W912DY21R0044_Amendment 01.pdf

PDF 311 KB Posted

Attached to
W912DY21R0044 Project Scheduling Service Support
Solicitation number
W912DY21R0044
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DY21R0044

DIRECTORATE OF CONTRACTING - HNC

ATTN RON SHEPHERD

256-895-1319

HUNTSVILLE AL 35816

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

To add CLINs to the SF1449 and clarify the language for both the Technical and Price Proposal submissions and provide an updated Price Sheet for use. This amendment incorporates the letter and price sheet posted to SAM.Gov on 12AUG2021.

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DY21R0044

X 9B. DATED (SEE ITEM 11)

06-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2021

CODE

US ARMY ENGINEERING & SUPPORT CENTER

475 QUALITY CIRCLE NW

HUNTSVILLE AL 35806

W912DY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912DY

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 01 TO W912DY21R0044

This amendment (01) incorporates the letter posted to SAM.gov on 12 AUG 2021 that was listed as amendment 01. The purpose of this amendment is to add CLINs to the SF 1449 and clarify language for both the Technical and Price Proposal submissions and provide an updated Price Sheet for use. The updated information is as follows:

1. Technical Proposal: The technical proposal shall include all non-price factors to include technical / management approach, labor categories and mix, relevant experience, and number of employees. Do NOT include costs in the technical proposal. Acceptable file format for the technical proposal is Adobe PDF. The proposal shall remain valid for 120 calendar days at a minimum and should be identified in the proposal submission. The offeror should make a clear statement in their proposal on the validity dates.

2. Price Proposal: The Contractor shall provide a firm fixed price in their proposal for each CLIN. The price for each CLIN shall be entered on the SF 1449.

Additionally, the Contractor shall provide a separate Adobe PDF File or Microsoft Excel file that provides labor categories, numbers of hours, and hourly rates for each. Contractor Manpower Reporting (CMR) will not be separately priced.

3. Price Sheet Inclusion. See attached.

4. Deadline for contractor questions is 10:00am, Tuesday, 17 August 2021.

5. All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Task 1: Coordination with PM/PDT for P2

FFP

FOB: Destination

NET AMT

CLIN 0002 is added as follows:

0002 1 Job Task 2: Prepare WBS and Initial Schedule

CLIN 0003 is added as follows:

0003 1 Job Task 3: Prepare Schedule Templates

CLIN 0004 is added as follows:

0004 1 Job Task 4: Provide Support to P2 & Maintain

CLIN 0005 is added as follows:

0005 1 Job Task 5: Conduct PM Training

CLIN 0006 is added as follows:

0006 1 Job Task 6: Develop Dashboard

CLIN 1001 is added as follows:

1001 1 Job OPTION Task 1: Coordination with PM/PDT for P2

CLIN 1002 is added as follows:

1002 1 Job OPTION Task 2: Prepare WBS and Initial Schedule

CLIN 1003 is added as follows:

1003 1 Job OPTION Task 3: Prepare Schedule Templates

CLIN 1004 is added as follows:

1004 1 Job OPTION Task 4: Provide Support to P2 & Maintain

CLIN 1005 is added as follows:

1005 1 Job OPTION Task 5: Conduct PM Training

DELIVERIES AND PERFORMANCE

The following Delivery Schedule for CLIN 0001 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

N/A N/A

The following Delivery Schedule for CLIN 0002 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

The following Delivery Schedule for CLIN 0003 has been added:

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

The following Delivery Schedule for CLIN 0004 has been added:

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

The following Delivery Schedule for CLIN 0005 has been added:

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

The following Delivery Schedule for CLIN 0006 has been added:

CAGE

POP 15-SEP-2021 TO

14-MAR-2022

The following Delivery Schedule for CLIN 1001 has been added:

CAGE

POP 15-MAR-2022 TO

14-SEP-2022

The following Delivery Schedule for CLIN 1002 has been added:

CAGE

POP 15-MAR-2022 TO

14-SEP-2022

The following Delivery Schedule for CLIN 1003 has been added:

CAGE

POP 15-MAR-2022 TO

14-SEP-2022

The following Delivery Schedule for CLIN 1004 has been added:

CAGE

POP 15-MAR-2022 TO

14-SEP-2022

The following Delivery Schedule for CLIN 1005 has been added:

CAGE

POP 15-MAR-2022 TO

14-SEP-2022

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0001:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0002:

The following Acceptance/Inspection Schedule was added for CLIN 0003:

The following Acceptance/Inspection Schedule was added for CLIN 0004:

The following Acceptance/Inspection Schedule was added for CLIN 0005:

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following Acceptance/Inspection Schedule was added for CLIN 1001:

The following Acceptance/Inspection Schedule was added for CLIN 1002:

The following Acceptance/Inspection Schedule was added for CLIN 1003:

The following Acceptance/Inspection Schedule was added for CLIN 1004:

The following Acceptance/Inspection Schedule was added for CLIN 1005:

(End of Summary of Changes)

File details come from the government source that posted it. Updated .