This Statement of Work (SOW) details the furnishings installation requirements for three buildings (9418, 9419, and 56651) at Fort Cavazos, focusing specifically on microwaves and related installation services. The project involves a non-staged delivery of furnishings to unoccupied buildings, with acceptable delivery hours between 0800-1600, and installation work spanning three floors. Key contractor responsibilities include coordinating delivery, uncrating and assembling items, installing microwaves and other electric appliances, ensuring proper placement according to provided drawings, cleaning and preparing items, and managing security and access requirements through the Clarke Road Gate military checkpoint.

The technical representative for the project is James Johnson, and the installation requires careful attention to building-specific logistics - for buildings 9418 and 9419, vendors can use a forklift to access 2nd and 3rd floors via catwalk, while building 56651 requires manual stair carry. Security protocols are strict, including cargo X-ray screening, requirements for valid driver's licenses and shipping documents, and prohibition of weapons. The contractor must also handle cleanup, documentation, and coordinate with the Technical Representative for any specific installation details or potential issues.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UH Furnishings Program Statement of Work - Installation of Furnishings

FORT CAVAZOS - Buildings 9418, 9419 & 56651, Microwaves

Attachment 3 Page 1 of 11

1. GENERAL

1.1 The Contractor shall provide all necessary materials, equipment, labor, supervision, and management to: (1) coordinate delivery; (2) load and unload; (3) place/install in designated rooms; (4) assemble items as required; (5) secure and store, as designated; and (6) properly dispose of all associated packaging/crating materials.

1.2 Awarded Contractor is responsible for verifying all existing field conditions, i.e., electrical power including, but not limited to, voltage, hertz, amperage, and outlets at each building through the Technical Representative.

1.3 The Technical Representative (TR) for this project is as shown in Table 1 of this document.

1.4 The contractor shall provide a digital color board of all furniture, finishes, and fabrics to the TR for reference, prior to manufacturing.

1.5 Upon final approval of the customer, the vendor shall reserve adequate quantities of fabrics from the manufacturer as soon as possible to avoid delays due to “out of stock” and/or “discontinued” fabrics.

1.6 If the awarded fabric is discontinued after award, the vendor shall contact the HNC

PM to develop a path forward.

2. DELIVERY

DELIVERY TYPES:

Staged Delivery – This type of delivery is selected for occupied buildings whereby the rooms must be emptied of old furnishings and reinstalled with the new furnishings by the end of each workday. The number of rooms that must be completed per day will be stated in the Table 1 of the Statement of Work (SOW). If there is a limited space for containers in the staging area, this will also be noted in the Table 1 of the Statement of Work. This information is important as it may dictate how the containers are loaded for delivery.

Non-Staged Delivery – This type of delivery is selected typically for empty buildings whereby the entire building is accessible during the install dates listed in the contract. This is important because it will dictate how the items are loaded into the containers for shipment.

Attachment 3 Page 2 of 11

2.1 The Contractor shall contact the TR at least 15 working days prior to shipping to ensure that the building is ready. The Contractor shall coordinate item delivery from all subcontractors and ship the goods only if the TR confirms that the building is ready. At this time, the Contractor shall also ensure they fully understand all security regulations for the installation and have started any required procedures so as to minimize the impact on the installation personnel.

2.2 In the event that a delay in delivery is requested by the TR, or if the Contractor is unable to confirm that the building is ready, the Contractor shall notify the Contracting Officer within 1 working day.

2.3 The Contractor shall provide the TR with a minimum of 48 hour notification as to the date and time that the trucks will be arriving. The Contractor shall also provide email notification as to the date and time the trucks will be arriving to furnishinginvoices@usace.army.mil at least 48 hours prior to scheduled arrival time.

2.4 Contractor must ensure that the driver of the delivery vehicle has copies of the

Delivery Order (contract) for the items being delivered in order to gain entry to the facility.

2.5 Drivers of the delivery vehicles shall not attempt to deliver any items before the scheduled delivery date. In the event the delivery date falls on a Saturday, Sunday, or federally recognized holiday, the delivery date shall be the next workday after the Saturday, Sunday, or holiday.

2.6 Shipping Label shall read as specified in Table 1 of this document.

2.7 Items shall be labeled with the building number(s) provided in Contract Line Item

(CLIN) 0001, unless otherwise noted in this paragraph.

3. RECEIVE AND UNLOAD

3.1 Contractor shall start assembling and installing items in rooms upon delivery between the hours specified in Table 1. The Contractor may work outside this time frame with prior approval of the TR.

3.2 If the Contractor is unable to complete the assembly and placement of all unloaded items before end of the workday, the contractor shall transport those items to a location designated by the TR for storage until the next workday. The Contractor shall be responsible for moving the items from the overnight storage site to its designated position in the building.

Attachment 3 Page 3 of 11

3.3 The Contractor shall verify and inspect all items. Any deficiencies

(damage/overage/shortage) shall be brought to the attention of the TR. The Contractor shall store damaged items in the location designated by the TR.

3.4 The Contractor shall maintain a complete file of all documents relating to each discrepancy. Copies of discrepancy reports shall be forwarded to the TR daily.

3.5 The Contractor shall repair or coordinate for replacement of damaged, defective, or missing items.

3.6 Additional items identified in Table 1 shall be picked up from location specified in

Table 1, on the date and time specified by the TR, and installed. If these items have been picked up, but not installed, they must be handled in accordance with paragraph 3.2. above. If no items are identified in Table 1, then there are no items in storage that must be installed under this contract.

3.7 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from the location specified by the TR and install in accordance with this Statement of Work.

4. PLACE AND INSTALL

4.1 Contractor shall place items in building(s) noted in CLIN 0001 of the contract.

Items shall be placed in the rooms in accordance with the drawings attached to this Statement of Work. If no drawings are provided herein, the furniture shall be placed as directed by the TR. Information about the building may be found in Table 1.

4.2 The Contractor shall complete installation of furnishings under this Statement of

Work in the time period specified in Table 1.

4.3 The contractor shall clean and polish all items that have been installed.

4.4 The Contractor shall ensure all light fixtures have the appropriate bulbs as identified in the contract as well as ensure they are in working order.

4.5 The Contractor shall remove all protective coverings from electronics (such as protective film on the microwaves, TV’s, and lamp shades, etc.).

Attachment 3 Page 4 of 11

4.6 The Contractor shall ensure that all stickers and labels are removed, and no adhesive residue remains on the surface.

4.7 The Contractor shall ensure that items which require batteries have been provided with new alkaline batteries and that they are working properly.

4.8 If recreational equipment is provided in this procurement, the Contractor shall install the recreational equipment. In addition, the Contractor shall be responsible for providing equipment, material, and expertise needed to place, assemble, and level pool tables, soccer tables, table tennis, and dart boards as identified in the contract.

4.9 If electric appliances are provided in this procurement, the Contractor shall install the appliances. In addition, the Contractor shall be responsible for providing all equipment and material to install the ice machines, refrigerators, electric ranges, microwaves, clothes washers, and electric dryers as identified in the contract.

The contractor shall provide power cords which are appropriate for the item and the building’s electrical service, as well as hoses, vent kits, and other accessories required to have a fully functioning unit. Vendor is not responsible for connecting gas appliances to the gas supply.

4.10 If artwork is provided in this procurement, the Contractor shall install the artwork.

In addition, the Contractor shall be responsible for providing equipment and material needed to install artwork in TV rooms, dayrooms, game rooms, etc., of each building as identified in the contract. The TR will provide locations for placement of artwork. Mount artwork at standing eye-level height of 5’-6” on center above finished floor or at seated eye-level height of 4’-4” on center above finished floor, per direction from TR.

4.11 If floor cleaning equipment is provided in this procurement, the Contractor shall uncrate, assemble, and provide all materials and equipment necessary to ensure the buffer, shampooers, and vacuum cleaners are in operational condition, and locate equipment within the building per direction from the TR.

4.12 The Contractor shall be responsible for installing other items that have been shipped to and/or stored at the installation as noted in Table 1. If no items are identified in these blocks, then there are no other items that must be installed under this contract.

4.13 Mattresses and box springs (if applicable) shall be installed whether provided by the Contractor or by the Government, even if not noted in Table 1. If mattresses are provided by the Government, the Contractor shall pick up these items from

Attachment 3 Page 5 of 11 the location specified by the TR and install in accordance with this Statement of Work.

5. ASSEMBLY

5.1 The Contractor shall uncrate all items received and perform all required assembly in accordance with the manufacturers' instructions.

5.2 All furniture, equipment, and accessories shall be level, plumb, square, and in proper alignment with adjoining furniture. Furnishings shall be securely attached to the building where applicable.

5.3 The Contractor shall inspect to ensure that the furniture is free of surface dirt and defects, that the installation is complete, and the furniture is ready to use.

5.4 If required, the Contractor shall reverse doors and handles on the refrigerators in sleeping rooms.

6. PROTECTION OF PROPERTY

6.1 The Contractor shall perform an inspection of the buildings and grounds with the

TR prior to starting work. The Contractor shall protect all items from damage during both removal and installation. The Contractor shall take precaution against damage to the building, grounds, and other furnishings. The Contractor shall perform a final inspection of the buildings and grounds after completing work. A corrective action plan shall be provided by the Contractor that details type, source, and schedule of repairs.

6.2 The Contractor shall repair or replace any items, building components, or grounds damaged due to negligence and/or direct action by the Contractor using materials of the same quality, size, texture, and color to match adjacent existing work. All repairs beyond simple surface cleaning require concurrence of the TR before the Contractor or anyone other than the facility construction contractor (or its subcontractors) may perform any significant repair work. Use of the facility construction contractor (or appropriate subcontractor) is required for all significant repairs so that the building warranty is maintained.

6.3 The Contractor shall be responsible for security of the area in which work is being performed and prior to completion and transfer to the Government. The Contractor shall maintain accountability and control of any keys provided and shall return them to the TR upon completion of work.

6.4 Material-handling equipment shall have rubber wheels.

Attachment 3 Page 6 of 11

7. PRODUCT DOCUMENTATION

7.1 The Contractor shall ensure that all owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, and any other information is provided to the TR upon completion of the installation.

7.2 The Contractor shall collect special assembly tools, the security hardware wrench, and any spare parts provided with the furnishings and turn them over to the TR.

8. CLEANUP

8.1 The Contractor shall be responsible for the removal and disposal of all trash connected with uncrating and assembling furniture and other items installed under this contract. Final acceptance of the furniture (Technical Representative signing acceptance on Delivery Order/contract), from the contractor will not occur until all trash connected with the furniture installation is removed from the site.

8.2 Recyclable cardboard products shall be disposed of in accordance with Table 1.

8.3 Packing materials will not be stored in the buildings for any period exceeding 24 hours.

8.4 Personal trash (food wrappers, drinks, etc.) shall be removed from the site daily by the contractor.

9. EXCESS ITEMS

9.1 Once equipment is installed as shown on the furniture layout, the Contractor shall coordinate with the TR as to where any excess items are to be stored.

Contractor will be responsible for delivery of excess items to storage area designated by TR.

10. AT-OPSEC

10.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security

Attachment 3 Page 7 of 11 matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

10.2 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See

Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

10.3 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

Attachment 3 Page 8 of 11

10.4 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. The Vendor must ensure that the Candidate has two (2) valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

10.5 All contractor and all associated sub-contractors’ employees shall comply with applicable installation or facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation and MEDOCM access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition at any installation or facility change, the Government may require changes in contractor security matters or processes.

Attachment 3 Page 9 of 11

TABLE 1. Project Specific Information.

Technical Representative: James Johnson

Tech. Rep. Phone: 254-535-3351

Tech. Rep. Email: james.f.johnson74.civ@army.mil

Will the Building be Occupied During Install

No

Delivery Type

Not Staged

If this is a staged delivery, how many rooms will be accessible per day? All

Acceptable Hours of Delivery: 0800-1600

Number of floors: 3

Elevator Available for Use During Install No Elevator Dimensions

N/A DRMO: It is the responsibility of the TR to coordinate with DRMO to ensure they are aware of the project

DRMO Location:

N/A Point of Contact Name:

Phone/Email:

Address:

Building Number Street Address City, State, Zip Code

Business Hours:

Do they accept mattresses?:

DRMO Special Requirements

(Pallets, Shrink Wrap):

All recyclable cardboard products to be delivered to:

Address:

Building Number TR will coordinate for on-site recycle support for cardboard only. TR will coordinate for on-site trash support.

Street Address City, State, Zip Code

Attachment 3 Page 10 of 11

Phone:

Access & Delivery Information:

Security Requirements: Must enter the installation thru Clarke Road Gate.

This is a military checkpoint and any cargo will be X-Rayed.

The driver must have a valid driver’s license and proper shipping documents.

Weapons/firearms are prohibited on the installation.

Shipping Label for Furniture:

Physical Address:

Building Number Street Address

City, State, Zip Code

Bldg 9418 Old Ironsides Ave Fort Cavazos, Texas 76544

Bldg 9419 Old Ironsides Ave Fort Cavazos, Texas 76544

56651 Tedesco Way Fort Cavazos, TX 76544

Shipping Label for Soft Goods (If different from furniture)

Warehouse information:

Address:

Building Number

Street Address N/A

City, State, Zip Code Items stored at warehouse location noted above, to be installed under this contract:

example: if you have mattresses in your warehouse and the vendor needs to pick them up and install with the new furnishings. Provide list of items and how many there are.

Attachment 3 Page 11 of 11

Building Specific Information:

Other Information such as truck parking, how close the truck can get to the building, can a vendor provided forklift be used on location, are the rooms accessible from the outside via a catwalk or the inside.

Bldg 9418 & 9419:

There will parking adjacent to the project building.

The vendor can use forklift to access the 2nd and 3rd floors and the rooms are accessible from the outside via a catwalk Highly recommend to have a forklift on-site as stairwells are fairly tight.

Bldg 56651:

Inside access to rooms only, it requires stair carry.

Trucks can park in the vicinity of the building and forklift can be used to unload deliveries, but not for installing into the building

The fields required if furnishings/window treatments/hardware are being removed as part of this contract.

Old furnishing to be delivered to: If DRMO/DLA is being used, state that in this box. If the vendor needs to dispose of, please say so here.

N/A

List ALL furnishings to be removed: Be specific and list the item and how many there are. If Captains beds are being removed, list the size and number of drawers: If drop lid desk or Armoires are being removed, list dimensions.

N/A

Old window treatments and hardware to be delivered to: If vendor needs to dispose of, please say so here.

List ALL window treatment and hardware to be removed: List how many draperies or blinds. List type of blinds being removed.

END OF SOW