AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference solicitation number W912ee-17-R-0010 for Inspection, Operation, Maintenance, Repair, Reconstruction and Rehabilitation of Project Facilities and Features Managed by the US Army Corps of Engineers, Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake. The purpose of this amendment is as follow s:
See continuation page for details
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE17R0010
X 9B. DATED (SEE ITEM 11)
13-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2017
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EE17R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
SUBCLIN 0001AE
The contract type CPFF has been deleted.
The CLIN description has changed from ARKABUTLA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
BASE YEAR - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ARKABUTLA
LAKE
To:
The unit of issue Job has been deleted.
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 561210 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AE
THIS SUBCLIN HAS BEEN CANCELLED
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
SUBCLIN 0001BE
The CLIN description has changed from ENID TOTAL OF COSTS, FEES AND
PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
BASE YEAR TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ENID LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0001BE
SUBCLIN 0001CE
The CLIN description has changed from GRENADA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
BASE YEAR - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR GRENADA LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0001CE
SUBCLIN 0001DE
The CLIN description has changed from SARDIS TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
BASE YEAR - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR SARDIS LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0001DE
SUBCLIN 0002AE
The CLIN description has changed from ARKABUTLA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 1 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ARKABUTLA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0002AE
OPTION THIS SUBCLIN HAS BEEN CANCELLED
SUBCLIN 0002BE
The CLIN description has changed from ENID TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 1 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ENID LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0002BE
SUBCLIN 0002CE
The CLIN description has changed from GRENADA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 1 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR GRENADA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0002CE
SUBCLIN 0002DE
The CLIN description has changed from SARDIS TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 1 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR SARDIS LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0002DE
SUBCLIN 0003AE
The CLIN description has changed from ARKABUTLA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 2 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ARKABUTLA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0003AE
SUBCLIN 0003BE
The CLIN description has changed from ENID TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 2 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ENID LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0003BE
SUBCLIN 0003CE
The CLIN description has changed from GRENADA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 2 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR GRENADA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0003CE
SUBCLIN 0003DE
The CLIN description has changed from SARDIS TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 2- TOTAL OF COSTS, FEES, AND PROCURMENTS FOR SARDIS LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0003DE
SUBCLIN 0004AE
The CLIN description has changed from ARKABUTLA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 3 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ARKABUTLA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0004AE
SUBCLIN 0004BE
The CLIN description has changed from ENID TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 3 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ENID LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0004BE
SUBCLIN 0004CE
The CLIN description has changed from GRENADA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 3 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR GRENADA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0004CE
SUBCLIN 0004DE
The CLIN description has changed from SARDIS TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 3 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR SARDIS LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0004DE
SUBCLIN 0005AE
The CLIN description has changed from ARKABUTLA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 4 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ARKABUTLA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0005AE
SUBCLIN 0005BE
The CLIN description has changed from ENID TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 4 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR ENID LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0005BE
SUBCLIN 0005CE
The CLIN description has changed from GRENADA TOTAL OF COSTS, FEES AND PROCU to THIS SUBCLIN HAS BEEN CANCELLED.
The CLIN extended description has changed from:
OPTION YEAR 4 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR GRENADA
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0005CE
SUBCLIN 0005DE
The CLIN description has changed from SARDIS TOTAL OF COSTS, FEES AND PROCU to THIS
SUBCLIN HAS BEEN CANCELLED.
OPTION YEAR 4 - TOTAL OF COSTS, FEES, AND PROCURMENTS FOR SARDIS LAKE
The FSC code Z1HB has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
0005DE
The following have been added by full text:
BID SCHEDULE
BID SCHEDULE FOR W912EE-17-R-0010
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
TOTAL
AMOUNT
Base Year
Operation, Maintenance, Inspection Repair, Reconstruction and Rehabilitation of project facilities and features managed by the U.S. Army Corps of Engineers Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake in accordance with the statements of work (Section C) and Contractor’s proposal dated ___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting Officer prior to the expiration date of the contract.
SCHEDULE 1 - BASE YEAR PERIOD
0001AA
ARKABUTLA TOTAL ESTIMATED COST
(CPFF) - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated Cost) Offerors shall insert percentage here:
Year
Estimated Cost
Fixed Fee
(This should be the total of the estimated cost plus the fixed fee)
0001AB
ARKABUTLA GOVERNMENT REQUESTED
PROCURE (CPFF) - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General (Cost estimate provided by the Government).
be the total of the estimated
0001AC
ARKABUTLA MOWING AND TRIMING (FFP) -
BASE YEAR - MOWING & TRIMMING
SERVICES - FIRM FIXED PRICE (FFP), reference C.7.3.1, for ARKABUTLA LAKE SHALL BE
PERFORMED AS DIRECTED BY THE
CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
Each
0001AD
ARKABUTLA JANITORIAL (FFP) - BASE YEAR
- JANITORIAL SERVICES reference C.7.4.11, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE (COR)
0001BA
ENID TOTAL ESTIMATED COST (CPFF) -
Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001BB
ENID GOVERNMENT REQUESTED PROCURE
(CPFF) - COST REIMBURSABLE MATERIALS,
SUPPLIES, AND SERVICES ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General (Cost estimate provided by the Government).
be the total of the estimated
0001BC
ENID MOWING AND TRIMING (FFP) - BASE
YEAR - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ENID LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE
0001BD
ENID JANITORIAL (FFP) - BASE YEAR -
JANITORIAL SERVICES reference C.7.4.11, for
ENID LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
0001CA
GRENADA TOTAL ESTIMATED COST (CPFF) -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001CB
GRENADA GOVERNMENT REQUESTED
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0001CC
GRENADA MOWING AND TRIMING (FFP) -
BASE YEAR - MOWING & TRIMMING
SERVICES - FIRM FIXED PRICE (FFP), reference C.7.3.1, for GRENADA LAKE SHALL BE
PERFORMED AS DIRECTED BY THE
0001CD
GRENADA JANITORIAL (FFP) - BASE YEAR -
GRENADA LAKE SHALL BE PERFORMED AS
0001DA
SARDIS TOTAL ESTIMATED COST (CPFF) -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0001DB
SARDIS GOVERNMENT REQUESTED
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0001DC
SARDIS MOWING AND TRIMING (FFP) - BASE
YEAR - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
SARDIS LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0001DD
SARDIS JANITORIAL (FFP) - BASE YEAR -
SARDIS LAKE SHALL BE PERFORMED AS
REPRESENTATIVE (COR)
BASE YEAR TOTAL AMOUNT
Option Year 1
Reconstruction and Rehabilitation of project facilities and features managed by the U.S. Army Corps of Engineers Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake in accordance with the statements of work (Section C) and Contractor’s proposal dated ___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 2 - OPTION YEAR 1 PERIOD
0002AA
(CPFF) – OY1 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated Cost) Offerors shall insert percentage here:
be the total of the estimated
0002AB
PROCURE (CPFF) – OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, Supplies, and Services for the Government General (Cost estimate provided by the Government).
be the total of the estimated
0002AC
ARKABUTLA MOWING AND TRIMING (FFP) –
OY1 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE
0002AD
ARKABUTLA JANITORIAL (FFP) – OY1 -
ARKABUTLA LAKE SHALL BE PERFORMED
0002BA
ENID TOTAL ESTIMATED COST (CPFF) – OY1 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In be the total of the estimated
0002BB
(CPFF) – OY1 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0002BC
ENID MOWING AND TRIMING (FFP) – OY1 -
MOWING & TRIMMING SERVICES - FIRM
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0002BD
ENID JANITORIAL (FFP) – OY1 - JANITORIAL
SERVICES reference C.7.4.11, for ENID LAKE
SHALL BE PERFORMED AS DIRECTED BY THE
0002CA
GRENADA TOTAL ESTIMATED COST (CPFF) –
OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0002CB
PROCURE (CPFF) – OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0002CC
GRENADA MOWING AND TRIMING (FFP) –
OY1 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0002CD
GRENADA JANITORIAL (FFP) – OY1 -
GRENADA LAKE SHALL BE PERFORMED AS
0002DA
SARDIS TOTAL ESTIMATED COST (CPFF) –
OY1 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0002DB
PROCURE (CPFF)- OY1 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0002DC
SARDIS MOWING AND TRIMING (FFP) – OY1 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0002DD
SARDIS JANITORIAL (FFP) – OY1 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 1 TOTAL
Year 2 and features managed by the U.S. Army Corps of Engineers Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake in accordance with the statements of work (Section C) and Contractor’s proposal dated ___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 3 - OPTION YEAR 2 PERIOD
0003AA
(CPFF) – OY2 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0003AB
PROCURE (CPFF) – OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003AC
OY2 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0003AD
ARKABUTLA JANITORIAL (FFP) – OY2 -
ARKABUTLA LAKE SHALL BE PERFORMED
0003BA
ENID TOTAL ESTIMATED COST (CPFF) – OY2 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In be the total of the estimated
$________. (Not to exceed 7% of Total Estimated
$ fixed fee)
0003BB
(CPFF) – OY2 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0003BC
ENID MOWING AND TRIMING (FFP) – OY2 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0003BD
ENID JANITORIAL (FFP) – OY2 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0003CA
OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0003CB
PROCURE (CPFF) – OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003CC
OY2 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0003CD
GRENADA JANITORIAL (FFP) – OY2 -
GRENADA LAKE SHALL BE PERFORMED AS
0003DA
OY2 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0003DB
PROCURE (CPFF)- OY2 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0003DC
SARDIS MOWING AND TRIMING (FFP) – OY2 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0003DD
SARDIS JANITORIAL (FFP) – OY2 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 2 TOTAL
Year 3 and features managed by the U.S. Army Corps of Engineers Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake in accordance with the statements of work (Section C) and Contractor’s proposal dated ___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 4 - OPTION YEAR 3 PERIOD
0004AA
(CPFF) – OY3 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0004AB
PROCURE (CPFF) – OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004AC
OY3 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0004AD
ARKABUTLA JANITORIAL (FFP) – OY3 -
ARKABUTLA LAKE SHALL BE PERFORMED
0004BA
ENID TOTAL ESTIMATED COST (CPFF) – OY3 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In be the total of the estimated
0004BB
(CPFF) – OY3 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0004BC
ENID MOWING AND TRIMING (FFP) – OY3 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0004BD
ENID JANITORIAL (FFP) – OY3 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0004CA
OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0004CB
PROCURE (CPFF) – OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004CC
OY3 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0004CD
GRENADA JANITORIAL (FFP) – OY3 -
GRENADA LAKE SHALL BE PERFORMED AS
0004DA
OY3 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0004DB
PROCURE (CPFF)- OY3 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0004DC
SARDIS MOWING AND TRIMING (FFP) – OY3 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0004DD
SARDIS JANITORIAL (FFP) – OY3 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 3 TOTAL
Year 4 and features managed by the U.S. Army Corps of Engineers Vicksburg District, Mississippi Lakes- Arkabutla Lake, Enid Lake, Grenada Lake and Sardis Lake in accordance with the statements of work (Section C) and Contractor’s proposal dated ___________. Pricing will be evaluated on the basis of the combined total for the base year and all option year costs, fees, and allowances. Written notice will be provided to the Contractor by the Contracting
SCHEDULE 5 - OPTION YEAR 4 PERIOD
0005AA
(CPFF) – OY4 - Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost (or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total be the total of the estimated
0005AB
PROCURE (CPFF) – OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005AC
OY4 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
ARKABUTLA LAKE SHALL BE PERFORMED
AS DIRECTED BY THE CONTRACTING
0005AD
ARKABUTLA JANITORIAL (FFP) – OY4 -
ARKABUTLA LAKE SHALL BE PERFORMED
0005BA
ENID TOTAL ESTIMATED COST (CPFF) – OY4 -
substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In be the total of the estimated
0005BB
(CPFF) – OY4 - COST REIMBURSABLE
MATERIALS, SUPPLIES, AND SERVICES
ALLOWANCE of Equipment, Materials, Supplies, be the total of the estimated
0005BC
ENID MOWING AND TRIMING (FFP) – OY4 -
FIXED PRICE (FFP), reference C.7.3.1, for ENID
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0005BD
ENID JANITORIAL (FFP) – OY4 - JANITORIAL
SHALL BE PERFORMED AS DIRECTED BY THE
0005CA
OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0005CB
PROCURE (CPFF) – OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005CC
OY4 - MOWING & TRIMMING SERVICES -
FIRM FIXED PRICE (FFP), reference C.7.3.1, for
GRENADA LAKE SHALL BE PERFORMED AS
DIRECTED BY THE CONTRACTING OFFICER'S
0005CD
GRENADA JANITORIAL (FFP) – OY4 -
GRENADA LAKE SHALL BE PERFORMED AS
0005DA
OY4 -Including Home Office Overhead rate will be substantiated by audit, but the allowance will not exceed _______% of the estimated direct labor cost
(or) ______ of the estimated direct contract cost. In no event will the Home Office Overhead exceed $________. (Not to exceed 7% of Total Estimated be the total of the estimated
0005DB
PROCURE (CPFF)- OY4 - COST
REIMBURSABLE MATERIALS, SUPPLIES, AND
SERVICES ALLOWANCE of Equipment, Materials, be the total of the estimated
0005DC
SARDIS MOWING AND TRIMING (FFP) – OY4 -
FIXED PRICE (FFP), reference C.7.3.1, for SARDIS
LAKE SHALL BE PERFORMED AS DIRECTED
BY THE CONTRACTING OFFICER'S
0005DD
SARDIS JANITORIAL (FFP) – OY4 -
SARDIS LAKE SHALL BE PERFORMED AS
OPTION YEAR 4 TOTAL
BASE + 4 OPTION YEARS
(End of Summary of Changes)