A22_Amendment_0003_W912EE18B0007.pdf
PDF 741 KB Posted
- Solicitation number
- W912EE18B0007
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Official_Abstract_Ouachita_Bank_Stab.pdf | ||
| A22_Amendment_0002_W912EE18B00070002.pdf | ||
| A22_Amendment_W912EE18B00070001.pdf | ||
| AM_0001_drawings.pdf | ||
| specs.pdf | ||
| 18b0007.pdf | ||
| 385-1-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912EE18B0007, for FC&CE, Ouachita River Basin, Ouachita River; Ouachita Parish, Louisiana; Levee Bank
Stabilization and Levee Rehabilitation; Miles 161 and 167, Ouachita River, is amended as follow s:
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE18B0007
X 9B. DATED (SEE ITEM 11)
23-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Aug-2018
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE18B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
BIDDING SCHEDULE IS REVISED AND REPLACED IN ITS ENTIRETY.
Line Items revised by this amendment have an asterisks (*) in the margins before and after the changes to the previous issue as well as the notation “Revised by Amendment 0003” at the bottom of the page.
FC&CE, OUACHITA RIVER BASIN, OUACHITA RIVER
OUACHITA PARISH, LOUISIANA LEVEE BANK STABILIZATION
AND LEVEE REHABILITATION
MILES 161 AND 167
ITEM DESCRIPTION
EST
QTY U/M UNIT PRICE AMOUNT
MOBILIZATION AND
DEMOBILIZATION 1 JOB FOR $
0002 CLEARING 1 JOB FOR $
305,850 TONS $ $
0003 GRADED STONE “A”
0003AA FIRST 305,850 TONS
0003AB OVER 305,850 TONS 203,900 TONS $ $
0004 GRADED STONE “C”
0004AA FIRST 59,550 TONS 59,550 TONS $ $
0004AB OVER 59,550 TONS 39,700 TONS $ $
DEMOLITION: STRUCTURE
REMOVAL 1 JOB FOR $
TOTAL $
"Revised by Amendment 0003"