This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for a U.S. Army Garrison (USAG) Bavaria storage contract. The amendment adds multiple option line items for OCONUS (Outside Continental United States) storage services across various buildings (405, 408, 642, 730, 775, 785, 790), each with identical terms.

The storage option line items are for 6-month periods of firm-fixed price storage, with the Contracting Officer retaining unilateral discretion to exercise each option. Contractors must provide comprehensive storage services including securing furnishings against theft, damage, and weather elements during contingency routes to installation. The storage requirements encompass all associated costs such as double handling, transportation, placement, and removal of furnishings, with pricing to include complete delivery and installation costs at the terminal location. These storage options can be exercised anytime between contract award and furniture installation completion dates, with Product Service Code X1GD and Storage as the requested service.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Continuation of Supplies or Services and Prices/Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were added:

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

6 Months

Item Supplies / Services Quantity Unit Unit Price Amount OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the

W912DY25QA0570001

Option Line Item discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

6 Months

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from

6 Months storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

6 Months

Item Supplies / Services Quantity Unit Unit Price Amount

Line Item

OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

6 Months

Item Supplies / Services Quantity Unit Unit Price Amount OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, Line Item damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

6 Months

Item Supplies / Services Quantity Unit Unit Price Amount

Option Line Item

OCONUS Storage: USAG Bavaria, Bldg ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage

(ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install

6 Months completion dates.

Product Service Code: X1GD Service Requested: Storage Pricing Arrangement: Firm Fixed Price

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

Option Line Item 0008

INFORMATION FROM TO CHANGED

BY

Description

OCONUS Storage: USAG Bavaria, Bldg 405 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

CONUS Storage: USAG Bavaria, Bldg 405 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0009

INFORMATION FROM TO CHANGED

BY

Description

OCONUS Storage: USAG Bavaria, Bldg 408 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in

CONUS Storage: USAG Bavaria, Bldg 408 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0010

INFORMATION FROM TO CHANGED

BY

Description

OCONUS Storage: USAG Bavaria, Bldg 642 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

CONUS Storage: USAG Bavaria, Bldg 642 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0011

INFORMATION FROM TO CHANGED

BY

OCONUS Storage: USAG Bavaria, Bldg 730 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per

CONUS Storage: USAG Bavaria, Bldg 730 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per

Description month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0012

INFORMATION FROM TO CHANGED

BY

Description

OCONUS Storage: USAG Bavaria, Bldg 775 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

CONUS Storage: USAG Bavaria, Bldg 775 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0013

INFORMATION FROM TO CHANGED

BY

OCONUS Storage: USAG Bavaria, Bldg 785

CONUS Storage: USAG Bavaria, Bldg 785

Description

***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

Option Line Item 0014

INFORMATION FROM TO CHANGED

BY

Description

OCONUS Storage: USAG Bavaria, Bldg 790 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

CONUS Storage: USAG Bavaria, Bldg 790 ***Option: This line item may be unilaterally exercised at the discretion of the Contracting Officer.

Storage shall be a Firm Fixed Price amount of $__________ per month, for a total amount of $__________ for six months.

Contractors shall take into account all costs necessary to store furnishings secure from theft, damage, and weather elements in case of any contingency en-route to installation. Storage shall include all costs to place furnishings into and remove furnishings from storage (ie. double handling, transportation, etc.). The quoted cost should include all costs necessary to complete delivery and installation of furniture at the terminal location. This option is exercisable anytime between contract award and furniture install completion dates.

IDCode: J
Page: 1
Pages: 11
AmendNo: 0001
EffDate: 17 JUN 2025
ReqNo:
ProjNo:
IssCode: W912DY
AdmCode:
IssuedBy: W2V6 USA ENG SPT CTR HUNTSVIL

300 SECURE GATEWAY, KO CONTRACTING DIVISION

REDSTONE ARSENAL, AL 35898-0000

UNITED STATES

JESSICA SIZEMORE, EMAIL: JESSICA.SIZEMORE@USACE.ARMY.MIL TELEPHONE: 000-000-0000

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912DY25QA057
SolDate: 17 JUN 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE CONTINUATION
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: A. THE PURPOSE OF THIS AMENDMENT IS TO ADD CONUS STORAGE CLINS.

B. ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.

ContNameTitle:
CoNameTitle:
ContDate:
CODate:

File details come from the government source that posted it. Updated .