Sol Amendment W912EF21B0007-0001.pdf

PDF 400 KB Posted

Attached to
MNA-LGA-LMA Headgate Rep Pit Upgrades Federal contract opportunity
Solicitation number
W912EF21B0007
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document is an amendment to a solicitation for the MNA-LGA-LMA Headgate Rep Pit Upgrades project. The amendment extends the response date from December 7, 2020 to December 22, 2020. It also revises several technical specifications sections and associated drawings. The revised sections cover masonry door infill, structural metal, resilient flooring, raceways and boxes for electrical systems, and bridge cranes. Revisions to the drawings update duct routing plans, add notes to existing components, and revise stair tower supports. The solicitation number remains W912EF21B0007 and the project is for upgrades at multiple dams overseen by the Department of the Army Corps of Engineers Walla Walla District.

View the file

Other files for this federal contract opportunity

Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The Purpose for this amendment is to extend he submission date from 12/7/2020 to 12/22/2020 and include revised technical specifications Sections 00 01 00.15 28 LIST OF DRAWINGS; 04 20 00.10 28 MASONRY DOOR INFILL; 05 50 14 STRUCTURAL METAL;09 65 00 RESILIENT FLOORING; 26 05 33.10 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS; 41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING. See summary of changes for further details All other tems and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21B0007

X 9B. DATED (SEE ITEM 11)

06-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Dec-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

LEANNE WALLING

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF21B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 07-Dec-2020 02:00 PM to 22-Dec-2020 02:00 PM.

The following have been added by full text:

SUMMARY OF CHANGES

Summary of Changes (amendment 0001) Specifications:

00 01 00.15 28 LIST OF DRAWINGS

1.3: Updated revision number and date for drawings revised by this amendment 1.4: Updated revision number and date for drawings revised by this amendment

04 20 00.10 28 MASONRY DOOR INFILL

Specification title changed to “Masonry Door Infill” PART 1 GENERAL: Replaced all info. Stated this applies to McNary Dam only.

1.1: Replaced all info for this subpart.

1.3: Revised Pre-mixed Mortar submittal to show it is for McNary (MNA) and added “G” code.

2.1.1: subpart revised 2.2.2: Added “MNA” to Pre-Mixed Mortar

2.3.1 (Grout Barriers): Deleted 3.1.1: subpart revised 3.1.2: subpart revised 3.1.6: Replaced all info for this subpart 3.3.1: Replaced all info for this subpart

05 50 14 STRUCTURAL METAL

1.2: Removed “Erector Certification” submittal under SD-01. Added “Access Design Analysis, LMA” submittal under SD-05.

1.3: Removed 2nd paragraph for erector certification requirement.

1.5: Added new subpart “DAMPER ACCESS PLATFORM DESIGN” that contains subparts 1.5.1 to

1.5.8.

09 65 00 RESILIENT FLOORING

1.2: Added “Wall Base” submittal under SD-02.

2.6: Added new subpart “WALL BASE” 3.8: Added new subpart “PLACING WALL BASE”

26 05 33.10 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

2.2.2 (fittings for Use in Hazardous (Classified) Locations: Deleted 2.3.3: Boxes, Outlet for Use in Hazardous (Classified) Locations: Deleted

41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING

1.2f: Removed “and also the crane runway track” from subpart.

1.5: Removed “Crane Runway Track System” and “Custom Runway Track Suspension Devices” submittals under SD-05 2.8: Replaced info under this subpart

Drawings:

Volume 1: No changes Volume 2 (Lower Monumental)

MH402 – ADDED EXISTING COMPONENT NOTES

W912EF21B0007

MH403 – ADDED PLATFORM AND EXISTING COMPONENT NOTES

MH405 – ADDED PLATFORM AND EXISTING COMPONENT NOTES

Volume 3 (McNary)

G-002 -REVISED THE TITLE FOR SHEET S-519

G-901 - REVISED BOTTOM STAIR TOWER SUPPORT

S-101 – ADDED STAIR TOWER CALLOUT

S-301 - REVISED BOTTOM STAIR TOWER SUPPORT

S-507 - REVISED CALLOUTS

S-509 - ADDED NOTE

S-519 - ADDED MASONRY INFILL

S-901 - REVISED BOTTOM STAIR TOWER SUPPORT

MH101 – UPDATED DUCT ROUTING PLAN

MH301 – UPDATED DUCT ROUTING ELEVATION

(End of Summary of Changes)