Attachment 0003 River Birch Road Repaving Plans.pdf

PDF 5 MB Posted

Attached to
River Birch Road Asphalt Paving
Solicitation number
W912EK26QA015
Issued by

About this file

This document is a set of construction drawings for a federal contract opportunity issued by the U.S. Army Corps of Engineers, Rock Island District, for road repaving work at Thompson Causeway Recreation Area in Thompson, Illinois, located within the Mississippi River Basin. The project, identified as River Birch Road Repaving, involves demolition and reconstruction of an existing asphalt road surface. The drawings are dated March 2026 and include a cover sheet, index of sheets, site map, general notes, demolition plan and sections, and new work plan and sections.

The scope of work includes milling and removal of 4 inches of existing asphalt pavement and excavating existing aggregate base and subgrade to a depth of 12 inches, with stockpiling of materials for reuse. New work consists of placing 8 inches of stockpiled asphalt and base millings on the existing aggregate base, topped with 4 inches of new asphalt pavement in a binder course and surface course configuration. The road width is approximately 27 feet 8 inches with shoulders widened from 13 to 16 feet on the north side. Work must comply with all federal, state, and local construction laws and ordinances, require coordination with the Government on parking and staging areas, utility locations, and existing site features that must remain undisturbed, including three bollards, a chain gate with posts, and existing riprap. The contractor must field-verify existing conditions and dimensions prior to work commencement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

R

IV

E R

B

IR

C H

R O

A D

R E

P A

V

IN

G

T H

O M

P S

O N

IL

T H

O M

P S

O N

C A

U S

E W

A Y

R E

C R

E A

T

IO

N A

R E

A

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

/1

D

U N

L O

P

C

V E

R S

H E

E T

G-001

J F

L E

IS

C

H M

A N

C W

IL

D

E R

M U

T H

J

F

L E

IS

C

H M

THOMPSON CAUSEWAY RECREATION AREA

RIVER BIRCH ROAD REPAVING

THOMPSON, IL

MISSISSIPPI RIVER BASIN

ROCK ISLAND DISTRICT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

IS

of Engineers

US Army Corps

LOCATION MAP

VICINITY MAP

LOCATION

PROJECT

Thompson

LOCATION

PROJECT

ISSUE DATE: MARCH 2026

S

E R

B

IR

C H

R O

A D

R E

P A

V

IN

G

T H

O M

P S

O N

IL

T H

O M

P S

O N

C A

U S

E W

A Y

R E

C R

E A

T

IO

N A

R E

A

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

D

U N

L

IN

E X

O F

S H

E E

T S

S

IT

E

M A

P A

N D

G E

N E

R A

L N

O T

E S

G-002

J F

L E

IS

C

H M

A N

C W

IL

D

E R

M U

F

L E

IS

C

H M

K1

INDEX OF SHEETS

A1

SITE MAP

PROJECT LOCATION

ENTRANCE

PROJECT WORK AREA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

NEW WORK PLAN AND SECTIONS

DEMOLITION PLAN AND SECTIONS

INDEX OF SHEETS, SITE MAP, AND GENERAL NOTES

COVER SHEET

TITLE OF SHEET

ID

SHEET

GENERAL

C-102

C-101

G-002

G-001

CIVIL

GENERAL NOTES

THOMPSON, IL

RECREATION AREA

THOMPSON CAUSEWAY

M

IS

S

IS

S

IP

P I

R

IV

E R

ROAD

RIVER BIRCH W. MAIN STREET

S A

N D

R

ID

G E R

O A

D

REMOVAL. SLOPE THE NEW PAVEMENT AS INDICATED AND AS DIRECTED BY THE GOVERNMENT.

THE NEW ASPHALT PAVEMENT IS TO BE PLACED TO THE APPROXIMATE SAME ELEVATION THAT IT EXISTED PRIOR TO 11.

FOR AGGREGATE SHOULDERS AS AVAILABLE.

THE EXISTING ASPHALT PAVEMENT TO BE REMOVED (MILLED) IS TO BE STOCKPILED AND REUSED AS AGGREGATE BASE AND 10.

AS NEEDED PRIOR TO REMOVAL.

SAWCUT THE EXISTING ASPHALT PAVEMENT TO BE REMOVED (MILLED) FULL DEPTH AND IN REASONABLE STRAIGHT LINES 9.

EXISTED PRIOR TO REMOVAL. LOCATIONS MAY BE ADJUSTED IN THE FIELD AS APPROVED BY THE GOVERNMENT.

IF A PROJECT SITE FEATURE NEEDS TO BE REMOVED, RE-INSTALL THE FEATURE IN THE SAME LOCATION AND WAY IT

EXISTING PROJECT SITE FEATURES ARE TO REMAIN UNLESS NEEDING TO BE REMOVED TO CONDUCT THE PROJECT WORK. 8.

COORDINATE WITH THE GOVERNMENT FOR LOCATING EXISTING UTILITIES PRIOR TO THE START OF THE PROJECT WORK. 7.

ELEVATIONS PRIOR TO THE START OF THE PROJECT WORK.

ANY INDICATED DIMENSIONS AND ELEVATIONS ARE APPROXIMATE. FIELD VERIFY ANY INDICATED DIMENSIONS AND 6.

COORDINATE THE LOCATION OF A PARKING AND STAGING AREA WITH THE GOVERNMENT. 5.

THE GOVERNMENT.

CONDUCT THE PROJECT WORK WITHIN THE INDICATED WORK AREA, EXCEPT AS COORDINATED WITH AND APPROVED BY 4.

FIELD VERIFY THE EXISTING PROJECT SITE CONDITIONS PRIOR TO THE START OF THE PROJECT WORK. 3.

PROJECT WORK.

COORDINATE WITH THE GOVERNMENT AND OTHER ENTITIES OCCUPYING THE PROJECT SITE PRIOR TO THE START OF THE 2.

ORDINANCES.

THE PROJECT WORK IS TO BE IN COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL CONSTRUCTION LAWS AND 1.

NORTH

PLAN

T R

U E

0 6

A N

S

E R

B

IR

C H

R O

A D

R E

P A

V

IN

G

T H

O M

P S

O N

IL

T H

O M

P S

O N

C A

U S

E W

A Y

R E

C R

E A

T

IO

N A

R E

A

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

D

U N

L

M O

L

IT

IO

N

P L

A N

A N

D S

E C

T

IO

N S

C-101

J F

L E

IS

C

H M

A N

C W

IL

D

E R

M U

F

L E

IS

C

H M

GRADE

EXISTING

A1

SCALE: 1"=40'

DEMOLITION PLAN

K1

SCALE: 3/16"=1'-0"

DEMOLITION SECTION

K8

SCALE: 3/16"=1'-0"

DEMOLITION SECTION

SHOULDER (TYP)

EXISTING AGGREGATE

AND AGGREGATE BASE

ASPHALT PAVEMENT

MILL 4" OF EXISTING

GRADE

EXISTING

AND AGGREGATE BASE

ASPHALT PAVEMENT

MILL 4" OF EXISTING

A DEPTH OF 12" (TYP)

SHOULDER AND SUBGRADE TO

EXCAVATE EXISTING AGGREGATE

OF 12" (TYP)

SUBGRADE TO A DEPTH

TOPSOIL AND EXCAVATE

STRIP EXISTING SOD AND

13' +/-

15' +/-

SPEED BUMP

EXISTING

15' +/-

THE GENERAL SHEET NOTES

STOCKPILE LOCATION. SEE

POSSIBLE ASPHALT MILLINGS

AND AGGREGATE BASE

ASPHALT PAVEMENT

MILL 4" OF EXISTING

TO A DEPTH OF 12"

SHOULDER AND SUBGRADE

EXCAVATE EXISTING AGGREGATE

DO NOT DISTURB

THREE EXISTING BOLLARDS.

TO A DEPTH OF 12"

TOPSOIL, AND SUBGRADE

EXCAVATE EXISTING SOD,

DO NOT DISTURB

GATE WITH POSTS.

EXISTING CHAIN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

RECREATION AREA

THOMPSON CAUSEWAY

A DEPTH OF 12"

SHOULDER AND SUBGRADE TO

EXCAVATE EXISTING AGGREGATE

SUBGRADE TO A DEPTH OF 12"

AND TOPSOIL AND EXCAVATE

STRIP EXISTING SOD

SUBGRADE.

FROM THE STRIPPED SOD AND TOPSOIL AND EXCAVATED AGGREGATE AND

D ASPHALT PAVEMENT AND AGGREGATE BASE SEPARATE STOCKPILE THE MILLE

AND EXCAVATED AGGREGATE AND SUBGRADE WITH THE GOVERNMENT.

ASPHALT PAVEMENT AND AGGREGATE BASE, STRIPPED SOD AND TOPSOIL,

COORDINATE THE EXACT LOCATION FOR THE STOCKPILING OF THE MILLED 3.

MANHOLE COVERS, AND UTILITIES TO REMAIN.

USE CARE TO AVOID DAMAGING THE EXISTING CHAIN GATE, BOLLARDS, SIGNS, 2.

UNDER A CONTRACT.ALL DEMOLITION WORK IS TO BE CONDUCTED 1.

GENERAL SHEET NOTES

BUILDING

40' 80'0

NORTH

PLAN

T R

U E

N

LEGEND

S A

N D

R

ID

G E R

O A

D

BASE

PAVEMENT AND AGGREGATE

MILL 4" OF EXISTING ASPHALT

EXISTING CONTOUR

8'0 4' 16' 8'0 4' 16'

RIVER BIRCH ROAD

C-101

K1

C-101

K8

S

E R

B

IR

C H

R O

A D

R E

P A

V

IN

G

T H

O M

P S

O N

IL

T H

O M

P S

O N

C A

U S

E W

A Y

R E

C R

E A

T

IO

N A

R E

A

M

IS

S

IS

S

IP

P I

R

IV

E R

B A

S

IN

/0

D

U N

L

W W

O R

K P

L A

N A

N D

S E

C T

IO

N

S

C-102

J F

L E

IS

C

H M

A N

C W

IL

D

E R

M U

F

L E

IS

C

H M

A1

SCALE: 1"=40'

NEW WORK PLAN

16' +/-

K1

SCALE: 3/16"=1'-0"

NEW WORK SECTION

K8

SCALE: 3/16"=1'-0"

NEW WORK SECTION

OR REUSED ASPHALT AND BASE MILLINGS

COURSE) ON EXISTING AGGREGATE BASE

(2.5" BINDER COURSE AND 1.5" SURFACE

PLACE 4" OF NEW ASPHALT PAVEMENT

AGGREGATE BASE (TYP)

AND BASE MILLINGS FOR NEW

PLACE 8" OF STOCKPILED ASPHALT

OR REUSED ASPHALT AND BASE MILLINGS

COURSE) ON EXISTING AGGREGATE BASE

(2.5" BINDER COURSE AND 1.5" SURFACE

PLACE 4" OF NEW ASPHALT PAVEMENT

FOR NEW SHOULDERS (TYP)

ASPHALT AND BASE MILLINGS

PLACE 12" OF STOCKPILED

GRADE

EXISTING

GRADE

EXISTING

EXISTING SHOULDERS (TYP)

AND BASE MILLINGS ALONG

PLACE STOCKPILED ASPHALT

WIDTH FROM 13' TO 16' TO THE SOUTH

NORTH SIDE OF THE ROAD AND INCREASE

MAINTAIN SAME ALIGNMENT ALONG THE

27'-8" +/-

27'-8" +

SEE THE LEGEND

ASPHALT PAVEMENT.

PLACE 4" OF NEW

SIDES OF ROAD

THE GOVERNMENT ON BOTH

RIPRAP PREVIOUSLY PLACED BY

DO NOT DISTURB

GATE WITH POSTS.

EXISTING CHAIN

DO NOT DISTURB

THREE EXISTING BOLLARDS.

SPEED BUMP

EXISTING

FOR NEW SHOULDERS (TYP)

ASPHALT AND BASE MILLINGS

PLACE 12" OF STOCKPILED

BY THE GOVERNMENT (TYP)

RIPRAP PREVIOUSLY PLACED

'-0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

C O

N T

R A

C T

/T .O

N

O

P R

O J E

C T

C O

D E

M A

T O

C /I

D

IQ

C O

N T

R A

C T

N O

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

®of Engineers

US Army Corps

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

IL

L

IN

RECREATION AREA

THOMPSON CAUSEWAY

AND 1.5" SURFACE COURSE)

PAVEMENT (2.5" BINDER COURSE

PLACE 4" OF NEW ASPHALT

AGGREGATE BASE AND SHOULDERS

AND BASE MILLINGS FOR NEW

PLACE STOCKPILED ASPHALT

GENERAL SHEET NOTES

BUILDING

40' 80'0

NORTH

PLAN

T R

U E

N

S A

N D

R

ID

G E R

O A

D

LEGEND

8'0 4' 16' 8'0 4' 16'

NEW ASPHALT PAVEMENT IS TO BE SLOPED AS INDICATED. 3.

MANHOLE COVERS, AND UTILITIES TO REMAIN.

USE CARE TO AVOID DAMAGING THE EXISTING CHAIN GATE, BOLLARDS, SIGNS, 2.

ALL NEW WORK IS TO BE CONDUCTED UNDER A CONTRACT. 1.

2%2%

MAINTAIN EXISTING SLOPE

PLACED BY THE GOVERNMENT

ILDOT RR-3 RIPRAP PREVIOUSLY

RIVER BIRCH ROAD

C-102

K1

C-102

K8

File details come from the government source that posted it. Updated .