Amendment 0002 W912DY26QA072 Ft. Riley Bldg. 362 and Ft. Stewart Bldg. 1152 Appliances.pdf
PDF 2 MB Posted
- Solicitation number
- W912DY26QA072
About this file
This is Standard Form 30 Amendment 0002 to a federal solicitation for furnishings procurement issued by the U.S. Army Engineer Support Center at Huntsville on March 23, 2026. The amendment revises the original Request for Quotation (W912DY26QA072) dated March 13, 2026, and is not extended regarding the offer receipt deadline.
The amendment incorporates revised pricing requirements for the Huntsville Center Centrally Managed Furnishings Program across multiple military installations. The procurement covers furnishings supply and installation services for 14 line items at Fort Riley, Building 362 and multiple Fort Stewart buildings (1152, 315, 328, 1365, 1366, 3010, 3011, 3040, 3041, 3043, 3044, and 3045). Additionally, 14 optional line items provide storage services at six-month intervals for the same locations, exercisable at the Contracting Officer's discretion at any time between contract award and furniture installation completion. All furnishings are quoted on a firm fixed-price basis with 120-day price validity required. The attached pricing templates require vendors to provide microwave quotations (model AP07 or AP07-1, 1 cubic foot) along with installation, shipping (CONUS), tariffs, and removal/disposal costs for existing items where applicable. All terms and conditions of the original solicitation remain unchanged except as modified herein.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
W912DY26QA0720002
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Furnishings: Ft. Riley - Bldg. 362 The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Riley - Bldg. 362 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings Pricing Arrangement: Firm Fixed Price
1 Lot
0002 Furnishings: Ft. Stewart - Bldg. 1152 The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 1152 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0003 Furnishings: Ft. Stewart - Bldg. 315 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 315 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0004 Furnishings: Ft. Stewart - Bldg. 328 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 328 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0005 Furnishings: Ft. Stewart - Bldg. 1365 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 1365 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0006 Furnishings: Ft. Stewart - Bldg. 1366 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 1366 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0007 Furnishings: Ft. Stewart - Bldg. 3010 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3010 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings Pricing Arrangement: Firm Fixed Price
1 Lot
0008 Furnishings: Ft. Stewart - Bldg. 3011 The contractor shall provide furnishings in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3011 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0009 Furnishings: Ft. Stewart - Bldg. 3040 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3040 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0010 Furnishings: Ft. Stewart - Bldg. 3041 in support of the Huntsville Center
Centrally Managed Furnishings
Program for Ft. Stewart - Bldg. 3041 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
0011 Furnishings: Ft. Stewart - Bldg. 3043 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3043 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0012 Furnishings: Ft. Stewart - Bldg. 3044 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3044 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
0013 Furnishings: Ft. Stewart - Bldg. 3045 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3045 in accordance with the attached Line
Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
0014 Furnishings: Ft. Stewart - Bldg. 3046 in support of the Huntsville Center Centrally Managed Furnishings Program for Ft. Stewart - Bldg. 3046 in accordance with the attached Line Items, Item Descriptions and Statement of Work. ****Please submit quotes valid for 120 days.
End-Item Description: Furnishings
Option Line Item
Storage: Ft. Riley - Bldg. 362 ***Option:
This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This
6 Months
Option is Exercisable anytime between
Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 1152 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 315 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 328 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 1365 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 1366 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 3010 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 3011 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage Pricing Arrangement: Firm Fixed Price
6 Months
Option Line Item
Storage: Ft. Stewart - Bldg. 3040 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 3041 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 3043 ***Option: This line item may be unilaterally exercised at the discretion
0025 of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 3044 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
Item
Storage: Ft. Stewart - Bldg. 3045 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
End-Item Description: Storage
Item
Storage: Ft. Stewart - Bldg. 3046 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer. Storage shall be a Firm Fixed Price amount of $ per month, for a total amount of $ for six months. Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation.
Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. **This Option is Exercisable anytime between Contract Award and Furniture Install Completion Dates.
W D H 1 144 8.1 AP07: Microwave, 1 cu.ft. $0.00
HNC Cost: $0.00
$0.00
GSA Contract Unit Cost is the cost provided on GSA schedule per item. HNC Unit Cost is the cost provided to HNC per item.
Do not alter any formulas in shaded cells
GRAND TOTAL:
If part of an item is on GSA Contract and part is open market, Vendor shall provide a description, model, and cost of open market item(s) on a new line below the GSA item.
Tariffs Shipping (CONUS)
Oversight of Delivery
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Attachment #1 - Ft. Riley WH 362 - Microwaves
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
When completing this form, do not delete or alter any columns or workbook tabs.
ATTACHMENT #1
1 133 8.2 AP07-1: Microwave, 1 cu.ft. $0.00 1 150 8.2 AP07-1: Microwave, 1 cu.ft. $0.00
HNC Cost: $0.00
$0.00
REV 3-18-26 - Attachment #1 - Ft. Stewart WH 1152 - Microwaves
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
If part of an item is on GSA Contract and part is open market, Vendor shall provide a description, model, and cost of open market item(s) on a new line below the GSA item.
Tariffs Shipping (CONUS)
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
GSA Contract Unit Cost is the cost provided on GSA schedule per item. HNC Unit Cost is the cost provided to HNC per item.
Do not alter any formulas in shaded cells
Oversight of Delivery
GRAND TOTAL:
1 36 8.2 AP07-1: Microwave, 1 cu.ft. $0.00
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 315, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
1 48 8.2 AP07-1: Microwave, 1 cu.ft. $0.00
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 328, Microwaves
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 1365, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 1366, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
1 24 8.2 AP07-1: Microwave, 1 cu.ft. $0.00
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3010, Microwaves
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3011, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00 Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3040, Microwaves
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3041, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3043, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3044, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3045, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
HNC Cost: $0.00
$0.00
Installation - Includes new and existing items, if applicable, in accordance with SOW
Qty FID Para. HNC Total CostFID Item Code / Description Vendor Quoted Product Line
Quoted
Installation & Shipping:
Furniture Subtotals:
Nominal Dimensions For Information Only
Provide dimensions in Inches
HNC Unit CostModel Quoted
Tariffs Shipping (CONUS)
REV 3-18-26 - Attachment #1 - Ft. Stewart, Bldg 3046, Microwaves
Do not alter any formulas in shaded cells
Removal of Existing Items and Disposal/Relocation in accordance with SOW
GRAND TOTAL:
| IDCode: J |
| Page: 1 |
| Pages: 15 |
| AmendNo: 0002 |
| EffDate: 23 MAR 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912DY |
| AdmCode: |
| IssuedBy: W2V6 USA ENG SPT CTR HUNTSVIL |
300 SECURE GATEWAY, KO CONTRACTING DIVISION
REDSTONE ARSENAL, AL 35898-0000
UNITED STATES
FANTASHA MCNAIR, EMAIL: FANTASHA.MCNAIR@USACE.ARMY.MIL TELEPHONE: 2568951128
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| SolNo: W912DY26QA072 |
| SolChg: 1 |
| SolDate: 13 MAR 2026 |
| AwardChg: Off |
| AwardNo: |
| Code: |
| FacCode: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE CONTINUATION |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The Purpose of this Amendment is issued to incorporate the following: |
1. Revised RFQ with additional CLINS for Ft. Stewart - Multi. Bldgs.
2. Attachment 1s for revised buildings at Ft. Stewart - Multi. Bldgs.
3. All other terms and conditions remain unchanged.
| ContNameTitle: |
| CoNameTitle: THOMAS W STRICKLAND |
| ContDate: |
| CODate: 23 MAR 2026 |
File details come from the government source that posted it. Updated .