W912EK22B0012 Amendment 0001.pdf
PDF 487 KB Posted
- Solicitation number
- W912EK22B0012
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK22B0012
X 9B. DATED (SEE ITEM 11)
01-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2022
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK22B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001
The purpose of Amendment 0001 to Solicitation W912EK22B0012 is as follows:
1. To include the unit of measure for Item Numbers 0011AA and 0011AB in the Schedule of Prices.
2. To amend the Specifications and Drawings as a result of ProjNet Q&A.
3. To extend the due date for receipt of bids to 09/14/2022 at 10:00 AM Central Time.
All other terms and conditions remain the same.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 31-Aug-2022 02:00 PM to 14-Sep-2022 10:00 AM.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SCHEDULE OF PRICES
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
MARSEILLES LOCK AND DAM
0001 Mobilization and Demobilization 1 JOB XXXXXXXX $________________
0002 Temporary Construction Facilities
0002AA First 6 Months 6 MO $__________ $________________
0002AB Over 6 Months 1 MO $__________ $________________
0003 Machinery Components Survey and Relocation Calculation
4 EA $__________ $________________
0004 Protection and Dewatering 1 JOB XXXXXXXX $________________
0005 Lock Chamber Debris Removal
0005AA First 50 Cubic Yards 50 CY $__________ $________________
0005AB Over 50 Cubic Yards 15 CY $__________ $________________
0006 Miter Gate Machinery Installation
0006AA Removal of Existing Machinery 1 JOB XXXXXXXX $________________
0006AB Machinery Base Fabrication and Installation 1 JOB XXXXXXXX $________________
0006AC Concrete Removal 1 JOB XXXXXXXX $________________
0006AD Concrete Placement 1 JOB XXXXXXXX $________________
0006AE Machinery Installation 1 JOB XXXXXXXX $________________
0006AF Electrical Work 1 JOB XXXXXXXX $________________
0007 Electrical Crossover Installation
0007AA Concrete Removal 1 JOB XXXXXXXX $________________
0007AB Bedrock Removal 1 JOB XXXXXXXX $________________
0007AC New Duct Bank 1 JOB XXXXXXXX $________________
0007AD Anchors and Reinforcing 1 JOB XXXXXXXX $________________
0007AE New Manholes 1 JOB XXXXXXXX $________________
0007AF Directional Drilling 1 JOB XXXXXXXX $________________
0007AG Embedded Steel and Miscellaneous Metals 1 JOB XXXXXXXX $________________
0007AH Concrete Placement 1 JOB XXXXXXXX $________________
0008 Testing and Commissioning 1 JOB XXXXXXXX $________________
0009 Site Restoration 1 JOB XXXXXXXX $________________
TOTAL OF ESTIMATED AMOUNTS OF MARSEILLES LOCK AND DAM
(ITEM NOS. 0001 THROUGH 0009, INCL.) $________________
STARVED ROCK LOCK AND DAM
0010 Mobilization and Demobilization 1 JOB XXXXXXXX $________________
0011 Temporary Construction Facilities
0011AA First 6 Months 6 MO $__________ $________________
0011AB Over 6 Months 1 MO $__________ $________________
0012 Machinery Components Survey and Relocation Calculation
4 EA $__________ $________________
0013 Miter Gate Machinery Installation
0013AA Removal of Existing Machinery 1 JOB XXXXXXXX $________________
0013AB Machinery Base Fabrication and Installation 1 JOB XXXXXXXX $________________
0013AC Concrete Removal 1 JOB XXXXXXXX $________________
0013AD Concrete Placement 1 JOB XXXXXXXX $________________
0013AE Machinery Installation 1 JOB XXXXXXXX $________________
0013AF Electrical Work 1 JOB XXXXXXXX $________________
0014 Testing and Commissioning 1 JOB XXXXXXXX $________________
0015 Site Restoration 1 JOB XXXXXXXX $________________
TOTAL OF ESTIMATED AMOUNTS OF STARVED ROCK LOCK AND DAM
(ITEM NOS. 0010 THROUGH 0015, INCL.) $________________
TOTAL OF ESTIMATED AMOUNTS OF MARSEILLES AND STARVED ROCK LOCK AND
DAMS (ITEM NOS. 0001 THROUGH 0015, INCL.) $________________
CY = CUBIC YARDS JOB = LUMP SUM MO = MONTH
PLEASE ENSURE THAT UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS
HAVE BEEN COMPLETED
MVR.13 INSTRUCTIONS TO BIDDERS
INSTRUCTION TO BIDDERS
The Rock Island District has implemented the below procedures for all current bid openings.
Electronic Submission of Bids:
For this IFB Solicitation, the Rock Island District is requesting all electronic bids be submitted via email to the Contracting Officer and Contract Specialist.
Contracting Officer – Elizabeth Dennison, elizabeth.a.dennison@usace.army.mil
Contract Specialist – Jeffrey Voss, jeffrey.r.voss@usace.army.mil
In the subject of the e-mail – the solicitation and Project Name shall be provided.
The Contracting Officer or Contract Specialist will send an email acknowledging receipt. Please note, the Firewall can cause a delay in receipt of email, so be sure to allow time for the delay.
The Bid Opening is currently scheduled for Wednesday, 14 September 2022 at 11:00 AM CST.
The Contracting Officer and Contract Specialist will begin downloading bids ONE HOUR BEFORE BID OPENING TIME, which is the bid receipt cutoff time.
All bids received after 10:00 AM CST on Wednesday, 14 September 2022 will be considered late.
Audio Teleconference Bid Opening Information:
Bid Opening will be held on Wednesday, 14 September 2022 at 11:00 AM CST. Please use the following call-in information to attend the meeting:
Toll-Free: 1-844-800-2712 Access Code: 1999 96 2853
Following the conclusion of the bid opening, the Bid Abstract will be uploaded to SAM website under this solicitation, within 24 hours.
Bid Bonds (Offer Guarantee) should be submitted electronically with the Bid Package as per the scheduled Bid Opening on Amendment.
Per Class Deviation 2020-O0016, Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates. In addition, a Corporate Seal is not required, the SF 28 need not be sworn and notarized and a written authorization of the release signed by the surety is acceptable in lieu of the notarized authorization of release by the surety. Original Certified Bonds need not be submitted at time of bid.
HOWEVER, the Rock Island District reserves the right to request the Original Certified Bonds, if deemed necessary to verify their authenticity.
The following deviation clauses now apply, in lieu of the corresponding FAR clauses:
52.228-11, Pledges of Assets (DEVIATION 2020-O0016), which removes the requirement for the Standard Form 28 to be sworn and notarized.
52.228-15, Performance and Payment Bonds—Construction (DEVIATION 2020-O0016), which removes the requirements for seals on Standard Forms.
52.228-16, Performance and Payment Bonds—Other than Construction (DEVIATION 2020-O0016), which removes requirements for seals on Standard Forms.
For any Questions please contact:
Contracting Officer – Elizabeth Dennison, elizabeth.a.dennison@usace.army.mil, 309-794-5293
Contract Specialist – Jeffrey Voss, jeffrey.r.voss@usace.army.mil, 309-794-5914
(End of Summary of Changes)
The following modifications are made to the Section 05 50 14 and the Drawings.
SECTION 05 50 14
a. PAGES SECTION 05 50 14 PAGE 1 AND SECTION 05 50 14 PAGE 10.
Delete pages SECTION 05 50 14 Page 1 and SECTION 05 50 14 Page 10 in their entirety, and substitute therefor revised pages SECTION 05 50 14 Page 1 and
SECTION 05 50 14 Page 10.
DRAWINGS (SUPERCEDED)
b. Revised drawings listed below are being issued with this Amendment. Such revised drawings supersede those of the same sheet identification numbers as listed in the INDEX OF DRAWINGS: MAR-MACH E-001, E-102, E-103, E-104, E-
105, E-601, E-701, E-702, E-703, E-704, E-709, and MGMACH SD-201, SD-211
SOLICITATION NO.: W912EK22B0012
B5IWPROJ202101
SECTION TABLE OF CONTENTS
DIVISION 05 - METALS
SECTION 05 50 14
STRUCTURAL METAL FABRICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 GENERAL REQUIREMENTS
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Welders and Welding Operators
1.4.2 Detail Drawings
1.5 QUALITY ASSURANCE TESTING BY THE GOVERNMENT
1.6 DELIVERY, STORAGE, AND PROTECTION
PART 2 PRODUCTS
2.1 MATERIALS, GENERAL
2.1.1 Structural Steel
2.1.2 Structural Steel Plate
2.1.3 Aluminum
2.1.3.1 Aluminum Profiles
2.1.3.2 Aluminum Plate
2.1.3.3 Aluminum Bar
2.1.3.4 Aluminum Tread Plate
2.1.4 Steel Pipe
2.1.5 Fittings for Steel Pipe
2.1.6 Steel Castings
2.1.7 Bolts, Nuts, and Washers
2.1.8 Welded Headed Shear Studs
2.1.9 Deleted
2.1.10 Access Hatches
2.1.11 Support Bracket Bearing Pad
2.1.12 Ladders
2.2 FABRICATION
2.2.1 Structural Fabrication
2.2.2 Assembly Drawings
2.2.3 Welding
2.2.3.1 Welding of Structural Steel
2.2.3.1.1 Welding Procedures for Structural Steel
2.2.3.1.2 Welding Process
2.2.3.1.3 Welding Technique
2.2.3.1.3.1 Filler Metal
2.2.3.1.3.2 Preheat and Interpass Temperature
2.2.3.1.3.3 Stress-Relief Heat Treatment
2.2.3.1.4 Workmanship
2.2.3.1.4.1 Preparation of Base Metal
2.2.3.1.4.2 Temporary Welds
2.2.3.1.4.3 Tack Welds
2.2.3.2 Welding of Steel Castings
2.2.3.3 Welding of Steel Studs
2.2.3.3.1 Application Qualification for Steel Studs
2.2.3.3.2 Production Control
2.2.3.4 Welding of Aluminum
SECTION 05 50 14 Page 1
AMEND 0001
19 AUG 2022
SOLICITATION NO.: W912EK22B0012
B5IWPROJ202101
2.1.4 Steel Pipe
Provide in accordance with ASTM A53/A53M, Type E or S, Grade B.
2.1.5 Fittings for Steel Pipe
Provide standard malleable iron fittings in accordance with ASTM A47/A47M.
2.1.6 Steel Castings
Provide in accordance with ASTM A148/A148M, Grade 80-50 or Grade 90-60, as indicated.
2.1.7 Bolts, Nuts, and Washers
a. Provide bolts in accordance with ASTM F3125/F3125M, Grade A325, Type 1, mechanically deposited zinc coated in accordance with ASTM B695, Class 55.
b. Provide washers in accordance with ASTM F436/F436M, plate hardened, Grade DH, mechanically deposited zinc coated in accordance with ASTM B695, Class 55.
c. Provide nuts in accordance with ASTM A563, Grade DH, mechanically deposited zinc coated in accordance with ASTM B695, Class 55 with lubricant on only the threads and one bearing surface.
2.1.8 Welded Headed Shear Studs
Provide standard manufacturer's headed concrete anchors (HCA) designed for connecting steel plate to concrete in accordance with ASTM A108. Design Basis: S3L Shear Connectors by Nelsen Stud Welding.
2.1.9 Deleted
2.1.10 Access Hatches
Provide access hatches of stainless steel or aluminum construction with spring assist and recessed handle. Design for HS-20 loading in accordance with AASHTO LRFD. Design Basis: Halliday Product Series H1R.
SECTION 05 50 14 Page 10
AMEND 0001
19 AUG 2022
File details come from the government source that posted it. Updated .