Exhibit_A_CDRL_List_.pdf
PDF 117 KB Posted
- Attached to
- Utility Monitoring and Control Systems - UMCS
- Solicitation number
- W912DY-17-R-0014
About this file
This document outlines deliverables required under the Utility Monitoring and Control Systems contract opportunity. The U.S. Army Corps of Engineers Engineering Support Center Huntsville is soliciting proposals for worldwide support for the procurement and installation of UMCS, including HVAC, chiller/boiler systems, SCADA systems, ACS such as FAS and ESS. Offerors must submit various plans and reports such as an accident prevention plan, health and safety reports, manpower reporting, and property control system plans. Training requirements include iWATCH, Corps Watch, threat awareness, and OPSEC awareness. Monthly status reports and other deliverables specified in task orders such as traffic control plans must also be provided. Proposals are due under solicitation number W912DY-17-R-0014 to provide comprehensive UMCS support on a worldwide basis.
Under Section J - Exhibit A - CDRLS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Exhibit_B_-_Specifications.pdf | ||
| Attachment_3_-_Sample_Task_Order_(rev._0.b).pdf | ||
| Attachment_8_-_Questions_and_Answers_from_ProjNet.pdf | ||
| Attachment_5-_Small_Business_Commitment_Document.docx | DOCX document | |
| Attachment_1_-_Experience_Reporting_Form.docx | DOCX document | |
| Amendment_1_to_RFP.pdf | ||
| ATTACHMENT_7.pdf | ||
| ATTACHMENT_3.pdf | ||
| ATTACHMENT_5.pdf | ||
| ATTACHMENT_2.pdf | ||
| W912DY-17-R-0014.pdf | ||
| ATTACHMENT_4.pdf | ||
| ATTACHMENT_6.pdf | ||
| ATTACHMENT_1.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UMCS-IV Base Contract CDRL List 05-19-17
A001 Site Specific Accident Prevention Plan (APP) A002 Health & Safety Reports A003 Accident Reports A004 After Action Reports A005 Manpower Reporting A006 Government-Furnished Property, Property Control System Plan (PCSP) A007 Subcontracting Reporting (LB Only) A008 Project Schedule A009 UMCS Group I Technical Data Package A010 UMCS Group II Technical Data Package A011 UMCS Group III Technical Data Package A012 UMCS Group IV Technical Data Package A013 UMCS Group V Technical Data Package A014 UMCS Group VI Technical Data Package A015 UMCS Testing, Factory Test Setup A016 HVAC Sys. & Hydronic System Balancing A017 UMCS Testing, Adjusting & Commissioning A018 UMCS Performance Verification Test Procedures A019 UMCS Endurance Test A020 UMCS Opposite Season Testing A021 UMCS Operators Training A022 FAS Shop Drawings A023 FAS Product Data A024 FAS Test Report A025 FAS Operation and Maintenance Data A026 FAS Technical Data and Computer Software A027 SCADA Technical Data Package A028 SCADA Existing Conditions Report A029 SCADA Factory Demonstration Data A030 SCADA Training Data A031 SCADA Operation and Maintenance Manuals A032 ESS Group I Technical Data Package A033 ESS Group II Technical Data Package A034 ESS Group III Technical Data Package A035 ESS Group IV Technical Data Package A036 ESS Group V Technical Data Package A037 UMCS Information Assurance Package A038 ESS Information Assurance Package A039 Corporate Quality Control and Surveillance Plan A040 Abbreviated Accident Prevention Plan (AAPP) A041 Traffic Control Plan A042 OPSEC Standing Operating Procedure (SOP)/Plan
Other deliverables as specified in the task order specific PWS.
DELIVERABLES
Document Due # Copies Submit To
Corporate Accident Prevention Plan
30 calendar days prior to commencing work
1 KO or designated representative
Task Order Specific Accident Prevention Plan
30 calendar days prior to commencing work
1 KO or designated representative
Corporate Quality Control Plan 30 days after contract award 1 KO or designated representative
Task Order Specific Quality Control Plan
Within the time frame outlined in the individual task order(s) for Task order specific QCP.
1 KO or designated representative
Monthly Status Reports 5 business days after the meeting
KO or designated representative
Property Control Plan Prior to contract start date 1 KO
Government Furnished Property Inventory
Prior to start of a task order TBD KO or designated representative
E-Verify 3 days after contract award KO or designated representative
Training:
• iWATCH/Corps Watch
• Threat Awareness Training
(TARP)
• Suspicious Activity Reporting
• AT Awareness
• OPSEC Awareness
30 days after contract award and within the time frame outlined in the individual task order(s) for Task order specific QCP.
KO or designated representative
Other Files As directed by the KO KO