- Solicitation number
- W912EE-17-R-0010
About this file
Please use the attached Bid Schedule to submit bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| bid_schedule_REV1.pdf | ||
| AMENDMENT02.pdf | ||
| amendment_01.pdf | ||
| A22_SOLICITATION_W912EE-17-R-0010_final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE FOR W912EE-17-R-0010
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
TOTAL
AMOUNT
Base Year
Operation, Maintenance, Inspection Repair, Reconstruction and Rehabilitation of project facilities and features managed by the U.S. Army Corps of
Engineers Vicksburg District, Mississippi Lakes-
Arkabutla Lake, Enid Lake, Grenada Lake and Sardis
Lake in accordance with the statements of work
(Section C) and Contractor’s proposal dated
___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
Officer prior to the expiration date of the contract.
SCHEDULE 1 - BASE YEAR PERIOD
0001AA
ARKABUTLA TOTAL ESTIMATED COST
(CPFF) - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated
Cost) Offerors shall insert percentage here:
Year
Estimated
Cost
Fixed Fee
(This should be the total of the estimated cost plus the fixed fee)
0001AB
ARKABUTLA GOVERNMENT REQUESTED
PROCURE (CPFF) - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General (Cost estimate provided by the Government).
be the total of the estimated
0001AC
ARKABUTLA MOWING AND TRIMING (FFP) -
BASE YEAR - MOWING & TRIMMING
SERVICES - FIRM FIXED PRICE (FFP), reference
C.7.3.1, for ARKABUTLA LAKE SHALL BE
PERFORMED AS DIRECTED BY THE
CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
Each
0001AD
ARKABUTLA JANITORIAL (FFP) - BASE YEAR
- JANITORIAL SERVICES reference C.7.4.11, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR)
0001BA
ENID TOTAL ESTIMATED COST (CPFF) -
Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001BB
ENID GOVERNMENT REQUESTED PROCURE
(CPFF) - COST REIMBURSABLE MATERIALS,
SUPPLIES, AND SERVICES ALLOWANCE of
Equipment, Materials, Supplies, and Services for the
Government General (Cost estimate provided by the
Government).
be the total of the estimated
0001BC
ENID MOWING AND TRIMING (FFP) - BASE
YEAR - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ENID LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE
0001BD
ENID JANITORIAL (FFP) - BASE YEAR -
JANITORIAL SERVICES reference C.7.4.11, for
ENID LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
0001CA
GRENADA TOTAL ESTIMATED COST (CPFF) -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001CB
GRENADA GOVERNMENT REQUESTED
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0001CC
GRENADA MOWING AND TRIMING (FFP) -
BASE YEAR - MOWING & TRIMMING
SERVICES - FIRM FIXED PRICE (FFP), reference
C.7.3.1, for GRENADA LAKE SHALL BE
PERFORMED AS DIRECTED BY THE
0001CD
GRENADA JANITORIAL (FFP) - BASE YEAR -
GRENADA LAKE SHALL BE PERFORMED AS
0001DA
SARDIS TOTAL ESTIMATED COST (CPFF) -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001DB
SARDIS GOVERNMENT REQUESTED
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0001DC
SARDIS MOWING AND TRIMING (FFP) - BASE
YEAR - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
SARDIS LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0001DD
SARDIS JANITORIAL (FFP) - BASE YEAR -
SARDIS LAKE SHALL BE PERFORMED AS
REPRESENTATIVE (COR)
BASE YEAR TOTAL AMOUNT
Option
Year 1 and features managed by the U.S. Army Corps of
Engineers Vicksburg District, Mississippi Lakes-
Arkabutla Lake, Enid Lake, Grenada Lake and Sardis
Lake in accordance with the statements of work
(Section C) and Contractor’s proposal dated
___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 2 - OPTION YEAR 1 PERIOD
0002AA
(CPFF) – OY1 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total
Estimated Cost) Offerors shall insert percentage here:
be the total of the estimated
0002AB
PROCURE (CPFF) – OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General
(Cost estimate provided by the Government).
be the total of the estimated
0002AC
ARKABUTLA MOWING AND TRIMING (FFP) –
OY1 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE
0002AD
ARKABUTLA JANITORIAL (FFP) – OY1 -
ARKABUTLA LAKE SHALL BE PERFORMED
0002BA
ENID TOTAL ESTIMATED COST (CPFF) – OY1 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0002BB
(CPFF) – OY1 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0002BC
ENID MOWING AND TRIMING (FFP) – OY1 -
MOWING & TRIMMING SERVICES - FIRM
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0002BD
ENID JANITORIAL (FFP) – OY1 - JANITORIAL
SERVICES reference C.7.4.11, for ENID LAKE
SHALL BE PERFORMED AS DIRECTED BY THE
0002CA
GRENADA TOTAL ESTIMATED COST (CPFF) –
OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0002CB
PROCURE (CPFF) – OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0002CC
GRENADA MOWING AND TRIMING (FFP) –
OY1 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0002CD
GRENADA JANITORIAL (FFP) – OY1 -
GRENADA LAKE SHALL BE PERFORMED AS
0002DA
SARDIS TOTAL ESTIMATED COST (CPFF) –
OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0002DB
PROCURE (CPFF)- OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0002DC
SARDIS MOWING AND TRIMING (FFP) – OY1 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0002DD
SARDIS JANITORIAL (FFP) – OY1 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 1 TOTAL
Year 2 and features managed by the U.S. Army Corps of
Engineers Vicksburg District, Mississippi Lakes-
Arkabutla Lake, Enid Lake, Grenada Lake and Sardis
Lake in accordance with the statements of work
(Section C) and Contractor’s proposal dated
___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 3 - OPTION YEAR 2 PERIOD
0003AA
(CPFF) – OY2 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0003AB
PROCURE (CPFF) – OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003AC
OY2 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0003AD
ARKABUTLA JANITORIAL (FFP) – OY2 -
ARKABUTLA LAKE SHALL BE PERFORMED
0003BA
ENID TOTAL ESTIMATED COST (CPFF) – OY2 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0003BB
(CPFF) – OY2 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0003BC
ENID MOWING AND TRIMING (FFP) – OY2 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0003BD
ENID JANITORIAL (FFP) – OY2 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0003CA
OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0003CB
PROCURE (CPFF) – OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003CC
OY2 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0003CD
GRENADA JANITORIAL (FFP) – OY2 -
GRENADA LAKE SHALL BE PERFORMED AS
0003DA
OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0003DB
PROCURE (CPFF)- OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003DC
SARDIS MOWING AND TRIMING (FFP) – OY2 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0003DD
SARDIS JANITORIAL (FFP) – OY2 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 2 TOTAL
Year 3 and features managed by the U.S. Army Corps of
Engineers Vicksburg District, Mississippi Lakes-
Arkabutla Lake, Enid Lake, Grenada Lake and Sardis
Lake in accordance with the statements of work
(Section C) and Contractor’s proposal dated
___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 4 - OPTION YEAR 3 PERIOD
0004AA
(CPFF) – OY3 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0004AB
PROCURE (CPFF) – OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004AC
OY3 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0004AD
ARKABUTLA JANITORIAL (FFP) – OY3 -
ARKABUTLA LAKE SHALL BE PERFORMED
0004BA
ENID TOTAL ESTIMATED COST (CPFF) – OY3 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0004BB
(CPFF) – OY3 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0004BC
ENID MOWING AND TRIMING (FFP) – OY3 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0004BD
ENID JANITORIAL (FFP) – OY3 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0004CA
OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0004CB
PROCURE (CPFF) – OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004CC
OY3 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0004CD
GRENADA JANITORIAL (FFP) – OY3 -
GRENADA LAKE SHALL BE PERFORMED AS
0004DA
OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0004DB
PROCURE (CPFF)- OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004DC
SARDIS MOWING AND TRIMING (FFP) – OY3 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0004DD
SARDIS JANITORIAL (FFP) – OY3 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 3 TOTAL
Year 4 and features managed by the U.S. Army Corps of
Engineers Vicksburg District, Mississippi Lakes-
Arkabutla Lake, Enid Lake, Grenada Lake and Sardis
Lake in accordance with the statements of work
(Section C) and Contractor’s proposal dated
___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 5 - OPTION YEAR 4 PERIOD
0005AA
(CPFF) – OY4 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0005AB
PROCURE (CPFF) – OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005AC
OY4 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0005AD
ARKABUTLA JANITORIAL (FFP) – OY4 -
ARKABUTLA LAKE SHALL BE PERFORMED
0005BA
ENID TOTAL ESTIMATED COST (CPFF) – OY4 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0005BB
(CPFF) – OY4 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0005BC
ENID MOWING AND TRIMING (FFP) – OY4 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0005BD
ENID JANITORIAL (FFP) – OY4 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0005CA
OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0005CB
PROCURE (CPFF) – OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005CC
OY4 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0005CD
GRENADA JANITORIAL (FFP) – OY4 -
GRENADA LAKE SHALL BE PERFORMED AS
0005DA
OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed
$________. (Not to exceed 7% of Total Estimated be the total of the estimated
0005DB
PROCURE (CPFF)- OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005DC
SARDIS MOWING AND TRIMING (FFP) – OY4 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0005DD
SARDIS JANITORIAL (FFP) – OY4 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 4 TOTAL
BASE + 4 OPTION YEARS TOTAL