A.07.24_W912EF-15-R-0046Amendment0001.pdf

PDF 72 KB Posted

Attached to
Ice Harbor and Little Goose Dam Spare Set of Draft Tube Stoplogs
Solicitation number
W912EF-15-R-0046
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
A.01.30Amendment_0002_Summary.doc DOC document
A.07.24W912EF-15-R-0046Amendment0002.pdf PDF
A.01.30TechnicalSpecAmendment2.pdf PDF
A.01.30TechSpec_Amend-0001.pdf PDF
A.01.30Plans_Amend-0001.pdf PDF
A.01.30Amend-0001_Summary.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV51193492

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Title: Ice Harbor Lock and Dam (HLD) and Little Goose Lock and Dam (LGA) Spare Set Draft Tube Stoplogs

The purpose of amendment 0001 of solicitation W912EF-15-R-0046 is to:

1. Incorporate the revised Technical Specif ications as attached.

2. Incorporate the revised Plans as attached.

3. Incorporate revised clause "252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000) " Please refer to "Summary of Changes" for details. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-R-0046

X 9B. DATED (SEE ITEM 11)

14-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Nov-2015

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

YI COCHRAN

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-15-R-0046

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

252.236-7001 CONTRACT DRAWINGS, MAPS, AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet

Title

Revision

Date

ICE HARBOR LOCK AND DAM

VOL. 1 - SPARE SET DRAFT TUBE STOPLOGS

GENERAL

IHG-1-0-1/494 G-001 COVER SHEET AND LOCATION MAPS

IHG-1-0-1/495 G-002 INDEX TO DRAWINGS

IHG-1-0-1/496 G-501 STOPLOG TOLERANCES - AND KEY

SECTION A 11/2/15

STRUCTURAL

IHP-1-5-1/19 S-301 TOP STOPLOG SECTION - PLAN AND

ELEVATION

IHP-1-5-1/20 S-302 SECOND STOPLOG SECTION - PLAN

AND ELEVATION A 10/29/15

IHP-1-5-1/21 S-303 THIRD STOPLOG SECTION - PLAN

AND ELEVATION

IHP-1-5-1/22 S-304 BOTTOM STOPLOG - PLAN AND

ELEVATION

IHP-1-5-1/23 S-401 TOP, 2ND & 3RD STOPLOG

SECTIONS - END ELEVATIONS

IHP-1-5-1/24 S-402 TOP, 2ND & 3RD STOPLOGS -

SECTION B

IHP-1-5-1/25 S-403 TOP, 2ND & 3RD STOPLOGS -

SECTION C

IHP-1-5-1/26 S-404 TOP, 2ND & 3RD STOPLOGS -

SECTION D

IHP-1-5-1/27 S-405 BOTTOM STOPLOG - END

ELEVATION - AND SECTION

IHP-1-5-1/28 S-406 BOTTOM STOPLOG - SECTIONS -

AND SECTIONS

IHP-1-5-1/29 S-501 STOPLOG DETAILS

IHP-1-5-1/30 S-502 SEAL DETAILS 1

IHP-1-5-1/31 S-503 SEAL DETAILS 2

FOR INFORMATION ONLY

IHP-1-4-2/31 FIO-001

POWERHOUSE CONCRETE OUTLINE

- GENERATOR BAYS - DRAFT TUBE

BULKHEAD BLOCKOUTS

IHP-1-5-1/4 FIO-002

POWERHOUSE STRUCTURAL -

DRAFT TUBE BULKHEAD GUIDES -

DRAFT TUBE BULKHEAD

BLOCKOUTS

IHP-1-4-2/25 FIO-003

POWERHOUSE CONCRETE OUTLINE

- GENERATOR BAYS - TAILRACE

DECK PLAN & DETAILS

IHP-1-4-0/1 FIO-004

POWERHOUSE CONCRETE -

GENERAL PLAN AND - SECTION OF

GENERATOR BAY

IHP-1-5-2/22 FIO-005

POWERHOUSE - NEW BOTTOM

DRAFT TUBE BULKHEAD -

MISCELLANEOUS DETAILS

IHP-1-5-2/20 FIO-006 POWERHOUSE - McNARY DRAFT

TUBE BULKHEADS - ALTERATIONS

IHP-1-5-2/14 FIO-007

POWERHOUSE - DRAFT TUBE

BULKHEADS - TOP SECTION -

McNARY DAM

IHP-1-5-2/15 FIO-008 POWERHOUSE - DRAFT TUBE

BULKHEADS - INTERMEDIATE

SECTION - McNARY

IHP-1-5-2/16 FIO-009

POWERHOUSE - DRAFT TUBE

BULKHEADS - BOTTOM SECTION -

McNARY DAM

IHP-1-5-2/16 FIO-010

POWERHOUSE - MECHANICAL -

DRAFT TUBE - BULKHEAD LIFTING

BEAM

(End of drawing list)

Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.

(End of Clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Technical Specifications 17-SEP-2015 Attachment 2 Ice Harbor Lock and Dam

(HLD) Plans

17-SEP-2015

Attachment 3 Little Goose Lock and Dam (LGA) Plans

17-SEP-2015

Attachment 4 Past Performance Questionnaire

17-SEP-2015

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 5 Technical Specification

Amendment 0001

04-NOV-2015

Attachment 6 Plans Amendment 0001 04-NOV-2015 Attachment 7 Amendment 0001

Summary

04-NOV-2015

(End of Summary of Changes)