This technical specification document outlines requirements for upgrades to headgate repair pits at McNary, Lower Granite, and Lower Monumental Dams. Key details include structural steel fabrication and installation specifications. Structural steel components must be designed and fabricated according to standards including AISC, AWS, and RCSC. Welding procedures must follow AWS D1.1 and be prequalified or tested. High strength bolting and galvanizing requirements are provided. The contractor must design, fabricate, and install an access system including a maintenance platform, guardrail, and ladder with fall protection to access an air damper. The access system design must be stamped by a registered engineer and meet safety standards.

View the file

Other files for this federal contract opportunity

Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NWW Gate Repair Pit Upgrades W912EF21B0007 amd 0001

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15.00 28 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 28 GENERAL REQUIREMENTS

01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS

01 14 00.10 28 PROJECT SITE RESTRICTIONS

01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY

(OPSEC)

01 22 00.00 28 MEASUREMENT AND PAYMENT

01 32 01.00 28 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.00 28 CONTRACTOR QUALITY CONTROL

01 51 00.00 28 TEMPORARY UTILITIES

01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20.00 28 ENVIRONMENTAL PROTECTION

01 78 00.00 28 CLOSEOUT SUBMITTALS

01 78 23.00 28 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 13.01 28 CLASS II ASBESTOS ABATEMENT

DIVISION 03 - CONCRETE

03 30 90.00 28 CRACK GROUTING AND CONCRETE REPAIR

03 60 00.01 26 CONCRETE DEMOLITION, REPAIR AND GROUTING

DIVISION 04 - MASONRY

04 20 00.10 28 MASONRY DOOR INFILL

DIVISION 05 - METALS

05 05 20.00 28 POST-INSTALLED ANCHORS IN CONCRETE

05 50 14 STRUCTURAL METALS

05 52 00 METAL RAILINGS AND GRATING

05 72 00.00 28 GATE REPAIR PIT EQUIPMENT TESTING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 WATER REPELLENTS

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 00.10 28 STEEL DOORS AND FRAMES

08 71 00.10 28 DOOR HARDWARE

DIVISION 09 - FINISHES

PROJECT TABLE OF CONTENTS Page 1

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 65 00 RESILIENT FLOORING

09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 22 - PLUMBING

22 00 00.00 28 PLUMBING, GENERAL PURPOSE

22 15 14.00 28 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE

22 62 10.00 28 (OPTIONAL) GATE REPAIR PIT VACUUM SYSTEM

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00.00 28 MECHANICAL GENERAL REQUIREMENTS

23 05 24.00 28 METAL SUPPORTS FOR MECHANICAL SYSTEMS

23 08 01.00 28 TESTING INDUSTRIAL VENTILATION SYSTEMS

23 34 00.00 28 FANS

23 35 00.00 28 LOCAL EXHAUST SYSTEM

23 35 19.00 28 INDUSTRIAL VENTILATION AND EXHAUST

DIVISION 26 - ELECTRICAL

26 05 00.00 28 GENERAL ELECTRICAL WORK

26 05 19.00 28 INSULATED WIRE AND CABLE

26 05 33.10 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 20 00.00 28 INTERIOR DISTRIBUTION SYSTEM

26 29 23.00 28 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

26 60 13.00 40 LOW-VOLTAGE MOTORS

DIVISION 40 - PROCESS INTERCONNECTIONS

40 17 30.00 28 WELDING GENERAL PIPING

40 94 43.01 28 PROCESS CONTROLLERS - PROGRAMMABLE LOGIC CONTROLLERS (PLC)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

41 24 26.00 28 HYDRAULIC FLUID POWER SYSTEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

1.2 VOLUME 1 CONTRACT DRAWINGS (LITTLE GOOSE)

1.3 VOLUME 2 CONTRACT DRAWINGS (LOWER MONUMENTAL)

1.4 VOLUME 3 CONTRACT DRAWINGS (MCNARY)

1.4.1 Use Of Government Prepared Contract CAD Electronic Files

1.5 RESOURCE DRAWINGS (R)

1.6 VOLUME 1 RESOURCE DRAWINGS (LITTLE GOOSE)

1.7 VOLUME 2 RESOURCE DRAWINGS (LOWER MONUMENTAL)

1.8 VOLUME 3 RESOURCE DRAWINGS (MCNARY)

-- End of Section Table of Contents --

DOCUMENT 00 01 15.00 28 Page 1

SECTION 00 01 15.00 28

LIST OF DRAWINGS

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 VOLUME 1 CONTRACT DRAWINGS (LITTLE GOOSE)

Contract drawings for Little Goose are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

GENERAL

G-001 LGG-1-0-1/468 COVER SHEET AND LOCATION MAPS

G-002 LGG-1-0-1/469 INDEX SHEET

G-101 LGG-1-0-1/470 SITE PLAN

G-102 LGG-1-0-1/471 SITE PLAN

G-301 LGG-1-0-1/472 HEADGATE REPAIR PIT SECTIONS

G-901 LGP-1-6-3/473 HEADGATE PIT ISOMETRIC VIEWS

CIVIL

C-201 LGP-1-4-3/122 GATE REPAIR PIT UPSTREAM WALL

STRUCTURAL

S-001 LGP-1-5-3/4 GENERAL NOTES

SD101 LGP-1-5-3/5 DEMOLITION PLAN AND SECTIONS

SD501 LGP-1-5-3/6 DEMOLITION TYPICAL DETAILS

SD901 LGP-1-5-3/7 DEMOLITION PHOTOGRAPHS 1

SD902 LGP-1-5-3/8 DEMOLITION PHOTOGRAPHS 2

SD903 LGP-1-5-3/9 DEMOLITION PHOTOGRAPHS 3

S-101 LGP-1-5-3/10 WORK PLATFORM GRATING AND

GUARDRAIL PLAN

DOCUMENT 00 01 15.00 28 Page 2

S-102 LGP-1-5-3/11 WORK PLATFORM FRAMING LAYOUT

S-103 LGP-1-5-3/12 BRIDGE CRANE RUNWAY PLAN

S-301 LGP-1-5-3/13 REPAIR PIT SECTIONS ELEVATIONS

S-302 LGP-1-5-3/14 REPAIR PIT SECTIONS ELEVATIONS

S-303 LGP-1-5-3/15 GATE REPAIR PIT HVAC SUPPORT

EXTERIOR SECTIONS

S-401 LGP-1-5-3/16 ENLARGED FAN SUPPORT PLATFORM

PLAN

S-402 LGP-1-5-3/17 HVAC MAF-1 & SF-18 PLATFORM PLANS

S-403 LGP-1-5-3/18 HVAC EF-18,MAF-1, & SF-18

PLATFORMS SECTIONS

S-420 LGP-1-5-3/19 HVAC EXHAUST FAN EF-18 PLATFORM

DETAILS

S-421 LGP-1-5-3/20 HVAC SF-18 PLATFORM DETAILS

S-422 LGP-1-5-3/21 HVAC MAF-1 PLATFORM DETAILS

S-501 LGP-1-5-3/22 PLATFORM FRAMING CONNECTION

DETAILS 1

S-502 LGP-1-5-3/23 PLATFORM FRAMING CONNECTION

DETAILS 2

S-503 LGP-1-5-3/24 PLATFORM FRAMING DETAILS 3

S-504 LGP-1-5-3/25 PLATFORM FRAMING DETAILS 4

S-505 LGP-1-5-3/26 ACCESS PLATFORM AND HVAC

PLATFORM GUARDRAIL DETAILS

S-506 LGP-1-5-3/27 WORK PLATFORM STAIR DETAILS

S-507 LGP-1-5-3/28 BRIDGE CRANE RUNWAY DETAILS

S-520 LGP-1-5-3/29 HVAC DUCT FIXED SUPPORT BRACKET

DETAILS

S-521 LGP-1-5-3/30 HVAC DUCT HINGED SUPPORT BRACKET

DETAILS

S-522 LGP-1-5-3/31 HVAC DUCT SUPPORT BRACKET PARTS

DETAILS

S-530 LGP-1-5-3/32 CONCRETE INFILL AND LEVELING

BOLT DETAILS

S-901 LGP-1-5-3/33 ACCESS PLATFORM ISOMETRICS

ARCHITECTURAL

A-001 LGP-1-2-3/1 GENERAL NOTES, BUILDING DATA,

ABBREVIATIONS AND DOOR SCHEDULE

A-101 LGP-1-2-3/2 LIFE SAFETY PLAN: ELEVATION

580.00'

A-102 LGP-1-2-3/3 LIFE SAFETY PLAN: ELEVATION

595.00'

A-103 LGP-1-2-3/4 LIFE SAFETY PLAN: ELEVATION

634.00'

DOCUMENT 00 01 15.00 28 Page 3

A-401 LGP-1-2-3/5 ENLARGED PLANS: ELEVATIONS

580.00', 589.00', 598.00' AND

607.00'

A-402 LGP-1-2-3/6 ENLARGED PLANS, ELEVATIONS

616.00', 625.00', 634.00' &

REFLECTED CEILING PLAN

A-403 LGP-1-2-3/7 INTERIOR ELEVATIONS: NORTH AND

EAST SIDES

A-404 LGP-1-2-3/8 INTERIOR ELEVATIONS: SOUTH AND

WEST SIDES

A-501 LGP-1-2-3/9 DETAILS

MECHANICAL

M-001 LGP-1-3-3/1 MECHANICAL GENERAL NOTES

MD401 LGP-1-3-3/2 GATE REPAIR PIT VENTILLATION

ENLARGED PLAN EL 590 - REMOVAL

MD402 LGP-1-3-3/3 GATE REPAIR PIT VENTILLATION

ENLARGED PLAN EL 618 - REMOVAL

MD403 LGP-1-3-3/4 GATE REPAIR PIT VENTILLATION

ENLARGED SECTIONS EL 590 & EL

618 - REMOVAL

MD501 LGP-1-3-3/5 REPAIR PIT PIPING DEMOLITION

M-101 LGP-1-3-3/6 HEADGATE REPAIR PIT PLAN AND

SECTION

M-102 LGP-1-3-3/7 HEAD GATE REPAIR PIT DRAINAGE

PLAN

M-301 LGP-1-3-3/8 HEAD GATE REPAIR PIT DRAINAGE

SECTIONS

M-401 LGP-1-3-3/9 GATE AND SCREEN PEDESTAL PLAN

M-402 LGP-1-3-3/10 GATE AND SCREEN BRACING PLAN AND

ELEVATIONS

M-420 LGP-1-3-3/11 BRIDGE CRANE LAYOUT

M-501 LGP-1-3-3/12 EXTENDED PLATFORMS LAYOUT

M-502 LGP-1-3-3/13 SINGLE STAGE EXTENDED PLATFORM

ASSEMBLY

M-503 LGP-1-3-3/14 SINGLE STAGE EXTENDED PLATFORM

PLATFORM

M-504 LGP-1-3-3/15 EXTENDED PLATFORM STAGE 1

CARRIAGE

M-505 LGP-1-3-3/16 EXTENDED PLATFORM STAGE 1

CARRIAGE PARTS

M-506 LGP-1-3-3/17 SINGLE STAGE EXTENDED PLATFORM

CHAIN DRIVE ROD

M-507 LGP-1-3-3/18 TWO STAGE EXTENDED PLATFORM

STAGE 1 ASSEMBLY

M-508 LGP-1-3-3/19 TWO STAGE EXTENDED PLATFORM

STAGE 2 PLATFORM ASSEMBLY

DOCUMENT 00 01 15.00 28 Page 4

M-509 LGP-1-3-3/20 TWO STAGE EXTENDED PLATFORM

STAGE 2 PLATFORM DETAILS

M-510 LGP-1-3-3/21 TWO STAGE EXTENDED PLATFORM

STAGE 2 CARRIAGE

M-511 LGP-1-3-3/22 TWO STAGE EXTENDED PLATFORM

STAGE 2 END CARRIAGE

M-512 LGP-1-3-3/23 TWO STAGE EXTENDED PLATFORM

STAGE 2 ROLLER BEAM

M-513 LGP-1-3-3/24 TWO STAGE EXTENDED PLATFORM

STAGE 2 ROLLER BEAM CONNECT END

M-514 LGP-1-3-3/25 TWO STAGE EXTENDED PLATFORM

STAGE 2 CHAIN DRIVE ROD

M-515 LGP-1-3-3/26 TWO STAGE EXTENDED PLATFORM

CHAIN DRIVE

M-520 LGP-1-3-3/27 ADJUSTABLE PEDESTAL ASSEMBLY

VIEWS

M-521 LGP-1-3-3/28 ADJUSTABLE PEDESTAL DETAILS

M-530 LGP-1-3-3/29 EQUIPMENT JIB CRANE PLANS AND

DETAILS

M-540 LGP-1-3-3/30 GATE AND SCREEN BRACES LATERAL

BRACE ASSEMBLY

M-541 LGP-1-3-3/31 GATE AND SCREEN BRACES DETAILS 1

M-542 LGP-1-3-3/32 GATE AND SCREEN BRACES DETAILS 2

M-543 LGP-1-3-3/33 GATE OFFSET BRACE ARRANGEMENT

M-544 LGP-1-3-3/34 GATE OFFSET BRACE DETAILS

M-550 LGP-1-3-3/35 GATE CYLINDER BRACE DETAILS 1

M-551 LGP-1-3-3/36 GATE CYLINDER BRACE DETAILS 2

M-560 LGP-1-3-3/37 SCREEN ADJUSTABLE PEDESTAL

ARRANGEMENT AND DETAILS

M-561 LGP-1-3-3/38 SCREEN ADJUSTABLE PEDESTAL

DETAILS 2

M-570 LGP-1-3-3/39 VACUUM SYSTEM ARRANGEMENT VACUUM

SYSTEM

M-901 LGP-1-3-3/40 MECHANICAL ISOMETRICS

MH001 LGP-1-3-3/41 ABBREVIATIONS, LEGENDS, NOTES

MH002 LGP-1-3-3/42 CONTROL LOGIC DIAGRAM LEGEND

MH101 LGP-1-3-3/43 GATE REPAIR PIT EXHAUST FAN PLAN

MH401 LGP-1-3-3/44 GATE REPAIR PIT VENTILATION

ENLARGED PLAN EL 580

MH402 LGP-1-3-3/45 GATE REPAIR PIT VENTILATION

ENLARGED PLAN EL 598

MH403 LGP-1-3-3/46 GATE REPAIR PIT VENTILATION

ENLARGED PLAN EL 618

MH404 LGP-1-3-3/47 GATE REPAIR PIT VENTILATION

ENLARGED PLAN EL 634

DOCUMENT 00 01 15.00 28 Page 5

MH405 LGP-1-3-3/48 GATE REPAIR PIT VENTILATION

ENLARGED SECTIONS EL 580 & EL 618

MH406 LGP-1-3-3/49 GATE REPAIR PIT VENTILATION

EXTERIOR SECTIONS

MH408 LGP-1-3-3/50 REPAIR PIT WELDING EXHAUST

MH501 LGP-1-3-3/51 GATE REPAIR PIT VENTILATION

EXHAUST STACK TERMINATION DETAILS

MH502 LGP-1-3-3/52 GATE REPAIR PIT VENTILATION

RECTANGULAR BEND DETAILS

MH503 LGP-1-3-3/53 GATE REPAIR PIT VENTILATION

RECTANGULAR AIR INLET BELL

DETAILS

MH504 LGP-1-3-3/54 STACK HEAD BIRD SCREEN AND

EXHAUST BRANCH FITTING DETAILS

MH505 LGP-1-3-3/55 GATE REPAIR PIT VENTILATION

RECTANGULAR AIR INLET BELL

SCREEN DETAILS

MH601 LGP-1-3-3/56 HEAD GATE REPAIR PIT VENTILATION

SCHEMATIC

MP201 LGP-1-3-3/58 REPAIR PIT WATER PIPING

MP202 LGP-1-3-3/59 REPAIR PIT AIR LINE TUBING

MP203 LGP-1-3-3/60 REPAIR PIT AIR LINE TUBING

BRACING CYLINDER DETAILS

MP901 LGP-1-3-3/61 REPAIR PIT PIPING ISOMETRICS

ELECTRICAL

E-001 LGP-1-6-3/1 LEGENDS

ED101 LGP-1-6-3/2 ERECTION BAY EL 580 LIGHTING AND

POWER

ED102 LGP-1-6-3/3 ERECTION BAY EL 598 LIGHTING AND

POWER

ED103 LGP-1-6-3/4 EMBEDDED CONDUIT AND GROUNDING

ERECTION BAY - INTAKE EL. 618 &

ED201 LGP-1-6-3/5 POWERHOUSE LIGHTING SECTION AND

DETAIL REPAIR PIT

ED601 LGP-1-6-3/6 CQ04 ONE-LINE DIAGRAM

ED602 LGP-1-6-3/7 CR05 SCHEMATIC DIAGRAM

ED603 LGP-1-6-3/8 CABLE AND CONDUIT SCHEDULE

E-101 LGP-1-6-3/9 ERECTION BAY EL 580 LIGHTING AND

POWER

E-102 LGP-1-6-3/10 ERECTION BAY EL 598 LIGHTING AND

POWER

E-103 LGP-1-6-3/11 EMBEDDED CONDUIT AND GROUNDING

ERECTION BAY - INTAKE EL. 618 &

DOCUMENT 00 01 15.00 28 Page 6

E-104 LGP-1-6-3/12 HEAD GATE REPAIR PIT EL 580

LIGHTING AND POWER

E-105 LGP-1-6-3/13 HEAD GATE REPAIR PIT EL 589

LIGHTING AND POWER

E-106 LGP-1-6-3/14 HEAD GATE REPAIR PIT EL 598

LIGHTING AND POWER

E-107 LGP-1-6-3/15 HEAD GATE REPAIR PIT EL 607

LIGHTING AND POWER

E-108 LGP-1-6-3/16 HEAD GATE REPAIR PIT EL 616

LIGHTING AND POWER

E-109 LGP-1-6-3/17 HEAD GATE REPAIR PIT EL 625

LIGHTING AND POWER

E-110 LGP-1-6-3/18 HEAD GATE REPAIR PIT EL 634

LIGHTING AND POWER

E-201 LGP-1-6-3/19 REPAIR PIT U/S AND D/S POWER,

LIGHTING AND CONDUIT ELEVATIONS

E-202 LGP-1-6-3/20 REPAIR PIT NORTH AND SOUTH SIDE

POWER, LIGHTING AND CONDUIT

ELEVATIONS

E-203 LGP-1-6-3/21 RPCC AND EF18CC ELEVATION VIEW

E-501 LGP-1-6-3/22 RPCC PANEL DETAIL

E-502 LGP-1-6-3/23 MAF1CC PANEL DETAIL

E-503 LGP-1-6-3/24 EF18CC PANEL DETAIL

E-504 LGP-1-6-3/25 LEFCC PANEL DETAIL

E-505 LGP-1-6-3/26 REPAIR PIT LIGHT FIXTURE DETAIL

E-601 LGP-1-6-3/27 CQ04 ONE-LINE DIAGRAM

E-602 LGP-1-6-3/28 CR05 SCHEMATIC DIAGRAM

E-603 LGP-1-6-3/29 CQ07 THREE LINE DIAGRAM AND

PANEL SCHEDULE

E-604 LGP-1-6-3/30 CRO5.2 SCHEMATIC

E-605 LGP-1-6-3/31 EXHAUST FAN 18 CONTROL CABINET

SCHEMATIC EF18CC

E-606 LGP-1-6-3/32 REPAIR PIT CONTROL CABINET

SCHEMATIC RPCC SHEET 1

E-607 LGP-1-6-3/33 REPAIR PIT CONTROL CABINET

SCHEMATIC RPCC SHEET 2

E-608 LGP-1-6-3/34 REPAIR PIT CONTROL CABINET

SCHEMATIC RPCC SHEET 3

E-609 LGP-1-6-3/35 MAKEUP AIR FAN 1 CONTROL CABINET

SCHEMATIC MAF1CC

E-610 LGP-1-6-3/36 LOCAL EXHAUST FAN CONTROL

CABINET SCHEMATIC LEFCC

E-611 LGP-1-6-3/37 RPCC AND EF18CC TERMINAL BLOCK

LAYOUT

E-612 LGP-1-6-3/38 MAKE-UP AIR FAN 1 CONTROL

CABINET TERMINAL BLOCK LAYOUT

E-613 LGP-1-6-3/39 LOCAL EXHAUST FAN CONTROL

CABINET TERMINAL BLOCK LAYOUT

DOCUMENT 00 01 15.00 28 Page 7

E-614 LGP-1-6-3/40 CABLE AND CONDUIT SCHEDULE

E-615 LGP-1-6-3/41 CABLE AND CONDUIT SCHEDULE PT. 2

1.3 VOLUME 2 CONTRACT DRAWINGS (LOWER MONUMENTAL)

Contract drawings for Lower Monumental are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

GENERAL

G-001 LMG-1-0-1/377COVER SHEET AND LOCATION MAPS

G-002 LMG-1-0-1/378INDEX SHEET

G-101 LMG-1-0-1/379LOWER MONUMENTAL DAM SITE PLAN

G-102 LMG-1-0-1/380GATE REPAIR PIT PLAN

G-301 LMG-1-0-1/381HEADGATE REPAIR PIT SECTIONS

G-901 LMG-1-0-1/382HEADGATE PIT ISOMETRIC VIEWS

CIVIL

C-201 LMP-1-4-3/113GATE REPAIR PIT UPSTREAM WALL

CRACK GROUTING

STRUCTURAL

S-001 LMP-1-5-3/1 STRUCTURAL GENERAL NOTES

SD101 LMP-1-5-3/2 DEMOLITION PLANS

SD301 LMP-1-5-3/3 DEMOLITION SECTIONS

SD501 LMP-1-5-3/4 DEMOLITION TYPICAL DETAILS

DOCUMENT 00 01 15.00 28 Page 8

SD901 LMP-1-5-3/5 DEMOLITION PHOTOGRAPHS 1

SD902 LMP-1-5-3/6 DEMOLITION PHOTOGRAPHS 2

SD903 LMP-1-5-3/7 DEMOLITION PHOTOGRAPHS STRUCTURAL

DEMOLITION PHOTOGRAPHS 3

S-101 LMP-1-5-3/8 WORK PLATFORM GRATING AND

GUARDRAIL PLAN

S-102 LMP-1-5-3/9 WORK PLATFORM FRAMING LAYOUT PLAN

S-301 LMP-1-5-3/10 REPAIR PIT SECTION ELEVATION 1

S-302 LMP-1-5-3/11 REPAIR PIT SECTION ELEVATION 2

S-303 LMP-1-5-3/12 STRUCTURAL HVAC SUPPORT SECTION

ELEVATIONS

S-401 LMP-1-5-3/13 ENLARGED PLAN HVAC EXHAUST FAN

EF-18 PLATFORM

S-402 LMP-1-5-3/14 ERECTION BAY HVAC MAF-1 & SF-21

PLATFORMS PLAN

S-403 LMP-1-5-3/15 ENLARGED SECTIONS HVAC EF-18,

MAF-1, & SF-21 PLATFORMS

S-420 LMP-1-5-3/16 HVAC EXHAUST FAN EF-18 ACCESS

PLATFORM DETAILS

S-421 LMP-1-5-3/17 HVAC EXHAUST SF-21 ACCESS PLATFORM

DETAILS

S-422 LMP-1-5-3/18 HVAC EXHAUST MAF-1 ACCESS PLATFORM

DETAILS

S-501 LMP-1-5-3/19 PLATFORM FRAMING CONNECTION

DETAILS 1

S-502 LMP-1-5-3/20 PLATFORM FRAMING CONNECTION

DETAILS 2

S-503 LMP-1-5-3/21 PLATFORM FRAMING CONNECTION

DETAILS 3

S-504 LMP-1-5-3/22 PLATFORM FRAMING CONNECTION

DETAILS 4

S-505 LMP-1-5-3/23 FISH SCREEN SUPPORT DETAILS

S-506 LMP-1-5-3/24 HVAC ACCESS PLATFORM CONNECTION

DETAILS

S-507 LMP-1-5-3/25 ACCESS PLATFORM GUARDRAIL DETAILS

S-508 LMP-1-5-3/26 WORK PLATFORM STAIR DETAILS

S-509 LMP-1-5-3/27 DOGGING BEAM DETAILS

S-520 LMP-1-5-3/28 HVAC SUPPORT DETAILS 1

S-521 LMP-1-5-3/29 HVAC SUPPORT DETAILS 2

S-530 LMP-1-5-3/30 CONCRETE INFILL AND REMOVAL DETAILS

S-901 LMP-1-5-3/31 WORK PLATFORM ISOMETRIC

DOCUMENT 00 01 15.00 28 Page 9

ARCHITECHURAL

A-001 LMP-1-2-3/1 GENERAL NOTES, LEGEND, AND DOOR

SCHEDULE

A-101 LMP-1-2-3/2 LIFE SAFETY PLAN: ELEVATION 482.00'

A-102 LMP-1-2-3/3 LIFE SAFETY PLAN: ELEVATION 500.00'

A-103 LMP-1-2-3/4 LIFE SAFETY PLAN: ELEVATION 536.00'

A-401 LMP-1-2-3/5 ENLARGED PLANS: ELEVATIONS

482.00', 491.00', 500.00' AND

509 00'A-402 LMP-1-2-3/6 ENLARGED PLANS: ELEVATIONS

518.00', 527.00', 536.00' AND

REFLECTED CEILING

A-403 LMP-1-2-3/7 INTERIOR ELEVATIONS: NORTH AND

EAST SIDES

A-404 LMP-1-2-3/8 INTERIOR ELEVATIONS: SOUTH AND

WEST SIDES

A-501 LMP-1-2-3/9 DETAILS

MECHANICAL

M-001 LMP-1-3-3/1 MECHANICAL GENERAL NOTES

MD401 LMP-1-3-3/2 GATE REPAIR PIT VENTILATION

DEMOLITION ENLARGED PLAN EL 482

MD402 LMP-1-3-3/3 GATE REPAIR PIT VENTILATION

DEMOLITION ENLARGED PLAN EL 520

MD403 LMP-1-3-3/4 GATE REPAIR PIT VENTILATION

ENLARGED SECTIONS EL 482 & EL 520

MD404 LMP-1-3-3/5 MECHANICAL FAN REMOVAL DETAILS

DEMOLITION

MD501 LMP-1-3-3/6 REPAIR PIT PIPING DEMOLITION

M-101 LMP-1-3-3/7 HEADGATE REPAIR PIT PLAN AND

SECTION

M-401 LMP-1-3-3/8 GATE AND SCREEN BRACING PLAN AND

ELEVATIONS

M-501 LMP-1-3-3/9 EXTENDED PLATFORMS LAYOUT

M-502 LMP-1-3-3/10 SINGLE STAGE EXTENDED PLATFORM

ASSEMBLY

M-503 LMP-1-3-3/11 SINGLE STAGE EXTENDED PLATFORM

PLATFORM

M-504 LMP-1-3-3/12 EXTENDED PLATFORM STAGE 1 CARRIAGE

M-505 LMP-1-3-3/13 EXTENDED PLATFORM STAGE 1 CARRIAGE

PARTS

M-506 LMP-1-3-3/14 SINGLE STAGE EXTENDED PLATFORM

CHAIN DRIVE ROD

M-507 LMP-1-3-3/15 TWO STAGE EXTENDED PLATFORM STAGE

1 ASSEMBLY

M-508 LMP-1-3-3/16 TWO STAGE EXTENDED PLATFORM STAGE

2 PLATFORM ASSEMBLY

DOCUMENT 00 01 15.00 28 Page 10

M-509 LMP-1-3-3/17 TWO STAGE EXTENDED PLATFORM STAGE

2 PLATFORM DETAILS

M-510 LMP-1-3-3/18 TWO STAGE EXTENDED PLATFORM STAGE

2 CARRIAGE

M-511 LMP-1-3-3/19 TWO STAGE EXTENDED PLATFORM STAGE

2 END CARRIAGE

M-512 LMP-1-3-3/20 TWO STAGE EXTENDED PLATFORM STAGE

2 ROLLER BEAM

M-513 LMP-1-3-3/21 TWO STAGE EXTENDED PLATFORM STAGE

2 ROLLER BEAM CONNECT END

M-514 LMP-1-3-3/22 TWO STAGE EXTENDED PLATFORM STAGE

2 CHAIN DRIVE ROD

M-515 LMP-1-3-3/23 TWO STAGE EXTENDED PLATFORM CHAIN

DRIVE

M-520 LMP-1-3-3/24 ADJUSTABLE PEDESTAL ASSEMBLY VIEWS

M-521 LMP-1-3-3/25 ADJUSTABLE PEDESTAL DETAILS

M-530 LMP-1-3-3/26 EQUIPMENT JIB CRANE PLANS AND

DETAILS

M-540 LMP-1-3-3/27 GATE AND SCREEN BRACES LATERAL

BRACE ASSEMBLY

M-541 LMP-1-3-3/28 GATE AND SCREEN BRACES DETAILS 1

M-542 LMP-1-3-3/29 GATE AND SCREEN BRACES DETAILS 2

M-543 LMP-1-3-3/30 OFFSET BRACE ARRANGEMENT

M-544 LMP-1-3-3/31 OFFSET BRACE DETAILS

M-550 LMP-1-3-3/32 GATE CYLINDER BRACE DETAILS 1

M-551 LMP-1-3-3/33 GATE CYLINDER BRACE DETAILS 2

M-570 LMP-1-3-3/34 VACUUM SYSTEM ARRANGEMENT

M-901 LMP-1-3-3/35 MECHANICAL ISOMETRICS

MH001 LMP-1-3-3/36 MECHANICAL ABBREVIATIONS, LEGENDS,

NOTES

MH002 LMP-1-3-3/37 CONTROL LOGIC DIAGRAM LEGEND

MH101 LMP-1-3-3/38 MECHANICAL VENTILATION PLAN

MH301 LMP-1-3-3/39 MECHANICAL VENTILATION SECTIONS

MH401 LMP-1-3-3/40 GATE REPAIR PIT VENTILATION

MAKE-UP AIR DUCTS ENLARGED PLAN EL

482MH402 LMP-1-3-3/41 GATE REPAIR PIT VENTILATION

GENERAL EXHAUST DUCTS ENLARGED

PLAN EL 500

1 11/16/20

MH403 LMP-1-3-3/42 GATE REPAIR PIT VENTILATION

GENERAL EXHAUST DUCTS ENLARGED

PLAN EL 520

1 11/16/20

MH404 LMP-1-3-3/43 GATE REPAIR PIT VENTILATION AIR

PRESSURE PORTS ENLARGED PLAN EL 536

DOCUMENT 00 01 15.00 28 Page 11

G4EDDMTJ

Line

MH405 LMP-1-3-3/44 GATE REPAIR PIT VENTILATION

ENLARGED SECTIONS EL 482 & EL 520

1 11/16/20

MH410 LMP-1-3-3/45 REPAIR PIT WELDING EXHAUST

MH501 LMP-1-3-3/46 GATE REPAIR PIT VENTILATION

EXHAUST STACK DETAILS

MH502 LMP-1-3-3/47 GATE REPAIR PIT VENTILATION

RECTANGULAR BEND DETAILS

MH503 LMP-1-3-3/48 GATE REPAIR PIT VENTILATION

RECTANGULAR AIR INLET BELL DETAILS

MH504 LMP-1-3-3/49 STACK HEAD BIRD SCREEN AND EXHAUST

BRANCH FITTING DETAILS

MH505 LMP-1-3-3/50 GATE REPAIR PIT VENTILATION

RECTANGULAR AIR INLET BELL SCREEN

MH601 LMP-1-3-3/51 HEAD GATE REPAIR PIT VENTILATION

SCHEMATIC

MH602 LMP-1-3-3/52 HEAD GATE REPAIR PIT PLC CONTROL

POINTS

MH603 LMP-1-3-3/53 DDC LOGIC DIAGRAM POWERHOUSE AND

GATE REPAIR PIT HVAC CONTROL

MP101 LMP-1-3-3/54 HEAD GATE REPAIR PIT DRAINAGE -

PLAN

MP201 LMP-1-3-3/55 REPAIR PIT PIPING ELEVATIONS AND

ISOMETRICS

MP202 LMP-1-3-3/56 REPAIR PIT WATER PIPING

MP203 LMP-1-3-3/57 REPAIR PIT AIRLINE PIPING

MP204 LMP-1-3-3/58 REPAIR PIT AIR TUBING GATE BRACING

CONNECTION DETAILS

MP301 LMP-1-3-3/59 HEAD GATE REPAIR PIT DRAINAGE -

SECTIONS 1

MP302 LMP-1-3-3/60 HEAD GATE REPAIR PIT DRAINAGE -

SECTIONS 2

MP501 LMP-1-3-3/61 HEAD GATE REPAIR PIT DRAINAGE -

DETAILS 1

MP502 LMP-1-3-3/62 HEAD GATE REPAIR PIT DRAINAGE -

DETAILS 2

ELECTRICAL

E-001 LMP-1-6-3/1 LEGENDS

ED101 LMP-1-6-3/2 GATE REPAIR PIT DEMOLITION PLAN

EL. 520

ED201 LMP-1-6-3/3 ELEVATION REPAIR PIT LIGHTS

DEMOLITION

ED601 LMP-1-6-3/4 ELECTRICAL DEMOLITION SCHEMATIC

E-101 LMP-1-6-3/5 PLAN VIEW EL. 482.0 GATE REPAIR PIT

E-102 LMP-1-6-3/6 PLAN VIEW EL. 493.5 GATE REPAIR PIT

E-103 LMP-1-6-3/7 PLAN VIEW EL. 501.5 GATE REPAIR PIT

DOCUMENT 00 01 15.00 28 Page 12

E-104 LMP-1-6-3/8 PLAN VIEW EL. 509.5 GATE REPAIR PIT

E-105 LMP-1-6-3/9 PLAN VIEW EL. 517.5 GATE REPAIR PIT

E-106 LMP-1-6-3/10 PLAN VIEW EL. 525.5 GATE REPAIR PIT

E-107 LMP-1-6-3/11 PLAN VEIW EL. 535.0 GATE REPAIR PIT

E-201 LMP-1-6-3/12 ELEVATION VIEW UPSTREAM AND

DOWNSTREAM WALLS GATE REPAIR PIT

E-202 LMP-1-6-3/13 ELEVATION VIEW NORTH AND SOUTH

WALLS GATE REPAIR PIT

E-501 LMP-1-6-3/14 RPCC PANEL LAYOUT

E-502 LMP-1-6-3/15 MAF1CC PANEL LAYOUT

E-503 LMP-1-6-3/16 EF18 PANEL LAYOUT

E-504 LMP-1-6-3/17 LEFCC PANEL LAYOUT

E-601 LMP-1-6-3/18 PANEL SCHEDULES CQ08, CR011

E-602 LMP-1-6-3/19 CABLE AND CONDUIT SCHEDULE

E-603 LMP-1-6-3/20 CQO8 SCHEMATIC

E-604 LMP-1-6-3/21 CR011.1 LIGHTING CONTROL SCHEMATIC

E-605 LMP-1-6-3/22 EF18CC SCHEMATIC

E-606 LMP-1-6-3/23 RPCC SCHEMATIC 1

E-607 LMP-1-6-3/24 RPCC SCHEMATIC 2

E-608 LMP-1-6-3/25 RPCC SCHEMATIC 3

E-609 LMP-1-6-3/26 MAF1CC SCHEMATIC

E-610 LMP-1-6-3/27 LEFCC SCHEMATIC

1.4 VOLUME 3 CONTRACT DRAWINGS (MCNARY)

Contract drawings for McNary are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

GENERAL

G-001 MDG-1-0-0/638 COVER SHEET AND LOCATION MAPS

DOCUMENT 00 01 15.00 28 Page 13

G-002 MDG-1-0-0/639 INDEX SHEET 1 NOV 2020

G-101 MDG-1-0-0/640 MCNARY DAM SITE PLAN

G-102 MDG-1-0-0/641 MCNARY DAM ERECTION BAY PLAN

G-301 MDG-1-0-0/642 HEADGATE REPAIR PIT SECTIONS

G-901 MDG-1-0-0/643 REPAIR PIT ISOMETRIC VIEWS 1 NOV 2020

G-902 MDG-1-0-0/644 PHOTOS

G-903 MDG-1-0-0/645 PHOTOS

STRUCTURAL

S-001 MDP-1-5-3/7 STRUCTURAL GENERAL NOTES

SD101 MDP-1-5-3/8 STRUCTURAL DEMOLITION PLAN

SD301 MDP-1-5-3/9 STRUCTURAL DEMOLITION SECTIONS 1

SD501 MDP-1-5-3/10 DEMOLITION TYPICAL DETAILS

SD901 MDP-1-5-3/11 DEMOLITION PHOTOGRAPHS 1

SD902 MDP-1-5-3/12 DEMOLITION PHOTOGRAPHS 2

SD903 MDP-1-5-3/13 DEMOLITION PHOTOGRAPHS 3

S-101 MDP-1-5-3/14 WORK PLATFORM GRATING AND

GUARDRAIL LAYOUT

1 NOV 2020

S-102 MDP-1-5-3/15 WORK PLATFORM FRAMING LAYOUT

S-301 MDP-1-5-3/16 HEADGATE REPAIR PIT SECTION

ELEVATIONS

1 NOV 2020

S-302 MDP-1-5-3/17 HEADGATE REPAIR PIT SECTION

ELEVATIONS

S-401 MDP-1-5-3/18 HVAC EXHAUST FAN F-50 PLATFORM

ENLARGED PLAN

S-402 MDP-1-5-3/19 HVAC EXHAUST FAN F-50 PLATFORM

SECTIONS

S-420 MDP-1-5-3/20 HVAC EXHAUST FAN F-50 PLATFORM

DETAILS

S-501 MDP-1-5-3/21 PLATFORM FRAMING CONNECTION

DETAILS 1

S-502 MDP-1-5-3/22 PLATFORM FRAMING CONNECTION

DETAILS 2

S-503 MDP-1-5-3/23 PLATFORM FRAMING CONNECTION

DETAILS 3

S-504 MDP-1-5-3/24 WORK PLATFORM FRAMING CONNETIONS,

CARRIAGE TRACK & OPTIONAL LEVELING

BOLT DETAILS

S-505 MDP-1-5-3/25 GATE BRACE WALL CONNECTION DETAILS

S-506 MDP-1-5-3/26 HVAC PLATFORM DETAILS

S-507 MDP-1-5-3/27 STAIR TOWER VIEWS AND SECTIONS 1 NOV 2020

S-508 MDP-1-5-3/28 STAIR TOWER CONNECTION DETAILS

DOCUMENT 00 01 15.00 28 Page 14

G4EDDMTJ

Line

G4EDDMTJ

Line

G4EDDMTJ

Line

G4EDDMTJ

Line

S-509 MDP-1-5-3/29 BOTTOM LANDING STAIR TOWER WALL

CONNECTION DETAILS

1 NOV 2020

S-510 MDP-1-5-3/30 WORK PLATFORM TOP ENTRANCE STAIR

DETAILS

S-511 MDP-1-5-3/31 WORK PLATFORM GUARDRAIL DETAILS

S-515 MDP-1-5-3/32 CYLINDER BRACE AT EL.303.00 DETAILS

S-516 MDP-1-5-3/33 CYLINDER SUPPORT AT EL. 344.00

DETAILS

S-517 MDP-1-5-3/34 BEARING COLLAR DETAILS

S-518 MDP-1-5-3/35 WORK PLATFORM CYLINDER SLOT

GRATING DETAILS

S-519 MDP-1-5-3/36 CYLINDER SLOT REMOVABLE GRATING

DETAILS

1 NOV 2020

S-520 MDP-1-5-3/37 HVAC ELBOW FLANGE SUPPORT DETAILS

S-521 MDP-1-5-3/38 HVAC DUCT FLANGE TO CONCRETE WALL

DETAILS

S-901 MDP-1-5-3/39 ACCESS PLATFORM ISOMETRIC 1 NOV 2020

ARCHITECTURAL

A-001 MDP-1-2-3/1 GENERAL NOTES, BUILDING DATA,

ABBREVIATIONS AND DOOR SCHEDULE

A-101 MDP-1-2-3/2 LIFE SAFETY PLAN: ELEVATION

287.00' (5TH FLOOR)

A-102 MDP-1-2-3/3 LIFE SAFETY PLAN: ELEVATION

320.00' (6TH FLOOR)

A-103 MDP-1-2-3/4 LIFE SAFETY PLAN: ELEVATION

344.25' (8TH FLOOR ACCESS)

A-401 MDP-1-2-3/5 ENLARGED PLANS: ELEVATIONS

287.00', 295.25', 303.42' AND

311 58'A-402 MDP-1-2-3/6 ENLARGED PLANS: ELEVATIONS

319.75', 327.92' AND 336.80'

A-403 MDP-1-2-3/7 ENLARGED PLANS: ELEVATION 344.25'

AND REFLECTED CEILING PLAN

A-404 MDP-1-2-3/8 INTERIOR ELEVATIONS: NORTH AND

EAST SIDES

A-405 MDP-1-2-3/9 INTERIOR ELEVATIONS: SOUTH AND

WEST SIDES

A-501 MDP-1-2-3/10 DETAILS

MECHANICAL

M-001 MDP-1-3-3/1 MECHANICAL GENERAL NOTES

MD101 MDP-1-3-3/2 EXISTING DAMPER AND GRILLES

DEMOLITION PLAN

MD901 MDP-1-3-3/3 MECHANICAL DEMOLITION PHOTOS OIL

SYSTEM EQUIPMENT

DOCUMENT 00 01 15.00 28 Page 15

G4EDDMTJ

Line

G4EDDMTJ

Line

MD902 MDP-1-3-3/4 MECHANICAL DEMOLITION PHOTOS OIL

SYSTEM SUPPLY PIPING

MD903 MDP-1-3-3/5 MECHANICAL DEMOLITION PHOTOS OIL

SYSTEM DRAIN PIPING

MD904 MDP-1-3-3/6 MECHANICAL DEMOLITION PHOTOS RAW

WATER PIPING

MD905 MDP-1-3-3/7 MECHANICAL DEMOLITION PHOTOS

SERVICE AIR PIPING

MD906 MDP-1-3-3/8 MECHANICAL DEMOLITION PHOTOS

HEADGATE COVER DRAINAGE PIPING

MD907 MDP-1-3-3/9 MECHANICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR DRAINAGE PIPING

M-101 MDP-1-3-3/10 HEADGATE REPAIR PLAN AND SECTION

M-102 MDP-1-3-3/11 REPAIR PIT DRAINAGE PLAN AND

DETAILS

M-201 MDP-1-3-3/12 PIPING AND ASSOCIATED EQUIPMENT

ELEVATION

M-301 MDP-1-3-3/13 REPAIR PIT DRAINAGE SECTIONS AND

DETAILS

M-401 MDP-1-3-3/14 GATE AND SCREEN PEDESTAL PLAN

M-402 MDP-1-3-3/15 GATE AND SCREEN BRACING PLAN AND

ELEVATIONS

M-501 MDP-1-3-3/16 EXTENDED PLATFORMS LAYOUT

M-502 MDP-1-3-3/17 EXTENDED PLATFORM SINGLE STAGE

M-503 MDP-1-3-3/18 EXTENDED PLATFORM SINGLE STAGE

PLATFORM DETAIL

M-504 MDP-1-3-3/19 EXTENDED PLATFORM STAGE 1 CARRIAGE

M-505 MDP-1-3-3/20 EXTENDED PLATFORM STAGE 1 CARRIAGE

DETAILS

M-506 MDP-1-3-3/21 SINGLE STAGE EXTENDED PLATFORM

CHAIN DRIVE ROD

M-507 MDP-1-3-3/22 TWO STAGE EXTENDED PLATFORM STAGE 1

M-508 MDP-1-3-3/23 TWO STAGE EXTENDED PLATFORM STAGE 2

M-509 MDP-1-3-3/24 TWO STAGE EXTENDED PLATFORM STAGE

2 PLATFORM

M-510 MDP-1-3-3/25 TWO STAGE EXTENDED PLATFORM STAGE

2 CARRIAGE

M-511 MDP-1-3-3/26 TWO STAGE EXTENDED PLATFORM STAGE

2 END CARRIAGE

M-512 MDP-1-3-3/27 TWO STAGE EXTENDED PLATFORM STAGE

2 ROLLER BEAM

M-513 MDP-1-3-3/28 TWO STAGE EXTENDED PLATFORM STAGE

2 ROLLER BEAM CONNECT END

DOCUMENT 00 01 15.00 28 Page 16

M-514 MDP-1-3-3/29 TWO STAGE EXTENDED PLATFORM STAGE

2 CHAIN DRIVE ROD

M-515 MDP-1-3-3/30 TWO STAGE EXTENDED PLATFORM CHAIN

DRIVE

M-520 MDP-1-3-3/31 GATE PEDESTAL ASSEMBLY VIEWS

M-521 MDP-1-3-3/32 GATE PEDESTAL DETAILS

M-531 MDP-1-3-3/33 OIL TANK SYSTEM DETAILS

M-540 MDP-1-3-3/34 GATE AND SCREEN BRACES LATERAL

BRACE ASSEMBLY

M-541 MDP-1-3-3/35 GATE AND SCREEN BRACES DETAILS 1

M-542 MDP-1-3-3/36 GATE AND SCREEN BRACES DETAILS 2

M-543 MDP-1-3-3/37 GATE AND SCREEN BRACES END BRACE

DETAILS

M-560 MDP-1-3-3/38 FISH SCREEN SUPPORT DETAILS

M-561 MDP-1-3-3/39 FISH SCREEN SUPPORT DETAILS 2

M-601 MDP-1-3-3/40 HYDRAULIC DIAGRAM

M-901 MDP-1-3-3/41 MECHANICAL ISOMETRICS

M-902 MDP-1-3-3/42 REPAIR PIT COVER WELDING 3D

DETAILS

MH001 MDP-1-3-3/43 LEGENDS

MH101 MDP-1-3-3/44 GATE REPAIR PIIT SUPPLY AIR

SYSTEM VENTILATION PLAN

1 11/24/20

MH301 MDP-1-3-3/45 GATE REPAIR PIT SUPPLY AIR SYSTEM

STORAGE ROOM SUPPLY DUCT SECTION

1 11/24/20

MH401 MDP-1-3-3/46 GATE REPAIR PIT EXHAUST FAN

PARTIAL PLAN

MH402 MDP-1-3-3/47 GATE REPAIR PIT EXHAUST FAN

PARTIAL SECTIONS

MH403 MDP-1-3-3/48 GATE REPAIR PIT WELDING EXHAUST

MH501 MDP-1-3-3/49 GATE REPAIR PIT VENTILATION

EXHAUST STACK TERMINATION DETAILS

MH502 MDP-1-3-3/50 STACK HEAD BIRD SCREEN DETAILS

MH601 MDP-1-3-3/51 MECHANICAL VENTILATION SYSTEM

SCHEMATICS GATE REPAIR PIT

MP201 MDP-1-3-3/52 REPAIR PIT GUTTER PIPING DETAILS

MP202 MDP-1-3-3/53 REPAIR PIT WATER PIPING

MP203 MDP-1-3-3/54 REPAIR PIT AIR LINE PIPING

MP204 MDP-1-3-3/55 REPAIR PIT LEAKAGE PIPING DETAILS

DOCUMENT 00 01 15.00 28 Page 17

MP205 MDP-1-3-3/56 REPAIR PIT HYDRAULIC PIPING

PIPING DETAILS

MP206 MDP-1-3-3/57 REPAIR PIT SERVICE AIR PNEUMATIC

TUBING DETAILS

ELECTRICAL

E-001 MDP-1-6-3/1 LEGENDS

ED101 MDP-1-6-3/2 EL. 287 GROUND LEVEL

ED102 MDP-1-6-3/3 EL.295.25 LEVEL 2

ED103 MDP-1-6-3/4 EL. 303.416 LEVEL 3

ED104 MDP-1-6-3/5 EL. 311.583 LEVEL 4

ED105 MDP-1-6-3/6 EL. 319.75 LEVEL 5

ED106 MDP-1-6-3/7 EL. 327.916 LEVEL 6

ED107 MDP-1-6-3/8 EL. 336.083 LEVEL 7

ED108 MDP-1-6-3/9 EL. 344.25 LEVEL 8

ED109 MDP-1-6-3/10 LEVEL 9 CRANE CONTROL

ED901 MDP-1-6-3/11 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 1 ELECTRICAL

SUPPLY ROOM

ED902 MDP-1-6-3/12 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 1 STORAGE ROOM

ED903 MDP-1-6-3/13 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 1 EL. 287.00

ED904 MDP-1-6-3/14 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 1 EL. 287.00

ED905 MDP-1-6-3/15 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 1 EL. 287.00

ED906 MDP-1-6-3/16 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 2 EL. 295.25

ED907 MDP-1-6-3/17 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 2 EL. 295.25

ED908 MDP-1-6-3/18 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 3 EL. 303.42

ED909 MDP-1-6-3/19 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 4 EL. 311.58

ED910 MDP-1-6-3/20 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 5 EL. 319.75

ED911 MDP-1-6-3/21 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 5 EL. 319.75

ED912 MDP-1-6-3/22 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 6 EL. 327.92

DOCUMENT 00 01 15.00 28 Page 18

ED913 MDP-1-6-3/23 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 7 EL. 336.08

ED914 MDP-1-6-3/24 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 8 EL. 344.25

ED915 MDP-1-6-3/25 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT

ED916 MDP-1-6-3/26 ELECTRICAL DEMOLITION PHOTOS

REPAIR PIT FLOOR 9

E-101 MDP-1-6-3/27 EL. 287: LEVEL 1

E-102 MDP-1-6-3/28 EL. 295.25: LEVEL 2

E-103 MDP-1-6-3/29 EL. 303.416: LEVEL 3

E-104 MDP-1-6-3/30 EL. 311.583: LEVEL 4

E-105 MDP-1-6-3/31 EL. 319.75 LEVEL 5

E-106 MDP-1-6-3/32 EL. 327.916: LEVEL 6

E-107 MDP-1-6-3/33 EL. 336.083: LEVEL 7

E-108 MDP-1-6-3/34 EL. 344.250, LEVEL 8

E-201 MDP-1-6-3/35 ELEVATION VIEW UPSTREAM PIT WALL

EL. 287.0 THROUGH 311.6

E-202 MDP-1-6-3/36 ELEVATION VIEW UPSTREAM PIT WALL

EL. 319.8 THROUGH 344.3

E-203 MDP-1-6-3/37 ELEVATION VIEW DOWNSTREAM PIT WALL

EL. 287.0 THROUGH 311.6

E-204 MDP-1-6-3/38 ELEVATION VIEW DOWNSTREAM PIT WALL

EL. 319.8 THROUGH 344.3

E-205 MDP-1-6-3/39 ELEVATION VIEW NORTH AND SOUTH PIT

WALLS EL. 287.0 THROUGH 311.6

E-206 MDP-1-6-3/40 ELEVATION VIEW NORTH AND SOUTH PIT

WALLS EL. 319.8 THROUGH 344.3

E-207 MDP-1-6-3/41 ELEVATION VIEW ELECTRICAL SUPPLY

ROOM WALLS EL. 287.0

E-208 MDP-1-6-3/42 MAP FILES FAN ROOM ELEVATION AND

PLAN VIEWS F50CC & LEFCC LOCATION

E-501 MDP-1-6-3/43 GENERAL EXHAUST FAN CONTROL

CABINET (F50CC) PANEL DETAIL

E-502 MDP-1-6-3/44 LOCAL EXHAUST FAN CONTROL CABINET

(LEFCC) PANEL DETAIL

E-503 MDP-1-6-3/45 HYDRAULIC PUMP CONTROL CABINET

(HPCC) PANEL DETAIL

E-601 MDP-1-6-3/46 CQO2 ONE LINE DIAGRAM

DOCUMENT 00 01 15.00 28 Page 19

E-602 MDP-1-6-3/47 CQO2.2 ONE LINE DIAGRAM, THREE

LINE DIAGRAM, AND PANEL SCHEDULE

E-603 MDP-1-6-3/48 CRO20 SCHEMATIC DIAGRAM AND PANEL

SCHEDULE

E-604 MDP-1-6-3/49 CRO20.1 SCHEMATIC DIAGRAM

E-605 MDP-1-6-3/50 GENERAL EXHAUST FAN CONTROL

CABINET SCHEMATIC DIAGRAM F50CC

E-606 MDP-1-6-3/51 LOCAL EXHAUST FAN CONTROL CABINET

SCHEMATIC DIAGRAM LEFCC

E-607 MDP-1-6-3/52 HYDRAULIC OIL SYSTEM SCHEMATIC

DIAGRAM HMCC & HPCC

E-608 MDP-1-6-3/53 CONDUIT AND CABLE SCHEDULE SHEET 1

E-609 MDP-1-6-3/54 CONDUIT AND CABLE SCHEDULE SHEET 2

1.4.1 Use Of Government Prepared Contract CAD Electronic Files

a. No Resource (R)("For Information Only") drawings are available on

CAD.

b. The Contractor assumes all risks associated in using electronic CAD drawings.

c. Electronic copies of CAD drawings are only available in Bentley DGN format.

d. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies.

The Government will not be responsible to correct the electronic CAD drawing.

1.5 RESOURCE DRAWINGS (R)

These R drawings are included with the drawings for information only. The

DOCUMENT 00 01 15.00 28 Page 20

Government does not warrant the accuracy of the R drawings. The Government recommends that the Contractor verify the accuracy of R drawings.

1.6 VOLUME 1 RESOURCE DRAWINGS (LITTLE GOOSE)

Resource (R) drawings for Little Goose (Volume 1) are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

R-001 LGP-6-0-0/12 POWERHOUSE - ARRANGEMENT ERECTION

BAY PLAN GALLERY - EL'S 580 & 598

R-002 LGP-1-6-1D1/6 POWERHOUSE - EMBEDDED CONDUIT &

GROUNDING - ERECTION BAY - INTAKE

EL 580 & 598

R-003 LGP-1-6-1D1/7 POWERHOUSE - EMBEDDED CONDUIT &

GROUNDING - ERECTION BAY - INTAKE

EL 618 & 634

R-004 LGP-1-6-2D1/7 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 580

R-005 LGP-1-6-2D1/8 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 598

R-006 LGP-1-6-2D1/9 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 618

R-007 LGP-1-6-2D1/10 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 634

R-008 LGP-1-6-2D1/13 POWERHOUSE - LIGHTING SECTIONS &

DETAILS SHEET 2

R-009 LGP-1-5-0/5 POWERHOUSE MISCELLANEOUS METAL

GATE REPAIR PIT STEEL SCAFFOLD

R-010 LGP-1.1-3-9/75 POWERHOUSE - ERECTION BAY -

EXPOSED PIPING EL 580 & GATE

REPAIR PIT PLAN & SECTIONS

R-011 LGP-1.1-3-7/62 POWERHOUSE AIR CONDITIONING

ERECTION BAY PLAN EL 580

R-012 LGP-1-4-3/34 POWERHOUSE ERECTION BAY -

CONCRETE OUTLINE INTAKE PLAN - EL

R-013 LGP-1.3-3-2/54 POWERHOUSE INTAKE GATE HOIST

CYLINDER ASSEMBLY

R-014 LGP-1-5-2/2 POWERHOUSE INTAKE BULKHEAD

ASSEMBLY

R-015 LGP-1-5-2/7 POWERHOUSE INTAKE GATE ASSEMBLY

R-016 GDP-5.7-3-4/4 POWERHOUSE PROTOTYPE EXTENDED

STS/SBS'S EXTENDED SBS ARRANGEMENT

R-017 GDP-5.7-3-4/110POWERHOUSE PROTOTYPE EXTENDED

STS'S/SBS'S SBS INNER FRAME

ASSEMBLY

R-018 GDP-5.7-3-4/111POWERHOUSE PROTOTYPE EXTENDED

STS'S/SBS'S SBS INNER FRAME,

SHEET 1

DOCUMENT 00 01 15.00 28 Page 21

R-019 GDP-5.7-3-4/112POWERHOUSE PROTOTYPE EXTENDED

STS'S/SBS'S SBS INNER FRAME -

SHEET 2

R-020 LGP-1-4-3/59 POWERHOUSE ERECTION BAY -

REINFORCEMENT INTAKE FLOOR, EL 580

R-021 LGP-1-4-3/60 POWERHOUSE - ERECTION BAY

REINFORCEMENT - INTAKE WALLS EL

580 TO EL 598 - SHEET 1

R-022 LGP-1-4-3/61 POWERHOUSE - ERECTION BAY

REINFORCEMENT - INTAKE WALLS EL

580 TO EL 598 - SHEET 2

R-023 LGP-1-3-8/24 POWERHOUSE EMBEDDED PIPING -

ERECTION BAY PLAN EL 598 & EL 580

R-024 LGP-1-3-8/25 POWERHOUSE EMBEDDED PIPING -

ERECTION BAY SECTIONS EL 598 & 580

R-025 LGP-1-4-3/27 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE

TRANSVERSE & LONGITUDINAL SECTIONS

R-026 LGP-1-4-3/28 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE

TRANSVERSE SECTION THRU PENSTOCK

R-027 LGP-1-4-3/32 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN - EL

R-028 LGP-1-4-3/33 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN - EL

R-029 LGP-1-4-3/35 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLANS -

EL'S 618 & 634

R-030 LGP-1-4-3/36 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE DECK - EL

R-031 LGP-1-4-3/57 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS EL 558

TO EL 580 - SHEET 1

R-032 LGP-1-4-3/58 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

558 TO EL 580 - SHEET 2

R-033 LGP-1-4-3/59 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR, EL 580

R-034 LGP-1-4-3/60 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

580 TO EL 598 - SHEET 1

R-035 LGP-1-4-3/61 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

580 TO EL 598 - SHEET 2

R-036 LGP-1-4-3/62 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR, EL 598

DOCUMENT 00 01 15.00 28 Page 22

R-037 LGP-1-4-3/63 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

598 TO EL 618 - SHEET 1

R-038 LGP-1-4-3/64 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS EL 598

TO 618 - SHEET 2

R-039 LGP-1-4-3/65 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR, EL 618

R-040 LGP-1-4-3/66 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS EL 618

TO EL 634

R-041 LGP-1-4-3/67 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR, EL 634

R-042 LGP-1-4-3/68 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

634 TO 651 - SHEET 1

R-043 LGP-1-4-3/69 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE WALLS, EL

634 TO EL 651 - SHEET 2

R-044 LGP-1-4-3/70 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE DECK, EL 651

R-045 LGP-1-4-3/99 POWERHOUSE - ERECTION BAY

REINFORCEMENT DOWNSTREAM WALL

BELOW EL 558 - SH 1

R-046 LTG-65-560-074-MISC. METALWORK POWERHOUSE

R-047 LTG-65-560-074-MISC. METALWORK POWERHOUSE

R-048 LGP-1.6-4-2/3 POWERHOUSE - ERECTION BAY INTAKE

MONO REPAIR PRESTRESS PLANS

R-049 LGP-1.6-4-2/4 POWERHOUSE - ERECTION BAY INTAKE

MONO REPAIR PRESTRESS SECTIONS

AND DETAILS

R-050 LGP-1-4-2/6 POWERHOUSE - ERECTION BAY INTAKE

MONO REPAIR EXPLORATION DRILLING

AND INSTRUMENTATION

R-051 LGD-1-4-2/1 SOUTH NON-OVERFLOW PLAN,

ELEVATIONS AND SECTIONS

R-052 20-10 SOUTH NON-OVERFLOW DAM LIFT

NUMBERING SYSTEM

R-053 LGF-1-13-12/81 PERMANENT JUVENILE FISH

FACILITIES PHASE II CONCRETE

MINING STA. 98+00.89 TO STA.

98+42.57 PLAN, SECTIONS AND

DETAILSR-054 LGF-1-13-12/82 PERMANENT JUVENILE FISH

FACILITIES PHASE II COLLECTION

CHANNEL STA. 98+42.57 TO STA.

98+61.23 PLANS AND SECTION

DOCUMENT 00 01 15.00 28 Page 23

1.7 VOLUME 2 RESOURCE DRAWINGS (LOWER MONUMENTAL)

Resource (R) drawings for Lower Monumental (Volume 2) are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

R-001 LMP-6-0-0/5 POWERHOUSE ERECTION BAY PLAN EL

482 & 500

R-002 LMP-1-4-3/30 POWERHOUSE ERECTION BAY -

CONCRETE OUTLINE INTAKE PLAN EL

R-003 LMP-1-6-1D1/6 POWERHOUSE - EMBEDDED CONDUIT &

GROUNDING ERECTION BAY - INTAKE

EL 482 & 500

R-004 LMP-1-6-1D1/7 POWERHOUSE - EMBEDDED CONDUIT &

GROUNDING ERECTION BAY - INTAKE

EL 520 & 536

R-005 LMP-1-6-2D1/7 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 482

R-006 LMP-1-6-2D1/8 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 500

R-007 LMP-1-6-2D1/9 POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 520

R-008 LMP-1-6-2D1/10POWERHOUSE - LIGHTING ERECTION

BAY - INTAKE EL 536

R-009 LMP-1-6-2D1/13POWERHOUSE - LIGHTING SECTION &

DETAILS SHEET 2

R-010 LMP-1.1-3-9/72POWERHOUSE - ERECTION BAY EXPOSED

PIPING - EL 482 & GATE REPAIR PIT

PLANS & SECTIONS

R-011 LMP-1-3-8/23 POWERHOUSE - EMBEDDED PIPING

ERECTION BAY PLAN EL 500 & 482

R-012 LMP-1-3-8/20 POWERHOUSE - EMBEDDED PIPING

ERECTION BAY - SECTIONS EL 585,

553, 536, 520 & 500

R-013 LMP-1-5-0/5 POWERHOUSE MISCELLANEOUS METAL

GATE REPAIR PIT STEEL SCAFFOLD

R-014 LMP-1-4-3/32 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN EL

R-015 LMP-1-4-3/34 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN - EL

520 & 536

R-016 LMP-1-4-3/63 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR EL 482

R-017 LMP-1.1-3-7/62POWERHOUSE AIR CONDITIONING

ERECTION BAY PLAN EL 482

R-018 LMP-1-3-2/20 POWERHOUSE INTAKE GATE HOIST

CYLINDER ASSMEBLY

DOCUMENT 00 01 15.00 28 Page 24

R-019 LMP-1-5-2/2 POWERHOUSE INTAKE BULKHEAD

ASSEMBLY

R-020 LMP-1-5-2/7 POWERHOUSE INTAKE GATE ASSEMBLY

R-021 LMP-1-3-8/24 POWERHOUSE - EMBEDDED PIPING

ERECTION BAY PLAN EL 460

R-022 LMP-1-3-8/25 POWERHOUSE - EMBEDDED PIPING

ERECTION BAY SECTIONS ELS. 482 &

R-023 95-48-21 GATE REPAIR & STORAGE PIT MODS

DOORS - PIPING - PEDESTALS

R-024 LMP-1-10-7/8 GATE REPAIR AND GATE STORAGE PITS

MODIFICATION - SCREEN SUPPORT

BEAMS SECTIONS & DETAILS

R-025 LMP-1-3-7/22 GATE REPAIR AND GATE STORAGE PITS

MODIFICATION PIPING MODIFICATION

R-026 LMP-1-4-3/66 POWERHOUSE - ERECTION BAY

REINFORCEMENT - INTAKE UPSTREAM

GALLERY WALL EL 482 TO EL 553

R-027 LMP-1-4-3/69 POWERHOUSE - ERECTION BAY

REINFORCEMENT - INTAKE DECK EL

553 - SH. 1

R-028 95-C-0048-4 GATE REPAIR PIT CRANES CRANE &

HOIST

R-029 LMP-1-3-7/18 GATE REPAIR AND GATE STORAGE PITS

MODIFICATION GATE REPAIR PIT

CRANES

R-030 LMP-1-4-3/31 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN EL

R-031 LMP-1-2-5/5 POWERHOUSE ELEVATION UPGRADE

MISCELLANEOUS ELEVATOR DETAILS 1

R-032 LMP-1.1-3-9/70POWERHOUSE - ERECTION BAY EXPOSED

PIPING ELEV 520 - PLAN & SECTIONS

R-033 LMP-1.1-3-9/70POWERHOUSE - ERECTION BAY EXPOSED

PIPING ELEV 520 - SECTIONS &

R-034 LMP-1.1-3-9/71POWERHOUSE - ERECTION BAY EXPOSED

PIPING ELEV 500 - PLAN & SECTIONS

R-035 LMP-1-4-3/3 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE LONGITUDINAL

R-036 LMP-1-4-3/26 POWERHOUSE - ERECTION BAY

CONCTRETE OUTLINE - INTAKE

TRANSVERSE & LONGITUDINAL SECTIONS

R-037 LMP-1-4-3/27 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE - INTAKE

R-038 LMP-1-4-3/33 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE PLAN EL

R-039 LMP-1-4-3/35 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE DECK EL

DOCUMENT 00 01 15.00 28 Page 25

R-040 LMP-1-4-3/36 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE SECTIONS

& DETAILS

R-041 LMP-1-4-3/37 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE -

ELEVATOR PENTHOUSE

R-042 LMP-1-4-3/42 POWERHOUSE - ERECTION BAY

CONCRETE OUTLINE INTAKE

DOWNSTREAM ELEVATION

R-043 LMP-1-4-3/67 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR EL 520

R-044 LMP-1-4-3/68 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE FLOOR EL 536

R-045 LMP-1-4-3/70 POWERHOUSE - ERECTION BAY

REINFORCEMENT INTAKE DECK EL

553-SH.2

R-046 LMP-1.1-2-0/5 POWERHOUSE ARCHITECTURAL PLAN EL

R-047 LMP-1.1-3-7/58POWERHOUSE AIR CONDITIONING

ERECTION BAY PLAN EL 520

1.8 VOLUME 3 RESOURCE DRAWINGS (MCNARY)

Resource (R) drawings for McNary (Volume 3) are as follows:

SHEET

NUMBER

FILE NUMBER DESCRIPTION Revision Number

Date

R-001 MDP-2-4-0/1 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLAN - EL

361.0

R-002 MDP-2-4-0/2 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLANS EL

333.0 & 346.0

R-003 MDP-2-4-0/4 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLAN EL

305 0R-004 MDP-2-4-0/5 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLAN EL

287 0

R-005 MDP-1-4-0/6 POWERHOUSE STRUCTURAL PLANS EL

361.0 & 320.0

R-006 MDP-1-4-0/7 POWERHOUSE STRUCTURAL PLAN EL

287.0

R-007 MDP-2-4-0/10 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE SECTIONS

R-008 MDP-2-4-0/184POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE INTERM.

PIERS EL 301.5 TO 361.0 - SH. 1

R-009 MDP-2-4-0/186POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE

ITERM.PIERS, EL 301.5 - 361.0,

R-010 MDP-2-4-0/190POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE -

DOWNSTREAM WALL EL 305.0 TO 361.0

DOCUMENT 00 01 15.00 28 Page 26

R-011 MDP-2-4-0/191POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE -

DOWNSTREAM SLUICE WALL - EL 305.0

R-012 MDP-1-6-1D1/1POWERHOUSE - POWER & CONTROL

CONDUIT ASSEMBLY & STATION

SERVICE BAYS EL 235.50.50 & 287.00

R-013 MDP-1-6-1D1/4POWERHOUSE - POWER & CONTROL

CONDUIT ASSEMBLY & STATION

SERVICE BAYS GALLERIES - EL

305.00 & 320.00

R-014 MDP-2-6-2D1/4POWERHOUSE - LIGHTING CONDUIT

ASSEMBLY BAY EL 287

R-015 MDP-2-6-2D1/5POWERHOUSE - LIGHTING CONDUIT

ASSEMBLY BAY - EL 305 - 346 STA.

SER. BAY - EL 287 - 346

R-016 MDP-3-6-2D8/7POWERHOUSE - LIGHTING SYSTEM

GALLERIES PIER A1-P1 EL 333.0 &

346.0

R-017 MDP-3-5-11/1 POWERHOUSE INTAKE GATE SUPPORTS

IN REAIR PIT

R-018 MDP-3-5-11/3 POWERHOUSE GATE REPAIR PIT STEEL

SCAFFOLD - 7'-6" WIDTH

R-019 MDP-1-3-4/4 POWERHOUSE - MECHANICAL INTAKE

GATES HYDRAULIC CYLINDERS

R-020 MDP-1-3-4/7 POWERHOUSE - MECHANICAL EMERGENCY

INTAKE GATES ASSEMBLY

R-021 MDP-1-6-1D1/3POWERHOUSE - POWER & CONTROL

CONDUIT ASSEMBLY & STATION

SERVICE BAYS GALLERIES - EL

330.00 & 346.00

R-022 MDP-3-3-9/14 POWERHOUSE - MECHANICAL PIPING

ARRANGEMENT - GATE REPAIR PIT

PLAN-SECTIONS & DETAILS

R-023 MDP-2-5-0/1 POWERHOUSE MISCELLANEOUS

METALWORK HATCH FRAMES - SHEET

NO. 1

R-024 SKET287 MCNARY OFFICE SKETCH HYDRAULIC

OIL TANK HEADGATE REPAIR PIT

R-025 SKET651A POWERHOUSE - MECHANICAL FIRE

PROTECTION WATER SYSTEM SCHEMATIC

DIAGRAM - ASSEMBLY BAY THRU UNIT 4

R-026 LMP-1-3-7/17 GATE REPAIR AND GATE STORAGE PITS

MODIFICATION GATE REPAIR PIT

HATCH - SECTIONS

R-027 597 POWERHOUSE - ASSEMBLY BAY INTAKE

GATE SUPPORTS IN REPAIR PIT

R-028 MDP-2-4-0/3 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLAN EL

320 0

R-029 MDP-2-4-0/6 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE PLAN - EL

267.50

DOCUMENT 00 01 15.00 28 Page 27

R-030 MDP-2-4-0/7 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE ELEV.

DOWNSTREAM WALL

R-031 MDP-2-4-0/8 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE ELEV.

UPSTREAM WALL

R-032 MDP-2-4-0/9 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE SECTIONS

R-033 MDP-2-4-0/10 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE SECTIONS

R-034 MDP-2-4-0/12 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE SECTIONS

R-035 MDP-2-4-0/13 POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - INTAKE SECTIONS

R-036 MDP-2-4-0/120POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE DECK SLAB -

EL 361.00

R-037 MDP-2-4-0/153POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE PIERS EL

267.5 TO EL 301.5 - SH. 1

R-038 MDP-2-4-0/154POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE PIERS EL

267.5 TO EL 301.5 - SH. 2

R-039 MDP-2-4-0/156POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY - INTAKE WALLS - EL

287.0 TO 305.0

R-040 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY ROOF PLAN

R-041 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY LONGITUD. SECTION

THRU GALLERIES

R-042 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY LONGITUDINAL SECTION

AT CL UNITS

R-043 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY ELEVATION SOUTH WALL

R-044 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY TRANSVERSE SECTION

R-045 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY OFFICE BLDG - PLANS

AND SECTS

R-046 MDP-2.1-4-0/3POWERHOUSE - CONCRETE OUTLINE

ASSEMBLY BAY - SECOND STORY

ADDITION OFFICE BLDG - PLANS &

R-047 MDP-2.1-4-0/4POWERHOUSE - REINFORCEMENT

ASSEMBLY BAY SOUTH WALL ABOVE EL

310.0

R-048 MDP-3-5-11/4 POWERHOUSE - GATE REPAIR PIT

STEEL SCAFFOLD SIX FOOT WIDTH

DOCUMENT 00 01 15.00 28 Page 28

R-049 SKET301 SHT1 GATE REPAIR PIT STAIRWAY

R-050 SKET301 SHT2 GATE REPAIR PIT STAIRWAY LANDING

DETIAL LANDINGS TWO THRU EIGHT

R-051 SKET301 SHT3 GATE REPAIR PIT STAIRWAY LANDING

DETAIL LANDING ONE

-- End of Document --

DOCUMENT 00 01 15.00 28 Page 29

SECTION TABLE OF CONTENTS

DIVISION 04 - MASONRY

SECTION 04 20 00.10 28

MASONRY DOOR INFILLWALL REPLACEMENT

PART 1 GENERAL

1.1 CONCRETE MASONRY UNIT (CMU) DOORWAY INFILL

1.2 REFERENCES

1.3 SUBMITTALS

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Masonry Units

1.4.2 Cementitious Materials, Sand and Aggregates

PART 2 PRODUCTS

2.1 CONCRETE MASONRY UNITS (CMU)

2.1.1 Kinds and Shapes

2.2 MASONRY MORTAR

2.2.1 Hydrated Lime and Alternates

2.2.2 Pre-Mixed Mortar, MNA

2.2.3 Sand and Water

2.3 GROUT AND READY-MIXED GROUT

2.3.1 Grout Barriers (DELETED)

PART 3 EXECUTION

3.1 LAYING MASONRY UNITS

3.1.1 Concrete Masonry Units

3.1.2 Tolerances

3.1.3 Cutting and Fitting

3.1.4 Jointing

3.1.4.1 Flush Joints

3.1.4.2 Tooled Joints

3.1.4.3 Door and Window Frame Joints

3.1.5 Joint Widths

3.1.5.1 Concrete Masonry Units

3.1.6 Embedded Items

3.1.7 Unfinished Work

3.2 MORTAR MIX

3.3 ANCHORAGE TO CONCRETE AND STRUCTURAL STEEL

3.3.1 Anchorage to Concrete

3.4 POINTING AND CLEANING

3.4.1 Dry-Brushing

-- End of Section Table of Contents --

SECTION 04 20 00.10 28 Page 1

SECTION 04 20 00.10 28

MASONRY DOOR INFILLWALL REPLACEMENT

PART 1 GENERAL

This section is for the doorway infill at the bottom of the gate repair pit. This specification applies to work at McNary Dam only. is to be used only if the Contractor decides to remove and replace the CONCRETE MASONRY UNITS (CMU) wall for ease of access to the waste water treatment tank.

1.1 CONCRETE MASONRY UNIT (CMU) DOORWAY INFILLWALL

The Contractor shall install the doorway infill per the drawing details.

If the Contractor elects to remove the wall, the Contractor shall replace the wall and door after construction is completed in the waste water treatment room as specified in this section. No salvaged CMU shall be used to re-build the wall. The original door, door frame and hardware may be re-used when the CMU wall is re-built, as long as they are not damaged.

All damaged door related items shall be replaced in-kind with new material at no additional cost to the Government Contractor shall not disconnect any utilities that are connected to the CMU wall without prior approval by the Contracting Officer and only then when the utility has been processed thru the projects Safe Clearance Program. The Contractor shall provide all temporary piping and connections, electrical lines and appurtances as required in Section 01 51 00.00 28 to maintain the services provided by the existing utilities that are rerouted due to the CMU wall removal. Utilities shall not be out of service for more than 2 hours. Out of service time shall be coordinated with the Contracting Officer. Contractor shall resurface the new CMU to match the existing CMU and area.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C 1019 (2009) Standard Test Method for Sampling and Testing Grout

ASTM C 1072 (2006) Standard Test Method for Measurement of Masonry Flexural Bond Strength

ASTM C 1142 (1995; R 2007) Standard Specification for Extended Life Mortar for Unit Masonry

ASTM C 129 (2006) Standard Specification for Nonloadbearing Concrete Masonry Units

ASTM C 144 (2004) Standard Specification for Aggregate for Masonry Mortar

SECTION 04 20 00.10 28 Page 2

ASTM C 207 (2006) Standard Specification for Hydrated Lime for Masonry Purposes

ASTM C 270 (2008a) Standard Specification for Mortar for Unit Masonry

ASTM C 476 (2009) Standard Specification for Grout for Masonry

ASTM C 780 (2009) Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry

ASTM C 90 (2009) Loadbearing Concrete Masonry Units

ASTM C 91 (2005) Masonry Cement

ASTM C 94/C 94M (2009a) Standard Specification for Ready-Mixed Concrete

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Pre-mixed Mortar, MNA; I ST

1.4 DELIVERY, STORAGE, AND HANDLING

Materials shall be delivered, stored, handled, and protected to avoid chipping, breakage, and contact with soil or contaminating material.

1.4.1 Masonry Units

Cover and protect moisture-controlled concrete masonry units and cementitious materials from precipitation. Conform to all handling and storage requirements of ASTM C 90. Mark prefabricated lintels on top sides to show either the lintel schedule number or the number and size of top and bottom bars.

1.4.2 Cementitious Materials, Sand and Aggregates

Cementitious and other packaged materials shall be delivered in unopened containers, plainly marked and labeled with manufacturers' names and brands. Cementitious material shall be stored in dry, weathertight enclosures or be completely covered. Cement shall be handled in a manner that will prevent the inclusion of foreign materials and damage by water or dampness. Store sand and aggregates in a manner to prevent contamination or segregation.

SECTION 04 20 00.10 28 Page 3

PART 2 PRODUCTS

2.1 CONCRETE MASONRY UNITS (CMU)

Cement shall have a low alkali content and be of one brand. Units shall be of modular dimensions and air, water, or steam cured. Hollow Non-Load-Bearing Units: ASTM C 129, made with normal weight aggregate.

Load-bearing units may be provided in lieu of non-load-bearing units.

2.1.1 Kinds and Shapes

Units shall be modular in size and shall include stretchercloser, jamb, header, lintel, and bond beam units and special shapes and sizes to complete the work as indicated. In exposed interior masonry surfaces, units having a bullnose shall be used for vertical external corners except at door., window, and louver jambs. Radius of the bullnose shall be 1 inch.

2.2 MASONRY…