This document outlines a Time and Materials (T&M) contract for elevator repair and maintenance services. The contractor is required to conduct repairs and replacements on an elevator, providing detailed written estimates to the Contracting Officer's Representative (COR) before initiating any work. The contract includes specific pricing terms with Not-to-Exceed (NTE) ceiling amounts of $15,000 for the primary nonroutine Contract Line Item Number (CLIN) and $5,000 for the secondary nonroutine CLIN.

The pricing structure includes hourly rates for Mechanic Labor and Team Labor across a base year and two option years, with rates to be filled in by the contractor. Materials will be reimbursed at cost plus 10% for handling, and the contract rates must include all costs for consumables and small tools. The contractor must obtain written authorization from the Contracting Officer before performing any additional repairs, and they assume financial risk if they exceed the established ceiling prices without a contract modification.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Time and Materials (T&M): The Contractor shall conduct repairs and/or replacements on the elevator to restore it to working order.

The Contractor shall note and report to the COR any required repairs and/or replacements necessary along with a detailed report, but shall not initiate such work until authorized to do so by the Contracting Officer in writing. The

Contractor shall furnish the COR with an itemized written estimate of the labor hours and the cost of parts and materials which may be required to complete necessary repairs and replacements. The written estimate should also include contract number and invoice number (example, invoice 0001). Payment for the Time and Material (T&M) line items will be as specified in Contract Clause Payment Under Time-and-Materials and Labor-Hour Contracts. In addition to the basis for the labor rate specified in the clause (wages, indirect costs, G&A expenses, and profit), the contract rates shall include all cost for consumables and small tools required to complete the required repairs.

Materials that are directly consumed in connection with the furnishing of the labor hours accomplished under the

T&M line item will be reimbursed at cost, plus 10 percent for material handling cost. Reimbursement will be limited to the direct cost of materials in excess of the amount paid under the labor hour rates and will be reimburse to the extent supported by invoice cost and previously approved for use by the Contracting Officer.

Time and Material CLINs -Price and payment shall be full compensation for all Time and materials performed, complete, as specified and approved.

The NTE ceiling amount for the primary nonroutine CLIN is $15,000.00. The NTE ceiling on the secondary nonroutine CLIN is $5,000.00. The extended amount for each of these items is the established ceiling price. Without a modification pursuant to FAR Clause 52.243-3, Changes -- Time-and-Materials or Labor-Hours (Sep 2000), the

Contractor exceeds the ceiling at their own risk.

Hourly Rates

For services pertaining to Time and Materials efforts provide hourly rates for:

Base Year:

Mechanic Labor: $_______ per hour

Team Labor: $_______ per hour

Option Year One:

Option Year Two: