Amendment 0001 W912EF-12-B-0004.pdf

PDF 43 KB Posted

Attached to
Lower Monumental Navlock Monolith 15 Wall Repair Phase 3 Federal contract opportunity
Solicitation number
W912EF-12-B-0004
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Lower Monumental Navlock Monolith 15 Wall Repair Phase 3, newest first.
File Type Posted
Bid Results W912EF-12-B-0004 LoMo Mono 15 Concrete Phase 3.pdf PDF
Amendment 0002.pdf PDF
Site Visit Attendees 12-B-0004.pdf PDF
Amend_Plans.pdf PDF
Site Visit Information.pdf PDF
W912EF-12-B-0004.pdf PDF
12-B-0004_Plans.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV12175562

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Changes are made to the solicitation as described on the attached pages. Bid opening remains unchanged as a result of this amendment.

Bids must be received no later than Friday, 02 December 2011 at 2:00pm, local time.

LOWER MONUMENTAL MONOLITH 15 CONCRETE REPAIR, PHASE 3

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Nov-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-12-B-0004

X 9B. DATED (SEE ITEM 11)

02-Nov-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Nov-2011

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

PHYLLIS L. BUERSTATTE

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-12-B-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

1. Bid opening date remains unchanged. Bids are due no later than 2:00 pm, Pacific Time, on December 02, 2011.

2. Bidders must acknowledge receipt of this amendment. See Block No. 11 of Standard Form 30 for methods of acknowledging solicitation amendments.

3. The following changes are made as a result of this amendment:

A. The ATTENTION TO BIDDERS form has been added to the solicitation.

B. Section 00700, DFARS Clause 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000) has been revised: Added note to “FOR INFORMATION ONLY” drawing header.

C. Drawing Sheet S-404 was revised. (See inside brackets for details.)

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

ATTENTION TO BIDDERS FORM

ATTENTION TO BIDDERS

Note: This form will be filled out by the apparent low responsive bidder after bid opening, but before award of the contract.

Please provide the following information for the responsibility determination:

QUALIFICATIONS

1. Current Balance Sheet and latest Profit and Loss Statement prepared from the most recent fiscal/calendar year and certified by an officer of the company.

2. The name of your banking institution, telephone number and the name of the individual to contact for a line-of-credit reference. (If you are the apparent low bidder, please contact your bank reference to let him/her know our office will be calling for financial information.)

Bank Institution ________________________________ Telephone Number ______________________________ Contact ________________________________________ Email Address __________________________________

3. Tax Identification Number ________________________

4. List of present work to include agency or firm name, address, telephone number, and email address of primary point of contact responsible for inspection and acceptance of the work. (Attach list) Will performance of the present work inhibit your ability to perform this contract?

5. Percentage of work under this contract to be subcontracted. ________ %.

Return completed form with all attachments to:

Email: Phyllis.L.Buerstatte@usace.army.mil

Walla Walla District Corps of Engineers, 201 North Third Avenue, Walla Walla, WA 99362-1876.

mailto:Phyllis.L.Buerstatte@usace.army.mil�

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Drawing Number

Sheet Number

Title

Revision Number

Date

LOWER MONUMENTAL LOCK AND DAM

Navigation Lock Monolith 15 Wall Repair Phase 3

GENERAL

LMG-1-0-1/274 G-001 COVER SHEET AND LOCATION MAPS

LMG-1-0-1/275 G-002 INDEX TO DRAWINGS

STRUCTURAL

LMN-1-4-1/20 S-101 SITE PLAN AND STAGING AREAS

LMN-1-4-1/21 S-201 DEMOLITION AND SALVAGE - ELEVATION

AND SECTION

LMN-1-4-1/22 S-202 WALL REPAIR - ELEVATION AND SECTION

LMN-1-4-1/23 S-401 WALL REPAIR - WALL ANCHOR DETAILS

LMN-1-4-1/24 S-402 WALL REPAIR - PRECAST BLOCK DETAILS

LMN-1-4-1/25 S-403 WALL REPAIR - POST-TENSIONED ANCHOR

DETAIL

LMN-1-4-1/26 S-404

WALL REPAIR - DECK & GUTTER, DECK &

CROSS - DRAIN AND VIEWING PANEL

DETAILS

A 11/18/11

LMN-1-4-1/27 S-405 WALL REPAIR - WATERSTOP SECTIONS AND

DETAIL

LMN-1-4-1/28 S-406 WALL REPAIR - WATERSTOP DETAILS

ELECTRICAL

LMN-1-6-1/3 E-501 LIGHTING - FIXTURE, CONDUIT, AND

BALLAST - PLAN, SECTION, AND DETAIL

LMN-1-6-1/4 E-901 LIGHTING - PRE-DEMOLITION AND

DEMOLITION - PHOTOS

FOR INFORMATION ONLY

The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.

LMN-1-4-1/1 I-001 NAVIGATION LOCK - GENERAL PLAN &

SECTIONS

LMN-1-4-2/19 I-002 NAVIGATION LOCK - MONOLITH 11,13,15,17,19

& 21 - PLAN, ELEVATION AND SECTIONS

LMN-1-4-2/50 I-003 NAVIGATION LOCK - TYPICAL CONCRETE

DETAILS

LMN-1-4-2/25 I-004 NAVIGATION LOCK - REINFORCEMENT -

TYPICAL

LMN-1-5-13/15 I-005 NAVIGATION LOCK - MISCELLANEOUS METAL

III

LMN-1-5-2/14 I-006 NAVIGATION LOCK - MONOLITH 7 - SECTIONS

LMN-1-4-1/15 I-007 MONOLITH 15 - REPAIR AND ANCHORAGE

LMN-1-4-1/16 I-008 MONOLITH 15 - WALL REPAIR DETAILS - 1

(End of Drawing List)

(End of clause)

Contract drawings created on CADD will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CADD. The Contractor assumes all risks associated in using electronic CADD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CADD drawing. If contract modifications are issued, the associated electronic CADD drawings will not be available to the Contractor. Electronic copies of CADD drawings are only available in Bentley MicroStation format. The Government will provide the files on CD ROM. If the Contractor requires different media, such as floppy disks, the Contractor shall be responsible for all conversions required for their use and associated conversion inaccuracies.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .