B08 - AMD 0003 SPECS ONLY_MODIFIED SEC 41 65 10_PG 9.pdf
PDF 1 MB Posted
- Solicitation number
- W912EK26BA007
About this file
This is a Construction Solicitation and Specifications document for a federal flood repair project managed by the U.S. Army Corps of Engineers Rock Island District. The project involves converting the Muscatine-Louisa County Drainage District No. 13 pump station in Louisa County, Iowa from liquid propane (LP) engine operation to diesel engine operation, with associated infrastructure improvements. The work encompasses demolition of existing LP components, installation of diesel engines and related equipment, architectural and structural work including concrete foundations and steel fabrications, electrical systems, mechanical systems with fuel piping and storage tanks, chain link fencing, site restoration, and closeout activities. The contract is structured as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside Invitation for Bid with a contract completion period of 460 calendar days from Notice to Proceed. Five primary job payment items are specified: Item 0001 for Demolition and Deconstruction, Item 0002 for Civil and Structural Work, Item 0003 for Mechanical Work, Item 0004 for Electrical Work, and Item 0005 for Pump Equipment (diesel engine, power take-off shaft, and gear drive).
The specifications establish comprehensive administrative, safety, and quality control requirements including preconstruction submittals for construction schedules, background checks, E-Verify enrollment, and environmental/safety plans. Contractors must comply with USACE Safety and Occupational Health Manual EM 385-1-1, implement Contractor Quality Control systems, and submit electronic payroll processing using Davis-Bacon Act compliance systems. Work restrictions include prohibition on clearing or damaging trees, environmental protections for bald eagle nests within 660 feet between January-July, coordination with drainage district operations to avoid pump station outages, and compliance with Force Protection Condition measures. A detailed submittal register identifies over 100 required submittals across 23 specification sections, including shop drawings, product data, design calculations, test reports, certifications, and manufacturer's instructions, with most requiring Government approval before work proceeds. The project work is restricted to land access only on private lands managed by the drainage district, and the contractor must establish coordination with the USACE Area Engineer, drainage district leadership, and Iowa Department of Inspections Appeals and Licensing.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: W912EK26BA007
B5MUSC13202401
US Army Corps of Engineers Rock Island District
MISSISSIPPI RIVER BASIN
MUSCATINE-LOUISA COUNTY DRAINAGE
DISTRICT NO. 13
LOUISA COUNTY, IOWA
2024 EVENT PL84-99 FLOOD REPAIRS
Construction Solicitation and Specifications
JUNE 2026
Muscatine PL84-99 SOLICITATION NO.: W912EK26BA007
SOLICITATION 06/2026 B5MUSC13202401
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
DIVISION 08 - OPENINGS
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 90 00 PAINTS AND COATINGS
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 10 REPAIR DAMAGED TURFED AREAS
DIVISION 33 - UTILITIES
33 52 10 FUEL SYSTEMS SERVICE PIPING
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 45 03 SPEED REDUCERS FOR STORM WATER PUMPS
PROJECT TABLE OF CONTENTS Page 1
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 65 10 DIESEL FUELED ENGINE PUMP DRIVES
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 21 39 WATER, VERTICAL TURBINE & APPURTENANCES PUMPS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 PROJECT LOCATION
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
The work includes, but is not limited to, prior Liquid Propane (LP) engine component demolition; installation of diesel engine and components, architectural work; electrical work; mechanical work; concrete work; metal fabrications; earthwork; chain link fencing; fuel tank installation;
deconstruction and removal of temporary pumps; and site restoration.
1.2 PROJECT LOCATION
The work is located in the Mississippi River Basin, at Muscatine-Louisa County Drainage District No. 13, Louisa County, Iowa, and as indicated.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 11 00 Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.4 COORDINATION WITH OTHERS
1.5 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.5.1 General Security Requirements and Guidance
1.5.2 Physical Security and Access Control Requirements
1.5.3 E-Verify Program
1.6 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
1.7 SPECIAL SAFETY REQUIREMENTS
1.8 LOCATION OF PARKING, STAGING, AND STORAGE AREAS
1.9 ELECTRICAL POWER LINES
1.10 BARRICADES AND WARNING SIGNS
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
ATTACHMENT A - Personnel Change Request Form
SECTION 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.106 Working Over or Near Water
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submittals not having a "G" designation are for information only. When used, a code following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Background Checks ; G SL
Company Enrollment In E-Verify ; G CT
Form I-9 ; G CT
**NOTE: To protect the privacy of Contractor personnel security information, submit with a cover page containing the Contract Number, Contract Title, and the Contractor's Point of Contact information in a sealed envelope/container and mail to:
ATTN: Security and Law Enforcement Office (CEMVR-SL) U.S. Army Corps of Engineers Rock Island District P.O. Box 2004 Rock Island, IL 61204-2004
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
In addition to the requirements of Contract Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, comply with the following requirements:
a. Provide all necessary protection, appurtenant equipment and supplies, SECTION 01 14 00 Page 2 including, but not limited to, enclosures, heating, lighting, and sufficient labor to accomplish the work required during the aforementioned periods, taking into account high water, low and high temperatures, wind forces, ice, sleet, snow, wind chill, high humidity, and heat index factors that may be encountered at the site and working adjacent to water. This may require additional labor or shifts and special equipment or special equipment maintenance to compensate for lost productivity caused by low or high temperatures and other associated environmental factors.
b. Work is by land access only. Work site is on private lands managed by the Muscatine-Louisa County Drainage District No. 13.
c. Clearing or damaging trees is prohibited.
d. Conduct operations in a manner that prevents noisy, disruptive activities, including disturbance to trees, within 660 feet of active bald eagle nests between 1 January and 31 July, inclusive. Clearly mark the 660 foot no work zone and have approved prior to any construction activities. When other previously unknown wildlife species are encountered, such as red shouldered hawk nests, blue heron rookeries, or nesting areas of other colonial nesting birds, conduct operations in a manner to minimize impacts. If any previously unknown nests are found within the project work area, contact the Contracting Officer immediately to ensure proper compliance measures are approved by the Iowa Department of Natural Resources (IDNR) and the U.S. Fish and Wildlife Service (USFWS).
e. Coordinate any activities that would impair operations of the pump station or emergency pumps with the contracting officer for approval.
Any planned outages coordinat a minimum two weeks in advance of the proposed outage.
f. Coordinate delivery of equipment to coincide with work. If items are to be stored, store in a temperature controlled, locked, and protected area. Protect all equipment delivered and placed in storage from the weather, humidity, and temperature variations, dirt and dust, or other contaminants.
1.4 COORDINATION WITH OTHERS
Schedule and coordinate operations affecting other Contractors, Government personnel, utilities, and property occurring within the work limits.
Accomplish with lead time sufficient for coordination of all involved parties as necessary for timely completion of each Contract feature. At a minimum, establish coordination with each of the following point(s) of contact, as required:
a. Area Engineer Central Area Office U.S. Army Corps of Engineers 1910 E. Kimberly Road, Suite 105 Davenport, IA 52807 Telephone No.: 563-386-0572 (Collect calls not accepted.)
b. Muscatine-Louisa County Drainage District No. 13 Chairman Muscatine-Louisa County
SECTION 01 14 00 Page 3
Drainage District No.13 Telephone No.: 563-299-2482 (Collect calls not accepted.)
c. Iowa Department of Inspections Appeals, and Licensing (DIAL) Telephone No.: 515-205-1420 (Collect calls not accepted.)
1.5 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.5.1 General Security Requirements and Guidance
The security requirements described below apply to Contractor personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this Contract. Address questions regarding security matters to the Contracting Officer. Contractor personnel are critical to the overall security and safety of USACE installations, facilities, and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; applicable Contractor personnel to complete initial training within 30 days after receiving Notice to Proceed. Notify the Contracting Officer within five business days of completing the training. Include documentation of the names of Contractor personnel trained and which training has been completed; maintain training records as part of Contract files; and be prepared to provide copies of training certificates to the Contracting Officer. Contractor personnel and vehicles are subject to search when entering installations. Comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (RAMs), and Health Protection Condition (HPCON) measures. Meet performance requirements during elevated FPCON and HPCON levels in accordance with USACE plans and procedures. This includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by FAR 52.243-4 CHANGES, if the FPCON or HPCON levels change at any individual facility or installation, the Government may implement security changes that affect Contractor personnel. Ensure that Contractor personnel are aware of their security responsibilities, including site-specific requirements identified in local policies or procedures.
1.5.2 Physical Security and Access Control Requirements
a. Overview: Contractor personnel requiring physical access to a Government facility to comply with the access control procedures of that location. Contractor personnel requiring unescorted access to meet Contract performance requirements will be vetted by the USACE Rock Island District Security and Law Enforcement Office (CEMVR-SL) using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB). Contractor personnel to comply with personal identity verification requirements as specified. Contractor personnel who do not meet requirements for unescorted access to Government installations to coordinate escorted access with the Contracting Officer. Contractor personnel who receive keys, access cards, or lock combinations that provide access to Government-owned property to comply with USACE key and lock control procedures.
b. Definition: For the purposes of this Contract, USACE facilities are defined as any USACE or Drainage District owned or leased property for
SECTION 01 14 00 Page 4 which entry is controlled and limited to authorized USACE employees, Contractors, and official visitors.
c. Procedures:
(1) Contractor personnel may have unescorted access within controlled areas upon completion of an adjudication of fitness by CEMVR-SL and entry onto an access control list (ACL) for the facility/project. Submit background checks conducted by a bonded third party within the last six months of Notice to Proceed and authorize reports to be provided to CEMVR-SL by the third party.
Background checks to consist of a check of NCIC-III and TSDB when available. Individuals may be denied access to USACE facilities and property if the results of the third party NCIC-III equivalent background check gives an indication that a person may present a threat to the good order, discipline, safety, or security of the facility. This information includes, but is not limited to a person who has:
(a) The background investigation contains criminal arrest information about the individual that causes the senior commander to determine that the person presents a threat to the good order, discipline, or health and safety on the property.
(b) A claimed identity that cannot be verified based on the reasonable belief that the person submitted fraudulent identity information in the attempt to gain access.
(c) Current arrest warrant in NCIC, regardless of the offense or violation.
(d) Current bar from entry or access to another Federal installation or facility.
(e) Conviction of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, or drug possession with intent to sell or distribute.
(f) Conviction for espionage, sabotage, sedition, treason, terrorism, or murder.
(g) Being registered as a sex offender.
(h) Felony conviction within the last 10 years regardless of the offense or violation.
(i) Felony conviction for a firearms or explosives violation regardless of when the conviction occurred.
(j) Engaged in acts or activities designed to overthrow the U.S.
Government by force.
(k) Been identified as known to be, or is suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.
(2) Short term Contractor personnel working at the USACE facility or
SECTION 01 14 00 Page 5 project for less than 15 calendar days may be escorted at the USACE facility by a USACE employee or other Contractor personnel that is on the ACL for the facility or project. Names and dates of work for short term Contractor personnel to be submitted to CEMVR-SL via e-mail at cemvr-sl@usace.army.mil to be added to the ACL for the period they will be working at the facility.
d. In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of CEMVR-SL personnel.
Cooperate and ensure that Contractor personnel provides documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. USACE Rock Island District retains the right to deny Contractor personnel from working on a USACE Rock Island District Contract based on final background investigation results.
e. Contractor personnel denied access based upon derogatory information from the NCIC-III or equivalent check may apply to the District Commander for a waiver. To obtain a waiver, Contractor personnel to:
(1) Obtain a certified copy of their complete criminal history including arrests and convictions.
(2) Obtain a letter of support from their USACE sponsor. The letter to indicate that the sponsor requests that the person be granted unescorted access to accomplish a specific purpose as well as the anticipated frequency and duration of such visits. If Contractor personnel is terminated, the sponsor is to inform the CEMVR-SL so that unescorted access is no longer authorized.
(3) Submit a letter requesting the access denial be waived, to the USACE sponsor who will submit it to the District Commander. The letter to include offenses, including an explanation of why the conduct to not result in denial of access. Other factors that the sponsor or requesting individual to address are the:
(a) Nature and seriousness of the conduct;
(b) Specific circumstances surrounding the conduct;
(c) Length of time elapsed since the conduct;
(d) Age of the person at the time of the incident or conduct;
(e) Proof of efforts toward rehabilitation; and
(f) Current mailing address or email address for Army communications.
(4) The USACE sponsor will review the person's information for completeness and determine whether to endorse the request for a waiver.
(5) If the USACE sponsor endorses the waiver letter, the sponsor will provide a letter of recommendation for the person. The letter to address the relevant conduct that caused the denial and indicate why the conduct to not prohibit the person from being granted
SECTION 01 14 00 Page 6 unescorted access. The USACE sponsor will submit the letters to the District Commander.
(6) The District Commander will render a determination in line with good order, discipline, and health and safety of the facility.
The District Commander will provide a copy of the determination to the person.
(7) The results of the District Commander's decision will be provided to the CEMVR-SL to update the Access Control List for the project.
(8) Persons who had a waiver request denied may request reconsideration from the District Commander one year after the date of the Commander's decision. Persons may request reconsideration earlier if they can present significant information that was not available at the time of the original request or show that the basis for the original denial was overturned, rescinded, or expired.
f. If an unexpected change in personnel is required due to sudden absence of critical path Contractor personnel, immediately contact the Contracting Officer to coordinate obtaining written approval from CEMVR-SL for new or additional Contractor personnel to be brought on-site prior to background check acceptance. Submit ATTACHMENT A - Personnel Change Request Form to receive written authorization from CEMVR-SL prior to bringing new Contractor personnel on-site. Ensure that a background check is sent to CEMVR-SL no later than 10 days from written notice of approval. USACE Rock Island District reserves the right to terminate access of Contractor personnel upon review of the background check. The Contractor will be notified immediately of any such Government decision.
g. If an unforeseen change in work site conditions, which may require a Contract Modification, causes the immediate addition of Contractor personnel, submit ATTACHMENT A - Personnel Change Request Form to receive written authorization from CEMVR-SL prior to bringing new personnel on-site. Ensure that a background check is sent to CEMVR-SL no later than 10 days from written notice of approval. USACE Rock Island District reserves the right to terminate access of Contractor personnel upon review of the background check. The Contractor will be notified immediately of any such Government decision.
1.5.3 E-Verify Program
Comply with FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION and Subpart
22.18 and submit Company Enrollment in E-Verify at:
https://www.e-verify.gov/ to meet the Contract employment eligibility requirements. Cooperate with Federal and State agencies responsible for enforcing labor requirements including eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i) FEDERAL AND STATE LABOR REQUIREMENTS - POLICY. Submit an initial list of verified/eligible candidates within three business days after Notice to Proceed. When Contracts are with individuals, the individuals to complete a Form I-9 , Employment Eligibility Verification, and submit it as part of the official Contract file.
SECTION 01 14 00 Page 7
1.6 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
Follow current Army Security Regulations concerning strict visitor control and preservation of Government assets. Immediately report security concerns to the Contracting Officer.
Work may be affected by the following Force Protection Conditions levels:
FPCON NORMAL
Applies when there is no discernible terrorist activity. Routine security posture.
FPCON ALPHA
When there is a general threat of possible threat activity against personnel and the installation, or both. There will be a limited impact on normal operations.
FPCON BRAVO
When there is an increased or more predictable threat. There will be an impact on normal operations, but it will not cause undue hardship to personnel, substantially affect operational capabilities, or cause aggravated relations with local authorities and civilians.
FPCON CHARLIE
When an incident occurs, or intelligence is received indicating imminent terrorist action. If this lasts for more than a short period it will probably create hardships for personnel and affect the peacetime activities of units and personnel.
FPCON DELTA
When a terrorist attack has occurred, or intelligence indicates likely terrorist action against a specific location. This is normally declared as a localized warning and requires implementation of mandatory security measures. This cannot be sustained for an extended period without causing significant hardships for personnel and affecting the peacetime activities of units and personal.
FPCON NORMAL through FPCON BRAVO will not affect the work. FPCON CHARLIE and FPCON DELTA will affect the work. FPCON CHARLIE will subject the Contractor to a higher degree of inspection and may not be able to work on-site for short periods of time as decreed by the USACE Rock Island District Security Officer. FPCON DELTA, as determined by the USACE Rock Island District Security and Law Enforcement Office, will close the site down and the Contractor will not be able to work on the site.
1.7 SPECIAL SAFETY REQUIREMENTS
Remove Contractor personnel from the job site who disregards safety regulations or displays unsafe attitudes and actions, as directed, and in accordance with EM 385-1-1 .
Work over or near water to be in accordance with 29 CFR 1926.106 and
SECTION 01 14 00 Page 8
EM 385-1-1 Chapter 19 (19-8.e).
a. Provide Contractor personnel working over or near water, where the danger of drowning exists, with U.S. Coast Guard-approved life jackets or buoyant work vests.
b. Prior to and after each use, inspect buoyant work vests or life preservers for defects which would alter their strength or buoyancy.
Do not use defective units.
c. Furnish ring buoys in accordance with EM 385-1-1 and refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraph LIFESAVING AND
SAFETY SKIFFS.
1.8 LOCATION OF PARKING, STAGING, AND STORAGE AREAS
The Contractor's parking, staging, and storage areas are as indicated or as coordinated and approved.
1.9 ELECTRICAL POWER LINES
Prior to mobilization, if the work will be adjacent to power lines, provide appropriate danger signs where equipment scheduled for use is capable of contacting such lines. To confirm the location of underground lines, contact the appropriate council listed in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS paragraph ONE CALL SYSTEM FOR EXCAVATORS.
Either have aerial power lines temporarily shut off and prevent the lines from being energized, or maintain clearances required by EM 385-1-1 . Do not proceed working into dangerous areas without assigning additional Contractor personnel to watch the movements of other personnel and equipment. Ensure that designated clearances are maintained.
1.10 BARRICADES AND WARNING SIGNS
Provide and maintain barricades, danger and warning signs, and, if applicable, suitable and efficient lighting at all points of entry to the area(s) that will be closed to public travel or access. Furnish flagmen and watchmen to warn and direct traffic or to prevent travel on any portion of roadways during the periods in which operations under the Contract are performed as may be required to ensure safety and prevent accidents. Separate payment will not be made for costs incurred for providing barricade and warning signs. Costs is to be considered as a subsidiary obligation and included in the appropriate Cost Line Item Numbers. Refer to Section 01 20 00 PRICE AND PAYMENT PROCEDURES.
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
The Government will not make utility or facility services available to the Contractor. Provide utility services and maintain a minimum field-type sanitary facility within the construction area, as approved.
SECTION 01 14 00 Page 9
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 10
ATTACHMENT A TO SECTION 01 14 00
PERSONNEL CHANGE REQUEST FORM
Contract No. ____________________ Date _______________
We, ____________________, respectfully request to add / replace (circle one) personnel to the jobsite due to the following situation:
Personnel to be conditionally added to the ACL (escorted by):
Background checks (if required for a long term employee) is to be submitted by the close of business on (Insert proposed date): _________________________
(Insert signature block)
SECTION 01 14 00 Page 11
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Demolition and Deconstruction
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Civil and Structural Work
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Mechanical Work
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.4 Electrical Work
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.5 Pump Equipment
1.1.5.1 Payment
1.1.5.2 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 20 00 Page 1
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the costs of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Demolition and Deconstruction
1.1.1.1 Payment
Payment for all costs associated with, or incidental to, demolition or deconstruction of applicable project features will be made for Item No.
0001, "Demolition and Deconstruction." Price to include deconstruction and transportation of temporary pumps in accordance with Section 02 41 00 DEMOLITION AND DECONSTRUCTION. Price to also include restoration of all areas disturbed by the temporary construction facilities to original or better condition at the completion of construction.
1.1.1.2 Unit of Measure
Unit of measure: job.
1.1.2 Civil and Structural Work
1.1.2.1 Payment
Payment for all costs associated with civil and structural work including, but not limited to, provide fencing, provide fuel tank and support, concrete, and steel accessories for equipment will be made for Item No.
0002, "Civil and Structural Work."
1.1.2.2 Unit of Measure
Unit of measure: job.
1.1.3 Mechanical Work
1.1.3.1 Payment
Payment for all costs associated with mechanical work including, but not limited to, pump engine system equipment installation, louver, piping, and fuel tank assembly will be made for Item No. 0003, "Mechanical Work."
SECTION 01 20 00 Page 2
1.1.3.2 Unit of Measure
Unit of measure: job.
1.1.4 Electrical Work
1.1.4.1 Payment
Payment for all costs associated with electrical work including, but not limited to, providing materials and equipment for electrical work will be made for Item No. 0004, "Electrical Work."
1.1.4.2 Unit of Measure
Unit of measure: job.
1.1.5 Pump Equipment
1.1.5.1 Payment
Payment for all costs associated with furnishing the pump equipment including, but not limited to, purchase and delivery of a diesel engine and accessories, power take off shaft, and right angle gear drive will be made for Item No. 0005, "Pump Equipment."
1.1.5.2 Unit of Measure
Unit of measure: job.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 20 00 Page 3
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PRECONSTRUCTION CONFERENCE
1.3.1 Attendees
1.4 SUSTAINABILITY
1.5 CONDITION OF EXISTING STRUCTURES AND OTHER FACILITIES
1.6 U.S. ARMY CORPS OF ENGINEERS SAFETY AND OCCUPATIONAL HEALTH MANUAL
(EM 385-1-1)
1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.8 PROGRESS MEETINGS
1.9 INSPECTION
1.10 DAMAGE TO WORK
1.11 ONE CALL SYSTEM FOR EXCAVATORS
1.12 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION
1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.14 DELAYS DUE TO HIGH WATER
1.15 HIGH WATER ACTION PLAN
1.16 IOWA SALES AND USE TAX EXEMPTION CERTIFICATE
1.17 PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.18 SUPERINTENDENCE OF SUBCONTRACTORS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule
ER 415-1-15 (1989) Construction -- Construction Time Extensions for Weather
1.2 SUBMITTALS
Government approval is required for submittals with a "G" classification.
Submittals not having a "G" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Preconstruction Condition Survey ; G ECDC
High Water Action Plan ; G ECDC
Superintendence of Subcontractors ; G ECDC
SD-11 Closeout Submittals
Postconstruction Condition Survey ; G ECDC
1.3 PRECONSTRUCTION CONFERENCE
Immediately after award, prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Conference. The purpose of this conference is to discuss and develop a mutual understanding of the administrative requirements of the Contract including, but not limited to: daily reporting, invoicing, value engineering, safety, schedule requirements, quality control, schedule of prices or earned value report, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections, and contract close-out. The Contractor to present and discuss their basic approach to scheduling the construction work and any required phasing.
SECTION 01 30 00 Page 2
1.3.1 Attendees
Contractor attendees to include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager, and major subcontractors.
1.4 SUSTAINABILITY
a. Meet USEPA recycled content requirements. Ensure all Contractor-furnished supplies contain recycled content (e.g., insulation, restroom dividers, roofing materials). The list of USEPA-Designated Recovered Material Products is available online at:
https://go.mil/cemvr-cpg
b. Meet USDA BioPreferred Program requirements. Ensure all Contractor-furnished supplies contain biobased content (e.g., interior wall panels, plastic insulating foam, plastic lumber). The list of USDA-Designated BioPreferred Program Product Categories is available online at:
https://go.mil/cemvr-eep
c. Use energy- and water-efficient building-related products and equipment as applicable. Ensure all Contractor-furnished equipment meets energy efficiency requirements (e.g., light fixtures, gas water heaters, central air conditioners, windows, doors), and water efficient requirements (e.g., faucets, showerheads, toilets) (when applicable to the work to be performed). The list of USDOE Product Categories Covered by Efficiency Programs is available online at:
https://go.mil/cemvr-bppc
d. Print all deliverables double-sided on paper that contains post-consumer fiber.
1.5 CONDITION OF EXISTING STRUCTURES AND OTHER FACILITIES
a. Preconstruction condition survey - After receiving Notice to Proceed, make a detailed survey of existing structures; Contractor staging, storage, and parking areas; roadways; levees; and other facilities that may be affected by the Contractor's operations. Conduct surveys with the Drainage District and the Contracting Officer and obtain signatures from all parties. Survey sufficiently in scope to provide advance agreement among all concerned as to the condition of the existing structures; Contractor staging, storage, and parking areas;
roadways; levees; and other facilities. Presume responsibility for full and active participation in such preconstruction condition survey of existing structures; Contractor staging, storage, and parking areas; roadways; levees; and other facilities as deemed necessary to permit determination and accurate assessment of any subsequent damage to existing structures; Contractor staging, storage, and parking areas; roadways; levees; and other facilities which may be incurred during the Contract.
b. Postconstruction Condition Survey - After completion of the work, and prior to final acceptance of the work, make a detailed Postconstruction condition survey of the same structures; Contractor
SECTION 01 30 00 Page 3 staging, storage, and parking areas; roadways; levees; and other facilities previously surveyed and obtain signatures from all parties. Survey sufficiently in scope to provide for agreement among all concerned as to the post-project condition of the structures;
Contractor staging, storage, and parking areas; roadways; levees; and other facilities. Presume responsibility for full and active participation in such postconstruction condition survey as deemed necessary to permit determination and accurate assessment of any damage to structures; Contractor staging, storage, and parking areas;
roadways; levees; and other facilities which have been incurred during the Contract.
c. Include, but do not limit the surveys to, photographs, videos, sketches, and written descriptions. Submit documentation to each party involved.
d. If it is determined by the postconstruction condition survey that damage has occurred to structures; Contractor staging, storage, and parking areas; roadways; levees; and other facilities, then repair such damage to a condition equal to the pre-Contract conditions, as approved, at no additional cost to the Government.
1.6 U.S. ARMY CORPS OF ENGINEERS SAFETY AND OCCUPATIONAL HEALTH MANUAL (EM
385-1-1)
The Government Safety and Occupational Health Manual, EM 385-1-1 (including all interim changes) to be followed and effective on the date of award. EM 385-1-1 is available online at:
https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/
1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
a. This paragraph does not apply to terminations. See FAR 49.206-2 BASES
FOR SETTLEMENT OF PROPOSALS.
b. Allowable cost for construction equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier will be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the Contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment will be based upon the applicable provisions of EP 1110-1-8 Region V. Working conditions will be considered to be average for determining equipment rates using the schedule unless specified otherwise. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations applies.
For retroactive pricing, the schedule in effect at the time the work was performed applies.
c. Equipment rental costs are allowable, subject to provisions of FAR
31.105 CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS, paragraph (d)(ii) and FAR 31.205-36 RENTAL COSTS. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined
SECTION 01 30 00 Page 4 using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the Contracting Officer will request a certified cost or pricing data, or partial/limited data, as appropriate. Submit data on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
1.8 PROGRESS MEETINGS
a. Attend progress meetings as scheduled by the Government. Prepare agendas for the meetings. The list of attendees to include, but not be limited to, the Contractor's key site personnel, supervisor(s)/superintendent(s), safety person(s), quality control manager(s), and subcontractors' representative(s).
b. Address and discuss such items as progress of the work, potential factors for delays, proposed daily work schedule for the next period, deficiencies, utility service interruptions, protection of adjacent areas, coordination with other Contractors and Government hired labor, material delivery schedules, submittals, quality control, safety issues, and any other issues requiring addressing or discussions.
c. Prepare minutes of the progress meetings and obtain a list of invitees and attendees from all parties. Submit minutes to all parties involved.
1.9 INSPECTION
The presence of a Government inspector does not relieve the Contractor of the responsibility for the proper execution of the work in accordance with the Contract Specifications and Drawings.
1.10 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work is specified in FAR 52.236-7 PERMITS AND RESPONSIBILITIES. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed or completed by the Contractor is damaged by flood, earthquake, or other natural disaster in which the damage is not due to the failure of the Contractor to take reasonable precautions or exercise sound engineering and construction practices in the conduct of the work, then make the repairs as directed, and full compensation for such repairs will be made at the applicable Contract unit or job price as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no Contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to FAR 52.243-4 CHANGES, will be made as full compensation for the repairs of that part of the permanent work. Except as herein provided, repair the damage to all work (including temporary construction), utilities, materials, equipment, and plant to the satisfaction of the Contracting Officer at no additional cost to the Government, regardless of the cause of such damage.
1.11 ONE CALL SYSTEM FOR EXCAVATORS
One call systems, established by law, are operated by owners of
SECTION 01 30 00 Page 5 underground utilities for excavators. Upon notification by an excavator through a one call system, all participating operators of underground utilities in a covered area will identify and locate utilities. Use of a ground penetrating radar or services of a utility locating company is acceptable to the Government. Identify one call system by contacting:
a. "Call Before You Dig" Telephone No.: 811 Internet: http://www.call811.com
1.12 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION
In addition to the requirements of Contract Clause PHYSICAL DATA, additional Contractor information is furnished below:
(b) Weather Conditions
National Weather Service climatological data consisting of precipitation and temperature records observed at Lock and Dam 16, Illinois City, Illinois, are shown in the table below. These data are based on monthly averages for the 10-year period 2015-2024, inclusive.
PRECIPITATION TEMPERATURE (Degrees Fahrenheit)
Days Over Days Over Total Average Average Monthly Days Below Month 0.1" 0.5" For Month Maximum Minimum Average 32 Degrees
January 4 0 1.23 31 16 24 29 February 3 1 1.31 36 17 27 25 March 6 1 2.20 49 30 40 18 April 6 2 2.90 61 39 50 8 May 9 3 4.77 73 52 63 0 June 8 3 4.91 83 62 73 0 July 7 3 4.26 86 65 75 0 August 7 3 3.96 83 63 73 0 September 5 2 3.43 80 57 68 0 October 5 2 2.87 67 44 56 3 November 4 1 2.00 51 31 41 18 December 4 1 1.80 40 24 32 24
(d) Reference Drawings
Provided as a separate file, Reference Drawings are for reference only. Drawings are the property of the U.S. Government and are not to be used for any purpose other than that intended by the Contract.
(e) Hydraulic Data
Daily and historic river gage readings from the Muscatine IA River Gage can be obtained from the U.S. Army Corps of Engineers web site as follows:
1. Go to http://www.rivergages.com
2. In the "Choose an Option" drop-down field, select "Rock Island District"
3. In the "Choose a Basin" drop-down field, select the
SECTION 01 30 00 Page 6
"Mississippi River & Passess"
4. Scroll to locate the Mississippi River at Muscatine, IA Gage
5. Review date range, stage or elevation, and choose output format (plot, tabulate, tabulate yearly)
Historic river duration curves may be constructed using the data provided in the output. Additional information and support is available upon request. River Gage datum is MSL1912. Project datum is
NAVD88.
1.13 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
a. Provision ER 415-1-15 specifies the procedure for determination of time extensions for unusually severe weather in accordance with FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION). In order for the Contracting Officer to award a time extension under this clause, the following conditions to be satisfied:
(1) The weather experienced at the project site during the Contract period was found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather to actually cause a delay to the completion of the project. The delay to be beyond the control and without the fault or negligence of the Contractor.
b. The following schedule of monthly anticipated adverse weather delays is based on National Weather Service Climatological Data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule to reflect these anticipated adverse weather delays in all weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (7) DAY WORK WEEK
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
(31) (28) (24) (14) (09) (08) (07) (07) (05) (08) (22) (28)
c. Upon acknowledgment of the Notice to Proceed and continuing throughout the Contract, record on the daily Contractor Quality Control report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days to prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days to include days impacted by actual adverse weather (even if adverse weather occurred in the previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in list item (b.), the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with FAR 52.249-10 DEFAULT (FIXED-PRICE
CONSTRUCTION).
SECTION 01 30 00 Page 7
1.14 DELAYS DUE TO HIGH WATER
Upon mobilization and continuing throughout the Contract, record on the daily CQC report, the high water level elevation at the site and any resultant impact to normally scheduled Contract work. The Contract period will be extended by the number of calendar days that water levels prevent such work and is over El. 546.74 feet. The Government will not reimburse the Contractor for standby costs, mobilization, demobilization, or any other costs associated with delays caused by high water levels. Delays caused by high water levels will not be the basis for an adjustment in Contract price. Refer to paragraph ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION and accurately interpret gages and duration curves.
1.15 HIGH WATER ACTION PLAN
Provide a plan detailing the activities to minimize the adverse effects of high water. Include protection of accomplished work and Contractor equipment and personnel. Include emergency measures to restore damaged sections of the project. Emergency measures to provide sound engineering methods that provide protection at, or greater than, the height of the existing feature, in the event that high water occurs.
1.16 IOWA SALES AND USE TAX EXEMPTION CERTIFICATE
Materials physically incorporated into real estate projects property are exempt from Iowa Sales and Use Taxes. However, sales of tools, fuel, lumber for forms, and other end use or consumption items which are not physically incorporated into real estate are taxable. After receiving Notice to Proceed, the Contractor may request the Government Sales Tax Exemption Number.
1.17 PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
The Contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing, and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8 PAYROLLS AND BASIC RECORDS and FAR 52.222-13 COMPLIANCE
WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS.
The Contractor is responsible for obtaining and providing access for licenses and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required to comply with the Davis-Bacon Act and related statutes. Use the electronic Davis-Bacon Act payroll service to prepare, process, and maintain the relevant payrolls and basic records for all work under the Contract. The electronic payroll service to be capable of preserving the payroll and related basic records for the required 3 years after Contract completion. Obtain and provide electronic system access including electronic review to the Government, as required in accordance with the Davis-Bacon Act and related statutes through the duration of the construction Contract.
The Contractor's provision and use of an electronic payroll processing system to follow the basic functional criteria below:
a. commercially available;
b. compliant with appropriate Davis-Bacon Act payroll provisions in the
SECTION 01 30 00 Page 8
FAR;
c. able to accommodate the required numbers of employees and subcontractors that will be employed under the Contract;
d. capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export into an Excel spreadsheet to be imported into the Contractor's mode of Resident Management System
(RMS);
e. demonstrate security of data and data entry rights;
f. able to produce Contractor-certified electronic versions of weekly payroll data;
g. able to identify erroneous entries and track the date/time of all versions of the certified Davis-Bacon Act payrolls submitted to the Government over the life of the Contract; and
h. capable of generating a durable record copy in a Compact Disc (CD) or Digital Versatile Disc (DVD) and Portable Document Format (PDF) file record of data from the system database at the end of the Contract closeout. This durable record copy of data from the electronic payroll processing system to be provided to the Government during Contract closeout.
Include Contractor-incurred costs related to the Contractor's provision and use of the electronic payroll processing service in the Contractor's price for the overall work under the Contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services to not be a separately bid, proposed, or reimbursed item under this Contract.
1.18 SUPERINTENDENCE OF SUBCONTRACTORS
a. Submit a list of the subcontractors being used under this Contract.
Include the name of the subcontractor, type of work or service being provided, the dollar amount of each subcontract, associated percentage of each subcontract based on the Contract award amount, and a summation of subcontractor costs and total subcontractor percentage based on the Contract award amount. Also submit the superintendence information as required by FAR 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR and, if more than 50 percent of the value of the Contract work is subcontracted, provide one additional superintendent at the site responsible for coordinating, directing, inspecting, and expediting the subcontract work.
b. After 50 percent of the subcontracted work has been completed and satisfactory progress is being made, the Contracting Officer may waive all or part of the above requirement for additional superintendence.
The Contracting Officer may reinstate such requirements if during the progress of the remaining work satisfactory progress is not being made.
SECTION 01 30 00 Page 9
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 30 00 Page 10
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 ACCEPTANCE
1.3 SCHEDULE FORMAT
1.3.1 Bar Chart Schedule
1.3.2 Schedule Submittals and Procedures
1.4 SCHEDULE MONTHLY UPDATES
1.5 CONTRACT MODIFICATION
1.6 2-WEEK LOOK AHEAD SCHEDULE
1.7 CORRESPONDENCE AND TEST REPORTS
1.8 ADDITIONAL SCHEDULING REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 32 16 Page 1
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only.