W912DY-17-R-0058,_Amendment_00002.docx
DOCX document 53 KB Posted
- Solicitation number
- W912DY17R0058
About this file
Amendment 00002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix_B_Templates.pdf | ||
| UFC_3-460-03_Final_Document_4_11_16_dated.pdf | ||
| 05_Army_Ph_3_Pricing_Worksheet_11_Aug_2017.xls | XLS spreadsheet | |
| 04_SB_Participation_Plan_rev26July2017,_Amend_00001.doc | DOC document | |
| W912DY-17-R-0058,_Amendment_00001.docx | DOCX document | |
| Army_Phase_3_PWS_Amendment_1_8-7-17.pdf | ||
| ProjNet_answers_Rev_1_Army_3_1632_28_JULY.pdf | ||
| 03_Wage_Determinations_Army_3.docx | DOCX document | |
| 05_Navy_Ph_3_Pricing_Worksheet_14_July_2017.xls | XLS spreadsheet | |
| 04_SB_Participation_Plan_rev16July2017.doc | DOC document | |
| 02_2017_06_16_-_Army_Phase_3_QASP.pdf | ||
| W912DY-17-R-0058_Army_Ph_3_FINAL.pdf | ||
| 06_Army_Phase_3_PPQ_Fillable.pdf | ||
| 01-Army_Phase_3_PWS.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DY17R0058
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SUMMARY OF CHANGES
The purpose of Amendment 02 is the following:
1. Provide Unified Facilities Criteria (UFC) 3-460-03 11 April 2016.
2. Incorporate Appendix B Templates of the Contract Binder (PWS).
3. Update “Notice to Offerors”.
4. Update FAR 52.212-2 Evaluation Commericial Items.
5. Incorporate by reference FAR 52.244-5 and DFARS 252.232-7007.
6. Extend proposal due date to 25 August 2017 at 10 AM CST.
7. All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
| DOCUMENT TYPE |
| DESCRIPTION |
| PAGES |
| DATE |
| Attachment 09 |
| UFC 3-460-03 |
| 417 |
| 11-APR-2016 |
The following have been added by reference:
52.244-5
252.232-7007
The following have been modified:
NOTICE TO OFFERORS
REF: W912DY-17-R-0058, Army Phase 3 Project
The United States Army Engineering and Support Center, Huntsville (CEHNC) issues this solicitation seeking to award a contract for Recurring Maintenance and Minor and Emergency Repairs at various CONUS installations. **Taking exception to any of the requirements found herein will cause the Offeror to be determined deficient, and thus unawardable.**
NOTE: Offerors proposing to entirely self-perform RM – CANNOT meet the Small business requirement – and will be determined deficient.
Offerors shall comply with the following commercial item terms and conditions:
1. See Addendum to FAR 52.212-1 (provision), Instructions to Offerors – Commercial Items, for instructions and required submissions.
2. See Addendum to FAR 52.212-2, (provision), Evaluation – Commercial Items, for information on how the Offerors’ proposals will be evaluated.
3. FAR 52.212-3, (provision) Offeror Representations and Certifications – Commercial Items. All Offerors shall submit a completed copy of the listed representations and certifications.
4. Wage Determinations for the geographic area where the awarded work is to be performed will be incorporated by reference (see attachment 03). A copy of the decision/determination is available at www.dol.gov. The labor rates in effect at the time a task order is awarded will remain in effect through completion of the project, unless modified due to an increase in the Department of Labor rates.
5. The contractor shall NOT engage in any form of contact with installation personnel/or Installation Directorate of Public Works (DPW) personnel, nor any Department of Defense (DoD) personnel regarding this requirement prior to submission of proposal and Award. Contact regarding the requirements set forth in this RFP shall only occur with the USACE HNC Contracting Officer. Discussions or information obtained via other sources could make you ineligible for award if deemed a Conflict of Interest of a Violation of the Procurement Integrity Act.
6. Availability of Funds. Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
7. Proposed recurring maintenance subcontractors DO NOT satisfy the competition requirements of the PWS 4.7, Competition Requirements, or FAR 44.204 for any work at the service order level on this RFP. Therefore, all subcontracting competition requirements of RFP and PWS shall be observed on all service order work, unless the prime contractor offeror (including those formed by agreement of two or more entities to form a single, independent authority that functions as a single prime contractor offeror on this entire contract), entirely self-performs the requirement.
8. Instructions for Technical Inquiries and Questions.
Technical Inquiries and Questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org NLT 28 July 2017. To submit and review inquiry items, prospective vendor will need to use the Bidder Inquiry Key presented below and follow instructions listed below for key access. A prospective vendor who submits a comment/question will receive an answer to the comment/question after it has been processed by the Government technical team. No questions will be received or answered by email. The Government reserves the right not to answer any questions after cutoff date for question(s) submittal.
IMPORTANT NOTE: Do not upload multiple questions to a single inquiry. Do not attach a document with multiple questions to a single inquiry. In order for each question to be addressed, they must be entered separately..
All timely questions and approved answers will be made through ProjNet. Approved answers to all timely questions will be posted by amendment to the solicitation on FedBizOpps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are adjudicated.
The Bidder Inquiry Key for solicitation W912DY-17-R-0058 is: T3426E-39GDGD
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Go to the webpage and select QUICK ADD.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you would like to use for communication.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from the ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
CONTRACT ADMIN DATA
1. Payment and Billing Office: Payment will be made by the office indicated in Block 18 of the SF 1449.
2. Invoices: All invoices must be submitted to the U.S. Army Engineering and Support Center, Huntsville (CEHNC) for technical review and payment. The required method for submitting invoices is via email.
3. Maintenance Reports: Maintenance reports shall be provided in accordance with the requirements described in Appendix B, Reporting Requirements.
4. Resident Management System (RMS) and Quality Control Systems (QCS): This contract will utilize RMS/QCS for administration, schedule, payments, submittals, correspondence, RFIs, QC and reports. The contractor shall comply with all requirements in the Unified Facilities Guide Specifications (UFGS) Specification 01 45 00.10 10 QCS. Reference Contract Binder Defense Logistics Agency – Energy (DLA-E) Preventive Maintenance and Corrective Maintenance, Performance Work Statement (PWS) Appendix E.
5. Payment Instructions for Single or Multiple Accounting Classification Citations: The payment office shall not make payments based on sequential Accounting Classification Reference Number (ACRN) order, cancellation rate, proration, or by fiscal year. Payments to the Contractor will only be made against the ACRN (alpha/alpha code) associated with the specific Task (to include Fiscal Year in which the work was performed) for which the Contractor is requesting payment. The Payment Office will only make payment to the Contractor within the CLIN based on the ACRN(s) associated with the CLIN.
If there is only one source of funding for the CLIN, the payment office shall make payments to the Contractor using the ACRN associated with the CLIN being billed. The contractor is required to clearly identify the CLIN, the ACRN (alpha/alpha code), and the amount billed against the TASK on the invoice. If the ACRN is not identified, or is incorrectly identified, payment will not be made and the entire invoice will be rejected.
6. Subcontract Reporting: In accordance with FAR 52.219-9, Small Business Subcontracting Plan (DEVIATION 2016-O0009) Alternate III, and DFARS 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) Alternate I, contractor shall submit Individual Subcontract Report (ISR) for this contract award on the form SF294 via email to the Contracting Officer as required semiannually. The contractor shall also submit a Summary Subcontract Report (SSR) annually to summarize subcontract reporting for all contracts combined for DoD in eSRS. **Please note: The Small Business requirement specifically precludes the Offeror from self-performing 100% of the Recurring Maintenance.
NOTE: Subcontract reporting for BOAs cannot be reported via eSRS. Contractor must submit via email to the Contracting Officer.
7. Wage Determinations: Service Contract Act (SCA) Wage Determinations and Davis Bacon Wage General Decisions for the geographic area where the awarded work is to be performed are all provided in Attachment 03. A copy of the decision/determination is available at www.dol.gov. The labor rates in effect at the time a task order is awarded will remain in effect through completion of the project, unless modified due to an increase in the Department of Labor wage rates.
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Technical Approach
2. Past Performance
3. Price
4. Small Business Participation
All non-price factors, when combined, are significantly more important than price.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
ADDENDUM TO FAR 52.212-2 EVALUATION—COMMERCIAL ITEMS
The Government intends to evaluate proposals in accordance with the criteria described within the solicitation. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract to a firm whose proposal contains a deficiency, as defined in FAR 15.001. Before award to a higher priced offer when a lower priced, conforming Offer(s) remains, the Source Selection Authority (SSA) must affirmatively determine that the higher priced offer’s technical superiority justifies award to that Offeror and offers the best value to the government. Innovations in proposals will be evaluated to determine if creative ideas of the Offeror are a better value to the Government compared to the minimum criteria. Innovations must be clearly delineated in the price proposal, and if awarded, will be incorporated into the resulting contract. This contract will be awarded to the Offeror whose proposal represents the best value to the Government, noting that as proposals become increasingly technically equal and are awardable in other non-price areas, the proposed price will become increasingly determinative in the best value decision. The following evaluation factors will be used:
| 1. | Technical Approach - Most important factor; |
| 2. | Past Performance - Somewhat less important than technical approach; |
| 3. | Price Proposal – Slightly less important than past performance; |
| 4. | Small Business Participation - Significantly less important than technical, past performance and price, considered individually. |
Technical approach is the most important factor. All the non-price factors, when combined, are significantly more important than price.
However, as proposals become increasingly technically equal (and at least awardable in the other non-price areas), the proposed price will become increasingly determinative in making best value decision for award.
The adjectival rating scale to be applied for Factor I, Technical, will use a combined technical/risk rating of Outstanding, Good, Acceptable, Marginal or Unacceptable in conjunction with the significant strengths, strengths, weaknesses, significant weaknesses, uncertainties and deficiencies in determining technical ratings. Proposals must receive a technical rating of acceptable or better to be eligible for award. See Table 1 below for descriptions of the adjectival ratings.
TABLE 1
Adjectival Rating Description
| Outstanding |
| Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths and the risk of unsuccessful performance is low. |
| Good |
| Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and the risk of unsuccessful performance is low to moderate. |
| Acceptable* |
| Proposal indicates and adequate approach and understanding of the requirements and the risk of unsuccessful performance is no worse than moderate. |
| Marginal – not eligible for award |
| Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high. |
| Unacceptable – not eligible for award |
| Proposal does not meet the requirements of the solicitation and, thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable. |
*Technical proposals shall receive an adjectival rating of Acceptable or better to be eligible for award.
2. Past Performance.
Factor II, Past Performance, will be evaluated for recency, relevancy and quality. Past Performance is limited to projects and/or contracts that are relevant to the type of work being solicited and were performed within the last three (3) years prior to the RFP release date. Past Performance portions of the proposals will receive a Recency Rating, a Relevancy Rating, and a Confidence Assessment, as detailed below:
| a. | Recency of work (within the last 3 years) – The Government will only review work performed during the last 3 years. |
| b. | Relevancy of work (including context of data)—evaluated as very relevant, relevant, somewhat relevant, and not relevant. Further evaluation/consideration will only be given to work that is somewhat relevant or better. |
TABLE 2
| Adjectival Rating |
| Description |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
| c. | Quality – evaluated to determine how well offerors performed on past contracts based on information from customers. |
| d. | Overall confidence Rating assigned to Past Performance in its Entirety--Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence, or No Confidence. Neutral Confidence or better required will be required for award. If no recent/relevant performance record is available or if the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be given a “Neutral Confidence” assessment rating. |
TABLE 3
| Adjectival Rating |
| Description |
| Substantial Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. |
| Neutral Confidence |
| No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance. |
| Limited Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. |
| No Confidence |
| Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort. |
3. Price
Factor III (Price) will not be assigned an adjectival rating but the Government will evaluate all aspects of the price proposal for fairness, reasonableness, and balance. Offers found to be unreasonably high may be considered unacceptable and may be rejected solely on that basis. The proposed prices in Factor III Price, will be evaluated to assure that the final agreed to price is fair and reasonable in accordance with FAR 15.404-1(b) and FAR 15.404-1(c). In accordance with FAR 15.306, the Government intends to make an award without discussions; however, the Government reserves the right to hold discussions, if necessary. Again, to be eligible for award, the price proposal will be evaluated for fairness, reasonableness and balance to determine the best value to the Government. Offers found to be unreasonably high may be considered unacceptable and rejected solely on that basis.
4. Small Business Participation
Factor (IV), Small Business Participation evaluators will evaluate proposals and an adjectival rating of Outstanding, Good, Acceptable, Marginal, or Unacceptable, as defined in the DOD Source Selection Procedures (DFAR PGI 215.3 dated 31 March 2016) and the Army Source Selection Supplement (AS3) to the Department of Defense Source Selection Procedures dated 21 December 2012.
| Ratings |
| Definition/Description |
| Outstanding |
| Proposal indicates an exceptional approach and understanding of the government’s small business objectives in the extent to which it: specifically identifies small businesses proposed for participation in this procurement; demonstrates substantive commitment to small business firm(s), e.g., an enforceable commitment with small business firms; identifies complexity and variety of work small businesses are to perform; demonstrates a commitment to offer 30% or more of its proposed total contract value* toward overall small business participation; states its proposed percentage and dollar values for its proposed amount toward small business in terms of offeror’s total proposed price as reflected in the Price Volume of the proposal. NOTE: Small businesses are not required to subcontract to other small business firms and may be rated Outstanding based on offering 30% or more for self-performance as prime contractor toward overall small business participation and meeting the remaining criteria within this adjectival rating definition. |
| Good |
| Proposal indicates a thorough approach and understanding of the government’s small business objectives in the extent to which it: specifically identifies small businesses proposed for participation in this procurement; demonstrates substantive commitment to small business firm(s), e.g., an enforceable commitment with small business firms; identifies complexity and variety of work small businesses are to perform; demonstrates a commitment to offer 25% or more of its proposed total contract value* toward overall small business participation; states its proposed percentage and dollar values for its proposed amount toward small business in terms of offeror’s total proposed price as reflected in the Price Volume of the proposal. NOTE: Small businesses are not required to subcontract to other small business firms and may be rated Outstanding based on offering 25% or more for self-performance as prime contractor toward overall small business participation and meeting the remaining criteria within this adjectival rating definition. |
| Acceptable |
| Proposal indicates an adequate approach and understanding of the government’s small business objectives in the extent to which it: specifically identifies small businesses proposed for participation in this procurement; demonstrates substantive commitment to small business firm(s), e.g., an enforceable commitment with small business firms; identifies complexity and variety of work small businesses are to perform; demonstrates a commitment to offer 20% or more of its proposed total contract value* toward overall small business participation; states its proposed percentage and dollar values for its proposed amount toward small business in terms of offeror’s total proposed price as reflected in the Price Volume of the proposal. NOTE: Small businesses are not required to subcontract to other small business firms and may be rated Outstanding based on offering 20% or more for self-performance as prime contractor toward overall small business participation and meeting the remaining criteria within this adjectival rating definition. |
| Marginal=not eligible for award |
| Proposal does not demonstrate an adequate approach and/or understanding of the government’s small business objectives in the extent to which it (one or more): specifically identifies small businesses proposed for participation in this procurement; demonstrates substantive commitment to small business firm(s), e.g., an enforceable commitment with small business firms; identifies complexity and variety of work small businesses are to perform; demonstrates a commitment to offer 20% or more of its proposed total contract value* toward overall small business participation; states its proposed percentage and dollar values for its proposed amount toward small business in terms of offeror’s total proposed price as reflected in the Price Volume of the proposal |
| Unacceptable=not eligible for award |
| Proposal does not meet small business objectives, in one or more of the following ways; fails to identify small businesses proposed for participation in this procurement; fails to demonstrate substantive commitment to small business firm(s), e.g., an enforceable commitment with small business firms; fails to identify complexity and variety of work small businesses are to perform; fails to demonstrates a commitment to offer at least 20% of its proposed total contract value* toward overall small business participation; fails to state its proposed percentage and dollar values for its proposed amount toward small business in terms of offeror’s total proposed price as reflected in the Price Volume of the proposal. |
*See definition of Total Contract Value/Total Acquisition Value located within this RFP.
Eligibility for Award:
To be eligible for award, a proposal must receive a rating of 1) Acceptable or better on Factor I, Technical Capability, 2) No lower than Neutral Confidence on Factor II, Past Performance, and 2) Acceptable or better for Factor IV, Small Business Participation Plan.
Basis for Award
This is a full and open competition that will be awarded based upon the best value to the Government. The Government intends to award without discussions, however, it reserves the right to enter into discussions if deemed necessary.
The price proposal will include binding labor rates across a series of labor categories. Offeror shall provide hourly burdened rates for ALL labor categories provided on the Pricing Worksheet. Offeror shall NOT provide additional labor categories. This factor will not receive an adjectival rating, as with Factors I, II and IV. The Government may reject an offer if evaluation reveals a lack of price fairness or reasonableness.
1. Volume 1 Factor I– Technical Approach
The technical approach narrative will be evaluated for clarity, technical feasibility and integration of a holistic systems engineering approach. Sufficient details should be provided to allow the government to assess the nature and quality of services being proposed. Specifically, the technical proposal shall address the following elements:
A. MANAGEMENT PLAN –Description of the offeror’s proposed plan for managing personnel, team members, and subcontractors including:
1. Organizational chart:
a . Include all key personnel.
b. Signify the dividing line between corporate level and contract level.
c. Signify if an individual will be shared across multiple contracts or supporting this contract with no other duties.
2. List of Key Personnel:
a. Project Manager. Provide Resume documenting relevant experience.
b. Quality Control Manager. Resume not required.
c. Safety Manager. Resume not required.
d. Project Engineer. Resume not required.
3. Recurring Maintenance (Preventive Maintenance) Subcontractors
Provide the following for any subcontractor the offeror plans to utilize for 50% or more of the recurring maintenance at a single site to be utilized
a. Location
b. Capabilities and capacity
c. Contractor’s management strategy of subcontractor
4. Corporate Resources – The Offeror should include a description of any corporate resources that will be used or otherwise made available in the performance of this contract. Also, identify how these charges are priced in the firm fixed price (FFP) CLINs and/or Minor Repair CLINs. This information should address the Offeror’s organization and describe specific information on how they will manage contracts with multiple simultaneous maintenance and repair activities over a wide geographic area. The Offeror should demonstrate an understanding of the risk management process associated with petroleum systems maintenance and repair.
5. Management Controls – The Offeror shall provide in narrative form the management techniques and controls that will be implemented to manage and control the work. The Offeror should include the following information:
a. Work management system
b. Document control
c. Financial reporting
d. Field and home office reporting
e. Field implementation of safety and quality control plans
f. Approach for managing subcontractors
g. Allocating responsibility between joint venture members if applicable.
6. Quality Control: Offerors shall describe in narrative form their team’s capabilities to assure quality control. Offerors should describe the quality control approach, corporate systems, and capabilities to maintain quality control of petroleum systems maintenance and repair. Offerors should describe specific information on how they will manage quality control on task orders with multiple simultaneous maintenance and repair activities over a wide geographic area. Offerors should describe how they will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. After contract award, the selected offeror will submit their Quality Control Plan for Government Approval.
7. Safety: Offerors shall describe in narrative form their team’s capabilities to assure safe performance. Offerors should describe the safety approach, corporate systems, and capabilities to maintain safe working environments. Offerors should describe specific information on how they will manage safety on task orders with multiple simultaneous maintenance and repair activities over a wide geographic area.
8. The Offeror shall describe in narrative form how costs will be controlled for orders to assure that excessive man-hours will not be expended to increase costs and profit margin. The Offeror should include types of supervision to be utilized, employee training, efficiency improvement methods, utilization of on-site staff for other task orders, and management of cost for minor repairs.
B. PERFORMANCE PLAN - Description of the offeror’s proposed plan for performing scheduled maintenance and minor repair as outlined in the PWS with regard to the total workload of current petroleum facility maintenance projects under contract and the additional sites in this task order if successful. The contractor shall discuss the following:
1. Capacity to perform task order.
a. The offeror should also discuss the approach to managing the workload of previously awarded and additional future contracts if successful. The approach should include the use of proposed key personnel dedicated to this action.
2. Explanation of tasks that will be self-performed and those that will be subcontracted.
**Please note: The Small Business requirement specifically precludes the Offeror from self-performing 100% of the Recurring Maintenance.
3. Describe how the offeror will meet response time requirements
a. The offeror should discuss the approach to managing multiple simultaneous routine and emergency repair requests for this contract in addition to previously awarded and additional future contracts if successful.
2. Volume 2 Factor II - Past Performance
2. Factor II - Past Performance
The goal of the Government’s past performance evaluation will be to rate the offeror's likelihood of success in performing the solicitation's requirements based upon that offeror's record of past performance. In this context, “offeror” refers to the proposed prime contractor.
Offerors should provide for themselves, as the prime contractor--offeror, three (3) CPARS reports or three (3) PPQs or a combination thereof (i.e., 2 CPARS and 1 PPQ or 2 PPQ and 1 CPARS). Additionally, prime contractor offerors intending to utilize or partner with any other entity (e.g.,subcontractor/team member/joint venture/partner) in the performance of the recurring maintenance portion of this requirement should submit the same number of CPARS/PPQs reports or a combination thereof for that entity. Furthermore, in order to have another entity's past performance submittals considered in the evaluation of the offeror's past performance, the offeror shall provide, in VOLUME 5, the letters of commitment, teaming agreements, or any other titled agreements which shall demonstrate either 1) a MUTUAL agreement between the prime contractor offeror and the other entity to work together on this contract for the recurring maintenance portion ONLY or 2) that the two or more entities agree to partner to perform the entire contract as a single prime contractor offeror.
Due to the competition in subcontracting requirements of the FAR and the PWS regarding the service order portions of this requirement, these agreements will be considered for past performance evaluation purposes ONLY; furthermore, said agreements shall not be recognized for any service order level requirements, unless the agreement partners two or more entities that form an independent single entity that functions as a single prime contractor offeror to entirely self-perform the service order portion.
NOTICE: Unless entirely self-performing as a prime contractor offeror, offerors shall compete all subcontracted service order work which exceeds the threshold established in the PWS and the FAR (micro purchase threshold).
Include copies of CPARS reports and/or page one (1) of each PPQ into your proposal. Provide correct and current phone numbers and email addresses for the PPQ customer point of contact. The Government will attempt to contact those customers who did not return a completed PPQ. The Government may contact those evaluators that returned a completed PPQ. CPARS reports will be verified by the government prior to past performance review.
Individual service order PPQs/CPARS under the same Task Order will not count more than once; cannot use the same project/contract for both PPQ and CPARS.
NOTE 1: CPARS and PPQ pages are not included in the page count.
A “contractor team arrangement” is an arrangement in which: (1) two or more companies form a partnership or joint venture to act as a potential prime contractor; or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified Government contract or acquisition program (see FAR 9.6). Past performance evaluation will consist of CPARS reviews and/or review of Past Performance Risk Assessment Questionnaires (PPQs) for the Prime Contractor and its team members. .
Past performance of prime contractors whose firms are divided into severable segments (i.e. division, group, unit, etc.) will only be evaluated for those segments of the firm(s) that will actually perform the work. The Government may properly consider past performance of an offeror's affiliated companies where the firm's proposal demonstrates that the resources of the affiliated company will affect the performance of the offeror. For these affiliated companies to be considered in the past performance rating, offeror must include a teaming agreement, as applicable. Past Performance references will first be reviewed to determine the relevancy of the past performance information. The Government will evaluate projects that are either currently underway (minimum 75% complete as billed or accomplished) or completed no more than three years preceding the closing date of this solicitation.
Past Performance is limited to projects and/or contracts that are relevant to the type of work being solicited and were performed within the last three (3) years prior to the RFP release date. Past Performance portions of the proposals will receive a Recency Rating, a Relevancy Rating, and a Confidence Assessment, as detailed below:
a. Recency of work (within the last 3 years)— If the submittal regards work outside the last 3 years, it will not be evaluated further.
b. Relevancy of work (including context of data)—evaluated as very relevant, relevant, somewhat relevant, and not relevant. Only submittals that evaluators consider are somewhat relevant or better will receive further evaluation/consideration in the overall Confidence Assessment rating.
c. Quality evaluated to determine how well offerors performed on past contracts based on information from customers.
d. Overall confidence Rating assigned to Past Performance in its Entirety--Substantial Confidence, Satisfactory Confidence, Neutral Confidence, Limited Confidence, or No Confidence. Neutral Confidence or better will be required for award. If no recent/relevant performance record is available or if the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be given a “Neutral Confidence” assessment rating.
The Government will evaluate performance ratings by the customer (e.g. CPARS and/or Past Performance Questionnaires). If no recent/relevant performance record is available or if the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be given a “Neutral Confidence” assessment rating.
The offeror is cautioned that in conducting the performance risk assessment, the Government may use data provided in the offeror's proposal in addition to data obtained from other sources. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
Since the Government may not necessarily obtain information on all of the listed contract references and/or may not contact all of the identified POCs provided by the offeror, it is required for the offeror to explain the relevance of the data provided. In the event that adverse past performance information is obtained from other sources, and the agency conducts either discussions or communications with the particular offeror as defined in FAR 15.306, the offeror if otherwise competitive for award will have the opportunity to respond to any adverse information received which it had not had a previous opportunity to comment.
Please forward the PPQ (Attachment 03) to your customer POC, as well as the government POC, after completing section one (1). Offeror should request that the customer POC email the completed questionnaire directly to the Government POC.
The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor II Past Performance. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 03), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government via email at CEHNC-DLAFuelsPPQs@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted information from other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
Provide copies of CPARS reports and/or PPQs into your proposal. Provide correct and current phone numbers and email addresses for the PPQ customer point of contact. The Government will attempt to contact those customers who did not return a completed PPQ, but again, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. Therefore, the offeror is encouraged to verify with the customer [not with the Government (HNC)] that the PPQ is submitted to the government.
The Government may contact those customers that returned a completed PPQ for clarifications, if necessary. CPARS reports will be verified by the government prior to past performance review. Offerors may provide information on problems encountered on the contracts identified in past performance submissions and corrective action taken.
In addition to the above, the Government reserves the right to perform a CPARS search on all Offerors, as well as, using DLA – Fuels personal program knowledge of DLA Fuels task order holders/contract awardee(s) to consider any other relevant past performance information.
Include copies of CPARS reports and/or page one (1) of each PPQ into your proposal. Provide correct and current phone numbers and email addresses for the PPQ customer point of contact. The Government will attempt to contact those customers who did not return a completed PPQ. The Government may contact those evaluators that returned a completed PPQ. CPARS reports will be verified by the government prior to past performance review.
NOTE 1: CPARS and PPQ pages are not included in the page count.
3. Factor III - Price
The Offeror shall provide a firm fixed price proposal. Each CLIN should be priced separately with the exception of the Minor and Emergency Repair (MR) CLIN. The MR CLIN amount will be set by the Government as an annual estimated ceiling amount. The Government anticipates this amount to be $1,800,000 for the base year and $1,800,000 for each option year. CLIN 0004, Minor and Emergency Repairs, will be evaluated as at estimated amount ($1.8M) for all Offerors. Do not price this CLIN.
Regarding the MR CLIN, actual pricing for MR will be determined and agreed upon at the time of Service Order (SO) award. Nevertheless, the Offeror is required to list all professional labor categories and administrative mark ups that the Offeror anticipates using in administering the service orders on a separate spreadsheet as indicated in Attachment 5. The Offeror shall not exceed the labor rates or markups in the contract, but is encouraged to offer lower rates which will be used for the award of service orders under this contract.
Submit the price proposal to perform the work described in the contractor binder. Please submit price proposed per site for each maintenance interval (quarterly, semi-annual, annual).
The service order process will be utilized to cover minor and emergency repair services at all facilities. These (firm-fixed price) service orders will pertain to needed minor or emergency unscheduled repairs. The awardee will not be entitled to the full amount obligated on CLIN 0004 unless the full amount is earned for performance of approved service orders. Each submitted service order and monthly report under this order will include a current balance sheet (indicating service order facility code, service order number, PWS description, service order CLIN/Sub-CLIN, and service order amount) to document that adequate are available/adequate funds remain. The Government will also keep a set of records for approved service orders and a working balance sheet for reconciliation and funding purposes. At the end of the performance period, any unused service order funds will be de-obligated and returned to the customer. See the enclosed Addendum A: Contract Binder for more information related to the service order process and service order form.
Offerors shall submit their proposals on the attached Pricing Worksheet as Solicitation Attachment 05 to RFP W912DY-17-R-0058 in Microsoft Excel format.
Price will be the deciding factor in the event that two or more evaluations are considered equal such as an overall rating tie. To evaluate compliance with FAR Clause 52.222-6 (Construction Wage Rate Requirements, formerly Davis Bacon Act) and 52.222-41 (Service Contract Labor Standards, formerly Service Contract Act), firms shall show separate price breakouts for the base Offer and option years 1 through 2, and the 6 month option to extend services, using the format specified below:
a. Tab A - Prime Contractor Price Proposal/Pricing Worksheet
1. Professional & Nonprofessional Labor (includes burdened hourly rates and labor categories).
Offeror shall provide hourly burdened rates for ALL labor categories provided on the Pricing Worksheet. Offeror shall NOT provide additional labor categories. Separate tabs have been provided for separate location labor rates.
2. Equipment/Supplies/Materials as required for Recurring Maintenance CLINS 0001- 0003 (include breakdowns showing types of materials, unit costs, and extended unit costs).
3. Travel as required for Recurring Maintenance CLINS X001-X003 (specify travel related components and include applicable rates). Note: Travel Cost Estimates will be evaluated in accordance with the Joint Travel Regulations (JTR).
4. Other Prime Contractor Total Proposed Price (Service Order Pricing Components)
a. Prime Service Order Fee - See Contract Binder: Attachment 01: Appendix A, Section 4.0, Service Order Pricing for more information.
b. Emergency Service Order Fee – See Contract Binder: Attachment 01: Appendix A, Section 4.0, Service Order Pricing for more information.
5. Total Price Proposed
Since minor and emergency repair service orders will be a significant portion of this proposed award, a service order price analysis will be performed to evaluate the effects of each Offeror’s labor and service order price components. Examples of previous minor and emergency service orders will be developed, each identifying a number of prime and subcontractor labor hours and labor categories to be utilized. Each Offeror’s labor and price components will be applied equally across the service orders to determine the effects of how the Offeror’s labor rates and fees will potentially forecast future Service Order prices. The results of this analysis will be evaluated for reasonableness.
The price proposal cover sheet must include a recap of your proposal (i.e. overall total proposed, proposed base year FFP, proposed option years FFP, and the FFP of any exercise of the option to extend services under Clause 52.217-8, for up to six months, incorporated herein to allow for proper evaluation pursuant to FAR Part 6 requirements.
Submit the price proposal using the pricing worksheet provided at Solicitation Attachment 06. Price proposals shall include a narrative describing how Offerors developed the service order fee and include the formula used to develop the service order fee. Prices provided in the proposal should be supported by price buildups for all price elements.
Offerors shall submit a price proposal for the base year and four option years, and for any exercise of the option to extend services for up to six months, under Clause 52.217-8 to allow proper evaluation pursuant to FAR Part 6 requirements. Proposal shall include, the breakout of the all-inclusive direct labor cost (i.e., overhead rate, G&A rate, profit, escalation rate and any subcontractor handling fee, if any) for option years (See Pricing Worksheet, Solicitation Attachment 06)
The Government will evaluate the price proposal in accordance with FAR 15.404-1. Price will not be an adjectivally rated criterion, but will be evaluated as to fairness and reasonableness and for providing the best value to the Government. Offers found to be unreasonably high may be considered unacceptable and may be rejected on that basis.
4. Factor IV - Small Business Participation Plan
a. Tab (A) – Small Business Participation Plan. All Offerors (both large and small businesses) are required to submit a Small Business Participation Plan (Solicitation Attachment 04). This is separate from the “Small Business Subcontracting Plan,” which is only a requirement for large business contractors. Offers shall propose toward Overall Small Business Participation (SBPP) in the minimum required amount of at least 20% of its proposed total contract value. Offerors shall provide detailed explanation of its SBPP as required by Attachment 04, to be eligible for award. Offerors shall propose a dollar amount and a percentage amount toward small business participation in terms of their proposed total contract value. All Offerors, both large and small businesses, are required to submit a Small Business Participation Plan in accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 215.304.
Small Business Participation Plans from all Offerors (both large and small businesses) will be evaluated on the level of proposed participation of U.S. small businesses in the performance of acquisition (as small business prime Offerors or small business subcontractors) relative to the minimum requirements and government small business participation goals established herein. In assigning an adjectival rating to each offeror’s small business participation plan (as defined herein and in the RFP), the government will evaluate how the offeror completes Attachment 04 to demonstrate the following::
(1) The extent to which such small business firms, as defined in FAR Part 19, are specifically identified in proposals for participation in this procurement;
(2) The extent of substantive commitment to utilize such small business firms demonstrated, with enforceable commitments considered more favorably.
(3) Whether the extent that the proposal identifies the complexity and variety of the work small business will perform;
(4) The extent of proposed participation of small business prime offerors and small business subcontractors in terms of the percentage and dollar amounts of the offeror’s proposed total value of the acquisition/proposed total contract value
(5) The extent to which the offeror meets or exceeds the required minimum small business participation percentage for overall small business for this procurement, twenty-percent (20%), To be eligible for award, offers must receive an adjectival rating of Acceptable or better for small business participation plan. To receive the adjectival rating of Acceptable, offers shall propose at least 20% of its proposed total contract value (e.g., amounts in the Small Business proposal must match amounts in the Price proposal) toward Overall Small Business, and meet all other requirements of the adjectival definition of Acceptable.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .