W912EF19B0001_TechSpec.pdf

PDF 2 MB Posted

Attached to
Lower Monumental Head Cover Oil/Water Separators Federal contract opportunity
Solicitation number
W912EF19B0001
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

W912EF19B0001 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Lower Monumental Head Cover Oil/Water Separators, newest first.
File Type Posted
W912EF19B0001_Bids_Worksheet.pdf PDF
19B0001_Plans_Amend-0002.pdf PDF
W912EF19B0001_Amendment_0002.pdf PDF
19B0001_Amend-0002_TechSpec_.pdf PDF
W912EF19B0001_Amend-0001_Section_26_05_00.00_28.pdf PDF
W912EF19B0001_Amend-0001_Plans.pdf PDF
W912EF19B0001_Amendment_0001.pdf PDF
Site_Visit_List_Attendee_List_19B0001_LMA_Headcover_Oil-Water_Sep.pdf PDF
W912EF19B0001_Site_Visit_Info.pdf PDF
W912EF19B0001_LMA_Headcover_Oil-Water_Separator.pdf PDF
W912EF19B0001_Plans.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lower Monument al Head Cover Oi l Wat er Separ at or W912EF19B0001

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 32 01. 00 28 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 51 00. 00 28 TEMPORARY UTI LI TI ES

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

01 78 23. 00 28 OPERATI ON AND MAI NTENANCE DATA

01 91 00. 00 28 SYSTEMS TESTI NG AND COMMI SSI ONI NG

DI VI SI ON 03 - CONCRETE

03 60 00. 01 28 CONCRETE CORE DRI LLI NG

DI VI SI ON 05 - METALS

05 50 13. 00 28 STEEL METALWORK FABRI CATI ON AND MACHI NE WORK

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00. 01 26 SEI SMI C RESTRAI NT FOR MECHANI CAL

DI VI SI ON 22 - PLUMBI NG

22 00 00. 00 28 PI PI NG, GENERAL PURPOSE

DI VI SI ON 26 - ELECTRI CAL

26 05 00. 00 28 GENERAL ELECTRI CAL WORK

26 05 19. 00 28 I NSULATED WI RE AND CABLE

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 45 02. 00 20 PUMP, SELF PRI MI NG CENTRI FUGAL TYPE

35 45 02. 00 28 PUMP, DI SC TYPE

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 25 14. 00 28 COALESCI NG OI L- WATER SEPARATORS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET

NUMBER

DESCRIPTION

LMP-1-0-1/27 G-001 COVER SHEET AND LOCATI ON MAPS

LMP-1-0-1/28 G-002 I NDEX TO DRAWI NGS

LMP-1-0-1/29 G-101 GENERAL - KEY PLANS

LMP-1-10-1/7 S-101 PI PE GALLERY STAI RS AND PUMPS 1- 6 SUPPORTS - PLAN

AND I SOMETRI C VI EWS

LMP-1-10-1/8 S-102 PUMP SUPPORT PLATES AND SUPPORTS - ENLARGED AND

I SOMETRI C VI EWS

LMP-1-10-1/9 S-501 ANGLE SUPPORT PI ECES - DETAI LS

LMP-1-10-1/10 S-901 UNI TS 1- 3 PUMP - PLATES AND SUPPORTS - I SOMETRI C

LMP-1-10-1/11 S-902 UNI TS 4- 6 PUMP - PLATES AND SUPPORTS - I SOMETRI C

LMP-1-3-1/38 M-001 MECHANI CAL - EQUI PMENT SCHEDULES

LMP-1-3-1/39 MD101 REMOVAL - TURBI NE PI T SUMP PUMP AND PI PI NG ( UNI TS

1-3)

LMP-1-3-1/40 MD102 REMOVAL - TURBI NE PI T SUMP PUMP AND PI PI NG ( UNI TS

4-6)

LMP-1-3-1/41 M-101 GENERATOR BAY PI PI NG - UNI TS 1- 6 - PLAN AND

SECTION

LMP-1-3-1/42 M-201 PI PE GALLERY PI PI NG - UNI TS 1- 6 - ELEVATI ON AND

PLAN

LMP-1-3-1/43 M-501 I NSTALLATI ON OF PUMP AND TURBI NE PI T PI PI NG

( UNI TS 1- 3) - DETAI LS

LMP-1-3-1/44 M-502 I NSTALLATI ON OF PUMP AND TURBI NE PI T PI PI NG

( UNI TS 4- 6) - DETAI LS

LMP-1-3-1/45 M-503 PI PE GALLERY PI PI NG - I NTAKE AND WASTE DETAI LS

LMP-1-3-1/46 M-504 PI PE GALLERY PI PI NG - DI SCHARGE DETAI LS

LMP-1-3-1/47 M-505 TURBI NE PI T PI PI NG - DETAI LS

LMP-1-3-1/48 M-506 OI L WATER SEPARATOR - I NSTALLATI ON

LMP-1-3-1/49 M-507 OI L WATER SEPARATOR - DETAI LS

LMP-1-3-1/50 M-508 OI L WATER SEPARATOR - WORK PLATFORM DETAI LS

LMP-1-3-1/51 M-509 OI L STORAGE TANK PUMP - PI PI NG ASSEMBLY

LMP-1-3-1/52 M-601 PI PI NG AND I NSTRUMENTATI ON - DI AGRAM

LMP-1-3-1/53 M-602 I SOMETRI C DETAI LS

LMP-1-6-1/18 E-001 GENERAL - NOTES AND SYMBOLS

LMP-1-6-1/19 ED101 EQUI PMENT DEMOLI TI ON - TURBI NE PI T UNI T 1- 3 -

WIRING

LMP-1-6-1/20 ED601 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU1 & CP1 - DEMOLI TI ON

LMP-1-6-1/21 ED602 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU2 & CP2 - DEMOLI TI ON

LMP-1-6-1/22 ED603 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU3 & CP3 - DEMOLI TI ON

LMP-1-6-1/23 ED604 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU4 & CP4 - DEMOLI TI ON

LMP-1-6-1/24 ED605 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU5 & CP5 - DEMOLI TI ON

LMP-1-6-1/25 ED606 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU6 & CP6 - DEMOLI TI ON

LMP-1-6-1/26 ED607 AUXI LI ARY CONTROL DI AGRAM - DEMOLI TI ON

LMP-1-6-1/27 ED608 TERMI NAL CONNECTI ON DI AGRAM - DEMOLI TI ON

LMP-1-6-1/28 ED609 CONTROL CI RCUI T DI AGRAM - DEMOLI TI ON

LMP-1-6-1/29 ED610 SU1 & SU2 & SU3 - CONTROL CI RCUI T DI AGRAM -

DEMOLITION

LMP-1-6-1/30 ED611 SU4 - CONTROL CI RCUI T DI AGRAM - DEMOLI TI ON

LMP-1-6-1/31 ED612 SU5 - CONTROL CI RCUI T DI AGRAM - DEMOLI TI ON

LMP-1-6-1/32 ED613 SU6 - CONTROL CI RCUI T DI AGRAM - DEMOLI TI ON

LMP-1-6-1/33 ED617 MAI N UNI TS 1- 3 - SCHEMATI C WI RI NG DI AGRAM -

TURBI NE PI T

LMP-1-6-1/34 ED618 MAI N UNI TS 4- 6 - TURBI NE PI T WI RI NG DI AGRAM TO

MAI N TERMI NAL CABI NET

LMP-1-6-1/35 E-101 EQUI PMENT I NSTALLATI ON - TURBI NE PI T UNI T 1- 3 -

WIRING

LMP-1-6-1/36 E-601 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU1 & CP1 - I NSTALLATI ON

LMP-1-6-1/37 E-602 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU2 & CP2 - I NSTALLATI ON

LMP-1-6-1/38 E-603 POWERHOUSE - MAI N UNI TS 1- 3 - ONELI NE DI AGRAM -

SU3 & CP3 - I NSTALLATI ON

LMP-1-6-1/39 E-604 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU4 & CP4 - I NSTALLATI ON

LMP-1-6-1/40 E-605 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU5 & CP5 - I NSTALLATI ON

LMP-1-6-1/41 E-606 POWERHOUSE - MAI N UNI TS 4- 6 - ONELI NE DI AGRAM -

SU6 & CP6 - I NSTALLATI ON

LMP-1-6-1/42 E-607 AUXI LI ARY CONTROL DI AGRAM - I NSTALLATI ON

LMP-1-6-1/43 E-608 TERMI NAL CONNECTI ON DI AGRAM - I NSTALLATI ON

LMP-1-6-1/44 E-609 CONTROL CI RCUI T DI AGRAM - I NSTALLATI ON

LMP-1-6-1/45 E-610 SU1 & SU2 & SU3 - CONTROL CI RCUI T DI AGRAM -

INSTALLATION

LMP-1-6-1/46 E-611 SU4 - CONTROL CI RCUI T DI AGRAM - I NSTALLATI ON

LMP-1-6-1/47 E-612 SU5 - CONTROL CI RCUI T DI AGRAM - I NSTALLATI ON

LMP-1-6-1/48 E-613 SU6 - CONTROL CI RCUI T DI AGRAM - I NSTALLATI ON

LMP-1-6-1/49 E-614 SCHEMATI C DI AGRAM - MAI N UNI T ANNUNCI ATI ON -

GENERATOR SWBD S1, S2, S3

LMP-1-6-1/50 E-615 OWS POWER DI STRI BUTI ON AND GEAR PUMP CONTROL

LMP-1-6-1/51 E-616 OWS TANK CONTROL - PANEL SCHEMATI C

LMP-1-6-1/52 E-617 MAI N UNI TS 1- 3 - SCHEMATI C WI RI NG DI AGRAM -

TURBI NE PI T

LMP-1-6-1/53 E-618 MAI N UNI TS 4- 6 - TURBI NE PI T WI RI NG DI AGRAM TO

MAI N TERMI NAL CABI NET

LMP-1-6-1/54 E-619 ONE LI NE DI AGRAM - FCQ2

LMP-1-6-1/55 E-620 CABLE AND CONDUI T SCHEDULE

LMP-1-6-1/56 E-901 POWERHOUSE - MAI N UNI TS 1- 3 - HC1 AND HC2 CABLE -

SU1 - SU3 & ANNUNCI ATI ON CABLE ROUTES

LMP-1-6-1/57 E-902 POWERHOUSE - MAI N UNI TS 4- 6 - HC1 AND HC2 CABLE -

ROUTES FROM SU4 - SU6

LMP-1-6-1/58 E-903 OI L AND WATER SKI MMER MOTOR CONTROL - I SOMETRI CS

LMP-1-6-1/59 E-904 PHOTOS 1

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

b. No For I nf or mat i on Onl y dr awi ngs ar e avai l abl e on CAD.

c. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

d. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey Mi cr oSt at i on f or mat .

e. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 FOR I NFORMATI ON ONLY DRAWI NGS ( FI O)

These FI O dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on. The Gover nment does not war r ant t he accur acy of t he FI O dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of FI O drawings.

FI O dr awi ngs ar e as f ol l ows:

FI LE NUMBER SHEET NUMBER DESCRIPTION

LMP-1-3-8/1 FIO-001 POWERHOUSE - EMBEDDED PI PI NG - TYPI CAL

DETAI LS - SHEET NO 1

LMP-1-3-8/9 FIO-002 POWERHOUSE - EMBEDDED PI PI NG - GENERATOR

BAYS - PLAN - TAI LRACE ELEVS 342 & 4085

LMP-1-3-8/12 FIO-003 POWERHOUSE - EMBEDDED PI PI NG - GENERATOR

BAY - PLAN ELEVATI ON 444

LMP-1-3-8/13 FIO-004 POWERHOUSE - EMBEDDED PI PI NG - GENERATOR

BAY - SECTI ONS AND DETAI LS

LMP-1.1-3-9/62 FIO-005 POWERHOUSE - GENERATOR BAYS - EXPOSED

PI PI NG - TURBI NE FLOOR EL 444 - PLAN,

SECTI ONS & DETAI LS

LMP-1.1-3-9/63 FIO-006 POWERHOUSE - GENERATOR BAYS - EXPOSED

PI PI NG - PI PE GALLERY- EL 424 - ELEVATI ONS

& SECTI ONS

LMP-1.1-3-9/65 FIO-007 POWERHOUSE - GENRATOR BAYS - EXPOSED

PI PI NG - PI PE GALLERY EL 424 - SECTI ONS &

DETAILS

LMP-1.8-3-9/109 FIO-008 POWERHOUSE - UNI TS 4- 6 - EXPOSED PI PI NG -

TRUBI NE FLOOR - EL 444 - AI R & OI L PI PE

TRENCH

LMP-1.8-3-9/110.1 FIO-009 POWERHOUSE - UNI TS 4- 6 - EXPOSED PI PI NG -

PI PE GALLEY - EL 424 - SHEET I

LMP-1.8-3-9/111 FIO-010 POWERHOUSE - UNI TS 4- 6 - EXPOSED PI PI NG -

PI PE GALLEY EL 424 - SHEET I I

LMP-1-4-2/19 FIO-011 POWERHOUSE - GENERATOR BAYS - CONCRETE

OUTLI NE - PLAN EL 444

LMP-1-4-2/21 FIO-012 POWERHOUSE - GENERATOR BAY - CONCRETE

OUTLI NE - TAI LRACE - PLAN EL 4085

LMP-1-4-2/22 FIO-013 POWERHOUSE - GENERATOR BAY - CONCRETE

OUTLI NE - TAI LRACE PLANS - EL 424 & EL 444

LMP-1-4-2/24 FIO-014 POWERHOUSE - GENERATOR BAY - CONCRETE

OUTLI NE - TAI LRACE - TRANSVERSE SECTI ONS

LMP-1-4-3/8 FIO-015 POWERHOUSE - ERECTI ON BAY - CONCRETE

OUTLI NE - PLAN EL 424

LMP-1-4-3/17 FIO-016 POWERHOUSE - ERECTI ON BAY - CONCRETE

OUTLI NE - TAI LRACE PLAN ELS 432 & 444

LMP-5-6-1A2/2 FIO-017 POWERHOUSE - UNI TS 4- 6 - GENERATOR BAYS -

PLAN EL 444 & EL 460

LMP-5-6-1A2/3 FIO-018 POWERHOUSE - UNI TS 4- 6 - GENERATOR BAY -

TRANSVERSE SECTI ON - BAYS 4, 5 & 6

4834-AQQ-1 FIO-019 TURBI NE PI T - SUMP PUMP - PI PI NG

4834-AQR-1 FIO-020 TURBI NE PI T - SUMP PUMP - PI PI NG PLAN

43864 FIO-021 SUMP PUMP AND DRAI N PI PI NG

43864-A FIO-022 SUMP PUMP AND DRAI N PI PI NG

LMP-1-4-3/20 FIO-023 POWERHOUSE - ERECTI ON BAY - CONCRETE

OUTLI NE - TAI LRACE LONGI TUDI NAL SECTI ON

LMP-1.1-6-1A8/4 FIO-024 POWERHOUSE - 480 VOLT CONTROL CENTERS -

SU1 THRU SU3

LMP-1.8-6-1F11/6 FIO-025 EQUI PMENT I NSTALLATI ON - TURBI NE PI T -

CONDUI T & CONTROL CABI NETS

LMP-1.26-6-1E51/4 FIO-026 3D CAM I NSTALLATI ON - MAI N UNI TS 4- 6 -

TERM. CONN. DI AG TURB. PI T

6549-CB-1 FIO-027 TURBI NE PI T - CONDUI T SECTI ONS

6549-CA-1 FIO-028 TURBI NE PI T - CONDUI T SECTI ONS

6549-BZ-1 FIO-029 TURBI NE PI T - CONDUI T PLAN

4570-UL-1 FIO-030 TURB. PI T ELEC. EQUI P. - TO MAI N TERM CAB.

43885-C FIO-031 TURBI NE PI T ELECTRI CAL SYSTEM - SECTI ONAL

ELEVATION

LMP-1.1-6-1E11/12 FIO-032 TURBI NE PI T MI WI RI NG

6586-2ACD FIO-033 SCHEMATI C DI AGRAM - MAI N UNI T

ANNUNI CATI ON - GENERATOR SWBD S1 & S2 & S3

- - End of Document - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an empl oyment i nf or mat i on at http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 5 EQUI PMENT LI ST

1. 6 TESTI NG OF EQUI PMENT

1. 7 DI SPOSI TI ON OF REMOVED EQUI PMENT

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 9 PRE- WORK AND POST WORK SURVEYS

1. 10 CARE OF DRAI NS

1. 11 PROTECTI ON OF POWERHOUSE FLOORS

1. 12 FI RE CONTROL

1. 13 TRAI NI NG

1. 14 PROJECT SUPERI NTENDENT

1. 15 KEY PERSONNEL SUBSTI TUTI ON

1. 16 POST AWARD MEETI NGS

1. 16. 1 Pr e- Wor k Meet i ng

1. 16. 2 Pr e- Const r uct i on Meet i ng

1. 16. 2. 1 Mi nut es

1. 16. 2. 2 Demobi l i z i ng And Remobi l i z i ng

1. 17 WEEKLY PRODUCTI ON MEETI NGS

1. 17. 1 Mi nut es

1. 18 ADDI TI ONAL MEETI NGS

1. 19 PARTNERI NG

1. 19. 1 Gener al

1. 19. 2 Par t ner i ng Meet i ngs

1. 20 RED ZONE MEETI NG

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Weekl y Meet i ng Agenda

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Equi pment Li st ; I C

Pr e- Wor k Sur vey Phot os And Repor t ; I C

Pr oj ect Super i nt endent ; I C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G C

SD- 11 Cl oseout Submi t t al s

Post - Wor k Sur vey Phot os And Repor t ; I C

Tr ai ni ng Manual s; G C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.

Any devi at i ons shal l be updat ed as per SECTI ON 01 78 23. 00 28, OPERATI ON AND MAI NTENANCE DATA, par agr aph MAI NTAI N WORKI NG AS- BUI LT CONTRACT DRAWI NGS

AND FI O DRAWI NGS.

1. 4 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 5 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect 30 days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i ncl ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 6 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 7 DI SPOSI TI ON OF REMOVED EQUI PMENT

Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .

1. 9 PRE- WORK AND POST WORK SURVEYS

Conduct a pr e- wor k sur vey pr i or t o st ar t of on- si t e wor k and a post-work survey dur i ng pr oj ect c l oseout , wi t h t he Cont r act i ng Of f i cer ( KO) , of t he wor k ar eas. The r esul t s of t he sur veys shal l be document ed by di gi t al phot ogr aphs and descr i pt i ve nar r at i ve r epor t s. A col or copy of t he sur vey phot ogr aphs and nar r at i ve r epor t s shal l be submi t t ed t o t he KO wi t hi n f i ve ( 5) days af t er sur vey has been compl et ed.

1. 10 CARE OF DRAI NS

Exi st i ng Power house f l oor dr ai ns shal l not be used f or di sposal of any sol i d mat er i al or any l i qui ds ot her t han c l ear wat er .

1. 11 PROTECTI ON OF POWERHOUSE FLOORS

Car e shal l be t aken t o pr event damage t o f l oor s ( t i l e and non- t i l e) and cur bs wi t hi n t he Power house. Take caut i on t o pr event damage when t r anspor t i ng equi pment , mat er i al or debr i s over power house f l oor . Damage t o f l oor s or cur bs caused by Cont r act or ' s oper at i on shal l be r epai r ed at no addi t i onal cost t o Gover nment . Repai r s shal l mat ch sur r oundi ng ar ea i n col or , t ext ur e, and sur f ace f i ni sh and ar e subj ect t o appr oval .

1. 12 FI RE CONTROL

Each pi ece of i nt er nal combust i on engi ne dr i ven equi pment used at t he wor k s i t e shal l be equi pped wi t h a f i r e ext i ngui sher i n accor dance wi t h r ecommendat i on Nat i onal Fi r e Pr ot ect i on Associ at i on ( NFPA) as appr opr i at e.

The mi ni mum appr oved r at i ng of ext i ngui sher s shal l not be l ess t han 5- B: C.

1. 13 TRAINING

Pr ovi de t wo ( 2) on- si t e t r ai ni ng sessi ons, appr oxi mat el y f our ( 4) hour s each by an aut hor i zed Manuf act ur es Repr esent at i ve. Thi s t r ai ni ng wi l l cover t he pr ogr ammi ng, oper at i on and mai nt enance of t he compl et e Oi l Wat er Separ at or syst em and Head Cover Pumps as i nst al l ed. One cl ass wi l l consi st of oper at or s and mai nt enance per sonnel and t he ot her c l ass wi l l be syst em manager s and engi neer s, each cont ai ni ng up t o s i x ( 6) st udent s.

Submit t r ai ni ng manual s and document at i on f or appr oval 30 days pr i or t o schedul ed c l asses and f ur ni sh suf f i c i ent t r ai ni ng mat er i al s at t he t r ai ni ng c l asses f or al l s t udent s pl us a mi ni mum of t hr ee ( 3) copi es f or pr oj ect f i l es. Wher e audi o/ v i sual mat er i al s ar e used i n t r ai ni ng c l asses, t hr ee ( 3) copi es of such mat er i al s shal l be f ur ni shed t o t he Pr oj ect f or use i n f ut ur e t r ai ni ng. I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o coor di nat e t he t r ai ni ng sessi ons wi t h t he KO t o ensur e mi ni mum conf l i c t s wi t h ongoi ng Pr oj ect wor k.

1. 14 PROJECT SUPERI NTENDENT

At al l t i mes dur i ng per f or mance of t hi s cont r act and unt i l t he wor k i s compl et ed and accept ed, assi gn and have on t he wor ksi t e, a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 15 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he KO. Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east 15 cal endar days i n advance of dat e of r epl acement .

1. 16 POST AWARD MEETI NGS

1. 16. 1 Pr e- Wor k Meet i ng

Wi t hi n 30 cal endar days af t er r ecei pt of Not i ce t o Pr oceed, at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f i nvol ved wi t h t hi s cont r act shal l par t i c i pat e i n t hi s meet i ng t o di scuss t he over al l cont r act r equi r ement s. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es.

1. 16. 2 Pr e- Const r uct i on Meet i ng

The Pr oj ect Super i nt endent shal l coor di nat e wi t h t he KO and est abl i sh t he dat e of t he Pr e- Const r uct i on Meet i ng. The meet i ng wi l l be hel d at t he Pr oj ect s i t e at l east one ( 1) week pr i or t o mobi l i z i ng t o t he j ob s i t e.

The Pr oj ect Super i nt endent shal l l ead t he Pr e- Const r uct i on Meet i ng di scussi ng t he Cont r act or ' s pl an on execut i ng t he wor k at t he pr oj ect s i t e, schedul e, r equi r ed c l ear ances and t i mef r ame f or t hem, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss envi r onment al and c l ear ance i ssues. Key member s of t he cont r act or st af f shal l at t end t hi s meet i ng i ncl udi ng t he Qual i t y Cont r ol ( QC) Syst em Manager , Si t e Saf et y and Heal t h Of f i cer ( SSHO) and any ot her member s det er mi ned by t he Gover nment t o be required.

1. 16. 2. 1 Minutes

The Pr oj ect Super i nt endent shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 16. 2. 2 Demobi l i z i ng And Remobi l i z i ng

Anyt i me t he Cont r act or demobi l i zes f r om t he s i t e and r emobi l i zes at a l at er dat e, anot her Pr e- Const r uct i on Meet i ng shal l be hel d and shal l f ol l ow t he r equi r ement s l i s t ed above.

1. 17 WEEKLY PRODUCTI ON MEETI NGS

Dur i ng al l f abr i cat i on and on- si t e const r uct i on wor k, hol d a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect .

a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.

b. Pr ovi de a t hr ee ( 3) week ' l ook ahead'

( 1) Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e, over t he next t hr ee ( 3) weeks.

( 2) ENSURE t hat t hese act i v i t i es al i gn t o t he over al l CONSTRUCTI ON SCHEDULE submi t t ed under SECTI ON 01 32 01. 00 28PROJECT SCHEDULE.

( 3) RECORD any changes t o t he Pr oj ect Schedul e and i ncl ude t hem i n t he next schedul ed updat e.

c. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he Si t e Saf et y and Heal t h Of f i cer ( SSHO) shal l attend.

d. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL.

e. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he

Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , schedul er or any key subcont r act or per sonnel t o at t end t he meet i ng.

1. 17. 1 Minutes

The Pr oj ect Super i nt endent shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 18 ADDI TI ONAL MEETI NGS

Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he KO f or concur r ence. E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

1. 19 PARTNERING

1. 19. 1 General

The Gover nment i nt ends t o encour age t he f oundat i on of a cohesi ve par t ner shi p wi t h t he Cont r act or and i t s subcont r act or s by i nf or mal l y par t ner i ng t hi s cont r act . Thi s par t ner shi p wi l l be st r uct ur ed t o dr aw on t he st r engt hs of each or gani zat i on t o i dent i f y and achi eve r eci pr ocal goal s. The obj ect i ves ar e ef f ect i ve and ef f i c i ent cont r act per f or mance and i nt ended t o achi eve compl et i on wi t hi n budget , on schedul e, and i n accor dance wi t h pl ans and speci f i cat i ons. Thi s par t ner shi p woul d be bi l at er al i n makeup and par t i c i pat i on wi l l be t ot al l y vol unt ar y. I f Par t ner i ng i s pur sued, meet i ngs woul d be hel d as i dent i f i ed i n t he f ol l owi ng par agr aph.

1. 19. 2 Par t ner i ng Meet i ngs

Wi t hi n 30 cal endar days of r ecei pt of Not i ce t o Pr oceed, t he i ni t i al par t ner i ng meet i ng wi l l be schedul ed. The Cont r act or ' s key per sonnel wi l l at t end a f ace- t o- f ace par t ner i ng meet i ng ( t ypi cal l y one day i n dur at i on) t oget her wi t h key Gover nment per sonnel , t o di scuss pr oj ect goal s and communi cat i on. Fol l ow- up meet i ngs wi l l be hel d per i odi cal l y , as r equi r ed, t hr oughout t he dur at i on of t he cont r act , as agr eed t o by t he Cont r act or and t he Gover nment .

1. 20 RED ZONE MEETI NG

Wi t hi n one ( 1) mont h of compl et i ng t he pr oj ect or when t he pr oj ect i s 80 per cent compl et ed, t he Cont r act or shal l set up and l ead a Red Zone meet i ng. The Cont r act or shal l cont act t he Cont r act i ng Of f i cer t o Schedul e t hi s meet i ng. The Gover nment ’ s r epr esent at i ve wi l l i nc l ude t he Cont r act i ng Of f i cer , key per sonnel f r om t he Pr oj ect , Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer . The key peopl e f r om t he Cont r act or shal l be, at a mi ni mum, t he Pr oj ect Super i nt endent , Qual i t y Cont r ol Syst em Manager , Schedul er , key subcont r act or s per sonnel , and Pr oj ect Manager .

The pur pose of t hi s meet i ng i s t o devel op an over al l schedul e f or al l act i v i t i es r equi r ed by bot h t he Gover nment and Cont r act or and t o compl et e t he pr oj ect t hr ough commi ssi oni ng and f i nal accept ance. The Gover nment wi l l come pr epar ed wi t h al l t hei r act i v i t i es, key dat es, and dur at i ons f or al l wor k r equi r ed by t he Gover nment t o compl et e t he pr oj ect . The

Cont r act or shal l pr ovi de t he same i nf or mat i on f or al l of t hei r act i v i t i es.

The Cont r act or ’ s schedul er shal l i nput al l of t hi s i nf or mat i on i nt o t he Cont r act or ’ s pr oj ect schedul e dur i ng t he meet i ng.

Thi s schedul e shal l be updat ed weekl y, or as needed, based on t he i nf or mat i on f r om t he weekl y pr oduct i on meet i ngs f or bot h t he Gover nment and Cont r act or act i v i t i es.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 PROJECT SECURI TY

1. 2. 1 Vehi c l e Access

1. 2. 2 I dent i f i cat i on of Empl oyees

1. 2. 3 Del i ver y of Equi pment

1. 3 USE OF POWERHOUSE BRI DGE CRANE

1. 3. 1 Cr ane Oper at or s

1. 3. 2 Use of t he Cr anes

1. 3. 3 Ri gger s

1. 4 FACI LI TY OCCUPANCY CLOSURE

1. 5 WORK SCHEDULES

1. 5. 1 Cont r act or ' s Wor k Schedul e

1. 5. 2 Gover nment ' s Wor k Schedul e

1. 6 USE OF WALLA WALLA DI STRI CT PARKS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Responsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 PROJECT SECURI TY

The Pr oj ect s i t e i s a secur ed ar ea and access ont o t he Pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her containers.

1. 2. 1 Vehi c l e Access

Pr oj ect access r oads on bot h s i des of t he dams ar e secur ed wi t h l ocked gat es. Al l vehi c l es t hat pass t hr ough t he l ocked gat es wi l l be subj ect t o bei ng sear ched. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed t hr ough l ocked gat es. Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n t he wor k ar eas. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on.

1. 2. 2 I dent i f i cat i on of Empl oyees

The cont r act or i s r esponsi bl e f or f ur ni shi ng an i dent i f i cat i on badge/ car d t o each empl oyee pr i or t o t he empl oyee' s wor k on t he Pr oj ect s i t e, and f or r equi r i ng each empl oyee engaged on t he wor k t o di spl ay i dent i f i cat i on at al l t i mes. Badges shal l i ncl ude phot o i dent i f i cat i on, company name, and t he i ndi v i dual ' s name and company i dent i f i cat i on number as a mi ni mum.

Badges shal l be l ami nat ed pl ast i c t ype. Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Cont r act i ng Of f i cer ( KO) f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he KO, empl oyees wi l l be phot ogr aphed by t he Gover nment .

Empl oyees who f ai l t o submi t t o phot ogr aphi ng wi l l not be al l owed on t he Pr oj ect s i t e.

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 2. 3 Del i ver y of Equi pment

The cont r act or i s r esponsi bl e f or del i ver y and r ecei pt of al l mat er i al s and equi pment . Gover nment per sonnel wi l l not be avai l abl e t o assi st t he Cont r act or i n t hese act i v i t i es. To t he maxi mum ext ent possi bl e, del i ver i es shal l ar r i ve on t he same si de of t he r i ver as t he Cont r act or ' s wor k ar ea.

Del i ver y vehi c l es wi l l be al l owed t o cr oss t he r i ver over t he dam onl y wi t h Gover nment appr oval . Del i ver y vehi c l es ar r i v i ng on t he opposi t e s i de of t he r i ver as t he wor k ar ea shal l be unl oaded out s i de t he l ocked gat e, equi pment shal l be l oaded ont o Cont r act or ' s vehi c l es, and Cont r act or ' s vehi c l es wi l l t hen be al l owed t o cr oss t he dam t o t he wor k ar ea.

1. 3 USE OF POWERHOUSE BRI DGE CRANE

The Gover nment ' s br i dge cr ane wi t hi n t he power house wi l l be avai l abl e f or t he wor k wi t hi n t he wor ki ng l oad and movement l i mi t s of t he cr ane. The br i dge cr ane wi l l be avai l abl e f or use by t he Cont r act or at such t i mes as not r equi r ed f or ot her mai nt enance and r epai r wor k per f or med by Gover nment per sonnel . The Gover nment wi l l f ur ni sh el ect r i c power , l ubr i cat i on, and nor mal mai nt enance i ncl udi ng adj ust ment s wi t hout cost t o t he Cont r act or .

Pr ovi de t he KO at l east 24 hour s not i ce i n advance each t i me use of t he cr anes i s desi r ed on weekdays and 48 hour s not i ce f or use on weekends and Feder al hol i days.

1. 3. 1 Cr ane Oper at or s

The Cont r act or shal l f ur ni sh qual i f i ed br i dge cr ane oper at or s f or t hei r oper at i ons. Each oper at or , i n addi t i on t o meet i ng t he r equi r ement s of SECTION 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS, shal l have had at l east 3- year s exper i ence on a br i dge cr ane of equi val ent capaci t y and characteristics.

1. 3. 2 Use of t he Cr anes

The Cont r act or wi l l be l i abl e f or al l damage, due t o f aul t or negl i gence, i ncur r ed whi l e t he cr anes ar e oper at ed by t he Cont r act or ' s cr ane oper at or s.

1. 3. 3 Riggers

Onl y qual i f i ed r i gger s shal l be used i n pr epar i ng l oads f or l i f t i ng and i n at t achi ng such l oads t o t he cr anes. Al l per sonnel per f or mi ng r i ggi ng shal l meet r equi r ement s of SECTI ON 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS. A Gover nment oper at or wi l l check t hem f or knowl edge of hand si gnal s. Hand hel d por t abl e r adi os may be used but onl y on non- Gover nment frequencies.

1. 4 FACI LI TY OCCUPANCY CLOSURE

St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he KO.

1. 5 WORK SCHEDULES

1. 5. 1 Cont r act or ' s Wor k Schedul e

At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. Fur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.

1. 5. 2 Gover nment ' s Wor k Schedul e

The mai nt enance cr ews at t he dam wor k f r om 6: 30 a. m. t o 5: 00 p. m. , Monday t hr ough Thur sday. Cr ews and st af f do not wor k on weekends and Feder al hol i days. I f a Feder al hol i day f al l s on a Fr i day, t he cr ews and st af f do not wor k on t he pr ecedi ng Thur sday. A power house oper at or i s at t he s i t e 24 hour s a day, 7 days a week, i ncl udi ng Feder al hol i days but i s not avai l abl e t o assi st t he Cont r act or .

I f t he Cont r act or r equi r es Gover nment suppor t or assi st ance out s i de of nor mal wor k hour s, t he Cont r act or must make a f or mal wr i t t en r equest t o t he KO at l east one week pr i or t o t he dat e t hat suppor t / assi st ance i s needed.

The Gover nment wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat Gover nment suppor t or assi st ance can be pr ovi ded.

1. 6 USE OF WALLA WALLA DI STRI CT PARKS

Speci al consi der at i on f or t he use of t he Wal l a Wal l a Di st r i c t Campi ng Gr ounds wi l l not be gi ven t o t he Cont r act or i f campi ng at t hese s i t es. The Cont r act or ' s cr ew may not use Gover nment par ki ng l ot s near t he Lower Monument al Lock and Dam f or RV par ki ng.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 2. 1 Bi ogr aphi cal I nf or mat i on Submi t t al

1. 3 AT LEVEL 1 TRAI NI NG

1. 4 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

1. 5 DOD FACI LI TY REQUI REMENTS ( COMMON ACCESS CARD NOT REQUI RED)

1. 6 EMPLOYEE ESCORT

1. 7 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act r equi r es access t o secur ed and r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment . Secur ed ar ea i s consi der ed any l ocat i on wher e on- si t e wor k i s per f or med by Cont r act or empl oyees. The r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment consi st s of ever yt hi ng i nsi de t he secur i t y f ence at t he pr oj ect .

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY ( DA)

AR 190- 13 ( 2011) The Ar my Physi cal Secur i t y Pr ogr am

Ar my Di r ect i ve 2014- 05 ( 2014) Pol i cy and I mpl ement at i on Pr ocedur es f or Common Access Car d Cr edent i al i ng and I nst al l at i on Access f or Uncl ear ed Cont r act or s

Websi t e f or Depar t ment of t he Ar my Regul at i ons:

http://armypubs.army.mil/

Feder al Acqui s i t i on Regul at i on ( FAR)

FAR 52. 204- 9 ( 2015) Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ant i Ter r or i sm ( AT) Level 1; I , SLE Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , SLE

1. 2. 1 Bi ogr aphi cal I nf or mat i on Submi t t al

The f ol l owi ng submi t t al shal l onl y be submi t t ed t o t he addr ess bel ow.

Submi t one har d copy.

Bi ogr aphi cal I nf or mat i on; See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or det ai l s

Di st r i c t Commander

ATTN: CENWW- EC- C

Wal l a Wal l a Di st r i c t Cor ps of Engi neer s 201 Nor t h Thi r d Avenue Wal l a Wal l a, WA 99362- 1876

1. 3 AT LEVEL 1 TRAI NI NG

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, r equi r i ng access t o gover nment f aci l i t i es and cont r ol l ed access ar eas shal l compl et e Ant i Ter r or i sm ( AT) Level 1 awar eness t r ai ni ng wi t hi n 30 days af t er Not i ce t o Pr oceed, and annual l y t her eaf t er unt i l pr oj ect compl et i on. Submi t cer t i f i cat es of compl et i on f or each empl oyee t o t he cont r act i ng of f i cer ( KO) , wi t hi n f i ve ( 5) cal endar days af t er i ni t i al compl et i on of t r ai ni ng or annual r ef r esher .

The cont r act or shal l r et ai n empl oyee t r ai ni ng cer t i f i cat es f or t he dur at i on of t he cont r act and mai nt ai n a cur r ent r ost er . The r ost er shal l cont ai n t he names of empl oyees who have compl et ed t he t r ai ni ng al ong wi t h t hei r most r ecent t r ai ni ng compl et i on dat e. The cont r act or shal l updat e t he r ost er and r esubmi t t o t he KO no l at er t han 5 cal endar days af t er compl et i on of r ef r esher t r ai ni ng or a new empl oyee compl et es cer t i f i cat i on.

AT Level I awar eness t r ai ni ng can be compl et ed i n appr oxi mat el y t wo ( 2) hour s and i s avai l abl e at t he f ol l owi ng websi t e:

http://jko.jten.mil/courses/atl1/launch.html

1. 4 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l compl y wi t h al l appl i cabl e f aci l i t y access and secur i t y pol i c i es and pr ocedur es. Local f aci l i t y pol i c i es and pr ocedur es shal l be pr ovi ded by a gover nment r epr esent at i ve.

The cont r act or shal l pr ovi de al l i nf or mat i on r equi r ed f or backgr ound checks t o meet f aci l i t y access r equi r ement s. Backgr ound checks wi l l be per f or med by Wal l a Wal l a Di st r i c t Secur i t y Of f i ce. Cont r act or wor kf or ce must compl y wi t h al l per sonal i dent i t y ver i f i cat i on r equi r ement s ( FAR 52. 204- 9, Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel :

http://www.ecfr.gov/cgi-bin/text-idx?rgn=div8&node=48:2.0.1.1.1.2.1.28 ) as di r ect ed by DOD and/ or l ocal pol i cy.

I n addi t i on t o t he changes ot her wi se aut hor i zed by t he changes c l ause of t hi s cont r act , shoul d t he For ce Pr ot ect i on Condi t i on ( FPCON) at any f aci l i t y change, t he Gover nment may r equi r e changes i n cont r act or secur i t y mat t er s or pr ocesses.

1. 5 DOD FACI LI TY REQUI REMENTS ( COMMON ACCESS CARD NOT REQUI RED)

Cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, shal l compl y wi t h adj udi cat i on st andar ds and pr ocedur es usi ng t he Nat i onal Cr i me I nf or mat i on Cent er I nt er st at e I dent i f i cat i on I ndex ( NCIC-III ) and Ter r or i st Scr eeni ng Dat abase ( TSDB) ( Ar my Di r ect i ve 2014- 05 / AR 190- 13), appl i cabl e f aci l i t y and ar ea access secur i t y pol i c i es and pr ocedur es ( pr ovi ded by a gover nment r epr esent at i ve, as NCI C and TSDB ar e avai l abl e) .

1. 6 EMPLOYEE ESCORT

Al l cont r act or empl oyees, i ncl udi ng al l associ at ed sub- cont r act or empl oyees, who ar e not i n possessi on of t he appr opr i at e secur i t y c l ear ance or access pr i v i l eges, wi l l be escor t ed i n sensi t i ve or r est r i c t ed ar eas and/ or ar eas wher e t hey may be exposed t o c l assi f i ed and/ or sensi t i ve materials.

1. 7 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

The Cont r act or must pr e- scr een Candi dat es usi ng t he E- ver i f y Pr ogr am ( http://www.uscis.gov/e-verify ) websi t e t o meet t he est abl i shed empl oyment el i gi bi l i t y r equi r ement s. The Vendor must ensur e t hat t he Candi dat e has t wo val i d f or ms of Gover nment i ssued i dent i f i cat i on pr i or t o enr ol l ment t o ensur e t he cor r ect i nf or mat i on i s ent er ed i nt o t he E- ver i f y syst em.

An i ni t i al l i s t of ver i f i ed/ el i gi bl e Candi dat es must be pr ovi ded t o t he KO no l at er t han 30 busi ness days af t er r ecei pt of r ecei pt of Not i ce t o Proceed.

* When cont r act s ar e wi t h i ndi v i dual s, t he i ndi v i dual s wi l l be r equi r ed t o compl et e a For m I - 9, Empl oyment El i gi bi l i t y Ver i f i cat i on, wi t h t he desi gnat ed Gover nment r epr esent at i ve. Thi s For m wi l l be pr ovi ded t o t he KO and shal l become par t of t he of f i c i al cont r act f i l e.

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 RETAI NAGE OF PAYMENT

1. 2 I TEM 0001 SUPPLY AND I NSTALL NEW OI L WATER SEPARATORS

1. 3 I TEM 0002 SUPPLY AND I NSTALL NEW TURBI NE PI T SUMP PUMPS

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 28

MEASUREMENT AND PAYMENT

PART 1 GENERAL

I n each i nst ance, t he cont r act pr i ce f or an i t em shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , equi pment , and mat er i al s, and f or per f or mi ng al l oper at i ons r equi r ed t o compl et e t he wor k i ncl uded i n t he i t em as her ei n speci f i ed, or as ot her wi se appr oved.

1. 1 RETAI NAGE OF PAYMENT

Ret ai nage i n t he amount of 10 per cent of or i gi nal cont r act awar d amount wi l l be wi t hhel d unt i l t he f i nal submi t t al s, l i s t ed bel ow, have been appr oved by t he Gover nment . The 10 per cent r et ai nage f or f i nal submi t t al s wi l l not be hel d unt i l such t i me as t he Cont r act or has ear ned 90 per cent of t he or i gi nal cont r act val ue. See SECTI ON 01 78 23. 00 28 " OPERATI ON AND MAI NTENANCE DATA" f or addi t i onal i nf or mat i on.

a. Fi nal Oper at i on and Mai nt enance Manual s and Par t s Cat al ogs.

b. Fi nal Appr oved Ver si ons of Cont r act or Pr epar ed Dr awi ngs.

c. As- bui l t cont r act dr awi ngs and FI O dr awi ngs.

d. Ret ur n of Gover nment I ssued I t ems.

1. 2 I TEM 0001 SUPPLY AND I NSTALL NEW OI L WATER SEPARATORS

" Suppl y and I nst al l New Oi l Wat er Separ at or s" wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0001, " Suppl y and I nst al l New Oi l Wat er Separ at or s, " whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o suppl y and i nst al l t wo ( 2) new oi l wat er separ at or s and Oi l St or age Tank, compl et e, as speci f i ed and appr oved. Feat ur es wi t h t hi s i t em i ncl ude, but ar e not l i mi t ed t o:

a. al l pi pi ng t o connect t o t he exi st i ng sump dr ai n pi pi ng i n s i x ( 6) locations.

b. al l el ect r i cal wi r i ng, condui t and cont r ol s.

c. ot her appur t anenances as speci f i ed, i ncl udi ng pr essur e washer , j i b cr ane, c l eani ng br ushes and t he i ndust r i al cur t ai n.

d. st ar t - up, t est i ng, commi ssi oni ng and t r ai ni ng as speci f i ed f or t he Oi l Wat er Separ at or Syst em.

1. 3 I TEM 0002 SUPPLY AND I NSTALL NEW TURBI NE PI T SUMP PUMPS

" Suppl y and I nst al l Tur bi ne Pi t Sump Pumps" wi l l be measur ed f or payment as a compl et e pay i t em ( JOB) . Payment wi l l be made at t he l ump sum pr i ce f or I t em No. 0002, " Suppl y and I nst al l Tur bi ne Pi t Sump Pumps" , whi ch pr i ce and payment shal l be f ul l compensat i on f or al l wor k r equi r ed t o suppl y and i nst al l seven ( 7) Tur bi ne Pi t Lead Pumps and seven ( 7) Tur bi ne Pi t Lag Pumps compl et e, as speci f i ed and appr oved.