 2 12 2
M 1
10A
M 1
10A
M 1
10A
M 1
10A
C B -1
B A
T S
W
B A
T S
R B
A T
T
B A
T S
W
B A
T S
R B
A T
T
C B
C B
50 AH
RTU BATTERY 3
50 AH
RTU BATTERY 4
14 2
11 3 13 1
R T
U B
A T
T
C B -1
R T
U B
A T
T
R T
U B
A T
T
R T
U B
A T
T
12 4 14 2 12 2
T B S
P
F U
T B S
P
F U
SR3_SOLAR +
SR3_SOLAR -
SR3_BATT +
SR4_SOLAR -
SR4_BATT +
SR4_SOLAR +
T B S
P
S P
S P
T B S
P
S P
C B -2
S P
SWITCH
KNIFE
SW33.5A
FU14
SWITCH
KNIFE
SW4
3.5A
FU15
C B -2
(TYPICAL)
GROUND BAR
SP1
SOLAR PANEL
SP2
SOLAR PANEL SP3
SOLAR PANEL
SP4
SOLAR PANEL
RTU ENCLOSURE
BATTERY BOX & BREAKER
BATTERY BOX & BREAKER
TO GROUND BAR
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y
N /A
N /A
N /A
A S S
H O
W N
A u g p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
(I P -1 S -2
(I P -2 S -2
(I P -3
C u lv e rt R e c o n s tr u c ti o n \0
P la n s \I P -1 \1
T e le c o m m u n ic a ti o n s \T -0
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T S
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N P
R O J E
C T
S -2
IP
-1
R E
C O
N S
T R
U C
T
IO
N X
X X
X X
X X
| 16R0011SF30ContAm0003 |
| 26 31 00 |
| ip1t_AMEND0003 |
| T-03 |
| T-05 |
| T-06 |
File details come from the government source that posted it. Updated .