A22_Amendment_0003_W912EE-17-B-0011.pdf

PDF 648 KB Posted

Attached to
FC/MR&T WEST BANK, MISSISSIPPI RIVER LEVEES GAINES LANDING, CHICOT COUNTY, ARKANSAS SEEPAGE BERMS ITEM 546-R
Solicitation number
W912EE17B0011
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
A22_Amendment_0007_W912EE-17-B-0011.pdf PDF
A22_W912EE17B00110006.pdf PDF
A22_Amendment_0005_W912EE-17-B-0011.pdf PDF
A22_Amendment_0004_W912EE-17-B-0011.pdf PDF
A22_Amendment_0002_W912EE-17-B-0011.pdf PDF
A22_Amendment_0001_W912EE17B00110001.pdf PDF
17b0011.pdf PDF
SPECS.pdf PDF
385-1-1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912EE17B0011, for FC/MR&T West Bank Mississippi River Levees, Gaines Landing, Chicot County, Arkansas, Seepage Berms, Item 546-R, is amended as follow s:

SEE CONTINUATION PAGE FOR SUMMARY OF CHANGES.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE17B0011

X 9B. DATED (SEE ITEM 11)

06-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jul-2017

CODE

VICKSBURG CONTRACTING OFFICE

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EE17B0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

Notes section is revised and replaced in its entirety.

Right of way is now available for this solicitation.

The bid opening date of 08 August 2017 @ 02:30 p.m. remains unchanged.

Notes revised by this amendment have the notation "Revised by Amendment 0003" at the bottom of the page.

DEPARTMENT OF THE ARMY

VICKSBURG DISTRICT, CORPS OF ENGINEERS

4155 CLAY STREET

VICKSBURG, MISSISSIPPI 39183-3435

REPLY TO ATTENTION OF:

SOLICITATION NO. W912EE-17-B-0011

FOR: FC/MR&T WEST BANK, MISSISSIPPI RIVER LEVEES GAINES LANDING,

CHICOT COUNTY, ARKANSAS SEEPAGE BERMS ITEM 546-R

TO OPEN:

1. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL

OPPORTUNITY CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS

SOLICITATION.

2. THIS PROCUREMENT IS TOTAL SMALL BUSINESS E SET-ASIDE.

3. Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity.

IF THE BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED

AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.

4. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) D-U-N-S number. If you do not already have a D&B D-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.

5. BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS

REQUIRED BY THIS SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR

MAKING FALSE STATEMENTS IN BIDS IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4

APR 1984)

6. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "job" or "each".

7. If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.

8. All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

9. Award will be made as a whole to the lowest responsive, responsible bidder as may be in the best interest of the Government.

"Revised by Amendment 0003" https://www.sam.gov/ http://fedgov.dnb.com/webform

10. THE NOTICE TO PROCEED (NTP): The Notice to Proceed will not be issued prior to the date provided for the fulfillment of the timber reservation.

11. Lack of registration in the SAM database will make an offeror ineligible for award. SEE

CONTRACT CLAUSE 52.204-7 ENTITLED, "SYSTEM FOR AWARD MANAGEMENT".

12. The SF1442, Bidding Schedule, and Section 00600 (Representations and Certifications) must be accurately completed and returned with your bid or it may be rejected as nonresponsive.

13. VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract.

While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs–VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program – http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation–Hiring Our Heros http://www.hiringourheroes.org/ Guide to Hiring Veterans – Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_- _guide_to_hiring_veterans_0.pdf

14. The Contractor should be aware of the additional surveying requirements for this contract. See Section 01 00 00.00 09 for more information.

DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and construction of seepage berms in Chicot County, Arkansas. Principle features of the work include, but are not limited to mobilization and demobilization, clearing and grubbing, borrow area excavation, berm construction, existing turf maintenance, new turf establishment, storm water pollution prevention, and environmental protection features.

NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN

ACCORDANCE WITH THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY

AND HEALTH REQUIREMENTS MANUAL", DATED NOVEMBER 2014.

ATTENTION:

Contractors must complete, and submit with their offer, the provisions located in section 00600. An offeror may also submit, in lieu of the completed section 00600, a complete hard copy of their Online Representations and Certifications Applications (ORCA) registration. See FAR Clauses 52.204-7 and 52.204-8 for requirement information. The website for ORCA is www.sam.gov.

"Revised by Amendment 0003" http://www.sam.gov/

Revised FRONT PAGES.pdf
DEPARTMENT OF THE ARMY
FOR: FC/MR&T WEST BANK, MISSISSIPPI RIVER LEVEES GAINES LANDING, CHICOT COUNTY, ARKANSAS SEEPAGE BERMS ITEM 546-R

File details come from the government source that posted it. Updated .