Amendment 1 - RFP W912DY22R0024_27Apr2022.pdf

PDF 2 MB Posted

Attached to
Utilities Privatization (UP) Technical Services Federal contract opportunity
Solicitation number
W912DY22R0024
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This is a solicitation for a Utilities Privatization (UP) Technical Services contract to be awarded by the U.S. Army Corps of Engineers Engineering Support Center Huntsville. The selected contractor will provide technical support services to assist the Army G-9's UP Program in evaluating Army-owned utility systems scheduled for conveyance to private control, completing analyses within 24 to 36 months to support potential UP contract awards by the Defense Logistics Agency. Work will include coordinating with Army UP leadership teams, other government contractors, the Assistant Secretary of the Army for Installations Energy and Environment, the Army Cost and Economics office, Army Reserve, Army Material Command, Army Installation Management Command, and contracting authorities at the Defense Logistics Agency Energy and Army Contracting Command. The contractor must have experience with UP program management, system evaluations, cost analyses, and supporting UP contract solicitation, award, and transition activities.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:00 PM local time 12 May 2022

X

A X B X C

D

EX

X G F 40 - 42

43 - 48 H 49 - 53

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 53

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912DY 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and electronic proposals only conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 10

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

11 - 22 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

24 - 25

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 26 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

27 - 38

PART II - CONTRACT CLAUSES

US ARMY ENGINEERING & SUPPORT CENTER

475 QUALITY CIRCLE NW

HUNTSVILLE AL 35806

256-895-1110

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

11 Apr 2022

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912DY22R0024

Section B - Supplies or Services and Prices

SECTION B INSTRUCTIONS

See Section L of this solicitation for additional instructions on how to submit a complete proposal.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job UP Technical Services

FFP

The contractor shall provide technical support services for the Army Utilities Privatization (UP) Program in support of Army G-9 in accordance with the Performance Work Statement (PWS).

FOB: Destination

PSC CD: R425

NET AMT

0002 1 Lot Travel

FFP

Offeror does not need to provide pricing for Travel:

***Not to Exceed (NTE) Amount: $30,000.00***

Travel will be a Not-To-Exceed (NTE) amount established by the Government based on estimated travel shown in the PWS.

Travel costs must be approved by the Contracting Officer (KO) in advance of travel, and costs will be reimbursed by routine invoicing procedures.

The contractor is responsible for providing sufficient and timely information and the KO's review and approval of travel.

The contractor is responsible for monitoring its paid and unpaid travel invoices in order to not request pre-approved travel in amounts exceeding the remaining funds on the Contract Line Item (CLIN).

The contractor will be reimbursed for pre-approved travel when it does not exceed remainng funds on this CLIN.

The contractor should inform the Government when funds for three trips are estimated to remain on the CLIN.

The contractor shall not add fees for its invoices for travel, to include General and Administrative (G&A) expenses.

Price for airfare should normally not exceed the price of a coach ticket purchased 14 days in advance.

Price for Per Diem (Lodging and Meals & Incidental Expenses) will be considered reasonable if based on the rates and policies of the Joint Travel Regulation (JTR) wihich can be found at http://www.gsa.gov.

0003 12 Each Monthly Activity Report

FFP

The contractor shall prepare and deliver a Monthly Progress/Activity Report to the Commercial Utilies Program (CUP) Project Manager, Contracting Officer Representative (COR) and to the UP Program Manager and UP Assistant Program Manger no later than the 10th calendar day of the month for the immediate month preceding.

0004 1 Job Service Contract Reporting (SCR)

FFP

Service Contract Reporting (SCR): The offeror is required to report service contract manpower on an annual basis by Task Order in the System for Award Management, https://sam.gov, (previously manpower reporting on the ecmra.mil website). The offeror shall ensure that the costs associated with this requirement are incorporated within their proposal and not separately priced.

NSP = Not Separately Priced

1001 1 Job OPTION Opt Yr 1 - UP Technical Services

FFP

The contractor shall provide technical support services for the Army Utilities Privatization (UP) Program in support of Army G-9 in accordance with the Performance Work Statement (PWS).

1002 1 Lot OPTION Opt Yr 1 - Travel

FFP

Offeror does not need to provide pricing for Travel:

***Not to Exceed (NTE) Amount: $30,000.00***

Travel will be a Not-To-Exceed (NTE) amount established by the Government based on estimated travel shown in the PWS.

Travel costs must be approved by the Contracting Officer (KO) in advance of travel, and costs will be reimbursed by routine invoicing procedures.

The contractor is responsible for providing sufficient and timely information and the KO's review and approval of travel.

The travel invoices in order to not request pre-approved travel in amounts exceeding the remaining funds on the Contract Line Item (CLIN).

The contractor will be reimbursed for pre-approved travel when it does not exceed remainng funds on this CLIN.

The contractor should inform the Government when funds for three trips are estimated to remain on the CLIN.

The contractor shall not add fees for its invoices for travel, to include General and Administrative (G&A) expenses.

Price for airfare should normally not exceed the price of a coach ticket purchased 14 days in advance.

Price for Per Diem (Lodging and Meals & Incidental Expenses) will be considered reasonable if based on the rates and policies of the Joint Travel Regulation (JTR) wihich can be found at http://www.gsa.gov.

1003 12 Each OPTION OY1 - Monthly Activity Report

FFP

The contractor shall prepare and deliver a Monthly Progress/Activity Report to the Commercial Utilies Program (CUP) Project Manager, Contracting Officer Representative (COR) and to the UP Program Manager and UP Assistant Program Manger no later than the 10th calendar day of the month for the immediate month preceding.

1004 1 Job OPTION OY1 - Service Contract Reporting

FFP

Service Contract Reporting (SCR): The offeror is required to report service contract manpower on an annual basis by Task Order in the System for Award Management, https://sam.gov, (previously manpower reporting on the ecmra.mil website). The offeror shall ensure that the costs associated with this requirements are incorporated within their proposal and not separately priced.

NSP = Not Separately Priced

2001 1 Job OPTION 6 Month Ext - UP Technical Services

FFP

6 Month Extension IAW FAR 52.217-8:

The contractor shall provide technical support services for the Army Utilities Privatization (UP) Program in support of Army G-9 in accordance with the Performance Work Statement (PWS).

2002 1 Lot OPTION 6 Month Extension - Travel

FFP

6 Month Extension IAW FAR 52.217-8

Offeror does not need to provide pricing for Travel:

***Not to Exceed (NTE) Amount: $15,000.00***

Travel will be a Not-To-Exceed (NTE) amount established by the Government based on estimated travel shown in the PWS.

Travel costs must be approved by the Contracting Officer (KO) in advance of travel, and costs will be reimbursed by routine invoicing procedures.

The contractor is responsible for providing sufficient and timely information and the KO's review and approval of travel.

The contractor is responsible for monitoring its paid and unpaid travel invoices in order to not request pre-approved travel in amounts exceeding the remaining funds on the Contract Line Item (CLIN).

The contractor will be reimbursed for pre-approved travel when it does not exceed remainng funds on this CLIN.

The contractor should inform the Government when funds for three trips are estimated to remain on the CLIN.

The invoices for travel, to include General and Administrative (G&A) expenses.

Price for airfare should normally not exceed the price of a coach ticket purchased 14 days in advance.

Price for Per Diem (Lodging and Meals & Incidental Expenses) will be considered reasonable if based on the rates and policies of the Joint Travel Regulation (JTR) wihich can be found at http://www.gsa.gov.

2003 12 Each OPTION 6 Month Ext - Monthly Activity Report

FFP

6 Month Extension IAW FAR 52.217-8:

The contractor shall prepare and deliver a Monthly Progress/Activity Report to the Commercial Utilies Program (CUP) Project Manager, Contracting Officer Representative (COR) and to the UP Program Manager and UP Assistant Program Manger no later than the 10th calendar day of the month for the immediate month preceding.

2004 1 Job OPTION 6 Month Ext - Service Contract Reporting

FFP

6 Month Extension IAW 52.217-8 Service Contract Reporting (SCR): The offeror is required to report service contract manpower on an annual basis by Task Order in the System for Award Management, https://sam.gov, (previously manpower reporting on the ecmra.mil website). The offeror shall ensure that the costs associated with this requirement are incorporated within their proposal and not separately priced.

NSP = Not Separately Priced

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

Technical Support Services for Army Utilities Program

07 March 2022

1.0 OBJECTIVE

Contractor shall provide technical support services for the Army Utilities Program; including assistance in policy development and implementation guidelines, providing program management support, facilitating utility system evaluations, conducting analyses to evaluate alternatives to upgrade Army-owned systems, and providing Utility Privatization (UP) program quality assurance (QA) technical support.

1.1 Structure. This contract is for a one-year base period award with one one-year option period to be awarded based on the Government’s need at the time. The workload is based upon the anticipated Utilities Program requirements are provided in paragraph 2.0 below that describes the specific work to be executed, proposed locations of the work to be performed, and the corresponding period of performance for that work.

1.2 Security.

1.2.1 All contractor employees who work for the successful Offeror selected to support this contract shall meet the minimum requirements of Homeland Security Presidential Directive-12 (HSPD-12), Federal Information Processing Standards Publication (FIPS PUB) Number 201-1, Office of Management and Budget (OMB) Guidance M-05-24 and DCS G-9 requirements. The complete DCS G-9 security specifications can be found at APPENDIX A.

1.2.2 For contractors working on-site at secure Government facilities, the contractor awarded the contract shall have a current facility security clearance granted by the Defense Industrial Security Clearance Office (DISCO) or be sponsored by a Government or DISCO cleared Contractor company for a facility security clearance IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM) before the contractor employee can be granted access to the Government worksite.

1.2.3 The Government is not responsible for assisting the Contractor's staff in acquiring the necessary security clearance; it is the Contractor's responsibility to obtain the appropriate level security clearance for contractor personnel.

2.0 Scope

The scope of services is to provide specialized Utility Program technical support to Headquarters Department of Army (HQDA) Deputy Chief of Staff G-9 Operations Directorate; work to be performed at the Pentagon G-9 office and from remote locations as directed by the Contracting Officer or Contracting Officer’s Representative (COR).

Temporary Duty (TDY) will be required at designated installation locations, IMCOM HQ at Joint Base San Antonio (JBSA), AMC HQ at Redstone Arsenal, and at other locations as required. Scope of effort includes the evaluation of Government-Owned (GO) utility systems in support of the Utilities Program requirements in accordance with OSD and Army Guidance (hereinafter referred to as “Pre-Award” work). Scope also includes the QA oversight of Utility Privatization (UP) Post-Award Contract Management, to include review of IMCOM, DLA-Energy, MICC, ACC, and AMC post-award efforts. The QA work hereinafter is referred to as Portfolio and Asset Management (PAM).

The PAM effort includes overseeing the Post-Conveyance Review (PCR) process mandated by DODI 4170.11, assessing with the Legacy Contract Conversion (LCC) process, reviewing Cyber-Security Assessments, evaluating Contract Administration Plans, and supporting the annual DoD UP Conference and Workshop. Program PAM support includes coordination with the Army UP Working Group Team from: DCS G-9; Assistant Secretary of the Army for Installations Energy and Environment (ASA-IE&E); DASA for Cost and Economics (DASA-CE); contracting authorities at Defense Logistics Agency (DLA Energy), U.S. Army Corps of Engineers (USACE), Army Contracting Command (ACC); affected Installations, Regions, and Headquarters of land-holding commands (LHCs) at Installation Management Command (IMCOM), Army Materiel Command (AMC), U.S. Army Reserve (USAR), Army National Guard, and other program stakeholders.

All work performed shall reflect thorough, professional, detailed knowledge of utility industry standards, alternative financing mechanisms (AFMs) laws and regulations, and UP policy and guidance: including but not limited to, Congressional guidance and amendments of 10 U.S. Code (USC) 2688, 10 USC 2922a, 10 USC 2813, and National Defense Authorization Act (NDAA), Office of the Secretary of Defense (OSD) guidance, and applicable Army policies. Support will be provided under direction of the DCS G-9 Energy and Facility Policy Branch Chief within the Operations Directorate, and the Utilities Privatization Program Manager at DCS G-9. The Contractor shall also work closely with other staff and offices supporting the Army Utilities Program, the UP Working Group, and the OSD UP Working Group Team. A member of the Energy Division of the U.S. Army Engineering and Support Center, Huntsville (CEHNC) will act as the COR on this contract.

The Contractor will provide support with on-site team members at the Pentagon, augmented by off-site Subject Matter Experts (SME), with significant knowledge of the utility management, AFM programs, and UP. Contractor is to assist in coordinating the activities of the Utility Program Team to keep program oversight activities and contract execution on-schedule. On-site staff at Army sites will be provided a cubicle and laptop or computer equipment for each of the assigned personnel. Program management function includes associated support for program execution, such as meetings, teleconferences, support for or presentation of briefings, and tracking of milestones needed for timely program execution.

2.1 HQDA DCS G-9 Utilities Program Support

The Army has multi-year requirements for technical support to meet PAM requirements driven by OSD and ASA- IEE Guidance for the UP program and the associated utility management function. OSD UP Guidance (7-Feb-19) expanded the alternatives to provide utility upgrades, sustainment, operations, and maintenance (O&M). The “pre-award program” that addresses the alternatives for utility management resides at the Land-Holding Commands (LHC), along with UP post-award contract oversight and the responsibility to complete ongoing evaluations of utility systems scheduled for UP decision in FY22-23.

The UP PAM program consists of on-site support to provide essential UP program management support. The support is for Program Management at HQDA, supporting initiatives identified as part of the Utilities Operational Planning Team (OPT) Utilities Program Review (UPR) effort, and providing quality assurance for requirements specified in the OSD UP Guidance (7-Feb-19) and corresponding ASA-IEE UP Guidance (14-Dec-20).

2.1.1 Program Management: Provide on-site support to HQDA for the development, coordination and dissemination of guidance to implement policy, to support UP decision analysis, and support integration with other Army programs that interface the utility programs, such as the Residential Communities Initiative (RCI), Advanced Metering Initiative (AMI), Privatized Army Lodging (PAL), and various elements of the Energy and Water Programs. UP PM includes supporting the OSD UP Working Group to meet program monitoring requirements related to energy resilience, utility performance metrics, and cybersecurity compliance. Support also includes management reporting, interface with other HQDA offices such as the ASA-IEE, ASA-CE, ABO, G-8, and OGC as necessary to administer the PAM program in conjunction with the G-9 UP Program Manager staff.

2.1.2 PAM Handbook: Contractor to develop the guidance document that incorporates all the pertinent policy, guidance, instructions, legal documents, administrative elements, and associated tools to effectively manage the Army UP Program. The PAM shall address the ninety-eight (98) existing utility service contracts resulting from privatization efforts and shall also include the strategy and approach to address the remaining major utility systems at IMCOM, AMC, and USAR installations nationwide.

The PAM Handbook shall identify roles and responsibilities of the various echelons within the Army from HQDA to Land-Holding Commands, to Garrisons at Installations. The Handbook shall also describe the reporting and approval cycle requirements to OSD. The Handbook shall address staffing and resource requirements associated with the UP program, including the administration of the post-award management efforts at Installations, LHC(s) and at HQDA.

2.1.3 Post-Award Program Quality Assurance: Contractor shall support the QA of the UP post-award programs at the LHC(s), including periodic assessments of the Post-Conveyance Reviews (PCR), Cost Control Reports (CCRs), and other UP performance data.

2.2 DCS G-9 Utilities Program (Pre-Award) Support and Quality Assurance

2.2.1 System Inventory and Condition Assessment (SI&CA): Evaluation of GO utility systems requires that a SI&CA be performed to establish the baseline for further analysis. Evaluation of privatized systems may also be necessary to inform the Army’s decision process for expiring contracts. The System Inventory is conducted concurrently with the Condition Assessment to provide detailed information in Geographical Information System (GIS) format describing the age, condition, material, and location of all major components comprising the system under study. Based upon the recently completed Utilities Program Review (UPR) results, there are approximately 60 major Government-Owned utility systems that are scheduled for the SI&CA process in the next ten (10) years, or an average of six (6) systems pre year. A list of the systems is provided at APPENDIX B; prioritization of systems to undergo assessment is determined by IMCOM, OCAR, AMC on an annual basis.

2.2.2 Analysis of Alternatives (AOA): Conduct analyses and/or QA of alternatives to provide reliable, efficient, and resilient utilities owned by the Government and utility systems covered by expiring UP contracts.

Per the OSD UP Guidance, the AOA shall address options for upgrading and sustaining infrastructure, and alternatives to provide operations and maintenance. Various contracting vehicles for infrastructure upgrade shall be considered in the analysis, including ESPC, UESC, PPA, EUL, and UP. Options for O&M include IGSA(s) with local Governments, BOS contracts, and UP. Analyses include the identification of viable alternatives, development of the viable alternatives to enable comparison, and a Business Case Analysis (BCA) that identifies the “preferred alternative” for further consideration. Analysis also includes the evaluation of IGSA Concept Packages to validate recommendations, and incorporation of IGSA decisions into the BCA. The proposed workload is to conduct six (6) AOA efforts per year starting with the Base Period, and extending through the life of the contract.

2.2.3 Preliminary Business Case Analysis (BCA): Based upon the outcome of the AOA, the Consultant shall conduct QA and if required, prepare a preliminary Business Case Analysis (BCA) of the leading alternatives to determine the preferred course of action (COA) for the utility system under study. The BCA shall be conducted in accordance with OSD and Army Guidance and will address the life-cycle cost analysis of the preferred alternatives. The BCA process culminates with a Decision Briefing to select the COA for each case. Utility systems selected to undergo the UP process will be referred to the Utilities Privatization Review Board (UPRB) for prioritization.

2.2.4 Utility Privatization Procurement (Pre-Award) Actions: There are currently two (2) active procurement actions involving US Army Reserve (OCAR) installations, at various stages in the process, that require support through the privatization decision point. Support required involves the UP pre-award tasks described in APPENDIX C. Ongoing UP actions for the OCAR systems include Ft. Hunter-Liggett (electric, water, and wastewater) and Ft. Buchanan (electric waster, and Wastewater).

For planning purposes, it is anticipated that two UP contracts will be in development in the Base Period and the subsequent Option Years thereafter. The UP-contracting process takes 36 months from the time that Contract Requirements are provided to the Contracting Officer; requirements are defined by the UP RFP Section J Attachments that include the System Inventory & Condition assessment data, operational requirements, and capital upgrade project descriptions (referred to as Initial System Deficiency Corrections (ISDC) projects).

3.0 DELIVERABLES

3.1 Electronic Deliverables – The Contractor shall provide reports and other products as described herein, submitted in electronic digital format (Microsoft Word for reports, analyses, and other text-based deliverables, PowerPoint for all presentations, Excel for system databases, cost estimates, system valuations, contract cost data, and technical data), and Portable Document Format (pdf) for all record images and documents, such as signed contracts.

Contractor shall email deliverables to the UP Program Manager with copy to the cognizant Land-Holding Command (LHC) and the Contracting Officer’s Representative (COR), to include the following (as required):

3.1.1 PAM Handbook

Outline Draft Handbook Final Handbook

3.1.2 System Inventory & Condition Assessments

Trip Report Draft SI&CA Report Final SI&CA Report

3.1.3 Analysis of Alternatives (AOA)

Draft AOA Final AOA Decision Briefing

3.1.4 UP Pre-Award Documents

Government Cost Estimate (GCE) Price Analysis Reports (PARs) Draft Certified Economic Analysis (CEA) Draft Business Case Analysis (BCA) Final BCA

3.2 Program Management Reporting – Deliverables in support of Utilities Program Management (PM) Support at DCS G-9 shall include documentation of meetings, seminars, briefings, data requests and results, and other documents associated with the administration of the Program.

3.2.1 G-9 OD-F Support

Deliverables resulting from participation in Army Operational Planning Teams (OPT) Draft formal correspondence (Notifications, Decision Documents, Concurrence Memos) Financial and contract review reports to meet requirements of DoD instructions and guidance Memoranda for Record (MFR) to document Army meetings, briefings, and site visits Capital Investment Program (CIP) Support Program Objective Memoranda (POM) Budget Data Input UP Contract Oversight reports, updates, and briefings Significant Activity (SIGACT) summaries (as required) Memoranda for Record (MFR) to document OSD and other agency meetings, briefings, and site visits;

including DoD UP Working Group and DLA-Energy Coordination meetings

3.2.2 UP Post-Award Program QA Support

Draft formal correspondence (Notifications, Decision Documents, Concurrence Memos) Financial and contract review reports to meet requirements of OSD instructions and ASA-IEE program guidance Memoranda for Record (MFR) to document meetings, briefings, and site visits

Capital Investment Program (CIP) Review Post-Conveyance Review (PCR) Assessments UP Contract Cost Control Reports (CCR) Assessments UP Contract Oversight reports, updates, and briefings

3.2.3 DoD UP Annual Conference and Workshop

Agenda Development Support Workshop Presentation materials Attendance and Participation After-Action Report summary of proceedings

4.0 PERIOD OF PERFORMANCE SCHEDULE

Period of Performance for this PWS is from date of award up to two (2) years following award; the base period is 12 months from the date of award, and the Option Period consists of 12 months. The Period of Performance may be extended to adapt to UP Program changes.

5.0 TRAVEL

The Contractor will be required to travel to/from the Pentagon, IMCOM HQ, AMC HQ, or other sites, in support of the tasks identified in Section 2. Contractor will be required to travel to relevant installations to support GO SI&CA and AOA efforts, UP pre-award and transition, PCR/CCR oversight efforts. Contractor will also be required to travel to support Program Management tasks, including participation in the annual DoD UP Conference and Workshop. All Contractor travel expenses must be estimated and included in the negotiated contract price. Travel expenses will be reimbursed at cost in accordance with Joint Travel Regulations upon presentation of invoices with accompanying traveler receipts.

6.0 DISTRIBUTION

All electronic deliverables shall be sent via email to:

Ali.a.bakhshi.civ@mail.mil kelvin.l.herring.civ@mail.mil

7.0 PAYMENTS

The Government will make progress payments no more frequently than monthly as the work proceeds under the issued contract. Payments shall be made against approved progress reports submitted by the Contractor. The Contractor shall provide data in support of their billings which are subject to acceptance by the Contracting Officer or Contracting Officer's Representative.

APPENDIX A: Security Requirements

1.0 SECURITY REQUIREMENTS:

1.0. 1. There are no requirements for Contractor key personnel and alternates to have routine access to classified Government information in the performance of this task order effort.

1.0.2. When required by the Government representative, if Contractor key personnel and alternates are required to provide support on a full-time basis on-site at secure Government facilities, attend meetings or briefings, a valid, current final Secret eligibility and access shall be granted and posted in the Joint Personnel Adjudication System (JPAS) to gain access.

1.1 PERSONAL IDENTITY VERIFICATION (PIV).

1.1.1. The Contractor shall comply with PIV procedures implemented by Homeland Security Presidential Directive- 12 (HSPD-12), Federal Information Processing Standards Publication (FIPS PUB) Number 201-1, Office of Management and Budget (OMB) Guidance M-05-24 and HQDA DCS G-9.

1.1.2. The Contractor shall insert this clause, FAR 52.204-9 as required by FAR 4.1303, in all subcontracts when the subcontractor is required to have physical access to a Federally-controlled facility or access to a Federally-controlled information system.

1.1.3. In accordance with HSPD-12, OMB M-05-24 and FIPS 201-1, unless a previous favorable background investigation has been completed in the last ten (10) years, all Contractor employees will be the subject of a background investigation conducted by the Government.

1.1.4. No Contractor employee will commence work until the personnel security questionnaire (PSQ) paperwork has been completed, reviewed and submitted to the Office of Personnel Management (OPM).

1.1.5. Contractor employees not meeting the minimum PIV requirements will be the subject of a National Crime Information Center (NCIC) check prior to beginning work in addition to the submission of the PSQ to OPM.

1.1.6. Non-US citizens will not be used in the performance of this task order unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-US citizen to perform the required support.

1.2 VISIT NOTIFICATIONS.

1.2.1. If the Contractor has previously been granted a facility clearance (FCL) through the Defense Industrial Security Clearance Office (DISCO), the Contractor Facility Security Officer (FSO) shall submit visit notifications via JPAS in the format prescribed and provided by OACSIM Security through the Government COR.

1.2.2. If the Contractor is not cleared through DISCO, the Contractor will submit a signed visit request on company letterhead stationary through the Government COR. The request will include the full name (last, first, middle), date of birth (MM/DD/YYYY), place of birth (city, state, country), citizenship, type of last investigation and date last investigation was completed, if any and will be the subject of a National Crime Information Center (NCIC) check prior to beginning work.

1.3 SECURITY REGULATIONS. All Contractor employees shall read all applicable security regulations, to be provided by the Government. Contractor personnel shall familiarize themselves with the Government’s regulations and policies and site-specific regulations regarding access to sensitive materials, computer facility/IT network access, issue of access credentials, etc., which shall be provided as required by the Government.

1.4 PHYSICAL SECURITY. The majority of work will be performed off the Government worksite. In the event that the Contractor is required to work on the Government site, the Contractor shall be responsible for safeguarding all Government property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.5 ACCESS CREDENTIALS. The Contractor shall establish and implement methods of making sure all access credentials (Common Access Card (CAC); DD Form 1466, DoD Building Pass; Kastle Key Systems) issued to the Contractor employee by the Government are not lost or misplaced and are not used by unauthorized persons. No access credentials issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering access credentials that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued access credentials by Contractor personnel who no longer require access to Government information systems or Government facilities. The Contractor shall immediately report any occurrences of lost access credentials to the COR.

1.5.1. In the event access credentials are lost or damaged, the Contractor employee shall immediately notify the COR who will notify DCS G-9 Security of the loss or damage and request re-issue of the credential.

1.5.2. Multiple occurrences of loss or damaged access credentials will be reported to the Contracting Officer. When the replacement of access credentials is performed by the Government, the total cost of re-issuing the credential(s) shall be deducted from the monthly payment due the Contractor.

1.5.3. The Contractor shall prohibit the use of Government issued access credentials by any persons other than the Contractor employee to whom the credential is issued. The Contractor shall prohibit the opening of secure or locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the DCS G-9 Security Office.

1.6 IDENTIFICATION OF CONTRACTOR EMPLOYEES. All Contractor personnel attending meetings, answering Government telephones and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. Contractor personnel shall also ensure that all documents or reports produced are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

Contractor employees with assigned duties requiring on-site performance shall meet the requirements to obtain a Department of Defense building pass. Contractor employees requiring use of Government information systems or facilities shall meet the criteria required to obtain a Common Access Card and building specific identification badge requirements/specifications.

1.7 ORGANIZATION AND CONSULTANT CONFLICTS OF INTEREST. Contractor and subcontractor personnel performing work under this task order may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 ANTI-TERRORISM AND OPERATIONS SECURITY REQUIREMENTS

2.1. AT Level I Training. All Contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil/courses.

2.2. Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204- 9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2.3. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 45 calendar days after contract award.

2.4. Operations Security (OPSEC) Training. Per AR 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training, and adhere to organization’s security program.

http://cdsetrain.dtic.mil/opsec/

2.5. Information Assurance (IA) / Information Technology (IT) Training: All Contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All Contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.

2.6 Access to Government Information Systems (IS). All contractor employees with access to a Government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

2.7 For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

2.8 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

APPENDIX B: Army-Owned Utility Systems

APPENDIX C: Scope of Work Descriptions

Utility Privatization (UP) Program Management Support

Contractor shall support HQDA in the management and performance of the UP PAM Program with personnel based at the DCS G-9 office at the Pentagon. On-site staff shall be augmented by Subject Matter Experts (SME) support from off-site. Contractor shall assure that findings and issues identified through post-transition support inform the development of policy and guidance recommendations, for application across the portfolio. Contractor shall provide financial analysis of UP contract portfolio and provide recommendations for buyout of UP contracts, early buy-down of amortized capital obligations, and/or economic measures to reduce UP costs. Required assistance may include data consolidation, analysis, and development of performance metrics to assess the success of Army awarded contracts, as well as other privatization and partnerships agreements or initiatives in meeting objectives for fiduciary oversight and compliance with utility regulatory standards including environmental, health, and safety.

Contractor shall provide management support on-site for UP Program oversight, planning, programing and budget development. Contractor shall develop and administer the asset management program for the entire portfolio of 98+/- UP contracts to assure effective oversight of privatized systems. PAM support shall include gleaning the lessons learned from prior contracts and applying to other contracts; identifying contracts in need of modification, and providing a forum for the dissemination of UP contract administration knowledge. Forums shall include posting information on the UP website, direct correspondence with installations, and the management of the annual DOD UP Workshop. Contractor shall assist the UP Program Manager in development of Army policies and guidance culminating in the PAM Handbook that includes:

Army Energy and Water Program Integration Support – technical and financial services to assist in the development, enhancement or review of Privatized Utility Projects in support of Army Energy and Water Program objectives. Projects include renewable energy, energy efficiency, energy resilience, water conservation, waste minimization, and other efforts within the scope of the UP program.

Residential Communities Initiative (RCI) – provide assistance to enable effective integration of UP and RCI programs; including, but not limited to, facilitating asset transfers, identifying and developing strategies to address “orphaned infrastructure”, assist installations in the development of utility rates, and developing capital costs allocations for infrastructure according to HQDA policy.

Real Estate and Environmental Support – provide technical services in support of real property conveyance after the initial asset transfer; including the development of the System Inventory, amended Bill of Sale, draft Easement (or other real estate instrument), and other actions as required.

Contract Cost Management Support – provide UP cost tracking, review and prioritization of capital investment projects, management of amortized resources, and budget development.

Quality Assurance (QA) Program Support – provide support services to the installation Contracting Officer’s Representative (COR) staff to enhance the QA program; services may include the development or modification of the Quality Assurance Surveillance Plan (QASP) or Contract Management Plan (CMP).

Training – assist with the planning and conduct of the annual DOD UP Conference and Workshop, support LHC planning and budgeting, and prepare associated analysis, high-level briefs and technical papers.

Task 2.1 System Inventory & Condition Assessment (SI&CA) QA

Contractor shall perform Quality Assurance of the SI&CA at designated installations for selected systems based upon prioritization established by the requisite LHC. The level of effort for the SI&CA will be determined at the onset of the project based upon the criticality of the utility system in support of vital missions. The SI&CA includes the following:

Pre-Site Visit Data Collection – provision of existing GIS and capital project data Site Visit – data collection, personnel interviews

Data Reduction – initial processing of information, data gap analysis Installation Energy and Water Plan (IEWP) Review – identification of critical loads Condition Assessment – application of condition codes based on data collected Capital Investment Plan (CIP) – multi-year plan to correct system deficiencies Draft SI&CA Report – solicit input from installation, LHC, and HQDA Final SI&CA Report – incorporate comments

Task 2.2 Analysis of Alternatives (AOA)

Contractor shall conduct an AOA in accordance with requirements of OSD UP Guidance (7-Feb-19) to evaluate viable alternatives to upgrade and sustain utility infrastructure, and for the Operation & Maintenance (O&M) of the systems.

The AOA effort shall be performed in conjunction with the LHC, Contracting Officer (DLA-Energy or other), and the affected Installation. The AOA includes the following activities:

Site Visit – interviews with key Installation personnel Review of Utility ISR and Investment Analytics (if available) Review of Utility Investment Plan (if available) & Installation Energy and Water Plan (IEWP) Assessment of Inter-Governmental Support Agreement (IGSA) potential Evaluation of the utility system condition (ISR or SCA, if available) Reviewing ESPC and UESC (as appropriate) Exploring PPA and EUL contracts and potential contracts Determination of Viable Alternatives for Upgrade/Sustain Systems Draft Report – Comparison of Alternatives Final Report – Selection of Preferred Alternative(s)

Task 2.3 Utility Privatization Pre-Award Tasks

UP RFP Requirements – Contractor shall prepare the RFP information for the Contracting Office; including, but not limited to, the following:

o Operational Requirements – response times, performance metrics o System Inventory – asset description by age, material and condition o Government Cost Estimate (GCE) – life-cycle cost estimate for O&M, R&R, and CIP

UP Contract Proposal Evaluation – Contractor shall support the Price evaluation process for the Source Selection Evaluation Team (SSET); including the analysis of the UP proposals, preparation of Price Analysis Reports (PARs) IAW DLA-Energy directions and prepare briefing materials as necessary for the Source Selection Authority (SSA), UP Review Board (UPRB), and UPRB members as required. Price analysis support includes participation in Risk Assessment meetings, negotiation strategy sessions, and other meetings as required.

UP Certified Economic Analysis (CEA) – Contractor shall prepare the draft CEA once the SSA has selected the winning Offeror, the CEA shall be developed IAW current guidelines comparing the selected Offeror against the GSCE. Contractor shall support the CEA review and produce a final version once comments are incorporated from the LHC, OGC, ASA-IEE and ASA-CE.

UP Business Case Analysis (BCA) – Contractor shall develop the draft BCA IAW OSD UP Guidance (7-

Feb-19); the BCA shall include a Risk Assessment associated with UP decision and compare the proposed action against other alternatives evaluated in the AOA Report. The draft BCA shall be reviewed by the LHC, HQDA, AMC, and DLA-Energy before it is forwarded to OSD for approval. Contractor shall incorporate comments as directed and produce the final version for OSD review.

Task 2.4 UP Post-Award Program Quality Assurance (QA)

The Contractor shall participate in the Post-Conveyance Reviews (PCR) Program: Per the OSD UP Guidance (7-Feb-19) and the DODI 4170.11 Energy Management guidance, the Army is required to evaluate 50% of all UP contracts within five (5) years, and 100% of all UP contracts within 10 years. The review process (PCR) consists of gathering technical and financial performance data for each contract to determine the proficiency and efficiency of the System Owners. The PAM oversight function is to perform Quality Assurance on the PCR process itself, and to accumulate and evaluate PCR results. The PAM function includes the identification of trends, lessons learned, and cost growth sources.

Cost Control Reports (CCRs): Contractor shall assess CCRs produced by LHC(s) for cases wherein the Cost Growth exceeds 20% over the life of the UP contract as determined in the PCR process. QA function includes evaluations of the reports, and validation that the mitigated actions to preclude further cost growth are implemented.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 1001 N/A N/A N/A Government 1002 N/A N/A N/A Government 1003 N/A N/A N/A Government 1004 N/A N/A N/A Government 2001 N/A N/A N/A Government 2002 N/A N/A N/A Government 2003 N/A N/A N/A Government 2004 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-JUN-2022 TO

31-MAY-2023

N/A SEE SCHEDULE

SEE SCHEDULE

SEE SCHEDULE

SEE SCHEDULE

SEE SCHEDULE AA AL

256-895-1110

W501YX

0002 POP 01-JUN-2022 TO

31-MAY-2023

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-JUN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-JUN-2022 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-JUN-2023 TO

31-MAY-2024

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-JUN-2024 TO

30-NOV-2024

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-JUN-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-JUN-2024 TO

N/…