B.08.02 Bid Opening Worksheet 20B0012.pdf

PDF 187 KB Posted

Attached to
McNary Spillway Gantry Cranes Main Hoist Gearbox Replacement
Solicitation number
W912EF20B0012
Issued by

About this file

This bid opening worksheet details bids received for the replacement of main hoist gearboxes on McNary Spillway gantry cranes. The solicitation was issued by the Department of the Army Corps of Engineers Walla Walla District as number W912EF20B0012 and sought bids for the replacement of gearboxes on Cranes 6 and 7. Seven vendors submitted bids by the June 30th, 2020 deadline ranging from $130,000 to $895,380. The lowest bidder was Norfolk Bearings & Supply Inc. at $130,000 and the highest was Thor Fabrication at $895,380. The government estimate was not disclosed. The required work includes the replacement of the main hoist gearboxes in accordance with the technical specifications and plans provided with the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING WORKSHEET – 30 June 2020, 11:00 A.M. PST

Solicitation Number: W912EF20B0012 AMENDMENTS: 4 Services: MNA SPILLWAY CRANES 6&7 GEARBOX REPLACEMENTS

CONTRACT SPECIALIST: Alan Inglis – 509-527-7217

VENDOR Amendments Acknowledged

TOTAL BID

PREMIER GEAR & MACHINE WORKS 4 $468,000

NORFOLK BEARINGS & SUPPLY INC. 4 $130,000

BRAD FOOTE GEAR WORKS 4 $282,100

APONTE POWERS 4 $375,800

THOR FABRICATION 4 $895,380

LARON

4 $377,407

KNIGHT CONSTRUCTION

4 $484,887

GOVERNMENT ESTIMATE

Not disclosed on supply contracts