Amendment_0003,_W912EF-17-R-0004.pdf
PDF 1 MB Posted
- Attached to
- McNary Turbine Replacement, Units 1-14 Federal contract opportunity
- Solicitation number
- W912EF-17-R-0004
About this file
Amendment 0003, W912EF-17-R-0004, including revised specifications
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV62093454
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0003 revises the solicitation as stated in the attached Summary of Changes.
Proposal due date is not changed. Proposals are due no later than 4:30pm, Pacific, on 04 August 2017.
MCNARY TURBINE REPLACEMENTS, UNITS 1-14
1. CONTRACT ID CODE PAGE OF PAGES
J 1 82
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-R-0004
X 9B. DATED (SEE ITEM 11)
14-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jul-2017
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
PHYLLIS L. BUERSTATTE
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
AMENDMENT 0003
Summary of Changes
Summary of changes for Amendment 0003 McNary Turbine Upgrades, Units 1-14
1. Revised the following Specifications:
SECTION 00 01 15.00 28 LIST OF DRAWINGS
Revised Sheets G-008 and G-009
SECTION 01 22 00.00 28 MEASUREMENT AND PAYMENT
Revised the following paragraph:
1.9.6, CLIN 2110 Furnish Blade Servomotor Shaft, Coupling Fasteners, Shaft Guard
For Adjustable Blade Units (Optional)
SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE
AREAS
Revised the following paragraph:
1.2, SUBMITTALS
Added the following paragraph:
1.5, GOVERNMENT ROADWAY DECKS ACCESS RESTRICTIONS
Added an attachment “Main Unit Bays Loading Diagrams”
SECTION 42 13 19.01 26 THRUST BEARING OIL COOLERS (OPTIONAL)
Revised the following paragraph:
• 2.4.1, Design of New Thrust Bearing Coolers
2. Revised the following
Bid Schedule: Updated See highlights.
SECTION 00100, PROPOSAL SUBMISSION INSTRUCTIONS,
Paragraph 3c(ii), VOLUME I – Past Performance, Section 10 has been revised.
See highlights.
SECTION 00800, Wage Rates: General Decision OR 77, dated 05-19-2017, has been revised.
The revised General Decision OR 77, dated 6-30-2017 is hereby incorporated into the solicitation.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
BID SCHEDULE
Bid Schedule (Amendment 0003) Unrestricted Competition
The magnitude of the project is estimated between $250,000,000 and $500,000,000
1. The bid schedule is divided into twenty categories/tables for the following;
Hydraulic Design Base and Options (1000s and 1100s) Prototype Adjustable Blade Design Base and Options (2000s and 2100s) Prototype Adjustable Blade Supply Base and Options (2000s and 2100s) Prototype Adjustable Blade Install Base and Options (3000s and 3100s) Prototype Fixed Blade Design Base and Options (4000s and 4100s) Prototype Fixed Blade Supply Base and Options (4000s and 4100s) Prototype Fixed Blade Install Base and Options (5000s and 5100s) Generator Supply Base and Options (6000s and 6100s) Generator Install Base and Options (7000s and 7100s) Alternate Adjustable Blade Supply (8100s) - further explained in item #2 below Alternate Adjustable Blade Install (9100s) - further explained in item #2 below
2. The alternate bid tables provide a complete list of Adjustable Blade Supply and Install
CLINS to complete 8 additional adjustable blade turbines beyond the base 6 in the event that Government chooses to install fewer than 8 fixed blade turbines. Depending on the results of the design process and a determination by the design team in accordance with the option award clause, it is the government’s intention to have the flexibility to change the total number of adjustable blade turbines from 6 to “up to” 14. The 8 additional adjustable blade turbines would replace any number of the 8 fixed blade turbines. See Section – 01 11.00 00 26 General Requirement for further explanation. In the instance that additional adjustable blade turbines are added, optional bid items for the supply and installation of additional adjustable blade turbine components would be exercised, concurrent with a modification to deduct the same number of fixed blade turbine component bid items. To provide for the recovery of any one-time-costs (OTCs) that would be lost if fixed blade units are replaced by alternate adjustable blade units, any OTCs included in base and optional CLIN’s for fixed blade units should be included in CLIN’s for alternate adjustable blade units. Such cost include, but are not limited to, manufacturing engineering, tooling, fixturing, work planning and shop routing.
3. Where variations of an item are priced under one CLIN (Runners and Discharge Ring
Modifications), the first item (AA) will be awarded and subsequently modified based upon the outcome of the hydraulic and prototype design. These CLINs will be evaluated during the selection process based upon an average price of all the variations consistent with the evaluation factor instructions within this solicitation.
4. The twenty bid schedule categories provided, generally align with the phases of work as defined in Section 01 11.00 00 26 (with some overlapping exceptions) as well as delineate which CLINs are governed by supply clauses and those that are governed by construction clauses. The Supply clauses defined in this contract apply to the Design and Supply categories and CLINs (1000s, 2000s, 4000s, 6000s, and 8000s) while the Construction clauses apply to the Install categories and CLINs (3000s, 5000s, 7000s, and 9000s).
5. Prototype bid items, dependent on the outcome of the hydraulic design, include a defined basis for bid. The basis and specification technical requirements define the configuration of the item for bidding purposes. The basis for some bid items include blanks where the Offeror shall provide material designations, material quantities and/or labor percentages.
Material quantities are finished material weights per generating unit, unless stated otherwise. Labor percentages are based on the total bid item price. In some instances the basis provides clarification for some bid items that might differ in scope between units (5, 6, 13, and 14) and the other ten units which were recently rewound in 2011-2015.
6. Prototype bid item “Description” column verbs are defined as follows:
Design – Prototype design/engineering including analysis and the preparation of design documentation (reports, drawings, etc.).
Furnish – Design/engineering, manufacturing, procurement and delivery of components to McNary Powerhouse.
Supply – Manufacturing/procurement and delivery to McNary Powerhouse Provide – Furnish and installation.
Install (Installation) – Field work to incorporate new, modified and/or existing components into the finished generating unit.
Refurbish (Refurbishment) – Rehabilitation of existing components (including incorporation of replacement/modified components) for usage in the rebuilt generating unit.
Replace (Replacement) – Removal of existing component (if required for installation of replacement components) and installation of replacement component.
Hydraulic Design Base Bid Sub-Total $______________
Hydraulic Design Base Bid Items
ITEM DESCRIPTION Q U/M U/P AMOUNT Basis
Pre Iteration Coordination, Design, Analysis and Model Construction
1 JOB XXXX $________ None
Adjustable Blade Iteration 1 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Adjustable Blade Iteration 2 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Adjustable Blade Iteration 3 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $_______ None
Adjustable Blade Iteration 4 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $______ None
Adjustable Blade Final Performance Model Testing
1 JOB XXXX $_______ None.
Fixed Blade Iteration 1 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Fixed Blade Iteration 2 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Fixed Blade Iteration 3 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Fixed Blade Iteration 4 Coordination, Design, Analysis, Model Testing
1 JOB XXXX $________ None
Fixed Blade Final Performance Model Testing
Hydraulic Design Optional Bid Sub-Total $ _____________
Hydraulic Design Optional Bid Items
Adjustable Blade Iteration 5 Coordination, Design, Analysis, Model Testing (Optional)
1 JOB XXXX $________ None
Fixed Blade Iteration 5 Coordination, Design, Analysis, Model Testing (Optional)
Provide Additional Model Adjustable Blade Runner (Optional)
NTE
EA $_____ $________ None
Provide Additional Model Fixed Blade Runner (Optional)
NTE
EA $_____ $________ None
Provide Additional Model Discharge Ring for Performance Model Testing (Optional)
NTE
EA $_____ $________ None
Provide Additional Model Stay Vane Assembly for Performance Model Testing (Optional)
NTE
EA $_____ $_______ None
Provide Additional Set of Model Wicket Gates for Performance Model Testing (Optional)
NTE
SET $_____ $_______ None
Provide Additional Set of Model Wicket gates for Observational Model Testing (Optional)
NTE
SET $_____ $_______ None
Provide Modified Model Draft Tube for Performance Model Testing (Optional)
NTE
EA $_____ $________ None
Additional Performance Model Testing (Optional)
NTE
DAY $_____ $________ None
Prototype Adjustable Blade Design Base Bid Items
(6 of 14 Turbine Units)
Prototype Design
1 JOB XXXX $________ None
Adjustable Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
Stay Vane Extensions Prototype Design
Wicket Gate Prototype Design
Prototype Adjustable Blade Design Base Bid Sub-Total $ _____________
Prototype Adjustable Blade Design Optional Bid Items
Thrust Bearing Structural Analysis (Optional)
NTE
JOB $_____ $________
None
Replacement Outer Headcover Prototype Design
Replacement Intermediate Headcover Prototype Design
Replacement Lower Headcover Prototype Design
Prototype Adjustable Blade Design Optional Bid Sub-Total $ _____________
Prototype Adjustable Blade Supply Base Bid Items
2005AA
Supply 280 Inch Adjustable 5-Blade Runner
6 EA $_____ $_______
Fully spherical hub and blades, 280 inch blade tip diameter with existing centerline. Runner details and gross dimensions as shown on proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
2005AB
Supply 280 Inch Adjustable 6-Blade Runner
6 EA $_____ $________
Fully spherical hub and blades, 280 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
2005AC
Supply 292 Inch Adjustable 5-Blade Runner
6 EA $_____ $_______
Fully spherical hub and blades, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton ______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
2005AD
Adjustable 6-Blade Runner
6 EA $_____ $_______
Fully spherical hub and blades, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton ______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
2006AA
Supply Discharge Ring Insert for 280 Inch Adjustable Blade Runner
6 EA $_____ $________
For 280 inch diameter runner having existing centerline.
Construction, materials and gross dimensions as shown on proposal drawings.
Includes a removable spherical section to facilitate spherical runner installation and removal. For insertion in existing discharge ring modified under bid item no.
3015.
Insert is stainless steel extending from the existing discharge ring welded connection with the bottom ring to the existing runner centerline elevation, forming the hydraulic wetted passage above the runner centerline.
____ tons austenitic stainless steel @ $_____/ton
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
2006AB
Supply Embedded Discharge Ring Section and Insert for 280 Inch Adjustable Blade Runner
6 SET $_____ $________
For 280 inch diameter runner having existing centerline.
Construction, materials and gross dimensions as shown on proposal drawings.
Embedded DR:
Component is carbon steel above centerline, and accepts the insert. Component below centerline forms the hydraulic passage and is stainless steel.
Length above centerline is
44.5 inch, connecting to the existing bottom ring. Length below centerline is 46.0 inch;
spherical for the length required by the replacement runner, with a 280 inch inner diameter at its lower end.
_______ tons austenitic stainless steel @ $________/ton
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Insert:
Includes a removable spherical section, for insertion in embedded section, to facilitate spherical runner installation and removal.
Insert is stainless steel extending from the replacement discharge ring welded connection with the bottom ring to the existing runner centerline elevation, forming the hydraulic wetted passage above the runner centerline.
____ tons austenitic stainless steel @ $_____/ton
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
2006AC
Supply Embedded Discharge Ring Section and Insert for 292 Inch Adjustable Blade Runner
6 SET $_____ $________
For 292 inch diameter runner having existing centerline.
Construction and material designations identical to 280 inch design.
Embedded DR:
Component is carbon steel above centerline, and accepts the insert. Component below centerline forms the hydraulic passage and is stainless steel.
Length above centerline is
44.5 inch, connecting to the existing bottom ring. Length below centerline is 46.0 inch;
spherical for the length required by the replacement runner, with a 280 inch inner diameter at its lower end.
_______ tons austenitic stainless steel @ $________/ton
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Insert:
Includes a removable spherical section, for insertion in embedded section, to facilitate spherical runner installation and removal.
Insert is stainless steel extending from the replacement discharge ring welded connection with the bottom ring to the existing runner centerline elevation, forming the hydraulic wetted passage above the runner centerline.
____ tons austenitic stainless steel @ $_____/ton
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Leading Edge Stay Vane Extensions
6 SET $_____ $________
One piece solid carbon steel 143 5/16 inch in length at connection to existing stay vanes. Cross sections shown in contract drawings.
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Trailing Edge Stay Vane Extensions
6 SET $_____ $________
One piece solid carbon steel 114 inch in length having cross sections shown in contract drawings.
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Wicket Gates
6 SET $_____ $_______
Cored martensitic stainless steel castings or weld fabrications having construction details and hydraulic shape equivalent to existing wicket gates.
____ tons of martensitic stainless steel @ $_____/ton
Percent of total bid item price that is labor ______%
Supply Spare Wicket Gates
4 EA XXXX $________
Cored martensitic stainless steel castings or weld fabrications having construction details and hydraulic shape equivalent to existing wicket gate.
____ tons of martensitic stainless steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Furnish Unit 13 – 14 Upper Bearing Bracket
2 EA $_____ $________ None
2012 Supply Turbine Shaft Seal 6 SET $_____ $________ None
Furnish Special Equipment, Tools, Scaffolding, and Runner Blade Maintenance Templates
1 SET XXXX $________ None
Furnish Gate Operating Mechanism Bushings and Bearing Plate
SET
Furnish Headcover and Bottom Ring Facing Plate
6 EA $_____ $________
Plate and fasteners for the existing outer headcover and bottom ring.
2016 Furnish Required Spares 1 SET XXXX $________ None
Furnish Turbine Maintenance Platform for Adjustable Blade Runner
1 EA XXXX $________
Platform sized for a five blade 280 inch runner as bid.
Percent of total bid item price that is labor ______%
Supply Spare Surface Air Coolers for Units 13 - 14 Generators
2 EA XXXX $________ None.
Prototype Adjustable Blade Supply Base Bid Sub-Total $_____________
Prototype Adjustable Blade Supply Optional Bid Items
Supply Draft Tube Liner Transition for 280 Inch Adjustable Blade Runner (Optional)
NTE
EA $_____ $________
Conical, 280 inch inner diameter at interface with bid item 2006AB embedded discharge ring, 308.8 inch inner diameter at connection to existing liner, 94.8 inch vertical length.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Draft Tube Liner Transition for 292 Inch Adjustable Blade Runner (Optional)
NTE
EA $_____ $________
Conical, 292 inch inner diameter at interface with bid item 2006AC embedded discharge ring, 308.8 inch inner diameter at connection to existing liner, 94.8 inch vertical length.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Outer Headcover (Optional)
NTE
EA $_____ $________
Identical to existing with the exception of a 12 inch larger inner diameter.
________ tons of carbon steel @ $________/ton
_______ tons austenitic stainless steel (for facing plate and plate fasteners) @ $________/ton
Supply Intermediate Headcover (Optional)
NTE
EA $_____ $________
Identical to existing with the exception of a 12 inch larger outer diameter.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Lower Headcover (Optional)
NTE
EA $_____ $________
Identical to existing.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Furnish Blade Servomotor Shaft, Coupling Fasteners, Shaft Guard For Adjustable Blade Units (Optional)
NTE
SET $_____ $________
Shaft identical to existing with the exception of a 10 inch larger diameter cylinder bore and 10 inch larger diameter servo-to-immediate shaft coupling flange.
______ tons of forged steel @ $_____/ton
Percent of total bid item price that is labor ______% 1 ton = 2,000 U.S. pounds finished material weight
Furnish Intermediate Shaft and Coupling Fasteners For Adjustable Blade Units (Optional)
NTE
SET $_____ $________
Shaft identical to existing with the exception of a 10 inch larger diameter servo-to-immediate shaft coupling flange.
______ tons of forged steel @ $_____/ton
Prototype Adjustable Blade Supply Optional Bid Sub-Total $ _____________
Prototype Adjustable Blade Install Base Bid Items
Pre-Disassembly Watered Operational Testing
6 JOB $______ $________ None
Mobilization and Demobilization
1 JOB XXXX $________ None
Generating Unit Disassembly
6 JOB $______ $________ None
Furnish Machining Device
1 JOB XXXX $________
Remains property of contractor.
Provide Draft Tube and Scroll Case Drain Valves
6 JOB $______ $________ None
Provide Unit 13 and 14 Generator Surface Air Coolers
2 JOB $______ $________ None.
Provide Unit 13 and 14 High Pressure Lift System Components
2 JOB $______ $_______ None
Provide Static Hub Pressurization System and Refurbish/Modify Oil Head
6 JOB $______ $________ None
Provide Inner Oil Pipe and Refurbish/Modify or Replace Existing Oil Pipes
6 JOB $______ $________ None
Lead Based Paint Removal and Disposal
6 JOB $______ $________
Includes paint removal and disposal from all existing painted surfaces specified to be painted as part of this contract.
Include removal and disposal required for modified existing embedded discharge ring with insert, reuse of existing headcovers w/o modification.
3011 Painting 6 JOB $______ $________
Includes painting for five blade adjustable blade runner, modified existing embedded discharge ring with insert, reuse of existing headcovers w/o modification.
Refurbish Outer Headcover
6 JOB $______ $________ None
Refurbish Lower Headcover
6 JOB $______ $________ None
Refurbish Intermediate Headcover
6 JOB $______ $________ None
Modify Discharge Ring Without Demolition for 280 Inch Adjustable Blade Runner
6 JOB $______ $________
For bid item 2005AA or 2005AB runner.
Machining of existing embedded discharge ring above runner blade centerline (elevation 230.92) to accept the adjustable blade bid item 2006AA insert. Installation of non-removable portion of insert.
Modification of existing discharge ring below blade centerline to elevation
227.083. Includes machining
(1/4 inch material thickness removal), installation of anchorage (60 total), stainless weld overlay, machining of overlay to contour required by replacement spherical runner.
Stay Vane/Ring Refurbishment Including Stay Vane Extension Installation
6 JOB $______ $________
Installation of extensions bid in items 2007 and 2008.
Bracing of leading edge extensions to scroll case not required.
3017 Refurbish Bottom Ring 6 JOB $______ $________ None
Refurbish Misc. Wicket Gate Operating Mechanism Components
6 JOB $______ $________ None
Line Boring and Installation of Wicket Gate Stem Bushings
6 JOB $______ $________ None
Refurbish/Replace Turbine Air Admission Valves
6 JOB $______ $________ None
Refurbish Gate Operating Ring
6 JOB $______ $________ None
Refurbish Intermediate and Generator Shafts
6 JOB $______ $________ None
Refurbish Servo Shaft for Adjustable Blade Operation
JOB
$______ $________ None
Refurbish Turbine Shafts For Adjustable Blade Operation
4 JOB $______ $________
Scope for units other than 5, 6, 13 and 14.
Refurbish Unit 13, 14 Turbine Shafts for Adjustable Blade Operation
Refurbish Wicket Gate Servomotors
4 JOB $______ $________
Scope for units other than 5, 6, 13 and 14.
Refurbish Units 13 and 14 Wicket Gate Servomotors
2 JOB $______ $________ None
Provide Water and Oil Piping Systems and Components
6 JOB $______ $________ None.
Provide Electrical Devices, Temperature Indicating Devices, Wiring/Cable Removal
Provide Generator Housing Lighting Wires for Units 13 and 14
2 JOB $______
Provide Unit 13 and 14 Generator Stator Heater Automatic Controls
2 JOB $______ $________ None.
Thrust Bearing Component Inspection
4 JOB $______ $________
Scope for units other than 5, 6, 13 and 14.
Thrust Bearing Component Inspection Units 13 and 14
2 JOB $______ $________ None
Guide Bearing Component Inspection
6 JOB $______ $________ None
Refurbish Units 13 and 14 Thrust Bearing Shoes
2 JOB $______ $_______ None
Refurbish Units 13 and 14 Thrust Bearing Runner and Collar
2 JOB $______ $________ None
Refurbish Units 13 and 14 Turbine Guide Bearings, Upper Guide Pads & Lower Guide Pads
2 JOB $______ $________ None
Reassembly of Adjustable Blade Units
6 JOB $______ $________
Includes installation of removable discharge ring insert as part of headcover, runner, and shaft assembly.
Commissioning of Adjustable Blade Units
6 JOB $______ $________
Adjustable Blade Install Time and Materials
NTE XX XXXX $________
See Rate Schedule A at the end of this section for
Prototype Adjustable Blade Install Base Bid Sub-Total $ ______________ individual Time and Material items and summation
Prototype Adjustable Blade Install Optional Bid Items
Draft Tube Modification Upstream of Bulkhead Gate Slot (Optional)
NTE
JOB $______ $________
Upstream (of gate slot) modification shown in contract drawings.
Percent of total bid item price that is labor ______%
Draft Tube Modification Downstream of Bulkhead Gate Slot (Optional)
NTE
JOB $______ $________
Downstream (of gate slot) modification shown in contract drawings
Percent of total bid item price that is labor ______%
Hone Wicket Gate Servomotors (Optional)
NTE
JOB $______ $_______ None
Machine Stay Ring Flange (Optional)
NTE
Refurbish Thrust Bearing Shoes (Optional)
NTE
JOB $______ $_______
Scope for units other than 13 and 14.
Replace Discharge Ring For 280 Inch Adjustable Blade Runner (Optional)
NTE
JOB $______ $________
Demolition above elevation
225.50 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.
2006AB replacement discharge ring embedded section and non-removable portion of discharge ring insert.
Replace Discharge Ring and Draft Tube Liner Transition For 280 Inch Adjustable Blade Runner (Optional)
NTE
JOB $______ $________
Demolition above elevation
218.00 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.
2006AB replacement discharge ring embedded section and non-removable portion of discharge ring insert.
Installation of bid item no.
2105 draft tube liner
Prototype Adjustable Blade Install Optional Bid Sub-Total $ ____________ transition.
Replace Discharge Ring and Draft Tube Liner Transition For 292 Inch
NTE
Demolition above elevation
218.00 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.
2006AC replacement discharge ring embedded section and non-removable portion of discharge ring insert.
Installation of bid item no.
2106 draft tube liner transition.
Additional Painting to Improve Stay Vane/Ring Surface Roughness (Optional)
NTE
JOB $______ $_______ None
Refurbish Thrust Bearing Runner and Collar (Optional)
NTE
JOB $______ $________
Scope for units other than 13 and 14.
Refurbish Upper Guide Bearing Pads (Optional)
NTE
JOB $______ $________
Scope for units other than 13 and 14.
Refurbish Lower Guide Bearing Pads (Optional)
NTE
JOB $______ $________
Scope for units other than 13 and 14.
Refurbish Turbine Guide Bearings (Optional)
NTE
JOB $______ $________ None
Provide Thrust Bearing Oil Coolers (Optional)
NTE
JOB $______ $________
Scope for units other than 13 and 14.
Provide Unit 13 – 14 Thrust Bearing Oil Coolers (Optional)
NTE
JOB $______ $________ None
Prototype Fixed Blade Design Base Bid Sub-Total $ ____________
Prototype Fixed Blade Design Base Bid Items
(8 of 14 Turbine Units)
Fixed Blade Runner Prototype Design
1 JOB XXXX $________ None
Fixed Blade Discharge Ring and Draft Tube Liner Transition Prototype Design
1 JOB XXXX
For bid item 2006AC and 2106 components installed according to bid item 3108.
Prototype Fixed Blade Design Optional Bid Sub-Total $ ____________
Prototype Fixed Blade Design Optional Bid Items
Thrust Bearing Structural Analysis (Optional)
1 JOB
XXXX
X
Stay Vane Extensions Prototype Design (Optional)
1 JOB
XXXX
X
$________ None
Wicket Gate Prototype Design (Optional)
1 JOB
XXXX
X
$________ None
Replacement Outer Headcover Prototype Design (Optional)
1 JOB
XXXX
X
$_______ None
Replacement Lower Headcover Prototype Design (Optional)
1 JOB
XXXX
X
$________ None
Replacement Intermediate Headcover Prototype Design (Optional)
1 JOB
XXXX
X
$________ None
Prototype Fixed Blade Supply Base Bid Items
4003AA
Supply 280 Inch Fixed 5- Blade Runner
EA
Cylindrical blade tip periphery, 280 inch blade tip diameter with existing centerline. Runner construction and gross dimensions as shown on proposal drawings.
______ tons/blade of martensitic stainless steel @ $_____/ ton. Minimum for bidding purposes is 16.25 ton/blade.
_______ tons/hub of martensitic stainless steel @ $______/ton. Minimum for bidding purposes is 63.5 tons.
______ tons/deflector of carbon steel @$ _____ / ton.
Minimum for bidding purposes is 2.4 tons.
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
4003AB
Supply 280 Inch Fixed 6- Blade Runner
8 EA $______ $________
Cylindrical blade tip periphery, 280 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade fixed runner proposal drawings.
______ tons/blade of martensitic stainless steel @ $_____/ ton. Minimum for bidding purposes is 14.0 ton/blade.
_______ tons/hub of martensitic stainless steel @ $______/ton. Minimum for bidding purposes is 63.5 tons.
______ tons/deflector of carbon steel @ $_____ / ton.
Minimum for bidding purposes is 2.4 tons.
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
4003AC
Supply 292 Inch Fixed 5- Blade Runner
8 EA $______ $________
Cylindrical blade tip periphery, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade fixed runner proposal drawings.
______ tons/blade of martensitic stainless steel @ $_____/ ton. Minimum for bidding purposes is 17.7 ton/blade.
_______ tons/hub of martensitic stainless steel @ $______/ton. Minimum for bidding purposes is 63.5 tons.
______ tons/deflector of carbon steel @ $_____ / ton.
Minimum for bidding purposes is 2.4 tons.
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
4003AD
Supply 292 Inch Fixed 6- Blade Runner
8 EA $______ $________
Cylindrical blade tip periphery, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade fixed runner proposal drawing.
______ tons/blade of martensitic stainless steel @ $_____/ ton. Minimum for bidding purposes is 15.2 ton/blade.
_______ tons/hub of martensitic stainless steel @ $______/ton. Minimum for bidding purposes is 63.5 tons.
______ tons/deflector of carbon steel @$ _____ / ton.
Minimum for bidding purposes is 2.4 tons.
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Leading Edge Stay Vane Extensions
8 SET $______ $________
One piece solid carbon steel 143 5/16 inch in length at connection to existing stay vanes. Cross sections shown in contract drawings.
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Trailing Edge Stay Vane Extensions
8 SET $______ $________
One piece solid carbon steel 114 inch in length having cross sections shown in contract drawings.
____ tons of carbon steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Set of Wicket Gates
Cored martensitic stainless steel castings or weld fabrications having construction details and hydraulic shape equivalent to existing wicket gates.
____ tons of martensitic stainless steel @ $_____/ton
Prototype Fixed Blade Supply Base Bid Sub-Total $ ____________
4007 Supply Turbine Shaft Seal 8 SET
$________ None
Supply Gate Operating Mechanism Bushings and Bearing Plate
8 SET $______ $________ None
Supply Headcover and Bottom Ring Facing Plate
8 EA $______ $________
Plate and fasteners for the existing outer headcover and bottom ring.
Furnish Turbine Maintenance Platform for Fixed Blade Runner
1 EA XXXX $________
Platform sized for a five blade 280 inch runner as bid.
Percent of total bid item price that is labor ______%
Furnish Special Equipment, Tools, Scaffolding, and Runner Blade Maintenance Templates
1 SET
XXXX
$________ None.
Prototype Fixed Blade Supply Optional Bid Items
4107AA
Supply Embedded Discharge Ring Section For 280 Inch Fixed Blade Runner (Optional)
NTE
EA $______ $________
For 280 inch diameter runner having existing centerline.
Component is cylindrical and stainless steel. Length above centerline is 16.0 inch. Length below centerline is 46.0 inch.
____ tons austenitic stainless steel @ $_____/ton
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
4107AB
Supply Embedded Discharge Ring Section For 292 Inch Fixed Blade Runner (Optional)
NTE
EA $______ $________
For 292 inch diameter runner having existing centerline.
Component is cylindrical and stainless steel. Length above centerline is 38.0 inch. Length below centerline is 46.0 inch.
____ tons austenitic stainless steel @ $_____/ton
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Draft Tube Liner Transition For 280 Inch Fixed Blade Runner (Optional)
NTE
EA
Conical, 280 inch inner diameter at interface with embedded discharge ring,
308.8 inch inner diameter at interface with existing liner,
94.8 inch vertical length.
________ tons of carbon steel @ $________/ton
1 ton = 2,000 U.S. pounds finished material weight
Supply Draft Tube Liner Transition For 292 Inch Fixed Blade Runner (Optional)
NTE
EA
Conical, 292 inch inner diameter at interface with embedded discharge ring,
308.8 inch inner diameter at connection to existing liner,
94.8 inch vertical length.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Outer Headcover (Optional)
NTE
EA $______ $________
Identical to existing outer headcover with the exception of a 12 inch larger inner diameter.
________ tons of carbon steel @ $________/ton
_______ tons austenitic stainless steel (for facing plate and plate fasteners) @ $________/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
Supply Intermediate Headcover (Optional)
NTE
EA $______ $________
Identical to existing with the exception of a 12 inch larger outer diameter.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______% finished material weigh
Prototype Fixed Blade Supply Optional Bid Sub-Total $____________
Supply Lower Headcover (Optional)
NTE
EA $______ $________
Identical to existing lower headcover.
________ tons of carbon steel @ $________/ton
Percent of total bid item price that is labor ______%
Prototype Fixed Blade Install Base Bid Items
Pre-Disassembly Watered Operational Testing
8 JOB $______ $________ None
Generating Unit Disassembly
8 JOB $______ $________ None
Provide PMG Support and Drive Components For Fixed Blade Units
Provide Draft Tube and Scroll Case Drain Valves
8 JOB $______ $________ None
Lead Based Paint Removal and Disposal
8 JOB $______ $________
Includes paint removal and disposal from all existing painted surfaces specified to be painted as part of this contract.
Include removal and disposal required for machining /overlay of existing embedded discharge ring, reuse of existing headcovers w/o modification.
5006 Painting 8 JOB $______ $________
Includes painting for five blade fixed blade runner, machining/overlay of existing embedded discharge ring, reuse of existing headcovers w/o modification.
Refurbish Outer Headcover
8 JOB $______ $________
Refurbish Lower Headcover
8 JOB $______ $________
Refurbish Intermediate Headcover
8 JOB $______ $________
Discharge Ring Modification Without Demolition For 280 Inch Fixed Blade Runner
8 JOB $______ $________
For bid item 4003AA or 4003AB runner.
Modification of existing embedded discharge ring from elevation 232.25 to elevation
227.083. Includes machining
(1/4 inch material thickness removal), installation of anchorage (80 total), stainless weld overlay, machining of overlay to 280.5 inch diameter cylindrical shape.
Stay Vane/Ring Refurbishment Including Stay Vane Extension Installation
8 JOB $______ $________
Installation of extensions bid in items 4004 and 4005.
Bracing of leading edge extensions to scroll case not required.
5012 Refurbish Bottom Ring 8 JOB $______ $________ None
Refurbish Misc. Wicket Gate Operating Mechanism Components
8 JOB $______ $________ None
Line Boring and Installation of Wicket Gate Stem Bushings
8 JOB $______ $________ None
Refurbish/Replace Turbine Air Admission Valves
8 JOB $______ $________ None
Refurbish Gate Operating Ring
8 JOB $______ $________ None
Refurbish Intermediate and Generator Shafts
8 JOB $______ $________ None
Refurbish Turbine Shafts for Fixed Blade Operation
6 JOB $______ $________
Scope for units other than 5, 6, 13 and 14.
Refurbish Unit 5, 6 Turbine Shafts for Fixed Blade Operation
2 JOB $______ $________ None
Refurbish Servo Shaft for Fixed Blade Operation
8 JOB $______ $________ None
Refurbish Wicket Gate Servomotors
6 JOB $______ $________
Scope for units other than 5, 6, 13 and 14.
Refurbish Units 5 and 6 Wicket Gate Servomotors
2 JOB $______ $________ None
Provide Water and Oil Piping Systems and Components
8 JOB $______ $________ None.
Prototype Fixed Blade Install Base Bid Sub-Total $______________
Provide Electrical Devices, Temperature Indicating Devices, Wiring/Cable Removal
Provide Generator Housing Lighting Wires for Units 5 and 6
2 JOB $______ $________ None
Provide Unit 5 and 6 Generator Stator Heater Automatic Controls
2 JOB $______ $________ None.
Install Government Furnished Generator Surface Air Coolers in Unit 6
1 JOB XXXX $________ None.
Thrust Bearing Component Inspection
6 JOB $______ $_______
Scope for units other than 5, 6, 13 and 14.
Thrust Bearing Component Inspection Units 5 & 6
2 JOB $______ $_______ None
Guide Bearing Component Inspection
8 JOB $______ $_______ None
Refurbish Unit 5 & 6 Thrust Bearing Shoes
2 JOB $______ $_______ None
Refurbish Unit 5 & 6 Thrust Bearing Runner and Collar
2 JOB $______ $________ None
Refurbish Unit 5 & 6 Turbine Guide Bearings, Upper Guide Pads & Lower Guide Pads
2 JOB $______ $________ None
Generating Unit Reassembly Fixed Blade Units
8 JOB $______ $________ None
Commissioning Fixed Blade Units
8 JOB $______
Fixed Blade Install Time and Materials
NTE XX XXXX $________
See Rate Schedule F at the end of this section for individual Time and Material items and summation
Prototype Fixed Blade Install Optional Bid Items
Discharge Ring Replacement For 280 Inch Fixed Blade Runner (Optional)
NTE
JOB
Demolition above elevation
225.50 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.
4107AA replacement discharge ring embedded section.
Discharge Ring and Draft Tube Liner Transition Replacement For 280 Inch Fixed Blade Runner (Optional)
NTE
218.00 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.
4107AA replacement discharge ring embedded section and bid item no. 4108 draft tube liner transition.
Discharge Ring and Draft Tube Liner Transition Replacement for 292 Inch Fixed Blade Runner (Optional)
NTE
218.00 feet, as shown on contract drawing S-001, to the maximum diameter shown on the drawing.
Installation of bid item no.4107AB replacement discharge ring embedded section and bid item no. 4109 draft tube liner transition.
Additional Painting to Improve Stay Vane/Ring Surface Roughness (Optional)
NTE
JOB $_____ $_______ None
Hone Wicket Gate Servomotors (Optional)
NTE
JOB $_____ $_______ None
Draft Tube Modification Upstream of Bulkhead Gate Slot (Optional)
NTE
JOB $_____ $________
Upstream (of gate slot) modification shown in contract drawings.
Prototype Fixed Blade Install Optional Bid Sub-Total $______________
Draft Tube Modification Downstream of Bulkhead Gate Slot (Optional)
NTE
JOB $_____ $________
Downstream (of gate slot) modification shown in contract
Percent of total bid item price that is labor ______%
Machine Stay Ring Flange (Optional)
NTE
Refurbish Thrust Bearing Shoes (Optional)
NTE
JOB $_____ $_______
Scope for units other than 13, Refurbish Thrust Bearing Runner and Collar (Optional)
NTE
JOB $_____ $________
Scope for units other than 13, Refurbish Upper Guide Bearing Pads (Optional)
NTE
JOB $_____ $________
Scope for units other than 13, Refurbish Lower Guide Bearing Pads (Optional)
NTE
JOB $_____ $________
Scope for units other than 13, Refurbish Turbine Guide Bearings (optional)
NTE
JOB $_____ $________ None
Provide Thrust Bearing Oil Coolers (Optional)
NTE
JOB $_____ $________
Scope for units other than 13, Generator Supply Base Bid Sub-Total $____________
Generator Supply Base Bid Items
Furnish Complete Set of Stator Bars, Supplies and Accessories for a New Winding - Including Factory Testing - for Unit
1 SET
XXXX
Furnish Complete Set of Stator Bars, Supplies and Accessories for a New Winding – including factor testing - for Unit 14
1 SET XXXX $________ None
Manufacture Prototype Stator Bars and Perform Voltage Endurance Test for Unit 13
1 JOB XXXX $________ None
Manufacture Prototype Stator Bars and Perform Voltage Endurance Test for Unit 14
1 JOB XXXX $________ None
Manufacture Prototype Stator Bars and Perform Thermal Cycling Test for Unit 13
1 JOB XXXX $________ None
Manufacture Prototype Stator Bars and Perform Thermal Cycling Test for Unit 14
1 JOB XXXX $________ None
Furnish Spare Parts for Unit 13
1 SET XXXX
Furnish Spare Parts for Unit 14
1 SET XXXX $________ None
Furnish Deteriorating Supplies For the Government Furnished Winding for Unit 5
1 SET XXXX $________ None
Generator Supply Optional Bid Items
Furnish Stator Core Materials And Accessories for Unit 13 Including Factory Tests (Optional)
1 SET $_____ $_______ None
Furnish Stator Core Materials And Accessories for Unit 14 Including Factory Tests
1 SET $_____ $________ None
Generator Supply Optional Bid Sub-Total $_____________
Generator Install Base Bid Sub-Total $_____________
Generator Install Base Bid Items
Remove Existing Stator Winding, Install and Test New Stator Winding for Unit 13
1 JOB
Remove Existing Stator Winding, Install and Test New Stator Winding for Unit 14
1 JOB XXXX $________ None
Remove Existing Stator Winding, Install and Test Government Furnished Winding for Unit 5
Inspect, Clean, and Test Stator Cores Units 5, 13 and 14
3 JOB
Clean, Inspect and Test Rotor Units 5, 13 and 14
Perform Special Field Test Units 5, 13 and 14
Clean, Inspect, and Test Stator and Rotor Units 1-4 and 6-12
11 JOB
Provide Surge Arrestors Units 5, 6, 13 and 14
4 JOB
$_______ None
Generator Install Optional Bid Items
Perform Additional Inter-laminar Insulation Test Units 5, 13 and 14 (Optional)
NTE
Remove Existing Stator Core, Install and Test New Stator Core for Unit 13 (Optional)
1 JOB
XXXX
X
$________ None
Remove Existing Stator Core, Install and Test New Stator Core for Unit 14 (Optional)
1 JOB
XXXX
X
$________ None
Remove Existing Stator Core, Install and Test Government- Furnished Stator Core Unit 5 (Optional)
$_______ None
Generator Install Optional Bid Sub-Total $_____________
Alternate Prototype Adjustable Blade Supply Optional Bid Items
8101AA
Supply 280 Inch Adjustable 5-Blade Runner (Optional)
NTE
EA $_____ $_______
Fully spherical hub and blades, 280 inch blade tip diameter with existing centerline. Runner details and gross dimensions as shown on proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal components of _______ material designation @ $_____/ton
______ tons/hub internal components of _______ material designation @ $_____/ton
______ tons/hub internal components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
Percent of total bid item price that is labor ______%
______ tons/operating rod of forged steel @ $_____/ton
8101AB
Supply 280 Inch Adjustable 6-Blade Runner (Optional)
NTE
EA $_____ $________
Fully spherical hub and blades, 280 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawings.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
8101AC
Adjustable 5-Blade Runner (Optional)
NTE
EA $_____ $_______
Fully spherical hub and blades, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawing.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub self-lubricating bushings @ $_____/ton
______ tons/operating rod of forged steel @ $_____/ton
Percent of total bid item price that is labor ______%
1 ton = 2,000 U.S. pounds finished material weight
8101AD
Supply 292 Inch Adjustable 6-Blade Runner (Optional)
NTE
EA $_____ $_______
Fully spherical hub and blades, 292 inch blade tip diameter with existing centerline. Runner construction and details similar to that shown on 280 inch five blade adjustable runner proposal drawing.
____ tons/blade of martensitic stainless steel @ $_____/ton
____ tons/hub & deflector of carbon steel @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material designation @ $_____/ton
______ tons/hub internal mechanism components of _______ material…
This is the start of the file's text. The full file is on GovTribe.