This document is an Amendment of Solicitation for a channel improvement project in Delta, Louisiana, issued by the U.S. Army Corps of Engineers Vicksburg Contracting Division. The solicitation (W912EE25BA008) is for casting articulated concrete mattresses, with a bid opening date of September 16, 2025, at 2:00 PM Central. Key contract requirements include casting at least 430 squares per calendar day, with liquidated damages of $3,458 per day for delays in completion.

The amendment (0001) revises specifications in Section 00 80 00.00 09, specifically updating the commencement and prosecution of work provisions. Notable changes include delaying the Notice to Proceed until March 1, 2026, and maintaining the original bid opening date. The project involves channel improvement work in Madison Parish, with specific requirements for equipment, security, access, and personnel, including mandatory antiterrorism training, e-verify compliance, and restrictions on non-U.S. citizens working on the contract.

View the file

Other files

File Type Posted
Bid.Abstract.W912EE25BA008.pdf PDF
Attachment 05.pdf PDF
Attachment 03.pdf PDF
Attachment 01.pdf PDF
Attachment 08.pdf PDF
Attachment 04.pdf PDF
Attachment 02.pdf PDF
Attachment 09.pdf PDF
Attachment 06.pdf PDF
Attachment 12.pdf PDF
Solicitation.W912EE25BA008.pdf PDF
Attachment 07.pdf PDF
Attachment 10.pdf PDF
Attachment 11.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Reference Solicitation No. W912EE25BA008, Block 14 (Description of Amendment/Modification):

for Delta, LA, Madison Parish, RM 438.0-R A.H.P., FC/MR&T, Channel Improvement, Articulated Concrete Mattress Casting, FY-26, is amended as follows:

Specifications Section 00 80 00.00 09 is revised. Specifications revised by this amendment have the notation "Revised by Amendment 0001" at the bottom of the page. Text added by this amendment is shown as underlined.

Bid Opening date and time remains the same: September 16, 2025, at 2:00 PM Central.

All other terms and conditions remain unchanged.

W912EE25BA0080001

W912EE25BA008

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS

01 22 00.00 09 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 09 QUALITY CONTROL

01 45 00.15 09 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 20.00 09 ENVIRONMENTAL PROTECTION

01 57 23.01 09 STORM WATER POLLUTION PREVENTION PLAN

DIVISION 03 - CONCRETE

03 30 01.00 09 ARTICULATED CONCRETE MATTRESS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 Revised by Amendment 0001

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 80 00.00 09

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1.2.1 Commencement

1.2.2 Prosecution and Completion

1.2.2.1 General

1.2.2.2 Assessing Retainages

1.2.2.3 Computing Time Delay for Liquidated Damages

1.3 LIQUIDATED DAMAGES-CONSTRUCTION

1.4 GOVERNMENT DELAY OF WORK

1.5 DELIVERY OF EXCESS QUANTITIES

1.6 VARIATION IN QUANTITY

1.7 F.O.B DESTINATION

1.8 CORRESPONDENCE AND ELECTRONIC COMMUNICATION

1.9 PHYSICAL DATA

1.9.1 Access Road

1.9.2 Railroads

1.9.3 Water Routes

1.9.4 Electricity

1.9.5 Potable Water

1.10 CASTING FIELD FLOODING

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.12 GENERAL SECURITY REQUIREMENTS AND GUIDANCE

1.13 ANTITERRORISM (AT) LEVEL 1 TRAINING

1.14 PHYSICAL SECURITY AND ACCESS CONTROL REQUIREMENTS

1.15 SUSPICIOUS ACTIVITY REPORTING TRAINING (E.G., IWATCH, CORPSWATCH,

OR SEE SOMETHING, SAY SOMETHING)

1.16 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

1.17 NON-U.S. CITIZENS WORKING ON GOVERNMENT CONTRACTS

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section Table of Contents --

DOCUMENT 00 80 00.00 09 Page 1

SECTION 00 80 00.00 09

SPECIAL CONTRACT REQUIREMENTS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

1.2.1 Commencement

Upon receipt of Notice of Award, the Contractor shall proceed with preparations for performance of the contract that do not interfere with any ongoing work at the casting field including removal of the previous Contractor's equipment, such as the on-site mobilization of plant, materials and supplies required for the work. The Contractor shall furnish his/her proposed sources of concrete aggregates and a plan for batch plant erection, including, but not limited to, type of plant and proposed location on the field, within ten days after receipt of Notice of Award.

The Contractor will be provided with two Notices to Proceed after award of the contract. The first, Notice to Proceed for mobilization will give the Contractor unrestricted access to the field to assemble and make ready all necessary plant and equipment for operations. The Contractor shall maintain the field in accordance this section's paragraph entitled "GOVERNMENT-FURNISHED FACILITIES", subparagraph entitled "Casting Field".

Any aggregate delivered to the site of the work shall not be removed without the written consent of the Contracting Officer. A second Notice to Proceed will be issued for casting no earlier than 15 days after the Contractor receives the Notice to Proceed for mobilization. The Notice to Proceed date will be mutually agreed upon by the parties with reasonable consideration given for mobilization and site preparation. The Contractor shall commence casting operations within 15 calendar days of acknowledging the Notice to Proceed for Casting . Notice to Proceed will be delayed until 1 March 2026. .

1.2.2 Prosecution and Completion

1.2.2.1 General

During the contract work period for Base Work and options, the Contractor shall execute the work at an average rate of not less than 430 squares per calendar day during any payment period. The Contractor shall cast at an average rate of not less than 430 squares per calendar day until the total quantity of articulated concrete mattress under bid item Base Work, “Articulated Concrete Mattress” has been completed.

DOCUMENT 00 80 00.00 09 Page 2

1.2.2.2 Assessing Retainages

For purposes of assessing retainages, the average calendar day rate shall be computed at the end of each pay cycle over the preceding pay period.

The production days will be computed using the calendar days in that period reduced by the number of excusable delay days. The average production shall be determined by dividing the number of acceptable squares cast during the period by the number of production days. If the Contracting Officer finds that satisfactory progress was achieved during the period, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made during the period, the Contracting Officer may retain a maximum of ten percent of the amount of the payment. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future partial payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds.

1.2.2.3 Computing Time Delay for Liquidated Damages

Time delay for liquidated damages, specified in paragraph entitled

"LIQUIDATED DAMAGES, SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (FAR

52.211-11 – SEP 2000)", shall be computed as follows: a calendar day of delay shall be determined by subtracting the actual number of acceptable mats cast during the contract from the theoretical minimum (i.e., 430 squares per day times the number of production days to date in the contract) divided by 430 squares per day. Computation shall be rounded to nearest whole day.

1.3 LIQUIDATED DAMAGES-CONSTRUCTION

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $3,458.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (FAR 52.211-12)

1.4 GOVERNMENT DELAY OF WORK

If the performance of all or any part of the work of this contract is delayed or interrupted;

(a) by an act of the Contracting Officer in the administration of this contract that is not implicitly authorized by this contract, or

(b) by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by such delay or interruption and the contract shall be modified in writing accordingly.

Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption;

DOCUMENT 00 80 00.00 09 Page 3 however, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.

A claim under this clause shall not be allowed;

(a) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved; and

(b) unless the claim, in the amount stated, is asserted in writing as soon as practicable after the termination of the delay or interruption, but not later than, the day of final payment under the contract.

1.5 DELIVERY OF EXCESS QUANTITIES

The Contractor is responsible for the delivery of each item quantity within allowable variations, if any. If the Contractor delivers and the Government receives quantities of any item in excess of the quantity called for (after considering any allowable variation in quantity), such excess quantities will be treated as being delivered for the convenience of the Contractor. The Government may retain such excess quantities up to $250 in value without compensating the Contractor therefore, and the Contractor waives all right, title, or interests therein. Quantities in excess of $250 will at the option of the Government either be returned at the Contractor's expense or retained and paid for by the Government at the contract unit price. (FAR 52.211-17)

1.6 VARIATION IN QUANTITY

(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below. (FAR 52.211-16)

(b) The permissible variation shall be limited to:

(1) 10 Percent increase

(2) 10 Percent decrease

This increase or decrease shall apply to number of squares cast under the base bid or any option item, subject to the approval of the Contracting Officer.

1.7 F.O.B DESTINATION

(a) The term "f.o.b. destination," as used in this clause, means:

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), DOCUMENT 00 80 00.00 09 Page 4 warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall:

(1) Pack and mark the shipment to comply with contract specifications; or In the absence of specifications, prepare the shipment in conformance with carrier requirements,

(2) Prepare and distribute commercial bills of lading,

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract,

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract,

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(FAR 52.247-34)

1.8 CORRESPONDENCE AND ELECTRONIC COMMUNICATION

For ease and speed of communications, both the Government and Contractor shall exchange correspondence and all other documents duplicate in both hard paper copy and electronic format. Inclusion of an electronic copy is in addition to any other parts of the contract that may specify a minimum number of hard copies to be submitted, such as for shop drawing transmittals. Electronic submission can be accomplished by one of the following methods: email, file upload to the following DoD Safe website https://safe.apps.mil/, or through the Resident Management System - Contractor Mode (RMS-CM) software interface with the Resident Management System (RMS). Format for electronic submissions will be in portable document format (.pdf). File naming will be determined by the Contracting Officer and presented at the Preconstruction Conference. Documents include all general correspondence, administrative plans, all material

DOCUMENT 00 80 00.00 09 Page 5 submittals including shop drawings, progress schedules, submittal registers, requests for information (RFIs), Quality Control (QC) test results, pay requests, etc. Paper documents will govern, in the event of discrepancy with the electronic version. Generally, paper documents will also govern where effective receipt dates are required, such as contractor claims submitted under the Disputes clause of the contract and progress payment requests. However in the case of administrative plans, shop drawings and other submittals transmitted for government review, both the electronic and hard copies are required to begin the review process, so the effective date of receipt will be the date when both the electronic and hard copies are received by the government.

1.9 PHYSICAL DATA

1.9.1 Access Road

A gravel road leads to the casting field at Delta, LA. The use of the roads along the top of the levee is regulated by the Fifth Louisiana Levee District. Authority for such use must be obtained by the Contractor in advance from the Fifth Louisiana Levee District. It shall be the Contractor's responsibility to make any necessary arrangements to provide access for plant, labor, materials, and equipment, both to and from the Delta Point Casting Field.

1.9.2 Railroads

There is a railroad siding in Delta, Louisiana. The Contractor is responsible for determining the availability of railroad service.

1.9.3 Water Routes

The casting field is accessible via the Mississippi River.

1.9.4 Electricity

Facilities for commercial electric power service is located at the field and electricity may be procured commercially. The Contractor shall make his/her own arrangements for power.

1.9.5 Potable Water

Water may be procured commercially, or it may be obtained from the Mississippi River, provided it meets the requirements for water as set out in these specifications. The Contractor shall provide drinking water for his/her workers and shall make his/her own arrangements for potable drinking water.

1.10 CASTING FIELD FLOODING

(a) The casting field is subject to flooding at high river stages;

therefore, the casting operations will not be permitted when, in the opinion of the Contracting Officer, river stages are such that casting operations cannot be performed. The contract time will be extended the number of days equivalent to the time lost by reason of the prevention of casting operations pursuant to the provisions of this paragraph. No adjustment in contract price will be made as a result of any time extension resulting from field flooding.

(b) The Contractor shall be responsible for securing and/or removing

DOCUMENT 00 80 00.00 09 Page 6

Government furnished equipment including, but not limited to, steel forms, welded wire fabric, etc. Prior to flooding, the Contractor shall be required to recover all forms from the field and place in stacks of ten (10) high in a location designated by the Contracting Officer Representative. No adjustment in contract price will be made for this requirement.

1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

(a) This special contract requirement does not apply to terminations. See 52.249-500, Basis for Settlement of Proposals and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8 , Construction Equipment Ownership and Operating Expense Schedule, Region III.

Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

(USACE Acquisition Instruction ("UAI") 31.105-101)

NOTE: EP 1110-1-8 , "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx, then search for EP 1110-1-8 , then click on the link and then choose EP_1110-1-8_Vol-03.pdf or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.

DOCUMENT 00 80 00.00 09 Page 7

1.12 GENERAL SECURITY REQUIREMENTS AND GUIDANCE

The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts.

The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations.

Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures.

The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel.

The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.13 ANTITERRORISM (AT) LEVEL 1 TRAINING

All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training.

Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

1.14 PHYSICAL SECURITY AND ACCESS CONTROL REQUIREMENTS

All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and

DOCUMENT 00 80 00.00 09 Page 8 procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

1.15 SUSPICIOUS ACTIVITY REPORTING TRAINING (E.G., IWATCH, CORPSWATCH, OR

SEE SOMETHING, SAY SOMETHING)

All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

1.16 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM

Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.

Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

1.17 NON-U.S. CITIZENS WORKING ON GOVERNMENT CONTRACTS

Government Approval MUST be obtained PRIOR to any non-U.S. Citizen being permitted to work on a government contract. The Contractor must submit a letter requesting approval via the Contracting Officer/Contracting Officer Representative to the Vicksburg District Security Officer. The letter must include the contract number, period of performance, location(s) of work performance and attach a copy of the individual’s passport and visa/work authorization documents.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

DOCUMENT 00 80 00.00 09 Page 9

IDCode: J
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 21 AUG 2025
ReqNo:
ProjNo:
IssCode: W912EE
AdmCode:
IssuedBy: W07V ENDIST VICKSBURG

KO CONTRACTING DIVISION, 4155 CLAY STREET

VICKSBURG, MS 39183-3435

UNITED STATES

FRETESHIA JOHNSON-OLIVER, EMAIL: FRETESHIA.L.JOHNSON-OLIVER@USACE.ARMY.MIL TELEPHONE: 601-631-5219 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912EE25BA008
SolDate: 15 AUG 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE SCHEDULE
ContNameTitle:
CoNameTitle: ROBERT E. SCREWS
ContDate:
CODate: 21 AUG 2025