B01 - BID SUMMARY SHEET_signed.pdf

PDF 22 KB Posted

Attached to
IWW Three Wicket Bulkhead Fabrication - Peoria, IL
Solicitation number
W912EK24B0021
Issued by

About this file

This document is a Bid Summary Sheet for Solicitation W912EK24B0021, which is for the fabrication, assembly, painting, and delivery of a 3 Wicket Bulkhead for deployment at the Peoria Lock and Dam and LaGrange Lock and Dam sites along the Illinois River. The solicitation requires that offerors maintain AISC and/or SSPC certifications, and a copy of these certifications must be submitted with the bid. The Government Estimate for the work is $521,952.48. Two bids were received, with G&G Steel, Inc. bidding $1,559,363.00 and Sealevel Construction, Inc. bidding $678,200.00. The bid opening date was September 16, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUMMARY SHEET

W912EK24B0021

ILLINOIS RIVER BASIN ILLINOIS WATERWAY PEORIA, ILLINOIS - IWW

THREE WICKET BULKHEAD FABRICATION

IFB NO: W912EK24B0021

DATE: September 16, 2024

TIME: 1:00 PM CT

PLACE: Webex

NO: BIDDER & ADDRESS AMOUNT

1. G&G Steel, Inc. $1,559,363.00

a. 15825 Hwy 243 Industrial Park

Russellville, AL 35654

2. Sealevel Construction, Inc. $678,200.00

a. P.O. Box 1037

Thibodaux, LA 70302

GOVERNMENT ESTIMATE: $521,952.48

Bid Opening Officer:

Ryan Larrison Date

Contracting Officer

Date: 9/16/2024
2024-09-16T13:09:11-0500
LARRISON.RYAN.R.1285260422

File details come from the government source that posted it. Updated .