BID SCHEDULE FOR W912EE-17-R-0010

ITEM NO.

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

TOTAL

AMOUNT

Base Year

Operation, Maintenance, Inspection Repair, Reconstruction and Rehabilitation of project facilities and features managed by the U.S. Army Corps of

Engineers Vicksburg District, Mississippi Lakes-

Arkabutla Lake, Enid Lake, Grenada Lake and Sardis

Lake in accordance with the statements of work

(Section C) and Contractor’s proposal dated

___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting

Officer prior to the expiration date of the contract.

SCHEDULE 1 - BASE YEAR PERIOD

0001AA

ARKABUTLA TOTAL ESTIMATED COST

(CPFF) - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated

Cost) Offerors shall insert percentage here:

Year

Estimated

Cost

Fixed Fee

(This should be the total of the estimated cost plus the fixed fee)

0001AB

ARKABUTLA GOVERNMENT REQUESTED

PROCURE (CPFF) - COST REIMBURSABLE

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General (Cost estimate provided by the Government).

be the total of the estimated

0001AC

ARKABUTLA MOWING AND TRIMING (FFP) -

BASE YEAR - MOWING & TRIMMING

SERVICES - FIRM FIXED PRICE (FFP), reference

C.7.3.1, for ARKABUTLA LAKE SHALL BE

PERFORMED AS DIRECTED BY THE

CONTRACTING OFFICER'S REPRESENTATIVE

(COR).

Each

0001AD

ARKABUTLA JANITORIAL (FFP) - BASE YEAR

- JANITORIAL SERVICES reference C.7.4.11, for

ARKABUTLA LAKE SHALL BE PERFORMED

AS DIRECTED BY THE CONTRACTING

OFFICER'S REPRESENTATIVE (COR)

0001BA

ENID TOTAL ESTIMATED COST (CPFF) -

Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0001BB

ENID GOVERNMENT REQUESTED PROCURE

(CPFF) - COST REIMBURSABLE MATERIALS,

SUPPLIES, AND SERVICES ALLOWANCE of

Equipment, Materials, Supplies, and Services for the

Government General (Cost estimate provided by the

Government).

be the total of the estimated

0001BC

ENID MOWING AND TRIMING (FFP) - BASE

YEAR - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

ENID LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

REPRESENTATIVE

0001BD

ENID JANITORIAL (FFP) - BASE YEAR -

JANITORIAL SERVICES reference C.7.4.11, for

ENID LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR).

0001CA

GRENADA TOTAL ESTIMATED COST (CPFF) -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0001CB

GRENADA GOVERNMENT REQUESTED

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0001CC

GRENADA MOWING AND TRIMING (FFP) -

BASE YEAR - MOWING & TRIMMING

SERVICES - FIRM FIXED PRICE (FFP), reference

C.7.3.1, for GRENADA LAKE SHALL BE

PERFORMED AS DIRECTED BY THE

0001CD

GRENADA JANITORIAL (FFP) - BASE YEAR -

GRENADA LAKE SHALL BE PERFORMED AS

0001DA

SARDIS TOTAL ESTIMATED COST (CPFF) -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0001DB

SARDIS GOVERNMENT REQUESTED

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0001DC

SARDIS MOWING AND TRIMING (FFP) - BASE

YEAR - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

SARDIS LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

0001DD

SARDIS JANITORIAL (FFP) - BASE YEAR -

SARDIS LAKE SHALL BE PERFORMED AS

REPRESENTATIVE (COR)

BASE YEAR TOTAL AMOUNT

Option

Year 1 and features managed by the U.S. Army Corps of

Engineers Vicksburg District, Mississippi Lakes-

Arkabutla Lake, Enid Lake, Grenada Lake and Sardis

Lake in accordance with the statements of work

(Section C) and Contractor’s proposal dated

___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting

SCHEDULE 2 - OPTION YEAR 1 PERIOD

0002AA

(CPFF) – OY1 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total

Estimated Cost) Offerors shall insert percentage here:

be the total of the estimated

0002AB

PROCURE (CPFF) – OY1 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General

(Cost estimate provided by the Government).

be the total of the estimated

0002AC

ARKABUTLA MOWING AND TRIMING (FFP) –

OY1 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

ARKABUTLA LAKE SHALL BE PERFORMED

AS DIRECTED BY THE CONTRACTING

OFFICER'S REPRESENTATIVE

0002AD

ARKABUTLA JANITORIAL (FFP) – OY1 -

ARKABUTLA LAKE SHALL BE PERFORMED

0002BA

ENID TOTAL ESTIMATED COST (CPFF) – OY1 -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0002BB

(CPFF) – OY1 - COST REIMBURSABLE

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0002BC

ENID MOWING AND TRIMING (FFP) – OY1 -

MOWING & TRIMMING SERVICES - FIRM

FIXED PRICE (FFP), reference C.7.3.1, for ENID

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0002BD

ENID JANITORIAL (FFP) – OY1 - JANITORIAL

SERVICES reference C.7.4.11, for ENID LAKE

SHALL BE PERFORMED AS DIRECTED BY THE

0002CA

GRENADA TOTAL ESTIMATED COST (CPFF) –

OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0002CB

PROCURE (CPFF) – OY1 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0002CC

GRENADA MOWING AND TRIMING (FFP) –

OY1 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

GRENADA LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

0002CD

GRENADA JANITORIAL (FFP) – OY1 -

GRENADA LAKE SHALL BE PERFORMED AS

0002DA

SARDIS TOTAL ESTIMATED COST (CPFF) –

OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0002DB

PROCURE (CPFF)- OY1 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0002DC

SARDIS MOWING AND TRIMING (FFP) – OY1 -

FIXED PRICE (FFP), reference C.7.3.1, for SARDIS

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0002DD

SARDIS JANITORIAL (FFP) – OY1 -

SARDIS LAKE SHALL BE PERFORMED AS

OPTION YEAR 1 TOTAL

Year 2 and features managed by the U.S. Army Corps of

Engineers Vicksburg District, Mississippi Lakes-

Arkabutla Lake, Enid Lake, Grenada Lake and Sardis

Lake in accordance with the statements of work

(Section C) and Contractor’s proposal dated

___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting

SCHEDULE 3 - OPTION YEAR 2 PERIOD

0003AA

(CPFF) – OY2 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated

0003AB

PROCURE (CPFF) – OY2 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0003AC

OY2 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

ARKABUTLA LAKE SHALL BE PERFORMED

AS DIRECTED BY THE CONTRACTING

0003AD

ARKABUTLA JANITORIAL (FFP) – OY2 -

ARKABUTLA LAKE SHALL BE PERFORMED

0003BA

ENID TOTAL ESTIMATED COST (CPFF) – OY2 -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0003BB

(CPFF) – OY2 - COST REIMBURSABLE

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0003BC

ENID MOWING AND TRIMING (FFP) – OY2 -

FIXED PRICE (FFP), reference C.7.3.1, for ENID

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0003BD

ENID JANITORIAL (FFP) – OY2 - JANITORIAL

SHALL BE PERFORMED AS DIRECTED BY THE

0003CA

OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0003CB

PROCURE (CPFF) – OY2 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0003CC

OY2 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

GRENADA LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

0003CD

GRENADA JANITORIAL (FFP) – OY2 -

GRENADA LAKE SHALL BE PERFORMED AS

0003DA

OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0003DB

PROCURE (CPFF)- OY2 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0003DC

SARDIS MOWING AND TRIMING (FFP) – OY2 -

FIXED PRICE (FFP), reference C.7.3.1, for SARDIS

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0003DD

SARDIS JANITORIAL (FFP) – OY2 -

SARDIS LAKE SHALL BE PERFORMED AS

OPTION YEAR 2 TOTAL

Year 3 and features managed by the U.S. Army Corps of

Engineers Vicksburg District, Mississippi Lakes-

Arkabutla Lake, Enid Lake, Grenada Lake and Sardis

Lake in accordance with the statements of work

(Section C) and Contractor’s proposal dated

___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting

SCHEDULE 4 - OPTION YEAR 3 PERIOD

0004AA

(CPFF) – OY3 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated

0004AB

PROCURE (CPFF) – OY3 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0004AC

OY3 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

ARKABUTLA LAKE SHALL BE PERFORMED

AS DIRECTED BY THE CONTRACTING

0004AD

ARKABUTLA JANITORIAL (FFP) – OY3 -

ARKABUTLA LAKE SHALL BE PERFORMED

0004BA

ENID TOTAL ESTIMATED COST (CPFF) – OY3 -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0004BB

(CPFF) – OY3 - COST REIMBURSABLE

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0004BC

ENID MOWING AND TRIMING (FFP) – OY3 -

FIXED PRICE (FFP), reference C.7.3.1, for ENID

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0004BD

ENID JANITORIAL (FFP) – OY3 - JANITORIAL

SHALL BE PERFORMED AS DIRECTED BY THE

0004CA

OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0004CB

PROCURE (CPFF) – OY3 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0004CC

OY3 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

GRENADA LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

0004CD

GRENADA JANITORIAL (FFP) – OY3 -

GRENADA LAKE SHALL BE PERFORMED AS

0004DA

OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0004DB

PROCURE (CPFF)- OY3 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0004DC

SARDIS MOWING AND TRIMING (FFP) – OY3 -

FIXED PRICE (FFP), reference C.7.3.1, for SARDIS

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0004DD

SARDIS JANITORIAL (FFP) – OY3 -

SARDIS LAKE SHALL BE PERFORMED AS

OPTION YEAR 3 TOTAL

Year 4 and features managed by the U.S. Army Corps of

Engineers Vicksburg District, Mississippi Lakes-

Arkabutla Lake, Enid Lake, Grenada Lake and Sardis

Lake in accordance with the statements of work

(Section C) and Contractor’s proposal dated

___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting

SCHEDULE 5 - OPTION YEAR 4 PERIOD

0005AA

(CPFF) – OY4 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated

0005AB

PROCURE (CPFF) – OY4 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0005AC

OY4 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

ARKABUTLA LAKE SHALL BE PERFORMED

AS DIRECTED BY THE CONTRACTING

0005AD

ARKABUTLA JANITORIAL (FFP) – OY4 -

ARKABUTLA LAKE SHALL BE PERFORMED

0005BA

ENID TOTAL ESTIMATED COST (CPFF) – OY4 -

substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0005BB

(CPFF) – OY4 - COST REIMBURSABLE

MATERIALS, SUPPLIES, AND SERVICES

ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated

0005BC

ENID MOWING AND TRIMING (FFP) – OY4 -

FIXED PRICE (FFP), reference C.7.3.1, for ENID

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0005BD

ENID JANITORIAL (FFP) – OY4 - JANITORIAL

SHALL BE PERFORMED AS DIRECTED BY THE

0005CA

OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0005CB

PROCURE (CPFF) – OY4 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0005CC

OY4 - MOWING & TRIMMING SERVICES -

FIRM FIXED PRICE (FFP), reference C.7.3.1, for

GRENADA LAKE SHALL BE PERFORMED AS

DIRECTED BY THE CONTRACTING OFFICER'S

0005CD

GRENADA JANITORIAL (FFP) – OY4 -

GRENADA LAKE SHALL BE PERFORMED AS

0005DA

OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost

(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed

$________. (Not to exceed 7% of Total Estimated be the total of the estimated

0005DB

PROCURE (CPFF)- OY4 - COST

REIMBURSABLE MATERIALS, SUPPLIES, AND

SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated

0005DC

SARDIS MOWING AND TRIMING (FFP) – OY4 -

FIXED PRICE (FFP), reference C.7.3.1, for SARDIS

LAKE SHALL BE PERFORMED AS DIRECTED

BY THE CONTRACTING OFFICER'S

0005DD

SARDIS JANITORIAL (FFP) – OY4 -

SARDIS LAKE SHALL BE PERFORMED AS

OPTION YEAR 4 TOTAL

BASE + 4 OPTION YEARS TOTAL