March7, 2017 USAMMCE Site Visit Questions
1. Is there a specific design in the new conference rooms?
a. There will be a specific design for the new VTC installation. Design plans will be provided.
2. Who is responsible for the integration of the new equipment with the old equipment?
a. The contractor shall be responsible for the integration of the new equipment with the old existing equipment.
3. What is the name of the German company that installed the existing system in building 4105?
a. The company is Holger Koelsch. Holger Koelsch only configured the equipment. No
German software was used.
4. Will wireless be required throughout building 3201?
a. Wireless is required throughout building 3201. The concrete walls will need core drilling to allow the routing of cables.
5. Will the contractor be responsible for wrapping and packaging the equipment to be relocated?
a. The contractor will not be responsible for wrapping and packaging of equipment.
6. Will the refrigeration units require wireless access?
a. The refrigeration units will require wireless access.
March7, 2017 USAMMCE Site Visit Questions
1. Is there a specific design in the new conference rooms?
a. There will be a specific design for the new VTC installation. Design plans will be provided.
2. Who is responsible for the integration of the new equipment with the old equipment?
a. The contractor shall be responsible for the integration of the new equipment with the old existing equipment.
3. What is the name of the German company that installed the existing system in building 4105?
a. The company is Holger Koelsch. Holger Koelsch only configured the equipment. No German software was used.
4. Will wireless be required throughout building 3201?
a. Wireless is required throughout building 3201. The concrete walls will need core drilling to allow the routing of cables.
5. Will the contractor be responsible for wrapping and packaging the equipment to be relocated?
a. The contractor will not be responsible for wrapping and packaging of equipment.
6. Will the refrigeration units require wireless access?
a. The refrigeration units will require wireless access.