W912EK20R0011-0002.pdf
PDF 2 MB Posted
- Attached to
- OTHER HEAVY CONSTRUCTION-MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) Federal contract opportunity
- Solicitation number
- W912EK20R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EK20R0011-0001.pdf | ||
| W912EK20R0011.pdf | ||
| A02. PLAN_SET_SOL-2020-03-24.pdf | ||
| A02. SPEC_SOL-2020-03-06-FINAL_TO1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
HEAVY CONSTRUCTION - MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
The reason for this amendment is to revise Task Order 0001- Cascade Levee Repair Specification Section 35 32 19 , see summary of changes.
All other terms and conditions remain the same
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Apr-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EK20R0011
X 9B. DATED (SEE ITEM 11)
27-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Apr-2020
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK20R0011
The following items are applicable to this modification:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
AMENDMENT 0002
SCHEDULE OF PRICES
ITEM
NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
0001 Stripping 1 JOB
XXXXXXXX $
0002 Excavation 1 JOB
XXXXXXXX
0003 Bedding Stone No. 5
XXXXXXXX XXXXXXXX
0003AA First 2,100 Ton 2,100 TN $ $
0003AB Over 2,100 Ton 350 TN $ $
0004 Bedding Stone No. 13
XXXXXXXX XXXXXXXX
0004AA First 500 Ton 500 TN $ $
0004AB Over 500 Ton 75 TN $ $
0005 Stockpiled Class D Riprap Placement
XXXXXXXX XXXXXXXX
0005AA First 900 Tons 900 TN $ $
0005AB Over 900 Tons 150 TN
0006 Stockpiled Class C Riprap Placement
0006AA First 1,000 Tons 1,000 TN $ $
0006AB Over 1,000 Tons 200 TN $ $
0007 Riprap - Class D
XXXXXXXX XXXXXXXX
0007AA First 500 Ton 500 TN $ $
0007AB Over 500 Ton 400 TN $ $
W912EK20R0011
JOB= LUMP SUM
TN= TON
CY= CUBIC YARD
ENSURE THAT UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS HAVE BEEN
COMPLETED
Changes have been made to task order 0001- Cascade Levee Repair Specification Section 35 32 19, as attached.
(end of summary of changes)
0008 Riprap - Class C
0008AA First 500 Ton 300 TN $ $
0008AB Over 500 Ton 150 TN $ $
0009 Site Restoration 1 JOB
XXXXXXXX
"TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0009, INCL.)"
The following modifications are made to SECTION 35 32 19.
SECTION 35 31 19
a. PAGE SECTION 35 31 19 PAGE 1 AND PAGE 4. Delete pages SECTION
35 31 19 Page 1 and Page 4, in their entirety, and substitute therefor revised pages SECTION 35 31 19 Page 1 and Page 4.
b. ATTACHMENTS B AND C. Delete Attachments B and C, in their entirety, and substitute therefor revised Attachments B, C and D.
RFTOP - MATOC-HVY CASCADE TO#1
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 31 19
STONE PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 RIPRAP SOURCES
1.4 QUALITY ASSURANCE
1.5 CONSTRUCTION TOLERANCES
1.5.1 Riprap
1.5.2 Bedding Stone
1.6 QUALITY CONTROL
PART 2 PRODUCTS
2.1 BEDDING STONE
2.2 RIPRAP
PART 3 EXECUTION
3.1 BASE PREPARATION
3.2 BEDDING STONE PLACEMENT
3.3 RIPRAP PLACEMENT
ATTACHMENTS:
Attachment A - Class C, Riprap Gradation Tally Chart
Attachment B - Class C, Riprap Gradation Curve
Attachment C - Class D, Riprap Gradation Tally Chart
SECTION 35 31 19 Page 1
Attachment D - Class D, Riprap Gradation Curve
-- End of Section Table of Contents --
AMEND 0002
17 APRIL 2020
1.6 QUALITY CONTROL
Gradation of riprap to ensure compliance with paragraph "Riprap Placement," determine the weight of pieces of each gradation of riprap as an approximate percent of the total weight before commencing placement of the riprap. The gradation to be reported on gradation test reports using the forms, Attachment A - Class C, Riprap Gradation Tally Chart, Attachment B - Class C, Riprap Gradation Curves, Attachment C - Class D, Riprap Gradation Tally Chart, and Attachment D - Class D, Riprap Gradation Curves attached.
Include the date of test and name of person conducting the inspection.
PART 2 PRODUCTS
2.1 BEDDING STONE
Provide IADOT, Gradations 5 and 13 (bedding stone).
2.2 RIPRAP
a. Provide riprap produced from sources in accordance with paragraph "RIPRAP SOURCES." Designate in writing only one such source or one combination of such sources from which the riprap is proposed for use prior to delivery at the site.
b. Listing of a riprap source is not to be construed as approval of all material from that source. The Government reserves the right to reject materials from certain localized areas, zones, strata, or ledges, when such materials are unsuitable for riprap as determined by the Contracting Officer.
c. Provide durable riprap and of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used. Provide riprap free from cracks, seams, and other defects that would tend to increase unduly its deterioration from natural causes.
The inclusion of objectionable quantities of dirt, impervious and pervious materials, and rock fines, as determined by the Contracting Officer, is prohibited.
d. Provide riprap as IADOT, Class C and Class D. Provide 450 and 250 pound (respectively) top size and reasonably well graded over the entire range of sizes according to the Class C and Class D Gradation Curves.
e. Rock quarried after 15 September and prior to 15 April and stockpiled at the quarry will not be accepted for gradation until after 15 April. This requirement will be deleted for rock of satisfactory performance as determined by the Contracting Officer.
SECTION 35 31 19 Page 4
RFTOP - MATOC-HVY CASCADE TO#1
IADOT 4130.02 CLASS C REVETMENT - GS09001 APR 2010
Stone Weight in Pounds Minimum % > Stone Weight
Nominal Top Size
ENG Form 4055
CONTRACT __________________________________
PROJECT __________________________________
DATE _______________________________________
2.2
2.4
2.6
2.8
3.2
2.2
2.4
2.6
2.8
3.2
ASSUMING A SHAPE MIDWAY BETWEEN A SPHERE AND A CUBE
SIZE OF STONES IN INCHES
SPE
C
IFIC
G
R A
V
IT
Y
SPE
C
IFIC
G
R A
V
IT
Y
90 80 70 60 50 40 30 20 9 8 7 6 5 4 3 2 1
100 0
100110100
10000
PE
R
C E
N T
FIN
E
R B
Y W
E
IG
H T
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
WEIGHT OF STONES IN POUNDS
RIPRAP GRADATION CURVES
3848 44 40 3436 32 30 28 26 24 22 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3
ATTACHMENT B TO SECTION 35 31 19
RIPRAP GRADATION TALLY CHART
Use to record individual stone weights
Total Weight of Gradation Test Sample1 in pounds: ____________ = “X”1
Column ► A B C D E F G2
Weight Ranges ► < 2 pounds 2 - 4 pounds 5 - 39 pounds 40 - 89 pounds
90 - 159 pounds
160 - 250 pounds
250 + pounds
Record Individual
Stone Weights
Total of Individual Weights in Column ► ______lb ______lb ______lb ______lb ______lb ______lb ______lb
Total Cumulative Weight Finer Than Next
Weight Range ►
(A)
______lb
(A+B)
______lb
(A+B+C)
______lb
(A+...+D)
______lb
(A+...+E)
______lb
(A+...+F)
______lb
(A+...+G)
______lb Percent Finer By Weight
(Total Cumulative
Weight of each Column, Divided by Total
Weight of Sample “X”3)
(A) X
(A+B) X
(A+B+C) X
(A+...+D) X
(A+...+E) X
(A+...+F) X
(A+...+G) X
1. - Recommended test sample size is approximately 40 times the top-size weight ≈ 10,000 pounds.
2. - 100% of the sample will be finer by weight than the heaviest individual stone weight plus one pound. Heaviest weight plus one will be plotted on the 100% Finer by Weight line of ENG Form 4055 - RIPRAP GRADATION CURVES. The totaled weights of all columns A - G should equal the initial test sample weight “X”.
3. - The Cumulative Percent Finer By Weight number for each column is plotted on ENG Form 4055 - RIPRAP GRADATION CURVES chart, on the weight increment line of the next column's weight range low number, i.e. column C cumulative percent would be plotted on the 40 pound line of the 4055 chart.
ATTACHMENT C TO SECTION 35 31 19
90 50
5 90 DATE ______________________________________
ENG Form 4055
IADOT 4130.02 CLASS D REVETMENT -- GS 09001 APR 2010 CONTRACT _________________________________ Stone Weight in Pounds Minimum % > Stone Weight
Nominal Top Size PROJECT ___________________________________
2.2
2.4
2.6
2.8
3.2
2.2
2.4
2.6
2.8
3.2
ASSUMING A SHAPE MIDWAY BETWEEN A SPHERE AND A CUBE
SIZE OF STONES IN INCHES
SPE
C
IFIC
G
R A
V
IT
Y
SPE
C
IFIC
G
R A
V
IT
Y
90 80 70 60 50 40 30 20 9 8 7 6 5 4 3 2 1
100 0
100110100
10000
PE
R
C E
N T
FIN
E
R B
Y W
E
IG
H T
PE
R
C E
N T
C O
A R
SE
R
B Y
W E
IG
H
T
WEIGHT OF STONES IN POUNDS
RIPRAP GRADATION CURVES
3848 44 40 3436 32 30 28 26 24 22 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3
AMEND 0002
ATTACHMENT D TO SECTION 35 31 19
| B5CASCAD1901-SPEC_AMND-2020-04-17-0001.pdf |
| Narrative |
| 35 31 19 |
| 35 31 19Amend |
| 35 31 19sb - IADOT Cl - C Gradation Curve |
| 400 IADOT |
| 35 31 19sc - IADOT Cl - D (5-90-250lbs) Gradation Curve & Tally Chart CORRECTED |
| 35 31 19sd - IADOT Cl - D (5-90-250lbs) Gradation Curve & Tally Chart CORRECTED |
| IADOT CL-D |
| 35 31 19sd - IADOT Cl - D (5-90-250lbs) Gradation Curve & Tally Chart CORRECTED.PDF |
| IADOT CL-E |
File details come from the government source that posted it. Updated .