A02. SPEC_SOL-2020-03-06-FINAL_TO1.pdf
PDF 659 KB Posted
- Attached to
- OTHER HEAVY CONSTRUCTION-MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) Federal contract opportunity
- Solicitation number
- W912EK20R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EK20R0011-0002.pdf | ||
| W912EK20R0011-0001.pdf | ||
| A02. PLAN_SET_SOL-2020-03-24.pdf | ||
| W912EK20R0011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFTOP
US Army Corps of Engineers Rock Island District
MISSISSIPPI RIVER BASIN
CASCADE LEVEE
DUBUQUE COUNTY, IOWA
NORTH FORK/MAQUOKETA RIVER
2018 AND 2019 EVENTS LEVEE REPAIR
Construction Solicitation and Specifications
MARCH 2020
SCHEDULE OF PRICES
ITEM
NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
0001 Stripping 1 JOB
XXXXXXXX XXXXXXXX
0002 Excavation 1 JOB $ $
0003 Bedding Stone No. 5
XXXXXXXX XXXXXXXX
0003AA First 2,100 Ton 2,100 TN $ $
0003AB Over 2,100 Ton 350 TN $ $
0004 Bedding Stone No. 13
XXXXXXXX XXXXXXXX
0004AA First 500 Ton 500 TN $ $
0004AB Over 500 Ton 75 TN $ $
0005 Stockpiled Class D Riprap Placement
XXXXXXXX XXXXXXXX
0005AA First 900 Tons 900 TN $ $
0005AB Over 900 Tons 150 TN
0006 Stockpiled Class C Riprap Placement
0006AA First 1,000 Tons 1,000 TN $ $
0006AB Over 1,000 Tons 200 TN $ $
0007 Riprap - Class D
XXXXXXXX XXXXXXXX
0007AA First 500 Ton 500 TN $ $
0007AB Over 500 Ton 400 TN $ $
0008 Riprap - Class C
JOB= LUMP SUM TN= TON
CY= CUBIC YARD
ENSURE THAT UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS HAVE BEEN
COMPLETED
Clauses applicable to this task order:
52.211-10 -- COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to
(a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 240 consecutive calendar days. The time stated for completion shall include final cleanup of the premises.
(d) See Section 00 73 05 for additional requirements.
0009 Site Restoration 1 JOB
XXXXXXXX
"TOTAL OF ESTIMATED AMOUNTS
(ITEM NOS. 0001 THROUGH 0009, INCL.)"
(End of clause)
52.211-12 -- LIQUIDATED DAMAGES CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,600.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
52.222-23 -- NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
0.6%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Dubuque County, Iowa.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20% percent of the TAS ORDER AMOUNT or $3,000,000 whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.236-4 -- Physical Data.
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations.
(b) Weather conditions are described in Section 00 73 05 SPECIAL CONTRACT REQUIREMENTS, paragraph ADDITIONAL PHYSCIAL DATA CLAUSE INFORMATION.
(c) Transportation facilities: Roads and railroads in the general area are shown on the drawings. Access ways shall be investigated by the Contractor to satisfy itself as to their existence and allowable use.
(d) For additional pertinent information see Section 00 73 05, paragraph ADDITIONAL
PHYSICAL DATA CLAUSE INFORMATION.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Mr. Mark Pratt, P.E.
Area Engineer Central Area Office
U.S. Army Corps of Engineers 1910 E. Kimberly Road, Suite 105 Davenport, Iowa 52807 Telephone No.: 563-386-0572
(Collect calls not accepted.)
252.219-7009 SECTION 8(A) DIRECT AWARD (OCT 2018)
(a) This contract is issued as a direct award between the contracting office and the 8(a) Contractor pursuant to the Partnership Agreement between the Small Business Administration (SBA) and the Department of Defense. Accordingly, the SBA, even if not identified in Section A of this contract, is the prime contractor and retains responsibility for 8(a) certification, for 8(a) eligibility determinations and related issues, and for providing counseling and assistance to the 8(a) Contractor under the 8(a) Program. The cognizant SBA district office is:
TBD
(b) The contracting office is responsible for administering the contract and for taking any action on behalf of the Government under the terms and conditions of the contract; provided that the contracting office shall give advance notice to the SBA before it issues a final notice terminating performance, either in whole or in part, under the contract. The contracting office also shall coordinate with the SBA prior to processing any novation agreement. The contracting office may assign contract administration functions to a contract administration office.
(c) The 8(a) Contractor agrees that it will notify the Contracting Officer, simultaneous with its notification to the SBA (as required by SBA’s 8(a) regulations at 13 CFR 124.515), when the owner or owners upon whom 8(a) eligibility is based plan to relinquish ownership or control of the concern. Consistent with section 407 of Public Law 100-656, transfer of ownership or control shall result in termination of the contract for convenience, unless the SBA waives the requirement for termination prior to the actual relinquishing of ownership and control.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall—
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the AS LISTED ON DRAWING SHEET WITH TITLE “INDEX OF DRAWINGS.”
MVR.11 CERTIFIED TO TRANSACT BUSINESS
Pursuant to FAR 52.236-7, the Contractor must comply with State law. The Contractor must be certified to transact business in the State of IOWA before the Notice to Proceed may be issued.
The certification is shown as an active registration on the Secretary of State website of the state where work is to be performed.
Davis Bacon Wage Determination
"General Decision Number: IA20200002 01/03/2020
Superseded General Decision Number: IA20190002
State: Iowa
Construction Type: Heavy River Work
Counties: Iowa Statewide.
HEAVY CONSTRUCTION PROJECTS LIMITED TO WORK ON OR PERTAINING
TO, OR WITHIN THE FLOOD PLAIN OF THE MISSISSIPPI AND MISSOURI
RIVERS INCLUDING ALL HEAVY WORK ON TRIBUTARIES AND LAKE ODESSA
WITHIN THE FLOOD PLAIN OF THE RIVERS. HEAVY WORK INCLUDES
CANALS, CHANNELS, COFFERDAMS, DAMS, DIKES, DOCKS, DREDGING
WORK, FLOOD CONTROL PROJECTS, JETTIES, LAND RECLAMATION, LEVEE
WORK, LOCKS, LOCK AND DAMS, PUMPING STATIONS, RAILROAD BRIDGES,
RAILROAD CONSTRUCTION, SHORELINE MAINTENANCE, AND WATER WAY
CONSTRUCTION.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2020
CARP0004-007 01/01/2019
SCOTT COUNTY
Rates Fringes
CARPENTER........................$ 30.39 25.32
ENGI0150-008 06/01/2019
CEDAR, CLINTON, DES MOINES, LEE, LOUISA, MUSCATINE AND SCOTT
COUNTIES
Power equipment operators:
GROUP 1.....................$ 36.00 33.30
GROUP 2.....................$ 35.00 33.30
GROUP 3.....................$ 32.35 33.30
GROUP 4.....................$ 31.30 33.30
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat
GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt
Paver Screed; Asphalt Plant; Automatic Curbing Machine;
Backfiller (throw bucket); Blastholer Self-Propelled Rotary
Drill or Similar Machines; Boom Tractor or Side Boom;
Boring Machine (Directional, Vertical or Horizontal);
Building Hoist (1,2 or 3 drums); Caisson Auguring Machines;
Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming
Machine; Combination Backhoe Front End Loader; Combination
Concrete Finishing Machine and Float; Concrete Breaker or
Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;
Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.);
Curing-Tinning Machine; Dipper Dredge Crane man; Dipper
Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.);
Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);
Grader, Motor Grader, Motor Patrol, Auto Grader, Form
Grader, Pull Grader, Sub Grader, Elevating Grader; Group
Equipment Greaser; Guard Rail Post Driver; Hoists;
Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck
Mounted or Pull Type, and Similar Equipment; Laser Screed;
Loader (Track, Rubber Tire or Articulated); Locomotive
Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile
Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder
Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad
Foot Compactor; Shovel; Slip Form Paver; Steel Track-Type
Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy;
Trenching Machine (40 H.P. & over); Work Boat.
GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster;
Boiler (Engineer or Fireman); Conveyor Over 20 H.P.;
Distributor; Driver on Truck Crane or Similar Machines;
Elevator; Farm-Type Tractor (Without Power Attachment);
Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant;
Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine
(Under 40 H.P.).
GROUP 4: Air Compressor (400 C.F.M. or over); Compact
Loader (Rubber Tire, Track & Utility); Engine Driven
Welding Machine; Mechanical Heater (other than steam boiler); Small Outboard Motor Boat (Safety Boat & Life
Boat); Water Pump (More than one well point pump).
ENGI0234-002 12/01/2018
REMAINING COUNTIES
Power equipment operators:
MISSISSIPPI RIVER
GROUP A....................$ 37.52 14.55
GROUP B....................$ 36.83 14.55
GROUP C....................$ 34.50 14.55
MISSOURI RIVER
GROUP A....................$ 37.04 14.55
GROUP B....................$ 36.37 14.55
GROUP C....................$ 34.11 14.55
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP A: Power shovel, crane, backhoe (1.5 yd and over), dragline, hoisting engineer (steel erection), motor patrol
(finish), piledriver, master mechanic, sideboom tractor, horizontal boring machine, finish dozer, central mix plant, paver or self propelled spreader, tow, safety, or push boat, CMI paver, subgrader or equivalent, asphalt plant, pushcat, mechanics - welders, churn or rotary drill, trenching machine (Cleveland 80 or similar capacity), asphalt laydown, asphalt screed, asphalt heater planer, concrete pump, self-propelled curb machine (with seat), loader operator (2 cu yd and over), scraper, dozer (rough), group greaser, asphalt roller, backhoes of any size when digging building footings.
GROUP B: Motor patrol (rough), concrete curb breaking machine, loader (under 2 yd), backhoe under 1/2 yd, concrete widening machine, paver breaker, Barber Green, Haiss loader or similar machines, crawler tractor (pulling disc, sheepsfoot, ripper, or flat roller), self-propelled sheepsfoot roller, self-propelled roller, dristributor, screening and washing plant, self-propelled vibrating compactor, trenching machine, steel placing machine, conveyor, finishing machine (on concrete), flex plane, bullfloat, form grader, self-propelled elevator grader, water wagon on compaction
GROUP C: Boiler, mechanical boom, oiler, welding machine, Pump (other than dredge), boom and winch trucks, compressor, tank car heater (combination boiler and booster), pumps on well points and deep wells for dewatering, truck crane combination driver-oiler, concrete curbing machine, batch plant (dry), spreader attachments, utility tractor with attachments, light plant mechanical heater, pumps over 3"", farm type tractor (pulling disc, harrow or roller).
IRON0111-005 07/01/2019
(EXCLUDING DES MOINES, LEE, DUBUQUE, CLAYTON, ALLAMAKEE,
HARRISON, POTTAWATTAMIE, MILLS, FREMONT, JACKSON, CLINTON,
LOUISA, MUSCATINE, WOODBURY AND MONONA COUNTIES)
Ironworker.......................$ 32.50 26.42
LABO0309-005 01/01/2019
LABORERS
GROUP 1.....................$ 28.13 21.07
GROUP 2.....................$ 28.63 21.07
GROUP 3.....................$ 29.26 21.07
LABORER CLASSIFICATIONS
GROUP 1 - Flagman; Dumpman; Spotter; Broom Man; Landscaper;
Planting & Removal of Trees; Fencing Laborers; Cleaning of
Forms or Lumber (in Bone Yard); Laying of Sod; Moving and/or Maintenance of Flares & Barricades; Operation of all
Hand, Electric, Air, Hydraulic or Mechanically Powered
Tools under the the Laborers' including Jackhammer, Tamper, Air Spade, Auger, Concrete Saw, Chain Saw, Utility Saw, Rock Drill, Vibrator; Mortar Mixer; Power & Hand Saw (When
Clearing Timber); General Laborer; Material Handler; Form
Handler; Concrete Dumper; Puddler; Explosives Handler;
Center Strip Handler & Installer; Prime Mover or any
Mechanical Device Taking the Place of Concrete Buggy or
Wheelbarrow; Sandpoint Setter; Asphalt Kettleman; Sheeting
Hammer Driver; Laying & Jointing of Telephone Conduit; Gas
Distribution Man; Pipe Setter On Lateral, Drain Tile, Culvert Pipe & Storm Sewer; Catch Basin Lead; Catch Basin;
Manholes; Batch Dumper; Tank Cleaner; Cofferdam Worker;
Bankman on Floating Plant; Jointman With Pipelayer; Back-up
Man (Corker, Joint Maker) With Pipe Setter On Sewer & Water
Main; Batterboard Man or Laser Operator on Sewer & Water
Main; Laborer in Ditch or Tunnel, on Sewer or Water Main &
Telephone Conduit, Cutters; Burners; Torchman; Gravel Box
Man; Asphalt Plant; Concrete Plant; Deck Hand; Unloading of
Steel & Rebar; & Wrecking Laborers
GROUP 2 - Asphalt Raker or Luteman; Pipe Setter on Sewer or
Water Main; Gunnite Nozzle Man; Asphalt or Concrete Curb
Machine Operator; Concrete Burning Machine Operator; &
Coring Machine Operator; Hazardous Waste Worker; Asbestos
Abatement Worker
GROUP 3 - Concrete Specialist (All work relating to but not limited to pouring, striking of & finishing all concrete surfaces)
PLAS0544-001 01/01/2019
CEMENT MASON/CONCRETE FINISHER...$ 27.90 23.16
* TEAM0371-001 05/01/2019
Truck drivers:
GROUP 1.....................$ 38.17 13.25+a
GROUP 2.....................$ 38.71 13.25+a
GROUP 3.....................$ 39.01 13.25+a
GROUP 4.....................$ 30.34 13.25+a
GROUP 5.....................$ 40.39 13.25+a
Footnote:
a. PENSION: $52.80 per day
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Drivers on 2 axle trucks hauling less than 9 tons , air compressor and welding machines and brooms, including those pulled by separate units, warehousemen, greasers and tiremen, pick- up-trucks when hauling material, tools or men to and from and on the job site, and forklifts up to
6,000 lb capacity
GROUP 2: 2 or 3 axle trucks hauling more than 9 tons but hauling less than 16 tons. A-frame winch trucks, or similar equipment when used for transportation purposes. Forklifts over 6,000 lb capacity, winch trucks, four axle combination units, hydrolift Trucks, vactor trucks or simiolar equipment when used for transportation purposes..
GROUP 3: 2, 3, and 4 axles hauling 16 tons or more, water pulls, 5 axles or more combination units, water pulls, articulated dump trucks
GROUP 4: Oil distributors, lowboys
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
SUIA2002-002 12/01/2014
CARPENTER
Mississippi River (Iowa
Side).......................$ 28.55 16.29
Mississippi River (Work that pertains to both banks, or extends across the Mississippi River. If a higher rate of pay previalis in the adjoining states, then those rates shall apply)................$ 34.60 21.38
Missouri River..............$ 31.25 12.43
CEMENT MASON/CONCRETE FINISHER...$ 33.35 10.05
Ironworkers: (setting of all structural steel and reinforcing steel installation:)
Des Moines and Lee
Counties....................$ 29.42 16.68
Dubuque, Clayton &
Allamakee Counties..........$ 26.67 16.68
Harrison, Pottawattamie, Mills & Fremont Counties....$ 24.89 16.68
Jackson, Clinton, Louisa
& Muscatine Counties........$ 36.20 16.68
Woodbury & Monona Counties..$ 19.46 16.68
Laborers:
Class A
Mississippi River..........$ 30.92 8.60
Missouri River.............$ 28.92 8.60
Class AA
Mississippi River..........$ 31.95 8.60
Missouri River.............$ 29.95 8.60
Class B
Mississippi River..........$ 29.22 8.60
Missouri River.............$ 28.22 8.60
Class C
Mississippi River..........$ 26.05 8.60
Missouri River.............$ 24.05 8.60
TRUCK DRIVER
Mississippi River...........$ 24.88 10.50
Missouri River..............$ 24.88 10.50
LABORERS CLASSIFICATIONS
GROUP A: Sandblaster, gunite nozzleman, diamond and core drills powered by air, sewer utility man and laser operator, all work performed by laborers working from a bos'n chair, swinging stage, tagline or block and tackle, drill operators of air tracks, wagon drills and similar drills, steel highway formsetter, stingman, powerman blaster, asphalt luteman and rakers, asphalt distributor operators, concrete saw operators, and skilled concrete laborers, deckhands.
GROUP AA: Pipelayer, concrete specialist; tunnelman
GROUP B: Tree climber, form setter, potmen (not mechanical), depth grade checker, and cutting torches on demolition work, trencher operator (walk behind), safety boat operators, power buggyman, concrete and paving sawmen, form line and expansion joint assembler, bottomman, caulker-jointer and painter (striper), timber and chair-sawman, mechanical stresser or strechman on post-tension or pre-stressed concrete on or off job, form tamper, air-gas and electric tool opertors-vibrators-
Barcohammer-Pavec-tampers-electric drills-hammers and jackhammers, tree groundman, chair tenders-tool room men and checkers, concrete processing material and monitors, stringman on paving work, broom operator (not self propelled), fence erectors, handling and placing of metal mesh, dowel bars, reinforcing baars and chairs, dumpmen and spotters, carring reinforcing rods, corrugated culvert pipe, stake chaser, seeding or mulching and planting of trees shrubs and flowers, water pumps (under 3""), compressors (under 400 CFM), general laborer, rodman, hot asphalt labor, carpenter tender, concrete finisher tender.
GROUP C: Waterboy, flagman, flagger/traffic control, watchman.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
RFTOP - MATOC-HVY CASCADE TO#1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 05 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 PRICE AND PAYMENT PROCEDURES
01 32 16 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 57 19 ENVIRONMENTAL PROTECTION
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 21 00 SURVEYS
DIVISION 31 - EARTHWORK
31 00 01 EXCAVATION
31 11 00 STRIPPING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 SEEDING
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE PROTECTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 73 05
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.3 COORDINATION WITH OTHERS
1.4 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.4.1 E-Verify Program
1.5 EVALUATION OF SUBDIVIDED ITEMS
1.6 VARIATIONS IN ESTIMATED QUANTITIES OF SUBDIVIDED ITEMS
1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.8 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION
1.9 DELAYS DUE TO HIGH WATER
1.10 HIGH WATER ACTION PLAN
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 73 05 Page 1
SECTION 00 73 05
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Company Enrollment in E-Verify; G DA Form I-9; G DA
**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, the preconstruction submittals listed above with a "G DA" submitted with a printed copy of the ENG 4025 to be used for the cover page stating the Contract number with Task Order number,(e.g.
W912EK20CXXXX-xxxx), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:
Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201
High Water Action Plan Superintendence of Subcontractors; G Pre-Construction Condition Survey; G
SD-11 Closeout Submittals
Post-Construction Condition Survey; G
1.2 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
In addition to the requirements of Contract Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, comply with the following requirements:
a. Provide all necessary protection, appurtenant equipment and supplies, including, but not limited to, enclosures, heating, lighting, and sufficient labor to accomplish the work required to be completed during the aforementioned periods, taking into account high water, low and high temperatures, wind forces, ice, sleet, snow, wind chill, high humidity, and heat index factors that may be encountered at the site and working adjacent to water. This may require additional labor or
DOCUMENT 00 73 05 Page 2 shifts and special equipment or special equipment maintenance to compensate for lost productivity caused by low or high temperatures and other associated environmental factors.
b. The Cascade Riverfront Trail may be closed during construction operations. Avoiding excessive damage to the trail is required, and repairing damage to the trail back to original conditions will be coordinated with the Contracting Officer.
c. Access to the site is by land only.
1.3 COORDINATION WITH OTHERS
Schedule and coordinate operations affecting other Contractors, Government Hired Labor Forces, utilities, and/or property occurring within the work limits. Such scheduling shall be accomplished with lead time sufficient for coordination of all involved parties as necessary for timely completion of each Contract feature. As evidence of compliance with this general requirement clause, the Contractor shall furnish the Contracting Officer with a copy of each coordinated schedule prior to commencing operations affecting such other Contractors, Government Hired Labor Forces, utilities, and/or property. As a minimum, coordination shall be established with each of the following point(s) of contact, as required.
a. Area Engineer Central Area Office U.S. Army Corps of Engineers 1910 E. Kimberly Road, Suite 105 Davenport, IA 52807 Telephone No.: 563-386-0572 (Collect calls not accepted.)
b. City of Cascade City Commissioner 320 - 1st Avenue West Cascade, IA 52033 Telephone No.: 563-852-3114 (Collect calls not accepted.)
1.4 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.4.1 E-Verify Program
The Contractor must pre-screen candidates using the E-Verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system.
Documentation of company enrollment in E-Verify, via a print screen of the company profile within the E-Verify system, must be submitted to the Security Office no later than 3 business days after receiving the Notice to Proceed.
*When Contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the Contracting Officer. This Form will be provided to the Security Office after Notice to Proceed is received.
DOCUMENT 00 73 05 Page 3
1.5 EVALUATION OF SUBDIVIDED ITEMS
Bid Item Nos. 0003, 0004, 0005, 0006, 0007, and 0008 are subdivided into two or more estimated quantities and separately priced. The Government will evaluate each of these items on the basis of total price of the subitems.
1.6 VARIATIONS IN ESTIMATED QUANTITIES OF SUBDIVIDED ITEMS
This variation in estimated quantities clause is applicable only to Bid Item Nos. 0003, 0004, 0005, 0006, 0007, and 0008.
a. Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in Contract unit price.
b. Where the actual quantity of work performed for Bid Item Nos. 0003, 0004, 0005, 0006, 0007, and 0008 are less than 85 percent of the quantity of the first sub-item listed under such item, it will be paid at the Contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment will be made.
c. If the actual quantity of work performed under Bid Item Nos. 0003, 0004, 0005, 0006, 0007, and 0008 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Bid Item Nos. 0003, 0004, 0005, 0006, 0007, and 0008 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this Contract, the Contract completion time will be adjusted.
1.7 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
The applicable provisions of EP 1110-1-8, to be Region IV. See main Contract for remaining paragraph requirements.
1.8 ADDITIONAL PHYSICAL DATA CLAUSE INFORMATION
Additional Contractor information associated with the Contract Clause
52.236-4 PHYSICAL DATA.
(b) Weather Conditions
National Weather Service climatological data consisting of precipitation and temperature records observed at Cascade, Iowa, are shown in the table below. These data are based on monthly averages for the 10-year period 2008-2017, inclusive.
DOCUMENT 00 73 05 Page 4
PRECIPITATION TEMPERATURE (Degrees Fahrenheit)
Days Over Days Over Total Average Average Monthly Days Below Month 0.1" 0.5" For Month Maximum Minimum Average 32 Degrees
January 4 1 1.36 26 10 18 30 February 4 1 1.46 29 11 20 27 March 5 1 2.06 42 23 33 25 April 7 3 3.77 56 34 45 12 May 8 3 4.16 69 48 58 1 June 9 5 7.08 78 57 68 0 July 6 2 3.61 80 60 70 0 August 6 2 3.80 80 59 69 0 September 6 3 3.45 75 52 64 0 October 5 3 3.65 61 41 51 6 November 4 2 2.15 45 28 36 20 December 4 1 1.96 33 20 27 27
(d) Hydraulic Data
Daily and historic river gage readings from the Cascade Gage can be obtained from the U.S. Army Corps of Engineers web site as follows:
1. Go to http://www.rivergages.com
2. In Block "Choose an Option" Select Rock Island District or click on the Rock Island icon on the Map
3. In Block "Choose a Basin" Select Mississippi River Basin
4. Scroll to locate Maquoketa River
5. Review date range, stage or elevation, and choose output format (plot, tabulate, tabulate yearly)
Historic river duration curves may be constructed using the data provided in the output. Additional information and support is available upon request.
1.9 DELAYS DUE TO HIGH WATER
Please see main Contract for requirements.
1.10 HIGH WATER ACTION PLAN
Please see main Contract for plan requirements.
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
The Government will not make utility or facility services available to the Contractor. Provide own utility services and maintain within the construction area a minimum field-type sanitary facility approved by the Contracting Officer.
***Please see main Contract for the remaining requirements of PART 1 and paragraphs for this project.***
DOCUMENT 00 73 05 Page 5
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used -- End of Section --
DOCUMENT 00 73 05 Page 6
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 PROJECT LOCATION
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
The work includes, but is not limited to, stripping, placeing stockpiled riprap, providing bedding stone and riprap, surveying, and site restoration.
1.2 PROJECT LOCATION
The work is located in the Mississippi River Basin on the North Fork/Maquotketa River, Cascade Local Flood Protection Levee, City of Cascade, Dubuque County, Iowa, and as indicated.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 11 00 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Stripping
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Excavation
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Site Restoration
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Bedding Stone
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.2 Stockpiled Riprap Placement
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.3 Riprap
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 22 00 Page 1
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
Payment items for the costs of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and as described. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed will constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Stripping
1.1.1.1 Payment
Payment for all costs associated with proper debris disposal, stripping, stockpiling, and spreading will be made for Item No. 0001, "Stripping."
1.1.1.2 Unit of Measure
Unit of measure: job.
1.1.2 Excavation
1.1.2.1 Payment
Payment for costs associated with or incidental to removal and proper disposal of debris, scarifying, excavating, transporting, spreading, compacting, and grading will be made for Item No. 0002 "Excavation."
1.1.2.2 Unit of Measure
Unit of measure: job.
1.1.3 Site Restoration
1.1.3.1 Payment
Payment for all costs associated with restoring site back to pre-construction conditions, staging areas, and seeding will be made for Item No. 0008 "Site Restoration."
1.1.3.2 Unit of Measure
Unit of measure: job.
SECTION 01 22 00 Page 2
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this Contract on which the Contract unit price payments will be paid are listed in the SCHEDULE OF PRICES and described below. The unit price and payment made for each item listed constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, surveys, and for performing all costs required for each of the unit price items.
1.2.1 Bedding Stone
1.2.1.1 Payment
Payment for costs associated with or incidental to providing and surveying bedding stone in accordance with Section 35 31 19 STONE PROTECTION and Section 02 21 00SURVEYS. The Government will pay up to 80 percent of the total tonnage used without final surveys verifying design has been met.
Final Payment will be made once final surveys are completed and work is accepted for:
Item No. 0003AA, "Bedding Stone No. 5, First 2,100 Tons;"
Item No. 0003AB, "Bedding Stone No. 5, Over 2,100 Tons;"
Item No. 0004AA, "Bedding Stone No. 13, First 500 Tons;" and
Item No. 0004AB, "Bedding Stone No. 13, Over 500 Tons," as applicable.
1.2.1.2 Measurement
Bedding stone will be in number of tons, weighed on approved scales in the presence of a Government inspector, accepted in the completed work. Weight certificates furnished by a public weighmaster will be acceptable in lieu of weighing as specified when authorized by the Contracting Officer. No payment will be paid for any material wasted, used for the convenience of the Contractor, unused or rejected.
1.2.1.3 Unit of Measure
Unit of measure: tons.
1.2.2 Stockpiled Riprap Placement
1.2.2.1 Payment
Payment for costs associated with or incidental to placing Government supplied riprap will be made for:
Item No. 0005AA, "Stockpiled Class D Riprap Placement, First 900 Tons;"
Item No. 0005AB, "Stockpiled Class D Riprap Placement, Over 900 Tons;"
SECTION 01 22 00 Page 3
Item No. 0006AA, "Stockpiled Class C Riprap Placement, First 1,000 Tons;" and
Item No. 0006AB, "Stockpiled Class C Riprap Placement, Over 1,000 Tons;"
as applicable.
1.2.2.2 Unit of Measure
Unit of measure: tons.
1.2.3 Riprap
1.2.3.1 Payment
Payment for costs associated with or incidental to providing and surveying riprap, as applicable, in accordance with Sections 35 31 19 STONE PROTECTION and 02 21 00 SURVEYS. The Government will pay up to 80 percent of the total tonnage used without final surveys verifying design has been met. Final Payment will be made once final surveys are completed and work is accepted for:
Item No. 0007AA, "Riprap - Class D, First 500 Tons;"
Item No. 0007AB, "Riprap - Class D, Over 500 Tons;"
Item No. 0008AA, "Riprap - Class C, First 300 Tons;" and
Item No. 0008AB, "Riprap - Class C, Over 300 Tons;" as applicable.
1.2.3.2 Measurement
Riprap will be in number of tons, weighed on approved scales in the presence of a Government inspector, accepted in the completed work. Weight certificates furnished by a public weighmaster will be acceptable in lieu of weighing as specified when authorized by the Contracting Officer. No payment will be paid for any material wasted, used for the convenience of the Contractor, unused or rejected.
1.2.3.3 Unit of Measure
Unit of measure: tons.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 22 00 Page 4
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 32 16 Page 1
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
Submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Construction Schedule; G
SD-07 Certificates
Monthly Updates
***Please see main Contract for the remaining requirements of PART 1***
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 32 16 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 REQUIREMENTS
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 REQUIREMENTS
This Contract will modify this Sections requirements from the main Contract for submittal transmission and the adequate time (a minimum of 14 calendar days exclusive of mailing time) will be allowed and shown on the register for review and approval. The Contracting Officer's review period will be completed in 14 calendar days from the date of submittal reciept.
***Please see main Contract for the remaining descriptions and requirements.***
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not…