This is a Quality Assurance Surveillance Plan (QASP) for a Performance Based Service Contract (PBSC) developed by the Government to ensure contractor compliance with performance metrics and contract requirements. The QASP establishes systematic quality assurance methods to verify that the contractor performs services according to specifications outlined in the Performance Work Statement (PWS), that the Government receives acceptable quality services, and that payment is rendered only for satisfactory work delivered.
The plan identifies critical performance processes requiring the contractor to provide all necessary personnel, equipment, tools, materials, supervision, and services to complete contract requirements with accurate transaction processing, material accountability, safety and security compliance, and timely delivery. Performance standards are measured against schedule adherence, service quality against PWS specifications, and past performance including workmanship standards and customer satisfaction. The surveillance methods include random or scheduled COR monitoring, contractor self-reporting of significant issues on a monthly basis, and validated customer complaints submitted in writing to the COR. The Performance-Based Matrix establishes specific acceptable quality levels: Contract Services must achieve >95% timely performance without rework; Overall Contract Performance requires annual assessment with all service elements rated Satisfactory or higher (95% or above); Contractor Self-Reports require >95% timely services; Customer Feedback demands 100% resolution of valid complaints; Invoicing requires 100% accuracy; and Combating Trafficking in Persons requires 100% adherence to FAR clause 52.222-50. Non-compliance results in Contract Discrepancy Reports (CDRs) requiring written contractor response within five days, with the Contracting Officer determining further action based on past performance and corrective plans. The Government retains the right to require replacement or correction of deficient work at no additional cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.
1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.
2. Performance Standards
a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.
b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self
Reporting, and validated customer complaints.
a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.
b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.
c. Customer Feedback. Customer feedback will be obtained from valid customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint; must be signed and must be forwarded to the COR by the contractor. The contractor shall maintain a log of all customer complaints as well as a copy of each complaint in a documentation file. The
COR may request to review the log and/or documentation file at any time.
4. Performance Measurement. Performance will be measured in accordance with the following table:
Performance-Based Matrix, Attachment A
Performance
Element
Performance
Requirement
Surveillance Method Frequency Acceptable
Quality Level
Contract Services Contract Services furnished as prescribed in the PWS as applicable.
Inspection by the COR Random inspection of all sampling of contract services.
>95% of services inspected performed timely and without rework required.
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s annual report on contractor performance
Assessment by the COR Annual All service elements rated
Satisfactory (or higher)
Satisfactory = 95% or above average contract acceptable random sampling
Contractor Self
Reporting
Contract Services furnished as prescribed in the PWS as applicable.
Contractor Self Reports Monthly >95% of services reported performed timely and without rework required.
Customer
Feedback
Customer complaints reviewed by COR
Inspection by the COR Per Occurrence 100% of valid customer complaints resolved
Invoicing Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice by COR
Monthly 100% accuracy
Combating
Trafficking in
Persons
Adherence to FAR clause
52.222-50.
Assessment by COR Random inspection of contract services.
100% Accuracy
Disincentives:
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract (52.212-4 (a) Inspection/Acceptance), the contractor will provide quality products in a timely manner since the Government can require the contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.