A22_Amendment_0002_W912EE18B00070002.pdf
PDF 732 KB Posted
- Solicitation number
- W912EE18B0007
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Official_Abstract_Ouachita_Bank_Stab.pdf | ||
| A22_Amendment_0003_W912EE18B0007.pdf | ||
| A22_Amendment_W912EE18B00070001.pdf | ||
| AM_0001_drawings.pdf | ||
| specs.pdf | ||
| 18b0007.pdf | ||
| 385-1-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912EE18B0007, for FC&CE, Ouachita River Basin, Ouachita River; Ouachita Parish, Louisiana; Levee Bank
Stabilization and Levee Rehabilitation; Miles 161 and 167, Ouachita River, is amended as follow s:
SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE18B0007
X 9B. DATED (SEE ITEM 11)
23-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2018
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE18B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SPECIFICATIONS: Bidding Schedule, Section 00 80 00.00 09, Section 01 00 00.00 09, Section
01 22 00.00 09, Section 01 57 20.00 09, Section 01 57 23.01 09, Section 31 01 00.00 09, and Section 32 92 04.00 09 are revised and replaced.
Specifications revised by this amendment have the notation "Revised by Amendment 0002" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
FC&CE, OUACHITA RIVER BASIN, OUACHITA RIVER
OUACHITA PARISH, LOUISIANA LEVEE BANK STABILIZATION
AND LEVEE REHABILITATION
MILES 161 AND 167
ITEM DESCRIPTION
EST
QTY U/M UNIT PRICE AMOUNT
MOBILIZATION AND
DEMOBILIZATION 1 JOB FOR $
0002 CLEARING 1 JOB FOR $
0003 GRADED STONE “A”
0003AA FIRST 305,850 TONS 305,850 TONS $ $
0003AB OVER 308,850 TONS 203,900 TONS $ $
0004 GRADED STONE “C”
0004AA FIRST 59,550 TONS 59,550 TONS $ $
0004AB OVER 59,550 TONS 39,700 TONS $ $
DEMOLITION: STRUCTURE
REMOVAL 1 JOB FOR $
TOTAL $
"Revised by Amendment 0002"
W912EE-18-B-0007
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.3 LIQUIDATED DAMAGES-CONSTRUCTION
1.4 EXCEPTION TO LIQUIDATED DAMAGES
1.5 CONTRACT DRAWINGS AND SPECIFICATIONS
1.6 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
1.7 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR
PROCESSING DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
1.8 PERFORMANCE OF WORK BY THE CONTRACTOR
1.9 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
1.10 PHYSICAL DATA
1.11 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
1.12 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1.13 OBSTRUCTION OF NAVIGABLE WATERWAYS
1.14 CONSTRUCTION RESTRICTIONS AT HWY 80 BRIDGE
1.15 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
1.16 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
1.17 I-WATCH
1.18 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
1.19 SECURITY CLEARANCE/ACCESS PRIVILEGES
1.20 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
1.21 FOREIGN NATIONALS WORKING ON GOVERNMENT CONTRACTS
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
DOCUMENT 00 80 00.00 09 Page 1 Revised By Amendment 0002
SECTION 00 80 00.00 09
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP-1110-1-8 (2009) Construction Equipment Ownership and Operating Expense Schedule
1.2 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 567 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. (FAR 52.211-10)
No work shall be performed during the period of 23 December 2018 through 28 December 2018 and 22 December 2019 through 27 December 2019, inclusive, and such period has not been considered in computing the time allowed for completion.
Notice to proceed will issued on or about 7 January 2019 Due to major repairs ongoing at Columbia Lock, issuance of Notice to Proceed is anticipated to be delayed to approximately 15 February 2019 .
1.3 LIQUIDATED DAMAGES-CONSTRUCTION
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,029 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Termination clause. (FAR 52.211-12)
1.4 EXCEPTION TO LIQUIDATED DAMAGES
Since the Contractor's obligations specified in Section 32 92 04.00 09 EROSION CONTROL may extend beyond the completion time specified in paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, these periods and the additional work, if required, will be exempt from liquidated damages provided all other work has been completed.
DOCUMENT 00 80 00.00 09 Page 2
1.5 CONTRACT DRAWINGS AND SPECIFICATIONS
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall --
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general --
(1) Large-scale drawings shall govern small scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the INDEX TO DRAWINGS shown on Drawing No. G-001 entitled COVER SHEET.
(DFARS 252.236-7001)
1.6 CORRESPONDENCE AND ELECTRONIC COMMUNICATION
For ease and speed of communications, both the Government and Contractor shall exchange correspondence and all other documents duplicate in both hard paper copy and electronic format. Inclusion of an electronic copy is in addition to any other parts of the contract that may specify a minimum number of hard copies to be submitted, such as for shop drawing transmittals. Electronic submission can be accomplished by one of the following methods: email, file upload to the following website https://safe.amrdec.army.mil/SAFE, or through the Resident Management System Contractor Mode (RMS CM). Format for electronic submissions will be in portable document format (.pdf). File naming will be determined by the Contracting Officer and presented at the Preconstruction Conference.
Documents include all general correspondence, administrative plans, all material submittals including shop drawings, progress schedules, submittal registers, requests for information (RFIs), Quality Control (QC) test
DOCUMENT 00 80 00.00 09 Page 3 results, pay requests, etc. Paper documents will govern, in the event of discrepancy with the electronic version. Generally, paper documents will also govern where effective receipt dates are required, such as contractor claims submitted under the Disputes clause of the contract and progress payment requests. However in the case of administrative plans, shop drawings and other submittals transmitted for government review, both the electronic and hard copies are required to begin the review process, so the effective date of receipt will be the date when both the electronic and hard copies are received by the government.
1.7 (S-102) CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING
DAVIS-BACON ACT CERTIFIED LABOR PAYROLLS
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations. When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records (format at http://rmssupport.helpserve.com/) for export in an Excel spreadsheet to be imported into the Contractor's Resident Management System Contractor Mode (RMS CM), that in turn shall export payroll data to the Government's Resident Management System (RMS);
demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
DOCUMENT 00 80 00.00 09 Page 4
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
FAR 52.222-8 and FAR 52.222-13
1.8 PERFORMANCE OF WORK BY THE CONTRACTOR
The Contractor shall perform on the site and with its own organization, work equivalent to at least twenty (20) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government. (FAR 52.236-1)
1.9 WORK TO BE PERFORMED BY CONTRACTOR'S OWN ORGANIZATION
Within 10 days after award, the successful Bidder/Contractor must furnish the Contracting Officer a description of the items of work which will be performed with its own forces and the estimated cost of those items. (See paragraph PERFORMANCE OF WORK BY THE CONTRACTOR.)
1.10 PHYSICAL DATA
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and borings.
(b) Weather Conditions. Information with respect to temperatures and precipitation may be obtained from the National Weather Service.
(c) Transportation Facilities.
(1) Roads. Local roads serve the general area.
(2) Railroads. The Contractor is responsible for determining the availability of railroad service.
(d) Floods.
(1) High water stages or events are not to be considered a "flood," and damages resulting therefrom are not compensable under Section 01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS, paragraph DAMAGE TO WORK unless high water stages or events exceed 40 feet on the Monroe gage.
(e) Additional Data. Additional data consisting of additional cross sections, records of borings, and boring samples are available for inspection at:
U.S. Army Engineer District, Vicksburg
DOCUMENT 00 80 00.00 09 Page 5
4155 Clay Street Vicksburg, Mississippi 39183-3435
(FAR 52.236-4)
1.11 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION
(a) The Government will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item.
(1) Sixty percent of the lump sum price upon completion of the Contractor's mobilization at the work site.
(2) The remaining forty percent upon completion of demobilization.
(b) The Contracting Officer may require the Contractor to furnish cost data to justify this portion of the bid if the Contracting Officer believes that the percentages in subparagraphs (a)(1) and (2) of this clause do not bear a reasonable relation to the cost of the work in this contract.
(1) Failure to justify such price to the satisfaction of the Contracting Officer will result in payment, as determined by the Contracting Officer, of--
(i) Actual mobilization costs at completion of mobilization;
(ii) Actual demobilization costs at completion of demobilization;
and
(iii) The remainder of this item in the final payment under this contract.
(2) The Contracting Officer's determination of the actual costs in paragraph (b)(1) of this clause is not subject to appeal.
(DFARS 252.236-7004)
1.12 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
(a) This special contract requirement does not apply to terminations.
See 52.249-500, Basis for Settlement of Proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the Contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region III. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula
DOCUMENT 00 80 00.00 09 Page 6 provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the Contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(USACE Acquisition Instruction ("UAI") 31.105-101)
NOTE: EP-1110-1-8 , "Construction Equipment Ownership and Operating Expense Schedule" is available on the Internet at http://www.publications.usace.army.mil/USACEPublications/EngineerPamphlets.aspx, then search for EP 1110-1-8, then click on the link and then choose EP_1110-1-8_Vol-03.pdf or may be purchased from the Government Printing Office on CD-ROM by calling (202) 512-1800.
1.13 OBSTRUCTION OF NAVIGABLE WATERWAYS
(a) The Contractor shall-
(1) Promptly recover and remove any material, plant, machinery, or appliance which the Contractor loses, dumps, throws overboard, sinks, or misplaces, and which, in the opinion of the Contracting Officer, may be dangerous to or obstruct navigation;
(2) Give immediate notice, with description and locations of any such obstructions, to the Contracting Officer; and
(3) When required by the Contracting Officer, mark or buoy such obstructions until the same are removed.
(b) The Contracting Officer may--
(1) Remove the obstructions by contract or otherwise should the Contractor refuse, neglect, or delay compliance with paragraph (a) of this clause; and
(2) Deduct the cost of removal from any monies due or to become due to the Contractor; or
(3) Recover the cost of removal under the Contractor's bond.
(c) The Contractor's liability for the removal of a vessel wrecked or sunk without fault or negligence is limited to that provided in Sections 15, 19, and 20 of the River and Harbor Act of March 3, 1899 (33 U.S.C. 410 et. seq). (DFARS 52.236-7002)
DOCUMENT 00 80 00.00 09 Page 7
1.14 CONSTRUCTION RESTRICTIONS AT HWY 80 BRIDGE
a. Restrictions at Hwy 80 Bridge - The Louisiana Department of Transportation Development (LA DOTD) shall be notified not less than five (5) days prior to any operations within 100 feet (both upstream and downstream) of the Highway 80 bridge. Work within these limits shall be performed within the hours of 9:00 am and 3:00 pm each day.
No equipment or machinery shall be tied to or any contact made with the bridge piers or any other part of the bridge. Low steel on the centerline span is at approximate elevation (verify elevation) NAVD 1988.
b. Prior to Operations - Prior to any operations, the Contractor shall contact the DOTD for any requirements for construction operations, maintenance of traffic, etc. The Contractor shall be responsible for complying with these requirements and shall also absorb all associated costs in the existing bid items identified in the contract. POC for DOTD is:
Sam Hodge District Water Resources Engineer
(318) 342-0237 Samuel.Hodge@LA.GOV
1.15 VARIATION IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS
This variation in estimated quantities clause is applicable only to Item Nos. 0003 and 0004.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Item Nos. 0003 and 0004 is less than 85 percent of the quantity of the first sub-item listed under such item, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(c) If the actual quantity of work performed under Item Nos. 0003 and 0004 exceeds 115 percent or is less than 85 percent of the total estimated quantity of the sub-item under that item, and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Item Nos. 0003 and 0004 exceeds 115 percent or is less than 85 percent of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(UAI 52.211-5001)
1.16 SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
All Contractor employees (U.S. citizens and Non- U.S. citizens) working under this contract who require access to Automated Information Systems (AIS), (stand alone computers, network computers/systems, e-mail) shall, at
DOCUMENT 00 80 00.00 09 Page 8 a minimum, be designated into an ADP-III position (non-sensitive) in accordance with DoD 5220-22-R, Industrial Security Regulation. The investigative requirements for an ADP-III position are a favorable National Agency Check (NAC), SF-85P, Public Trust Position. The Contractor shall have each applicable employee complete a SF-85P and submit to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 within three (3) working days after award of any contract or task order, and shall be submitted prior to the individual being permitted access to an AIS.
Contractors that have a commercial or government entity (CAGE) Code and Facility Security Clearance through the Defense Security Service shall process the NACs and forward visit requests/results of NAC to the Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435. For those Contractors that do not have a CAGE Code or Facility Security Clearance, Security Officer, ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183-3435 Security Office will process the investigation in coordination with the Contractor and contract employees.
1.17 I-WATCH
The Contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.18 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
All Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
1.19 SECURITY CLEARANCE/ACCESS PRIVILEGES
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.20 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to
DOCUMENT 00 80 00.00 09 Page 9 ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.21 FOREIGN NATIONALS WORKING ON GOVERNMENT CONTRACTS
In order for a foreign national to be permitted to work on a Government contract, the Contractor must submit a letter requesting such to the Foreign Disclosure Officer (FDO). The FDO will conduct a disclosure review and provide a recommendation to the Contracting Officer. If the request is approved, the foreign national must be escorted at all times while on a Government property or work site. Letters should be mailed to Foreign Disclosure Officer (Carol Bridges), ATTN: CEMVK-PM, 4155 Clay Street, Vicksburg, MS 39183
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
DOCUMENT 00 80 00.00 09 Page 10
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PARTNERING
1.4 RIGHTS-OF-WAY
1.5 LAYOUT AND MARKING OF RIGHTS-OF-WAY
1.6 INITIAL SURVEYS AND QUANTITIES SURVEYS
1.7 MONITOR SURVEYS
1.8 COMPLIANCE SURVEYS
1.9 PRECONSTRUCTION CONFERENCE
1.10 SUBMITTAL OF SUBCONTRACTING PLAN
1.11 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.12 ORDER OF WORK
1.13 PROGRESS CHART
1.14 DESIGNATED BILLING OFFICE
1.15 PAYMENT INVOICES
1.16 TEMPORARY PROJECT FENCING
1.17 AS-BUILT DRAWINGS
1.18 PROJECT SIGN
1.19 MINIMUM REQUIRED INSURANCE
1.20 WORK IN QUARANTINED AREA
1.21 CERTIFICATES OF COMPLIANCE
1.22 PROCESS FOR OBTAINING CURRENT REQUIREMENTS OF THE U.S. ARMY CORPS
OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS MANUAL (EM 385-1-1)
1.23 SAFETY SIGN
1.24 ACCIDENT PREVENTION PLAN
1.25 DAILY INSPECTIONS
1.26 ACCIDENT INVESTIGATIONS AND REPORTING
1.27 MACHINERY AND MECHANIZED EQUIPMENT
1.28 VEHICLE WEIGHT LIMITATIONS
1.29 PUBLIC AND PRIVATE UTILITIES
1.30 DAMAGE TO WORK
1.31 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.32 CONTROL OF ACCESS TO CONSTRUCTION AREAS
1.33 MAINTENANCE OF TRAFFIC
1.34 HARBOR MAINTENANCE FEE
1.35 PERMISSIBLE HOURS OF OPERATION
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 00 00.00 09 Page 1
SECTION 01 00 00.00 09 Page 2
SECTION 01 00 00.00 09
GENERAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
19 CFR 24.24 Harbor Maintenance Fee
33 CFR 156 Oil and Hazardous Material Transfer Operations
1.2 SUBMITTALS
Government approval is required for all submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Accident Prevention Plan; G, GA
1.3 PARTNERING
The Government encourages formation of informal project partnerships on all projects. A project partnership strives to utilize a cooperative working relationship to jointly establish and effectively reach mutual project execution goals. The partnering process will in no way relax or stiffen the requirements of the contract, but will enhance the likelihood of success through improved working relationships. The possibility of an informal partnership may be discussed at the Pre-construction Conference for this project.
1.4 RIGHTS-OF-WAY
a. The rights-of-way for the work to be constructed under this contract, within the limits indicated on the drawings, will be provided by the Government without cost to the Contractor. If these rights-of-way are used by the Contractor, he shall, at his own expense, do all work necessary to make such rights-of-way suitable for traveling to and from the worksite. Upon completion of the Contractor's work, any such rights-of-way furnished by the Government shall be left in a
SECTION 01 00 00.00 09 Page 3 condition satisfactory to the Contracting Officer.
b. When so directed by the Contracting Officer, the Contractor shall, without expense to the Government and at any time during the progress of the work when it is not being actively used for contract operations, promptly vacate and clean up any part of the Government grounds or rights-of-way that have been allotted to or have been in use by the Contractor.
c. The Contractor shall not obstruct any existing roads on lands controlled by the United States except with written permission of the Contracting Officer and shall maintain such roads in as good condition as exists at the time of commencement of work under this contract.
d. The Contractor shall procure, without expense to the Government, all additional lands, access roads, or rights-of-way necessary for his use in the performance of the work or as required by his method of operation. The Contractor shall submit written evidence to the Contracting Officer that he has obtained the rights-of-way from the property owners. The written evidence shall consist of an authenticated copy of the conveyance under which the Contractor acquired such rights-of-way, prepared and executed in accordance with the laws of the State in which the land is located. The Contractor shall also obtain from the owners a release for the Government for any damages which may result from his use of such rights-of-way. The written conveyance and release shall be provided to the Government prior to use of Contractor obtained additional lands, access roads, or rights-of-way. If temporary rights-of-way are obtained by the Contractor the period of time for those rights shall coincide with Section 00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS, paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, plus a reasonable time for any extension granted for the completion of the work. Any agreements or permits with levee boards, counties, parishes, municipalities, or other political subdivisions for moving material and equipment will be the responsibility of the Contractor and shall be obtained at no expense to the Government. Any delays to the Contractor resulting from delays in procuring such additional lands, access roads, rights-of-way, or permits for moving material and equipment for his work under this contract will not be a basis for any claim for increase in the cost of this contract. The Contractor shall make his own investigations to determine the conditions, restrictions and difficulties which may be encountered in acquiring such rights-of-way and in the transportation of material and equipment. In addition, the Contractor shall be solely liable for any and all damages and claims of any nature whatsoever arising from or growing out of the acquisition and use of rights-of-way, etc., other than those furnished by the Government.
f. The Contractor shall repair at no expense to the Government, any and all damage to any existing roads when such damage is a result of his operations under this contract. (CEMVK-OC, 1989)
1.5 LAYOUT AND MARKING OF RIGHTS-OF-WAY
The Contractor shall layout and mark the rights-of-way limits as indicated on the drawings prior to beginning any other work, unless otherwise approved. The marking shall be placed at intervals approved by the Contracting Officer. The rights-of-way limits shall be marked by stakes, flagging or other approved means. The marking shall be highly visible from
SECTION 01 00 00.00 09 Page 4 a distance of at least 100 feet, and shall be maintained for the duration of the contract. If the rights-of-way marking should fade significantly in color, become damaged or lost as a result of the Contractor's operation or as a result of vandalism, or in any other way cease to function as a highly visible marker of the rights-of-way limits, the Contractor shall layout and restore the marking to the original condition. After all work is complete and upon approval of the Contracting Officer, the Contractor shall remove all marking. No separate payment will be made for layout, marking and maintaining the rights-of-way limits or for removing the marking.
1.6 INITIAL SURVEYS AND QUANTITIES SURVEYS
Prior to any construction of any definable feature of work, the Contractor shall locate the centerline and baseline stations as specified in the before-construction drawings, task order specifications, and/or as directed in the field by the Contracting Officer Representative. The surveys shall be under the direct supervision of a licensed surveyor with at least five years of hydrographic surveying experience, no less than 7 days before the work commences. Submit the name and address of the professional surveyor responsible for surveying to the Contracting Officer's Representitive prior to the start of survey activities. All Hydrographic surveys shall be conducted using multi-beam technology. The Contractor shall provide overbank surveys at each dig-in portion of the dike. Overbank survey shall extend 400 ft inland along the baseline and shall extend 75 ft each side of the Structural Azimuth Line. The Contractor shall layout the work and take the following surveys of placed stone for compliance with the grades, limits, and tolerances specified in the before-construction drawings, task order specifications, and/or as directed in the field by the Contracting Officer Representative.
Survey profiles, not to exceed 20 feet intervals, shall be taken and plotted to cover the area of the stone construction before stone placement begins. Survey cross-sections, not to exceed 100 feet intervals, shall be taken and plotted to cover the area of the stone construction before stone placement begins. Additional profiles and cross-sections shall be taken and plotted as necessary or as directed by the onsite Government Representative during construction operations. Complete electronic survey data files (.xyz, .txt File: (Point # Northing, Easting, Elevation), .dtm, etc.), copies of the field notes, plotted profiles and cross-sections, and quantity computations for all stone placement under this contract shall be furnished through the Contracting Officer's Representative for review and approval at least 7 calendar days ahead of the initial placement of any stone. Surveys mentioned above shall be provided as RAW data and processed in a 2 X 2 grid. Profiles and cross-sections taken more than 14 calendar days ahead of construction will not be acceptable.
1.7 MONITOR SURVEYS
Once stone placement has begun on the first dike, as shown in SECTION 01 15 00.00 09 GENERAL REQUIREMENTS, para. 3.2.1 Sequece, additional monitor surveys shall be taken of the next or subsequent dikes if stone placement of the next or subsequent dike begins more than 14 days after the initial surveys in para. INITIAL SURVEYS AND QUANTITIES SURVEYS. These monitor surveys shall also be performed before stone placement resumes after more than 14 days delay in stone placement operations. As directed by the Government Representative, if these monitor surveys indicate changed conditions from the initial surveys (para. INITIAL SURVEYS AND QUANTITIES SURVEYS), additional surveys shall be performed. Survey profiles not to exceed 20 feet intervals shall be taken and plotted to cover the area of
SECTION 01 00 00.00 09 Page 5 stone placement. Survey cross-sections not to exceed 100 feet intervals, shall be taken and plotted to cover the area before any additional stone placement begins. Additional profiles and cross-sections shall be taken and plotted as necessary or as directed by the on-site Government Representative during construction operations. Complete electronic survey data files (.xyz, .txt File: (Point # Northing, Easting, Elevation), .dtm, etc.), copies of the field notes, plotted profiles and cross-sections, and quantity computations for all stone placement under this contract shall be furnished through the Area Office to the Vicksburg District, Engineering Division, River Stabilization Section for review and approval at least 7 calendar days ahead of the initial placement of any stone.
1.8 COMPLIANCE SURVEYS
Survey profiles and cross-sections shall be taken and plotted of the completed stone placement daily or as directed by the Government Quality Assurance Representative. Copies of the field notes, plotted cross-sections, and quantity computations shall be furnished as requested by the Contracting Officer or his/her representative. The Contractor can utilize single beam or multi-beam technology hydrographic surveys to prepare daily compliance surveys; however, the Contractor will not be allowed to place Stone "C" above Stone "A" as shown in the construction drawings without multi-beam surveys to ensure that the entire length of underwater revetment is constructed to grade at and between cross sections. Complete electronic survey data as indicated in Paragraph INITIAL SURVEYS AND QUANTITIES SURVEYS shall be provided to the Engineer for review and approval.
The profiles and cross-sections shall be plotted on 10 x 10 cross-section tracing paper to a scale of 1-inch = 20 feet vertical and horizontal. The profiles and cross-sections shall be plotted with the profiles and corresponding vertical and horizontal scales at the top of the sheet. The horizontal stationing for the profiles shall be plotted with increasing stationing running as if looking upstream. The cross-sections with corresponding vertical and horizontal scales shall be plotted beneath the profile directly under the corresponding stationing of the profile. The area of daily stone placement shall be identified by coloring the area of placement with alternating color pencils. The right and left sides of the cross-section shall conform with the direction of the increasing stations.
Horizontal distance shall be shown on the top margin in distances of 100 feet, and datum shown on the appropriate horizontal lines. The cross-sections shall be identified by station number under each section.
Approximately one foot shall be left void at each end of the roll. Near each end of the roll, pertinent information shall be shown, including job name, item number, inclusive stations, contract number, completion data and name of inspector. Sections plotted by the electronic plotter will be acceptable. Pencil work shall be of such firmness and line weight that a good reproduction may be obtained.
1.9 PRECONSTRUCTION CONFERENCE
a. A preconstruction conference will be arranged by the Area Engineer as soon after contract award as possible, and the conference will be conducted before work is allowed to commence. The Area Engineer will notify the Contractor of the time, date, and location for the meeting.
At this conference, the Contractor will be oriented with respect to contract administration procedures, lines of authority, and construction matters. All known subcontractors performing at least 20 percent of the contract are required to attend this conference.
SECTION 01 00 00.00 09 Page 6
Additional conferences may be established by the Area Engineer for any major subcontractors unknown at the time of the initial conference.
b. Submission by the Contractor of the items listed below will determine the date of the conference. The following items shall be submitted to the Area Engineer in hard copy and electronic (pdf) format for review at least seven (7) calendar days prior to the preconstruction conference:
(1) Accident Prevention Plan
(2) Quality Control Plan
(3) Environmental Protection Plan
(4) Six copies of the certified Small Construction Notice of Intent (SCNOI) for each site
c. The Contractor shall bring to this conference, in completed form, the following:
(1) Letter of superintendent appointment and authority
(2) List of subcontractors
d. The Contractor should bring to this conference, or at least be prepared to discuss, the following:
(1) Submittal register
(2) Progress chart or Network Analysis System (as applicable)
e. Minutes of this conference will be taken and prepared by the Area Engineer and sent to the Contractor for his concurrence and signature.
1.10 SUBMITTAL OF SUBCONTRACTING PLAN
a. This paragraph does not apply to small business concerns.
b. After bid opening, and within 7 days, the apparent low bidder, upon telephone notification by the Small and Disadvantaged Business Utilization Specialist, shall submit a Small and Disadvantaged Business Subcontracting Plan. The plan shall be submitted in accordance with the Contract Clauses SMALL BUSINESS SUBCONTRACTING PLAN - ALTERNATE I.
The person responsible for administering the plan shall be named in paragraph AGENT FOR SUBMITTING SMALL BUSINESS SUBCONTRACTING PLAN of the Representations and Certifications.
1.11 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
At least 7 days before beginning work, and at least one day before resuming work after a period of 7 days or more when no work has been performed, the Contractor shall notify U.S. Army Corps of Engineers, Mr. Robin Blake, Chief, Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032, telephone (318) 336-5226.
1.12 ORDER OF WORK
The work shall be carried on in accordance with the Progress Chart
SECTION 01 00 00.00 09 Page 7
(schedule) required by paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS. In preparing the Progress Chart (schedule), the Contractor shall adhere to the following order of work:
a. All construction shall begin at the upstream end of the job and proceed to the downstream end unless otherwise directed by the Contracting Officer.
b. Debris, tree removal, and clearing.
c. Construction of the longitudinal stonefill revetment shall be from the river unless otherwise directed by the Contracting Officer.
d. Construction of the stone paving.
e. Erosion control shall follow, as closely as practicable, completion of all other work in the area to receive erosion control.
a. All construction shall begin at the upstream end of the job and proceed to the downstream end unless otherwise directed by the Contracting Officer.
b. Debris, tree removal, and clearing along the water's edge in advance of Stone "A" placement. Clearing shall be limited to sufficient area to install Stone "A" as indicated on the contract drawings.
c. Construction of Stone "A" in no less than 1000 lf reaches.
d. Complete required multi-beam surveys.
e. Debris, tree removal, and clearing on upper bank in advance of Stone "C" placement.
f. Construction of Stone "C".
g. Erosion Control and other environmental protection features shall be installed in advance of or as soon as practical upon need for the required protection features. Erosion control on cleared or disturbed sections of bank without stone protection shall be addressed as required in advance of heavy rain events when stone placement work is suspended or delayed.
1.13 PROGRESS CHART
The progress chart required by provisions of paragraph (a) of the Contract Clause SCHEDULES FOR CONSTRUCTION CONTRACTS shall be prepared on ENG FORM 2454, copies of which will be furnished to the Contractor by the Government. Three (3) copies of the schedule will be required. The Progress Chart shall be updated by the Contractor monthly and submitted in accordance with paragraph PAYMENT INVOICES.
1.14 DESIGNATED BILLING OFFICE
The designated billing office for this contract shall be U.S. Army Corps of Engineers, Vidalia Area Office, 100 Advocate Row, Vidalia, Louisiana 71373-3032.
SECTION 01 00 00.00 09 Page 8
1.15 PAYMENT INVOICES
a. The Federal Acquisition Regulation requires that the "REMIT TO" address on the invoice match the "REMIT TO" address on the contract or a proper notice of assignment. The Payment Office will verify a match of the "REMIT TO" address in the contract and Contractor’s invoice prior to payment. If the addresses do not match, the invoice will be determined improper and returned to the Contractor for correction and resubmission. If an invoice is improperly returned, the original invoice receipt date shall be used as the basis for determining interest to be paid in accordance with the PROMPT PAYMENT ACT.
b. Among other things, the Contract Clause PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS requires that a proper invoice for payment include substantiation of the amounts requested. As required in Office of Management and Budget, Circular A-125 (Rev.), PROMPT PAYMENT, dated December 12, 1989, substantiation of the amount requested for progress payments under construction contracts includes the following:
(1) An itemization of the amounts requested related to the various elements of work required by the contract covered by the payment request;
(2) A listing of the amount included for work performed by each subcontractor under the contract;
(3) A listing of the total amount of each subcontract under the contract;
(4) A listing of the amounts previously paid to each such subcontractor under the contract; and,
(5) Additional supporting data in a form and detail required by the Contracting Officer.
(6) Updated ENG Form 2454 Progress Chart.
c. Failure to include the above information in a Contractor’s invoice will result in the invoice being considered defective under the provisions of the PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS clause of the contract, and it will be returned to the Contractor for correction and resubmission. (CEMVK-OC, 1997)
1.16 TEMPORARY PROJECT FENCING
Temporary project fencing as required by Section 4, "Temporary Facilities", paragraph 04.A.04 of EM…