This document is a set of design and construction drawings for the Cedar Rapids Flood Risk Management Project, specifically Volume 117 covering the South Railyard Floodwall construction. The project is managed by the U.S. Army Corps of Engineers Rock Island District and references contract number W912EK26BA002, with solicitation date of February 2026.
The drawings detail comprehensive civil and structural design specifications for floodwall construction including overall detour and traffic control plans, water main relocation details with a 36-inch diameter DIP (Ductile Iron Pipe) system, foundation and levee profiles, and splash pad construction. Key structural elements include monolithic concrete wall sections (M1026 through M1042) with sheet pile and H-pile (HP 14X73) foundations, reinforced concrete construction with specified concrete strength of f'c = 4,500 PSI and reinforcing steel fy = 60,000 PSI, and piezometer installation for monitoring. The floodwall achieves a top elevation of 741.10 feet with detailed aesthetics specifications including exposed aggregate formliner finishes and integrally colored concrete. Construction coordination requirements include maintaining existing infrastructure access (Shaver Road, Cedar Lake Trail), implementing traffic control per City of Cedar Rapids and MUTCD standards, and performing vibration monitoring during pile driving near the existing 36-inch water main. The project specifications reference ACI 318-14, AISC 360-10, AWS welding codes, and the 2018 International Building Code with local amendments, with the contractor responsible for furnishing all shoring and temporary construction measures during the earthwork and structural phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABANDONED
ABANDONED
W
W
W
W
W
W
A N
S I
D
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
T
W E
K B
A
R O
C K
I S
L A
N D
D
IS
T R
IC
C K
I S
L A
N D
IL
L
IN
IS
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
IA
B
C
E D
R P
D
IO
W
A R
IV
E
R B
A S
IN
RIVER DETOUR
BEGIN CEDAR
SB DETOUR
NB DETOUR AND
SB DETOUR
NB DETOUR AND
RIVER DETOUR
END CEDAR
VOL117 WORK LIMITS
TRAIL CLOSED
GC106
M
K L
IN
E
J U
N
A M
N D
G E
N E
R A
L R
E V
IS
IO
N
C
E D
R P
D
P
D
IE
R K
IN
G
H
VOL 117
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_GC106.dgn
M
K U
R E
K
M
K L
IN
E
A1
SCALE: 1" = 300'
EXISTING CEDAR LAKE TRAIL DETOUR
O V
E R
A L
L D
E T
O U
R A
N D
T R
A F
F
IC
C O
N T
R O
L P
L A
N
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
(P R
S
T
S
T N
W
T
H
S
T
Q
T
H
S
T
AVE
AVE
AVE
J AVE
AVE
N
AVE
T
H
T
H
WEARE
LINCOLN
BROWN
AVE
AVE
LAKE
H
HUBBARD
T
H
S T
I
J
C E
N T E
R
T
H
S T
D A
N
IE
L S
R D
P O
IN
T
K
AVE
AVE
S H
A V
E R
D R N
E S
IE
R R
A
R D
O A
K L
A N
D
R D N
E
NW NW
NW
N W
NW
NW
ELLIS LN NW
R
D S
T N
W
R
D S
T N
W
N W
N W
N
D S
T N
W
NW
NW
NW
NW
NW
T
H S
T N
W
C A
VE N
E
S T N
E
T
H
AVE NE
NE
N E
G AVE NE
S T N
E
AVE NE
NE
S T
N E
N E
N E
AVE NE
NE
AVE NE
N E
AVE N
E
C O
L L E
G E D
R N
E
F A
VE N
E
CEDAR LAKE
C E
D A
R R
IV
E R
CEDAR LAKE
AVE NE
K AVE NW
NE
U
D R D
D A
VE N
E
T
H S
T R
E E
T N
E
M C
LO
U D R
U
N J AVENUE NE
T
H S
T R
E E
T N
E
I AVENUE NE
IN
T E
R S
T A T E
S H
A V
E R R
O A
D
H AVENUE NE
B
C E
D R
P D
V
O L
G C
.D
G N
NORTH
PLAN
600'0 300'
FROM/TO CEDAR LAKE TRAIL.
USE 10TH STREET AND CEMAR TRAIL FOR DETOUR
NB/SB PEDESTRIAN AND BICYCLIST:A.
GENERAL SHEET NOTES
T R
U E N
CONTROL OPERATIONS FROM ADJACENT PROJECTS.
ANTICIPATED THAT VOLUME 117 WORK WILL DISRUPT OTHER TRAFFIC
OPERATIONS, DETOURS, ETC. SHOWN ARE CURRENTLY IN PLACE. IT IS NOT
10. PLAN SHEET INCLUDED FOR INFORMATION ONLY. TRAFFIC CONTROL
TO 10TH STREET CONSTRUCTION.
REMOVE TRAIL DETOUR AND RESTORE TRAFFIC TO CEDAR LAKE TRAIL PRIOR 9.
CEDAR LAKE TRAIL DETOUR.8.
DETOUR SIGNAGE AT INTERSECTIONS.
SEE SHEET CP106 FOR 10TH STREET CLOSURE PLAN AND CP107 FOR TRAIL 7.
CONSTRUCTION.
INSTALL TRAIL DETOUR SIGNAGE AND BARRIERS PRIOR TO STARTING 6.
MAINTAIN AND RESTORE ROADWAYS TO PRE-CONSTRUCTION CONDITION.5.
BIKE OR PEDESTRIAN LANE.
CURB OR TEMPORARY BARRIER ON DETOUR ROUTES WITH NO ESTABLISHED
SEPARATE PEDESTRIAN AND BICYCLE TRAFFIC FROM VEHICLE TRAFFIC BY 4.
PRIOR TO DATE OF CLOSURE.
OFFICER. OBTAIN APPROVAL FOR TEMPORARY CLOSURES AT LEAST 7 DAYS
EXCEPTION OF TEMPORARY CLOSURES AUTHORIZED BY THE CONTRACTING
OPEN TO TRAFFIC FOR THE DURATION OF THE CONTRACT, WITH THE
SHAVER ROAD, CEDAR LAKE TRAIL DETOUR, AND DRIVEWAYS ARE TO REMAIN 3.
LEVEE TRAILS ARE OPEN TO PEDESTRIAN AND BIKE TRAFFIC.
10TH STREET WILL BE CLOSED AND USED AS A TRAIL DETOUR UNTIL THE 2.
CONTRACTING OFFICER APPROVAL PRIOR TO STARTING CONSTRUCTION.
VERSIONS OF CITY OF CEDAR RAPIDS AND MUTCD STANDARDS FOR
DESIGN AND SUBMIT A TRAFFIC CONTROL PLAN FOLLOWING CURRENT 1.
SOLICITATION
F E
B R
U A
R Y
D
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
CS602
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
P
D
IE
R K
IN
G
H
D R
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
VOL 117
B5CEDRPD202302_VOL117_CS602.dgn
K C
O H
N H
D R
A J U
D D
H
D R
M R
E D
IN
G
T O
N H
IV
IL
C
O N
T R
O L
S C
H E
D U
L
D1
SCALE: NTS
SHEET PILE TIP ELEVATIONS
F1
CONTROL LINE DATA - 10TH STREET
A1
PERMANENT PIEZOMETER LOCATIONS
A9
CONTROL POINTS
PUMP STATION
SCALE: NTS
D9
SCALE: NTS
RIPRAP ELEVATIONS
TOP OF MCLOUD RUN CHANNEL
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
B C
E D
R P
D V
O L
C
S .D
G N
SEE SHEET VF101 FOR PROJECT SURVEY CONTROL.1.
GENERAL SHEET NOTES
INSTALL 3 BOLLARDS AROUND RIVERSIDE AND LANDSIDE PIEZOMETERS AT 152+50 AND 157+00 PER DETAIL A8 ON CF5054.
APPROXIMATE ELEVATION 724.5 FEET
PZ-3, PZ-6, PZ-9, AND PZ-12: 2 FEET ABOVE SURFACE OF POLLINATORS AREA PLANTING MEDIA ATb.
APPROXIMATE ELEVATION 724 FEET
PZ-1, PZ-4, PZ-7, PZ-10, PZ-13, PZ-15, PZ-16 AND PZ-18: 2 FEET ABOVE SURFACE OF RIPRAP ATa.
INSTALL PIEZOMETERS WITH STICKUP COMPLETION TO THE FOLLOWING TOP OF PROTECTIVE CASING ELEVATIONS3.
OF THE LEVEE AT STATIONS 132+00, 137+00, 142+00, AND 147+00 IN THE POLLINATORS AREA.
RIPRAP COVERED SLOPE BETWEEN THE TRAIL AND THE EDGE OF THE LAKE. INSTALL PIEZOMETERS ON THE RIVERWARD (WEST) SIDE
INSTALL PIEZOMETERS ON THE CEDAR LAKE (EAST) SIDE OF THE LEVEE AT STATIONS 132+00, 137+00, 142+00, AND 147+00 ON THE 2.
INSTALL PIEZOMETERS AFTER LEVEE EMBANKMENT IS COMPLETE.1.
NOTE:
TOP OF SHEET PILE ELEVATION IS 722 FEET.1.
NOTE:
F E
B R
U A
R Y
SOLICITATION
OR BEDROCK, WHICHEVER OCCURS FIRST1
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
VAULT WALL EL. 732.00
TOP OF CONCRETE CAST-IN-PLACE
NOTE: FIELD VERIFY LOCATION OF EXISTING WATERMAIN.
2'-0" (+/-)
TOP OF FLOODWALL EL. 741.10
CONNECT TO EXISTING WATER MAIN VAULT
REMOVE UNREINFORCED BLOCKOUT AND
EXISTING COLD CONSTRUCTION JOINT (TYP. 4 SIDES)
WATERMAIN
EXISTING
CONCRETE VAULT WALL
EXISTING 1'-3" CAST-IN-PLACE
PIPE SUPPORT (TYP.)
EXISTING CONCRETE
TO EXISTING WATERMAIN
REMOVE PLUG AND TIE
COARSE AGGREGATE
FILLED WITH COMPACTED
EXISTING WATERMAIN VAULT
EXISTING REMOVABLE SLABSSEE SHEET SS303 DETAIL A6
FILLED WATER MAIN VAULT
(DESIGNED BY OTHERS) SEE VOL 120
EXISTING PEPSI CO/QUAKER FLOODWALL
CU104
J U
N E
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
P
D
IE
R K
IN
G
H
D R
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
VOL117
B5CEDRPD202302_VOL117_CU104.dgn
REMOVED
WATER MAIN TO BE
EXISTING 36"
W A
T E
R M
A
IN
P L
A N
A N
D P
R O
F
IL
E
L S
W A
N K
C
D G
R L
O D
E W
Y C
K C
D G
D
R
IE
C K
C
D G
D4
A4
NORTH CONNECTION - PLAN
NORTH CONNECTION - PROFILE
BELOW GRADE AND BACKFILLED.
EQUIPMENT TO BE REMOVED AND LINE TO BE PLUGGED
FOR 36" DIA. MAIN. UPON COMPLETION, FLUSHING
OR AS APPROVED BY THE CITY PER SUDAS SECTION 5930
OTHER METHOD TO PROVIDE FLUSHING VELOCITY OF 3 FPS
AND DISINFECTION OF NEW 36" DI MAIN. FIRE HYDRANT OR
CONNECTION POINT FOR TEMPORARY FLUSHING, BLOW-OFF,
SEE CU502
36" DIA WATER MAIN
HOT TAP EXISTING
SUBDRAIN IN VOL115A.
PIPE. MAINTAIN A 10' MIN. SEPARATION FROM 18"
CONCRETE THRUST BLOCK TO SUPPORT END OF
RELOCATED 36" WATER MAIN
CONCRETE THRUST BLOCK
WATER MAIN
EXISTING 36"
36" DIA 45° BEND
36" DIA 45° BEND
36" DIA 22.5° BEND
36" DIA 22.5° BEND
EL. 727.5
CL 36" WATER MAIN
FOOTING
FLOOD WALL
THRU WALL
36" DIP SLEEVE
FLOOD WALL
FINISH GRADE
EXISTING GRADE
PLACEMENT OF PERMANENT LINE PLUG.
FOR PLACEMENT OF LINE STOP SEE CU502 FOR
INSTALL HOT TAP AND PLUG ON EXISTING 36" DIP
THROUGH WALL DETAIL.
SS307 FOR PIPE PENETRATION
THROUGH VAULT WALL. SEE SHEET
OF VAULT WALL PENETRATION
PROVIDE PIPE JOINT ON EACH SIDE
SEE SHEET SS302 DETAIL A6
TOP OF CONCRETE EL 732.0
FILLED WATER MAIN VAULT
SCALE: 1" = 10'
SCALE: 1" = 10'
36" X 12" TEE
36" X 36" TAPPING SLEEVE
36" TAPPING GATE VALVE AND
36" X 12" TEE
36" X 36" TAPPING SLEEVE
36" TAPPING GATE VALVE AND
36" DIA 22.5° BEND
36" DIA 45° BEND 36" DIA 22.5° BEND
36" DIA 45° BEND
PRIOR TO CLSM FILLING ABANDONMENT.
RELOCATED 36" WATER MAIN IS IN SERVICE,
REMOVE 36" MAIN AND PROTECTION AFTER
ENCASEMENT DETAIL C4 ON SHEET CF505.
RESTRAINING DETAILS ON SHEET CU506 AND
CONCRETE ENCASE 60 LINEAR FEET. SEE
RESTRAINT AT ALL EXPOSED JOINTS AND
EXCAVATE EXISTING 36" MAIN. PROVIDE JOINT
JOINT COUPLING
36" RESTRAINED
SOUTH CONNECTION - PROFILE
SCALE: 1" = 10'
A1
36" RESTRAINED JOINT COUPLING
SEE SHEET CG101
WITH CLSM ENCASEMENT,
18" RCP STORM SEWER
SEE SHEET CG101
WITH CLSM ENCASEMENT,
18" RCP STORM SEWER
ENCASEMENT.
AND STORM SEWER
WATER MAIN ENCASEMENT
BOND BREAKER BETWEEN
CLSM ENCASEMENT. USE
CLSM ENCASEMENT
BLOCK
THRUST
CONC.
SEE CU101 OF VOL115A
0.10% SLOPE
18" SUBDRAIN NON-PERFORATED
TESTING
FOR USE DURING FLUSHING AND
WITHIN THE VAULT PER SUDAS,
PROVIDE AIR RELEASE VALVE
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
6.86' 5.48' 10.8' 40.45' 12.03' 10'4.52'
5,418,016.95 E
3,464,079.28 N
23+00.00 STA
POB
C B
D
CL OF PIPE EL. 727.50
TOP OF FOOTING EL. 724.00
B C
E D
R P
D V
O L
C
U .D
G N
S T
A . 1
.7
P I
NORTH
PLAN
TRUE N
TOP EL 724.02
CONSTRUCT EXPANSION JOINT WITH 1/2-INCH JOINT FILLER AND SEALANT.
ABUT THE VERTICAL WALLS OF THE NEW VAULT TO THE EXISTING VAULT.9.
DETERMINE JOINT LOCATIONS AND THE LOCATION FOR THE LINE STOP.
SHALL PERFORM EXPLORATION ON THE EXISTING WATER MAIN TO
PRIOR TO STARTING ANY WORK RELATED TO LINE STOP, THE CONTRACTOR 8.
IMPACT EXISTING OR FUTURE CONSTRUCTION ACTIVITIES.
THRUST BLOCK RESTRAINT SIZE AND WORK AREA NEEDED SO AS NOT TO
CONTRACTOR TO PROVIDE SUBMITTAL OF DESIGN FOR LINE STOP WITH 7.
REGARDING SCHEDULING.
VALVES ON THE 36" WATER MAIN. CONTRACTOR TO COORDINATE WITH CITY
CITY OF CEDAR RAPIDS WATER DEPARTMENT TO OPERATE THE WATER 6.
DURING CONSTRUCTION PER SPECIFICATION.
CONTRACTOR TO PROVIDE VIBRATION MONITORING FOR 36" WATER MAIN 5.
WITH TRACER WIRE THE ENTIRE LENGTH OF THE NEW WATER MAIN.
ALL DIP SHALL BE INSTALLED WITH NITRILE GASKETS AND SHALL BE FITTED 4.
ALL DIP SHALL BE WRAPPED WITH 8 MIL POLYETHYLENE ENCASEMENT.3.
BLOCKING SHALL BE PROVIDED FOR PIPING OUTSIDE OF VAULT.
ALL DIP AND FITTINGS SHALL BE RESTRAINED JOINT (RJ). CONCRETE THRUST 2.
COMPLETED AND CLSM FILL.
ABANDON EXISTING WATER MAIN AFTER NEW WATERMAIN HAS BEEN 1.
GENERAL SHEET NOTES
10' 20'0
10' 20'0
NOTE: FIELD VERIFY LOCATION OF EXISTING WATERMAIN.
NOTE: FIELD VERIFY LOCATION OF EXISTING WATERMAIN.
IE
.0
R
C P
S T
O R
M S
E W
E R
10.0' 7.0'
SOLICITATION
F E
B R
U A
R Y
SEE NOTE 9
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
1"
/2 t o
7 EQ TOTALS 25'-7 1/2 "*
3'-0"
3" TYP
31'-1 1/2 " REPEATING PATTERN*
26'-1 1/2 "* 1'-0"
V A
R
IE
S
2"
EQ.EQ.
W A
L L
WALL
2'-0"
COLUMN
2'-6"
C O
L U
M N
2"
C O
N C
R E
T E C
A P
CONCRETE CAP
2'-10"
T Y
P
1/2"
3"
1/2"
1 1/2"
CF504
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O
JE
C T
F1
SCALE: NTS
A7
COLUMN CAP DETAIL - MONOLITH M1026
SCALE: 1 1/2" = 1'
B1
MONOLITHIC JOINT DETAIL
A1
PANEL JOINT DETAIL
C3
PROFILE JOINT DETAIL
C
IV
IL
D
E T
A
IL
S
S H
E E
T
O F
B5CEDRPD202302_VOL117_CF504.dgn
FLOODWALL AESTHETICS - STA 161+06.48 TO STA 161+24.73
P
C A
R D
W E
L L
C
D G
A3
COLUMN CAP DETAIL
SCALE: 1 1/2" = 1'
P
C A
R D
W E
L L
C
D G
C K
O T
T W
IT
Z
C
D G
VOL 117
"6
1 1/2 " PANEL JT. TYP.
FINISHED GRADE
PROFILE JOINT TYP.
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
TYPICAL
TOP OF WALL
EL 741.10'
SEE NOTE 5
FORMLINER NO PAINT
EXPOSED AGGREGATE
SEE NOTE 3
PAINT TYPE 2
CONCRETE
CSC3 FINISH
TYPICAL
PAINT TYPE 1
COLUMNS
SEE NOTE 3
OR GRANITE CAP
PRECAST CONCRETE
NOTE:
1. PRECASTER MAY SUBMIT ALTERNATE CONNECTION
FOR APPROVAL.
EASE OF CAP PLACEMENT.
LARGE HOLE DIAMETERS FOR
FILL HOLES W/ GROUT.
STEEL THREADED RODS.
IN CAP W/ (2) 3/4" DIA STAINLESS
(2) 2" DIA x 6" HOLES CENTERED
COLUMN
CAST-IN-PLACE
WALL
CAST-IN-PLACE
SEE PLANS
EXPANSION JOINT
DRIP EDGE
LEVELING BED
1/4" MAX. GROUT
PI STA. 161+24.73
CAST-IN-PLACE WALL
CONCRETE CAP ANCHORS
PRECAST CONCRETE CAP
CL FLOODWALL
PAINTED FACE
FORM LINER OR SEALANT
NOTE 1
JOINT FILLER
1/2" PREFORMED
NOTES:
1. COLOR TO CLOSELY MATCH
ADJACENT CONCRETE.
1" CHAMFER
PAINTED FACE
FORM LINER OR
EACH SIDE
1/2" CHAMFER
V-NOTCH
FACE
FORM LINER
EACH SIDE
CHAMFER
B
C E
D R
P D
V
O L
C F
.D
G N
1' 2'0 6"1' 2'0 6"
GENERAL SHEET NOTES
DARK GRAY - KEIM CONCRETAL W. 18166 GRAPHITE
PAINT TYPE 2 COLOR - BASE AND COLUMN TOPS:
TAN - KEIM CONCRETAL W. COLOR 22178
PAINT TYPE 1 COLOR - COLUMNS:11.
BELOW GRADE: ACI 347 CONCRETE SURFACE CATEGORY 1 (CSC1).10.2
(CSC3).
EXPOSED ABOVE GRADE: ACI 347 CONCRETE SURFACE CATEGORY 3 10.1
PRESSURE WASH TO REMOVE LAITANCE.
CONCRETE FINISH: FORMLINER: PER MANUFACTURER RECOMMENDATION. 10.
FEET.
FINISH CSC3 SHALL BE PROVIDED WHERE EXPOSED HEIGHT IS LESS THAN 3
EXTEND PATTERN UNTIL EXPOSED HEIGHT IS 3 FEET OR LESS. CONCRETE 9.
TYPE 2 COLOR. SEE SPECIFICATION SECTION 03 41 00.
EDWARDS CAST STONE COLOR #55-022 AND PAINTED ON SITE WITH PAINT
PRECAST CONCRETE CAP SHALL BE INTEGRALLY COLORED CONCRETE 8.
FOOTING CONCRETE.
ALL VISIBLE PORTIONS OF WALL (WALL STEMS). NO COLOR ADDED TO
CONCRETE SHALL BE INTEGRALLY COLORED CONCRETE, SOLOMON 920, FOR 7.
DIMENSION AT PI MONOLITHS ON FLOOD SIDE AND PROTECTED SIDE.
PATTERN LAYOUT BASED ON CENTERLINE OF WALL STEM. ADJUST 6.
EXPOSED AGGREGATE OR EQUAL.
EXPOSED AGGREGATE FORMLINER SHALL BE FITZGERALD STYLE 16981 5.
POWER WASH ALL PAINT AREAS AS REQUIRED BEFORE APPLICATION.4.
SOL-SILICATE CONCRETE PAINT SHALL BE KEIM CONCRETAL W.3.
SPECIFICATION.
MOCK-UP APPROVAL REQUIRED PRIOR TO WALL CONSTRUCTION, SEE 2.
DRAWINGS AND SHALL SUBMIT FOR REVIEW. SEE SPECIFICATIONS.
SIDE OF WALL. CONTRACTOR TO DEVELOP PATTERN DETAILED SHOP
ARCHITECTURAL TREATMENT IS REQUIRED ON FLOOD SIDE AND PROTECTED 1.
SOLICITATION
F E
B R
U A
R Y
P
D
IE
R K
IN
G
H
D R
PAINT TYPE 2
PATTERN FOR DIFFERENT LENGTHS.
*NOTE: TYPICAL PATTERN SHOWN, ADJUST
18" AGGREGATE
SUBGRADE SECTION 32 11 23
GEOGRID PER SPECIFICATION
ELEVATION 731.00
18" AGGREGATE
SUBGRADE SECTION 32 11 23
GEOGRID PER SPECIFICATION
ELEVATION 731.00
A N
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
FLOODWALL
FINISHED GRADE
2'-4"
12"
SPLASH PAD
8' CONCRETE
STONE
4' COMPACTED
GRADATION 11
8" THICK IOWA DOT
JOINT FILLER
1/2" PRE-FORMED
JOINT FILLER
1/2" PRE-FORMED
8'-0" 8'-0"
FLOODWALL
SOUTH RAIL YARD
FOUNDATION
ITC POWER POLE
EXISTING 9' DIAMETER
7'-0"
TO ALLOW FUTURE REMOVAL OF ENCASEMENT.
BETWEEN ENCASEMENT AND WALL FOOTING CONCRETE
SEE CU506 FOR RESTRAINT DETAIL. USE BOND BREAKER
JOINTS, THEN ENCASE THE 60' LENGTH IN CONCRETE.
PIPE) AND INSTALL JOINT RESTRAINTS AT ALL EXPOSED
EXPOSE MAIN 30' IN BOTH DIRECTIONS (ALONG AXIS OF
MAIN TO BE ABANDONED.
EXISTING 36" WATER
19'-1 9/16"
'-2 /2 "11'-2 1/2"
OFFSET 13.09' LT
STA. 170+30.21
OFFSET 5.16'' LT
STA. 170+22.29OFFSET 5.16'' LT
STA. 170+03.15
OFFSET 13.09' LT
STA. 169+95.23
POWER POLE FOUNDATION
EXISTING 9' Ø ITC
SHEET PILING
PZ-40
CENTER LINE
SHORING
135° 13 5°
CF505
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
P
D
IE
R K
IN
G
H
D R
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
VOL117
M Q
U A
L Y
H
D R
M R
E D
IN
G
T O
N H
D R
S H
E E
T
O F
B5CEDRPD202302_VOL117_CF505.dgn
A J U
D D
H
D
A3
SOUTH RAIL YARD SPLASH PAD DETAIL - 8'W
C
IV
IL
D
E T
A
IL
S
C1
SPLASH PAD AT ITC POLE
SOUTH AGGREGATE ACCESS PAD
F1
NORTH AGGREGATE ACCESS PAD
F6
SCALE: NTS
C4
WATER MAIN CONCRETE ENCASEMENT
D8
SHORING AT ITC POLE
1:12.0%
O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
2.0%
CL
FLOOD WALL
SOUTH RAIL
SOUTH RAIL YARD FLOOD WALL STA 161+25.78 TO 171+80
SHOULDER
2.0%
.0
(T Y
P
2.0%
DESIGN, SEE SPECIFICATION SECTION 01 53 00 FOR REQUIREMENTS.
PROPOSED SPLASH PAD. CONTRACTOR MAY SUBMIT ALTERNATIVE
AND REMOVE TOP OF SHORING TO 6" BELOW BOTTOM OF
INDICATED IS TO REMAIN IN PLACE AFTER CONSTRUCTION, CUT
SIZE AND EMBEDMENT, ARE SHOWN ON SHEET CF310. SHORING
BY THE CONTRACTOR. MINIMUM CANTILEVER SHEET PILE DESIGN,
SHORING FOR EXCAVATION AND CONSTRUCTION TO BE FURNISHEDNOTE:
B
C E
D R
P D
V
O L
C F
.D
G N
OTHERWISE APPROVED BY THE CONTRACTING OFFICER. SEE SUDAS DETAIL PV-101, TRANSVERSE CONTRACTION JOINT 'C'.
PRIOR TO INITIATING WORK. TRANSVERSE JOINT SPACING SHALL BE 12 FEET MAXIMUM, OR AS
NOTE: CONTRACTOR TO SUBMIT SPLASH PAD JOINTING PLAN TO THE CONTRACTING OFFICER FOR APPROVAL
SOLICITATION
F E
B R
U A
R Y
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A S
IN
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_S-001.dgn
S-001
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
VOL117
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
S T
R U
C T
U R
A L
N O
T E
S
P C
A R
D W
E L
L C
D G
E W
IL
S
O N
C
D G
C
K O
T T
W
IT
Z
C D
G
P
D
IE
R K
IN
G
H
D R
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
B
C E
D R
P D
V
O L
S -0
.D G
N
PROJECT. REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL DETAILS UNLESS OTHERWISE SHOWN.
THE CONTRACT DOCUMENTS AND OTHERWISE REQUIRED FOR THE FURNISHING OF A FUNCTIONALLY COMPLETE
COORDINATE AND PROVIDE OPENINGS AS REQUIRED TO ACCOMMODATE ALL WORK SHOWN OR SPECIFIED IN
OPENINGS FOR PIPES, DUCTS, CONDUITS, ETC. ARE NOT ALL SHOWN ON THE STRUCTURAL DRAWINGS.
OPENINGSG7.
SPECIFIED 28-DAY COMPRESSIVE DESIGN STRENGTH.
DO NOT BACKFILL AGAINST WALLS UNTIL GROUND LEVEL CONCRETE FRAMING AND SLAB HAVE REACHED THEIR
STRUCTURE.
CONTRACTOR. STRUCTURES HAVE BEEN DESIGNED TO RESIST THE DESIGN LIVE LOADS ONLY AS A COMPLETED
SAFETY AND STRUCTURE STABILITY DURING CONSTRUCTION ARE THE SOLE RESPONSIBILITY OF THE
SAFETYG6.
115 PCFWATER MAIN BACKFILL UNIT WEIGHT (DRY):A.3.
125 PCFSOIL UNIT WEIGHT (SATURATED):A.2.
115 PCFSOIL UNIT WEIGHT (DRY):A.1.
FLOODWALL:A.
SOIL CHARACTERISTICSG5.
DOCUMENTATION REPORT.
THE GEOTECHNICAL DESIGN BASIS FOR THIS PROJECT IS PRESENTED IN APPENDIX D OF THE DESIGN G4.
741.10'TOP OF WALL FLOOD ELEVATION (EXTREME):F.3.
739.43'750-YEAR FLOOD ELEVATION (UNUSUAL):F.2.
721.06'10-YEAR FLOOD ELEVATION (USUAL):F.1.
FLOOD CRITERIA (SOUTH RAILYARD):F.
1.2Ct:THERMAL FACTOR, E.4.
1.1Is:IMPORTANCE FACTOR, E.3.
1.0Ce:EXPOSURE FACTOR, E.2.
30.0 PSFPf:FLAT ROOF SNOW LOAD, E.1.
25.0 PSFPg:GROUND SNOW LOAD, E.1.
SNOW LOAD:E.
0.081SPECTRAL RESPONSE COEFFICIENT, SD1:D.1.5.5.
0.081SPECTRAL RESPONSE COEFFICIENT, SDS:D.1.5.4.
BSEISMIC DESIGN CATEGORY:D.1.5.3.
DSITE CLASS:D.1.5.2.
1.25 RESPONSE MODIFICATION COEFFICIENT, R:D.1.5.1.
STRUCTURE-SPECIFIC DESIGN CRITERIA: D.1.5.
0.051RESPONSE ACCELERATION, S1:SPECTRAL D.1.4.
0.076SPECTRAL RESPONSE ACCELERATION, SS: D.1.3.
1.25IMPORTANCE FACTOR, Ie:D.1.2.
IIRISK CATEGORY:D.1.1.
ABOVE GRADE STRUCTURES AND BELOW GRADE WATER BEARING STRUCTURES:D.1.
SEISMIC:D.
IIIRISK CATEGORY:C.3.
CEXPOSURE:C.2.
120 MPHBASIC WIND SPEED (ULTIMATE):C.1.
WIND:C.
250 PSFCONSTRUCTION (FLOODWALL):B.2.
100 PSFWALKWAYS, STAIRS, GRATING, CHECKERED PLATE:B.1.
LIVE LOAD:B.
ACTUAL TRIBUTARY STRUCTURE WEIGHTA.1.
DEAD LOAD:A.
APPLIES TO ALL STRUCTURES (UNLESS NOTED OTHERWISE)
DESIGN CRITERIAG3.
STRUCTURES
USACE EM 1110-2-2102 - WATERSTOPS AND OTHER PREFORMED JOINT MATERIALS FOR CIVIL WORKS P.
USACE EM 1110-2-1806 - EARTHQUAKE DESIGN AND EVALUATION FOR CIVIL WORKS PROJECTSO.
USACE EM 1110-2-2906 - DESIGN OF PILE FOUNDATIONSN.
USACE EM 1110-2-2502 - RETAINING AND FLOOD WALLSM.
USACE EM 1110-2-2104 - STRENGTH DESIGN FOR REINFORCED CONCRETE HYDRAULIC STRUCTURESL.
USACE EM 1110-2-2100 - STABILITY ANALYSIS OF CONCRETE STRUCTURESK.
ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURESJ.
ACI 530-13 BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURESI.
AWS D1.5 - BRIDGE WELDING CODEH.
AWS D1.3 - STRUCTURAL WELDING CODE - SHEET METALG.
AWS D1.1 - STRUCTURAL WELDING CODE - STEELF.
ALL LOCAL JURISDICTION AMENDMENTS, SEE CEDAR RAPIDS MUNICIPALITY CODEE.
AISC 360-10 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGSD.
ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETEC.
ACI 350-06 CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURESB.
RAPIDS AND APPLICABLE EDITIONS OF THE CODE REFERENCED STANDARDS.
2018 INTERNATIONAL BUILDING CODE WITH AMENDMENTS FROM CODE OF ORDINANCES OF CEDAR A.
APPLICABLE SPECIFICATIONS AND CODESG2.
WRITING PRIOR TO CONSTRUCTION.
IF THERE ARE QUESTIONS, THEY SHALL BE SUBMITTED TO THE CONTRACTING OFFICER AND ANSWERED IN
OUT OR NOT, EXCEPT WHERE THERE ARE SPECIFIC INDICATIONS TO THE CONTRARY ON STRUCTURAL SHEETS.
THE NOTES ON THIS SHEET ARE TYPICAL AND APPLY TO THE ENTIRE PROJECT WHETHER SPECIFICALLY CALLED
SCOPEG1.
GENERAL STRUCTURAL NOTES:
BELOW THE BOTTOM OF BASE SLAB IS REQUIRED FOR MONOLITHS M1026 ONLY.
SPECIFICATION FOR TESTING AND INSTALLATION REQUIREMENTS. A MINIMUM PILE DEPTH OF 37 FEET
H-PILES TO BE DRIVEN TO ACHIEVE THE MINIMUM AXIAL COMPRESSIVE RESISTANCE PROVIDED. SEE P1.
FLOODWALL PILING
CONFORM TO AISC 360-10 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS.S5.
SPECIFIED TO BE SLIP-CRITICAL. PROVIDE LOAD INDICATING WASHERS AT SLIP-CRITICAL CONNECTIONS.
ALL BOLTED STRUCTURAL CONNECTIONS ARE BEARING TYPE CONNECTIONS UNLESS OTHERWISE S4.
THICKNESS IN ACCORDANCE WITH AISC SPECIFICATIONS.
WHEN FILLET WELD SIZE IS NOT INDICATED, PROVIDE MAXIMUM WELD SIZE BASED ON MATERIAL S3.
TOP OF STEEL REFERS TO TOP SURFACE OF MEMBER OR FLANGE UNO.
ELEVATIONS:S2.
Fy=36 KSIALL OTHER PLATES AND SHAPES:
Fy=50 KSIHP SHAPES:
Fy=46 KSIHSS:
Fy=35 KSIPIPES:
Fy=50 KSIWIDE FLANGES:
Fy=33 KSISTAINLESS STEEL:
DESIGN STRENGTHS:S1.
STEEL
N.P. INDICATES LAP SPLICES ARE NOT PERMITTED.5.
CONTRACTING OFFICER.
UNLESS APPROVED OTHERWISE BYTOGETHER
ALL SPLICES TO BE CONTACT SPLICES AND WIRED4.
THAN OR EQUAL TO 12" OF FRESH CONCRETE CAST BELOW.
"TOP" BARS ARE THOSE HORIZONTAL BARS WITH GREATER3.
VALUES IN THE TABLE BY 1.2.
EPOXY-COATED BARS IN ALL OTHER CONDITIONS, MULTIPLY
DIAMETERS, MULTIPLY VALUES IN THE TABLE BY 1.5. FOR
DIAMETERS OR CLEAR SPACING LESS THAN 6 BAR
EPOXY-COATED BARS WITH CLEAR COVER LESS THAN 3 BAR
VALUES ABOVE ARE BASED ON UNCOATED BARS. FOR2.
ACI 318-14 FOR APPROPRIATE GUIDANCE.
DIAMETERS. IF THESE CONDITIONS ARE NOT MET, REFER TO
CENTER-TO-CENTER SPACING OF AT LEAST 5 BAR
AND CLEAR COVER OF AT LEAST 2 BAR DIAMETERS AND
VALUES ABOVE ARE BASED ON NORMAL-WEIGHT CONCRETE1.
NOTES:
UNCOATED REINFORCING STEEL.
ALL REINFORCING STEEL IN MONOLITH M1001 TO BE EPOXY COATED. ALL OTHER MONOLITHS TO UTILIZE C15.
HOOKS AS SHOWN.
ALL BARS INDICATED AS BEING HOOKED SHALL HAVE AN ACI STANDARD 90 DEGREE OR 180 DEGREE C14.
ALL REINFORCING CONTINUOUS THROUGH CONSTRUCTION JOINTS UNLESS NOTED OTHERWISE.C13.
CENTERLINE OF SPAN.
CENTERED OVER THE SUPPORTS. SPLICES FOR TOP REINFORCING BARS SHALL BE LOCATED ON
UNLESS OTHERWISE SHOWN, SPLICES FOR BOTTOM REINFORCING BARS IN BEAMS AND SLABS SHALL BE C12.
PER THE ICC EVALUATION REPORT.
ANCHORS SHALL HAVE THE ICC REPORT SHOWING EQUIVALENT LOAD CAPACITY. SUBMIT AND INSTALL
COMPLY WITH CHAPTER 17 OF ACI 318 AND CHAPTER 19 OF THE IBC. ALL EXPANSION AND ADHESIVE
ALL CAST IN PLACE AND POST-INSTALLED ANCHORS INDICATED IN THE STRUCTURAL DOCUMENTS SHALL C11.
JOINT TYPES, JOINT LOCATIONS AND CONCRETE PLACEMENT SEQUENCE.
CONTRACTOR SHALL SUBMIT A CONCRETE PLACEMENT PLAN TO CONTRACTING OFFICER IDENTIFYING C10.
SHALL BE ALLOWED.
ABSOLUTELY NO WELDING OF REINFORCING BARS OR TORCHING TO BEND OR CUT REINFORCING BARS C9.
DRAWINGS FOR LOCATIONS.
CONTINUOUS WATERSTOP SHALL BE INSTALLED IN JOINTS SUBJECT TO STATIC WATER PRESSURE. SEE C8.
CONTRACTING OFFICER. COORDINATE LOCATION, SIZE AND EMBEDMENT PRIOR TO CASTING CONCRETE.
AND CODE REQUIREMENTS. SUBMIT AS A SHOP DRAWING FOR REVIEW AND APPROVAL BY THE
PROFESSIONAL ENGINEER, RETAINED BY THE CONTRACTOR, IN ACCORDANCE WITH APPLICABLE PROJECT
ANCHOR BOLTS NOT SPECIFIED ON THE DRAWINGS SHALL BE DESIGNED AND CERTIFIED BY A REGISTERED C7.
FIELD ADJUST REINFORCING AT OPENINGS AND EMBEDDED ITEMS AS INDICATED.C6.
SHOWN ON DRAWINGS.
PROVIDE 3/4" CHAMFERS AT ALL EXPOSED EDGES UNLESS NOTED OTHERWISE. NOT ALL CHAMFERS ARE C5.
DETAILS UNLESS OTHERWISE SHOWN.
OF A FUNCTIONALLY COMPLETE PROJECT. REINFORCE AROUND OPENINGS PER STANDARD STRUCTURAL
SHOWN OR SPECIFIED IN THE CONTRACT DOCUMENTS AND OTHERWISE REQUIRED FOR THE FURNISHING
PENETRATIONS NOT SHOWN ON STRUCTURAL DRAWINGS. AS REQUIRED TO ACCOMMODATE ALL WORK
REFER TO OTHER DISCIPLINE DRAWINGS PRIOR TO CONSTRUCTION FOR EMBEDDED ITEMS AND C4.
SEE DIVISION 3 CONCRETE SPECIFICATIONS FOR REINFORCING PLACEMENT REQUIREMENTS.C3.
SEE DRAWINGS FOR EXCEPTIONS
4"t > 24":
3"t = 13" TO 24":
2"t < 12":
CONCRETE THICKNESS (t):
4"CONCRETE DEPOSITED AGAINST EARTH:
NOTED OTHERWISE:
FOR CAST-IN-PLACE CONCRETE, PROVIDE CONCRETE COVER FOR REINFORCING AS FOLLOWS, UNLESS
CONCRETE COVERC2.
fy = 60,000 PSIREINFORCING:
f'c = 4,500 PSI (FLOODWALL) f'c = 4,500 PSIGENERAL USE STRUCTURAL CONCRETE:
CONCRETE (28-DAY COMPRESSIVE STRENGTH)
DESIGN STRENGTHS:C1.
CONCRETE
FRAMING IS APPROVED TO SUPPORT THE EQUIPMENT.
SAID EQUIPMENT SHALL NOT BE FABRICATED AND PLACED UNTIL THE CONCRETE SUPPORT PADS AND/OR
RECESSES REQUIRED BY SUCH EQUIPMENT. CONCRETE PADS AND/OR FRAMING REQUIRED TO SUPPORT
WEIGHTS, VIBRATION FORCES, SUPPORT LOCATIONS, ALONG WITH ANY FLOOR OPENINGS, NOTCHES, AND
CONTRACTOR TO SUBMIT TO CONTRACTING OFFICER FOR REVIEW ALL EQUIPMENT SIZES, OPERATING
APPROVAL OF CONTRACTING OFFICER IN WRITING FOR SIMILAR CONDITIONS PRIOR TO CONSTRUCTION.
EXPLICITLY SHOWN ON THE DRAWINGS THEY SHALL BE MADE SIMILAR TO THE TYPICAL DETAILS. OBTAIN
THE TYPICAL DETAILS DEPICT TYPICAL DETAILING TO BE USED ON THIS PROJECT. IF CONDITIONS ARE NOT
TYPICAL DETAILS G8.
SOLICITATION
F E
B R
U A
R Y
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
14'-0"
2'-10 1/2 "
5'-9" 1'-3"
4" CL.
9'-6"2'-0"2'-6"
@ MID-HEIGHT
EA. WAY
#6 @ 10" O.C.
BACKFILL (TYP.)
STRUCTURAL SIDE)
FILLER (TYP. EA.
FORMED JOINT
1/2" PRE-
(TYP. EA. FACE)
#6 @ 12" O.C. HORIZ.
HOOKS (TYP. EA. FACE)
VERTICALS W/ STD 90°
#7 @ 10" O.C.
3" CLR. (TYP. @ VAULT WALL)
SS306 FOR DETAILS
@ 14'-0" MAX., SEE
PIPE SUPPORT, SPA.
TO CF SHEETS
FINISHED GRADE REFER
FOR SPLASH PAD AND
/1
C
L R
(T
Y P
HOOK EE (TOP & BOT.)
#9 @ 10" O.C. W/ STD 90°
AGGREGATE SPA. @ 10' TO 20'± O.C.
SCREEN PLACED IN AREAS OF
6" DIA PVC DRAIN PIPE W/ GEOGRID
SPECIFICATION
UTILITY BEDDING, SEE
COMPACTED PIPE AND
2'-0"5'-0"5'-0"2'-0"
(CONT.)
SHEET PILE
E M
B E
D
LOCATION (TYP.)
SHEET PILE AT REBAR
CUT HOLES THROUGH
Ø 36" WATER MAIN
HP 14X73
(TYP.)
MISS PILES
SHIFT REBAR TO
SEE SHEET SS502
SHEAR STUDS,
E M
B E
D
SEE SHEET SS502
SHEAR STUDS,
2'-6"
36"
WATE
R M
AIN
14'-0"
2'-10 1/2 "
5'-9" 1'-3"
4" CL.
2'-0"6'-0"4'-0"2'-0"
E M
B E
D
7'-0"2'-0"5'-0"
@ MID-HEIGHT
EA. WAY
#6 @ 10" O.C.
BACKFILL (TYP.)
STRUCTURAL
E M
B E
D
(TYP. EA. SIDE)
JOINT FILLER
1/2" PRE-FORMED
(TYP. EA. FACE)
#6 @ 12" O.C. HORIZ.
HOOKS (TYP. EA. FACE)
VERTICALS W/ STD 90°
#7 @ 10" O.C.
3" CLR. (TYP. @ VAULT WALL)
SS306 FOR DETAILS
@ 14'-0" MAX., SEE
PIPE SUPPORT, SPA.
TO CF SHEETS
FINISHED GRADE REFER
FOR SPLASH PAD AND
E M
B E
D
/1
(BATTERED)
HP 14X73
MISS PILES (TYP.)
SHIFT REBAR TO
SEE SHEET SS502
SHEAR STUDS,
(CONT.)
SHEET PILE
LOCATION (TYP.)
SHEET PILE AT REBAR
CUT HOLES THROUGH
C
L R
(T
Y P
HOOK EE (TOP & BOT.)
#9 @ 10" O.C. W/ STD 90°
AGGREGATE SPA. @ 10' TO 20'± O.C.
SCREEN PLACED IN AREAS OF
6" DIA PVC DRAIN PIPE W/ GEOGRID
SPECIFICATION
UTILITY BEDDING, SEE
COMPACTED PIPE AND
SS303
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
VOL117
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_SS303.dgn
A1
SCALE: 1/2" = 1'
A6
SCALE: 1/2" = 1'
N O
L
IT
H S
E C
T
IO
B
A R
G E
R C
D G
N B
A R
G E
R C
D G
P C
A R
D W
E L
L C
D G
P
D
IE
R K
IN
G
H
D R
SECTION - SOUTH RAIL YARD - MONOLITHS M1039 THROUGH M1040 SECTION - SOUTH RAIL YARD - MONOLITHS M1041 THROUGH M1042
SEE SHEET SS502
TENSION STRAP
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
CL PIPE EL. 727.50
CL
T/ BASE SLAB EL. 724.00
T/ CONC. EL. 732.00
T/ WALL EL. 741.10
FLOOD SIDE
(TYP.)
PROTECTED
SIDE
(ROUGHENED)
CONSTR. JT.
#6 @ 10" O.C.
BOT. BASE SLAB EL. 721.00
EA. FACE
#7 @ 12" O.C.
(TOP & BOT.)
#9 @ 12" O.C.
(ROUGHENED)
CONSTR. JT.
WATERSTOP
HYDROPHILIC STRIP
CONTINUOUS
WATERSTOP
HYDROPHILIC STRIP
CONTINUOUS
HOOK INTO BASE SLAB
#7 @ 12" O.C. W/ STD 90° SLAB
90° HOOK INTO BASE
#9 @ 10" O.C. W/ STD
NOTE: TOE DRAIN NOT SHOWN FOR CLARITY, REFER TO CIVIL.
JOINT FILLER
1/2" PRE-FORMED
SEE DETAILS ON SS306
REMOVABLE SLAB.
CAST-IN-PLACE
HP14X73
E M
B E
D
CL PIPE EL. 727.50
CL
T/ BASE SLAB EL. 724.00
T/ CONC. EL. 732.00
T/ WALL EL. 741.10
FLOOD SIDE
(TYP.)
PROTECTED
SIDE
(ROUGHENED)
CONSTR. JT.
HP14X73
#6 @ 10" O.C.
BOT. BASE SLAB EL. 721.00
EA. FACE
#7 @ 12" O.C.
(TOP & BOT.)
#9 @ 12" O.C.
(ROUGHENED)
CONSTR. JT.
WATERSTOP
HYDROPHILIC STRIP
CONTINUOUS
WATERSTOP
HYDROPHILIC STRIP
CONTINUOUS
HOOK INTO BASE SLAB
#7 @ 12" O.C. W/ STD 90° SLAB
90° HOOK INTO BASE
#9 @ 10" O.C. W/ STD
NOTE: TOE DRAIN NOT SHOWN FOR CLARITY, REFER TO CIVIL.
JOINT FILLER
1/2" PRE-FORMED
SEE DETAILS ON SS306
REMOVABLE SLAB.
CAST-IN-PLACE
B C
E D
R P
D V
O L
S
S .D
G N
0 2' 4'1' 0 2' 4'1'
SOLICITATION
F E
B R
U A
R Y
B1
SS306
E7
SS306
B1
SS306
E7
SS306
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
1/4 "
2'-4 1/4 "
5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"
2'-4 1/4 " 1/4 "
11'-6"11'-6"11'-6"11'-6"11'-6"
ALONG STEM WALL CL
62'-2 1/2 "
1/4 "
/8
13'-0"
69'-8 1/4 "
41'-6 1/8 "
/4
12'-11 7/8 "1'-3 7/8 "
/4
/2
9'-4" 9'-4" 9'-4" 9'-4" 9'-4" 2'-4"
2'-0"3'-0"2'-0"4'-0"2'-0"
/8
/8
63'-3 3/8 "
4'-8" 4'-8" 4'-8" 4'-8" 4'-8" 4'-8" 4'-8" 4'-8" 4'-8" 2'-4"4'-8"
4 1/2 "
4'-6"9'-8 1/2 "
A L
O N
G E
A S
T /W
E S
T S
T E
M W
A L L C
L
ALONG NORTH/SOUTH STEM WALL CL
62'-2 3/4 "
1/4 "
1/4 "
11'-6"11'-6"
2'-6 5/8 "
5'-9"5'-9"5'-9"5'-9"5'-9"
2'-6 5/8 "
5'-9" 5'-9"
5'-9" 5'-9"
5'-9"
2'-6 5/8 "
11'-6"
11'-6" 2'-6 5/8 "
ALONG STEM WALL CL
31'-1 1/4 "
ALONG STEM WALL CL
31'-1 1/4 "
SPACE BOTTOM TO MISS PILES
#9 @ 7" OC (TOP & BOT.)
S P
A C
E B
O T
T O
M T
O M
IS
S
P
IL
E S
O
C
T O
P
B O
T
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_SS405.dgn
SS405
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
VOL117
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
D B
U R
D
IC
K C
D G
N B
A R
G E
R C
D G
P
IL
E L
A Y
O U
T P
L A
P
C
A R
D W
E L
L C
D G
P
D
IE
R K
IN
G
H
D R
A1
SCALE: 3/16"=1'
E1
SCALE: 3/16"=1'
E6
SCALE: 3/16"=1'
A7
DETAIL - BASE SLAB REINFORCING STEEL LAYOUT
SCALE: 3/16"=1'
PILE PLAN - MONOLITHS M1027, M1028, M1029, M1031 THRU M1037 PILE PLAN - MONOLITH M1030
PILE PLAN - MONOLITH M1026
SEE NOTE 2
SEE NOTE 2
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
CENTER LINE
STEM WALL
PROTECTED SIDE
FLOOD SIDE
SHEET PILING
CONCRETE
FACE OF
HP14X73 (TYP)
3:1 BATTERED
VERTICAL HP14X73 (TYP)
EJ STA. A EJ STA. B
CENTERLINE
EXPANSION JOINT
CENTER LINE
EXPANSION JOINT
CONCRETE
FACE OF
ALONG PILE CL
ALONG PILE CL
PROTECTED SIDE
FLOOD SIDE
CENTER LINE
EXPANSION JOINT
EJ STA. 161+86.98
FACE OF CONCRETE
SHEET PILING
PI STA. 161+24.73
HP14X73 (TYP)
3:1 BATTERED
VERTICAL HP14X73 (TYP)
87°15'02.62"
PI STA. 161+06.48
STEM WALL CL
NORTH/SOUTH
STEM WALL CL
EAST/WEST
HP14X73 (TYP)
3:1 BATTERED
NOTES:
PILE WEBS ARE PLACED PERPENDICULAR TO EAST/WEST STEM WALL.
PILE WEBS ARE PLACED PARALLEL TO NORTH/SOUTH STEM WALL.
BATTERED CORNER PILES CROSS AT DIFFERENT ELEVATIONS AND DO NOT INTERSECT.
CONTRACTOR SHALL ADHERE TO PILE DRIVING TOLERANCES AS INDICATED IN THE
SPECIFICATIONS AND TAKE EXTRA CARE TO AVOID CONFLICT.
FOR REINFORCING STEEL LAYOUT, SEE DETAIL A7, THIS SHEET.
FOR DETAIL
SEE SHEET SS502
TENSION STRAP, (3 TOTAL)
VERTICAL HP14X73 W/
EJ STA. 163+73.73
CENTER LINE
STEM WALL
PI STA. 164+04.86
SHEET PILING
PROTECTED SIDE
FLOOD SIDE
CONCRETE
FACE OF
EJ STA. 164+35.98
CENTER LINE
STEM WALL
HP14X73 (TYP)
3:1 BATTERED
VERTICAL HP14X73 (TYP)
CENTERLINE
EXPANSION JOINT
CONCRETE
FACE OF
CENTER LINE
EXPANSION JOINT
174°22'30"
02°48'45"
ALONG PILE CL
ALONG PILE CL
ALONG PILE CL
ALONG PILE CL
SHEET PILING
VERTICAL HP14X73 (TYP)
87°15'02.62"
HP14X73 (TYP)
3:1 BATTERED
HP14X73 (TYP)
3:1 BATTERED
VERTICAL HP14X73 (TYP)
SHT. NO. SS302
SEE SECTION A6 ON
FOR REINF. SIZE & SPACING,
SHT. NO. SS303
SEE SECTION A1 ON
FOR REINF. SIZE & SPACING,
B C
E D
R P
D V
O L
S
S .D
G N
8'0 4' 16'
8'0 4' 16' 8'0 4' 16'
TRUE N
8'0 4' 16'
SUBMITTAL REQUIRED.
THIS JOINT TO BE SPLICED, USE OF MECHANICAL COUPLERS IS ACCEPTABLE,
WATERMAIN CENTERLINE WHILE IN SERVICE. ALL BARS PERPENDICULAR TO
SERVICE. NO PILE DRIVING ACTIVITIES WITHIN 10 FEET OF THE EXISTING
SHEET PILING EAST OF JOINT AFTER NEW WATERMAIN IS INSTALLED AND IN
PROVIDE CONSTRUCTION JOINT AT STA 161+13.91. INSTALL H-PILES AND 2.
SEE S-001 FOR PILING NOTES AND ESTIMATED PILE TIP ELEVATIONS.1.
GENERAL SHEET NOTES
SOLICITATION
F E
B R
U A
R Y
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
1/4 "
1'-6 13/16 "
11'-6"11'-6"11'-6"11'-6"11'-6"
2'-4 1/4 "
1/4 "
61'-5 1/16 "
1/4 "
2'-11 5/16 "
5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9"5'-9" 2'-4 1/4 "
1/4 "
62'-9 9/16 "
62'-2 1/2 "
2'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 1/4 "
1/4 "
2'-9"
5'-9"
5'-9"
5'-9"
5'-9"
5'-9"
11'-6"11'-6"2'-9"
11'-6"
11'-6"
2'-9"
31'-1 1/4 "
31'-1 1/4 "
9'-3 7/16 "
31'-8 5/16 "
31'-8 5/16 "
1/4 "
2'-10 1/4 "
1/4 "2'-9 7/8 " 5'-5" 5'-5" 5'-5" 5'-5" 5'-5" 5'-5" 5'-5" 5'-5"
4'-8"
1/4 " 2'-10
1/4 "
4'-8"
'-0
'-6
'-0
'-0
'-0
48'-2 5/16 " 10'-5
5/8 "
47'-10 1/8 "
11'-6 1/16
49'-2 11/16 "
10'-1 1/2 "
4'-8"
5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"5'-5"2'-9 7/8 " 6'-7 1/2 "
4'-8"
4'-8"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10" 1/4 " 2'-1" 4'-10
1/4 " 2'-2"
'-0
'-6
'-0
'-0
'-0
50'-4 3/4 "
11'-9 3/4 "
12'-1 0 3/1
6 "
51'-5 3/16 "
50'- 5/8 "
11'-5 5/8 "
2'-1" 4'-10" 4'-10" 4'-10" 4'-10" 4'-10" 4'-10" 4'-10" 4'-10" 4'-10" 5'-7 13/16 " 5'-7 1 3/16
4'-10
2'-2"
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_SS406.dgn
SS406
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
VOL117
P
D
IE
R K
IN
G
H
D R
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
D B
U R
D
IC
K C
D G
N B
A R
G E
R C
D G
P
IL
E L
A Y
O U
T P
L A
N S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
D6
A1
SCALE: 3/16"=1'
D1
A6
SCALE: 3/16"=1'
SCALE: 3/16"=1' SCALE: 3/16"=1'
P C
A R
D W
E L
L C
G
PILE PLAN - MONOLITH M1039
PILE PLAN - MONOLITH M1038
PILE PLAN - MONOLITH M1041
PILE PLAN - MONOLITH M1040
3:1 BATTERED HP14X73 (TYP)
SEE SHEET SS502
VERTICAL HP14X73 W/TENSION STRAP (TYP)
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
PROTECTED SIDE
FLOOD SIDE
ALONG STEM WALL CL
FACE OF
CONCRETE
ALONG
PILE CL
FACE OF
CONCRETE
ALONG PILE CL
ALONG PILE CL ALONG PILE CL
EJ STA. 170+54.93
EJ STA. 171+17.18
5°37'30"
ALONG STEM WALL CL
HP14X73 (TYP)
3:1 BATTERED
168°45'00"CENTER LINE
STEM WALL
EJ STA. 168+71.73
VERTICAL HP14X73 (TYP)
PI STA. 169+02.85
SHEET PILING
ALONG PILE CL
FACE OF
CONCRETE
CENTER LINE
STEM WALL
JOINT CL
EXPANSION
ALONG PILE CL
ALONG
PILE CL
LINE
CENTER
JOINT
EXPANSION
EJ STA. 169+33.98
ALONG PILE CL
PROTECTED SIDE
FLOOD SIDE
ALONG STEM WALL CL
FACE OF
CONCRETE
FACE OFCONCRETE
FACE OFCONCRETE
PROTECTED SIDE
FLOOD SIDE
ALONG PILE CL
JOINT CL
EXPANSION
FACE OF
CONCRETE
ALONG PILE CL
ALONG PIL
E CL
JOIN
T CLEXPANSION
FACE OF
CONCRETE
ALONG PIL
E CL
EJ STA. 169+96.23
VERTICAL HP14X73 (TYP)
CENTER LINE
STEM WALL
SHEET PILING
VERTICAL HP14X73 (TYP)
PI STA. 170+44.44
EJ STA. 170+54.93
ALONG STEM WALL CL ALONG STEM WALL C
L
FACE OF
CONCRETE
FACE OF
CONCRETE
168°45'00"
PROTECTED SIDE
FLOOD SIDE
ALONG STEM WALL CL
FACE OF
CONCRETEALONG STEM WALL C
L
168°45'00"
ALONG PILE CL
FACE OF
CONCRETE
JOINT CL
EXPANSION
ALONG PILE CL
EJ STA. 169+33.98
EJ STA. 169+96.23
PI STA. 169+84.40
SHEET PILING
CENTER LINE
STEM WALL
VERTICAL HP14X73 (TYP)
VERTICAL HP14X73 (TYP)
ALONG PIL
E CL
JOIN
T CLEXPANSION
ALONG
PILE
CL
5°37'30"
FACE OF
CONCRETE
FACE OF
CONCRETE
B C
E D
R P
D V
O L
S
S .D
G N
8'0 4' 16'
8'0 4' 16' 8'0 4' 16'
8'0 4' 16'
FOR MONOLITH SECTIONS SHOWING REINFORCING STEEL, SEE SHEET SS303.2.
SEE S-001 FOR PILING NOTES AND ESTIMATED PILE TIP ELEVATIONS..1.
GENERAL SHEET NOTES
SOLICITATION
F E
B R
U A
R Y
S
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
E
K B
A
C K
I S
L A
N D
D
IS
T R
C K
I S
L A
N D
IL
L
IN
D A
R R
IV
E
R
C E
D A
R R
A P
ID
S
C
E D
R P
D
IO
W
A R
IV
E
R B
A
1/4 "
1'-6 13/16 "
11'-6" 11'-6" 11'-6" 11'-6" 11'-6"
2'-4 1/4 "
1/4 "
61'-5 1/16 "
1/4 "
2'-11 5/16 "
5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 5'-9" 2'-4 1/4 "
1/4 "
62'-9 9/16 "
62'-2 1/2 "
861444_SpecificWork_ActiveHarper, LaShell L CIV USARMY CEMVR (USA)
B5CEDRPD202302_VOL117_SS407.dgn
SS407
J U
N
N D
G E
N E
R A
L R
E V
IS
IO
C
E D
R P
D
VOL117
P
D
IE
R K
IN
G
H
D R
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
D B
U R
D
IC
K C
D G
N B
A R
G E
R C
D G
P
IL
E L
A Y
O U
T P
L A
N S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
A6
SCALE: 3/16"=1'
P C
A R
D W
E L
L C
G
PILE PLAN - MONOLITH M1042
SEE SHEET SS502
VERTICAL HP14X73 W/TENSION STRAP (TYP)
3:1 BATTERED HP14X73 (TYP)
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S I Z
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
C
H E
C K
E D
B Y
D R
A W
N B
Y
IS
S
U E
D A
T E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
S O
U T
H R
A
IL
Y A
R D
F L
O O
D W
A L
L
C E
D A
R R
A P
ID
S
F L
O O
D R
IS
K
M A
N A
G E
M E
N T
P R
O J E
C T
PROTECTED SIDE
FLOOD SIDE
ALONG STEM WALL CL
FACE OF
CONCRETE
ALONG PILE CL
FACE OF
CONCRETE
ALONG PILE CL
ALONG PILE CLALONG
PILE CL
EJ STA. 171+17.18 EJ STA. 171+79.43
B C
E D
R P
D V
O L
S
S .D
G N
8'0 4' 16'
FOR MONOLITH SECTIONS SHOWING REINFORCING STEEL, SEE SHEET SS303.2.
SEE S-001 FOR PILING NOTES AND ESTIMATED PILE TIP ELEVATIONS.1.