Amendment_1_to_RFP.pdf

PDF 505 KB Posted

Attached to
Utility Monitoring and Control Systems - UMCS
Solicitation number
W912DY-17-R-0014
Issued by

About this file

This is a request for proposal (RFP) from the Department of the Army Corps of Engineers Engineering Support Center Huntsville for utility monitoring and control systems (UMCS) services. The RFP seeks proposals for multiple award task order contracts (MATOCs) with a total programmatic capacity of $2.1 billion over seven years. Services include procurement, installation, and maintenance of UMCS, HVAC, fire alarm, security, and other automated control systems at DoD and government facilities worldwide. Offerors must submit proposals by August 16, 2019 addressing technical solutions, pricing, and other requirements. Awards will be made to both large and small businesses, with some task orders reserved for small business offerors. Task orders will be on a firm-fixed price basis for services, construction, and supply work. The incumbent will oversee performance of awarded task orders.

Amendment 1 to RFP

View the file

Other files

File Type Posted
Amendment_0002.pdf PDF
Exhibit_B_-_Specifications.pdf PDF
Attachment_3_-_Sample_Task_Order_(rev._0.b).pdf PDF
Attachment_8_-_Questions_and_Answers_from_ProjNet.pdf PDF
Attachment_5-_Small_Business_Commitment_Document.docx DOCX document
Attachment_1_-_Experience_Reporting_Form.docx DOCX document
Exhibit_A_CDRL_List_.pdf PDF
ATTACHMENT_7.pdf PDF
ATTACHMENT_3.pdf PDF
ATTACHMENT_5.pdf PDF
ATTACHMENT_2.pdf PDF
W912DY-17-R-0014.pdf PDF
ATTACHMENT_4.pdf PDF
ATTACHMENT_6.pdf PDF
ATTACHMENT_1.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912DY-17-R-0014

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The purpose of this amendment is issue administrative changes to Sections: A, C, E, F, G, I, L, M, attached Exhibit A CDRL list as listed in Section J, and to extend the proposal due date.

2. The proposal due date is extended to 2:00 pm CT on 16 August 2019.

3. All changes are identified in highlighted yellow text.

4. It is the Offeror's responsibility to review the amendment in its entirety to identify all changes.

5. All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 91

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DY-17-R-0014

X 9B. DATED (SEE ITEM 11)

09-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2019

CODE

US ARMY ENGINEERING & SUPPORT CENTER

HUNTSVILLE ENGINEERING & SUPPORT CENTER

P.O. BOX 1600

HUNTSVILLE AL 35807-4301

W912DY 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The number of offeror copies required has increased by 1 from 2 to 3.

The following have been modified:

SECTION A - SOLICITATION/CONTR

EXECUTIVE SUMMARY

A.1 Objective. The contractor shall provide all personnel, equipment, tools, materials, supervision, and non-personal services necessary to perform the procurement and installation of Utility Monitoring and Control Systems (UMCS) and similar services such as Heating, Ventilating, and Air Conditioning (HVAC) Systems to include chiller/boiler systems installation and/or integration; Building Automation Systems (BAS); Supervisory Control and Data Acquisition (SCADA) Systems, and other Automated Control Systems including Fire Alarm Safety (FAS) systems, chemical / biological / radiological contaminant detection / filtration / response, utilities (electric/gas/water/steam) metering; Electronic Security Systems (ESS); and security and/or force protection measures such as, but not limited to, barriers, fencing, gates, window treatments, hardening, and lighting worldwide.

These services include those actions required to preserve and maintain the systems in such a condition that they may be effectively used for their designated functional purpose. The North American Industry Classification System (NAICS) code for these services is 541512, Computer Systems Design Services. This acquisition may require the handling and generation of classified information. Providing these services may call for extensive domestic and foreign travel. Personnel must be able to obtain necessary security clearances and visas/passports, as needed. These UMCS services are required to support Department of Defense (DoD) installations or other Government facilities throughout the Continental United States, Alaska, Hawaii, and US Territories and possessions, as well as Afghanistan, Belgium, Germany, Italy, Iraq, Japan, Kuwait, Malaysia, Poland, Qatar, Romania, South Korea, and United Kingdom where controls systems are installed. The requirements for performing work in other countries not already listed may be added at the TO level as the need arises.

A.2 Contract Type. The U.S. Army Engineering and Support Center, Huntsville (CEHNC) intends to award Multiple Indefinite Delivery/Indefinite Quantity (ID/IQ) type contracts to both large and small businesses. The Government intends to award a contract or contracts resulting from this solicitation to all qualifying offerors as stated in Class Deviation 2018-O0006. This requirement will be competed on an unrestricted basis and will result in Multiple Award Task Order Contract (MATOCs). The total programmatic capacity for the MATOC is $2.1 Billion for services and ancillary construction and supply elements. Individual capacities will not be assigned to each contract. Under this MATOC, task orders will be awarded as Firm Fixed Price (FFP).

A.3 Contract Term. This MATOC will have a base ordering period of forty-eight (48) months with three (3) twelve (12) month option periods. There is no guarantee that the option will be exercised on the awarded contract.

The below table reflects an ESTIMATED period of performance. The period of performance shall be set at time of the award.

Estimated Contract Period Start End Base Period 15 April 2020 14 April 2024 Option Year 1 15 April 2024 14 April 2025 Option Year 2 15 April 2025 14 April 2026 Option Year 3 15 April 2026 14 April 2027

The Government may extend the ordering period in accordance with terms in FAR 52.217-8, Option to Extend Services. The evaluated rates in effect during the last exercised option period will remain in effect during any extensions executed under the stated clauses; not to exceed six months.

The Government may extend the term of the contract in FAR 52.217-9, Option to Extend the Term of the Contract.

The Government shall provide a written notice to the Contractor within 30 calendar days before the expiration of the contract; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

The Government reserves the right to make staggered awards. Later awarded contracts will have an initial period of performance that will be less than the full three year base period in duration and will end on the same date as all other contractors which receive a basic MATOC award. Option periods will be the same for all awardees. If determined to be in the Government’s interest to hold discussions, discussions may be held with offerors remaining in the competitive rage after initial awards have been made to some offerors.

A.4 Contract Ordering. Task orders will be awarded against the base MATOC/IDIQ contracts using the fair opportunity procedures pursuant to FAR PART 16.5 and in accordance with the instructions listed in Section H.3, Method of Ordering. The Government is under no obligation to issue any orders against this contract in excess of the minimum contract obligation of $2,000.00. The only authorized ordering office is the U.S. Army Engineering and Support Center, Huntsville, Alabama. Other agencies may be delegated this authority, in which case, an advance written notice will be given to the contractor. In addition to, or in lieu of mailing an order, the Contracting Officer may issue an order orally, by facsimile or by electronic commerce methods, at his / her discretion.

A.5 Contract Capacity. The estimated maximum contract capacity is $2,100,000,000.00 over a period of seven years (if all options are exercised) for this acquisition. The Contracting Officer will ensure price is evaluated at the task order level. Values provided under the Contract Line Item Numbers represent the estimated capacity only and the Government reserves the right to move capacity between CLINs and performance periods as necessary.

A.6 Wage Determinations. Approximately 90% of the individual task orders to be issued under this contract are for services as defined by FAR 37.101 and are subject to the Service Contract Act (See FAR 52.222-41). In the event that individual service task orders contain more than incidental, segregable construction effort, the Construction Wage Rate (See FAR 52.222-6) will apply to the construction portion in accordance with FAR 22.402.

Approximately 10% of the individual task orders to be issued under this contract will include construction as defined by FAR 36 and are subject to the Construction Wage Rate. Individual task orders will identify the work to be performed therein as either “service” (subject to Service Contract Act) or “construction” (subject to Construction Wage Rate provisions). Wage Decisions/Determinations for the geographic area where the awarded work is to be performed will be incorporated by reference in the individual task order. Also, Defense Base Act (DBA) insurance requirements will be included in task orders performed overseas, when required. A copy of the decision/determination is available at www.wdol.gov. The labor rates in effect at the time a task order is awarded will remain in effect through completion of the project, unless modified in accordance with Department of Labor regulations.

A.7 Small Business Set-Aside. This contract has an unrestricted suite and a small business reserve. Task orders under this MATOC will be set aside for the small business qualifying offerors in accordance with FAR 19.502-2. A Decision Matrix will be used, as a tool, under this MATOC to determine which task orders will be reserved for the small business concerns or competed among all MATOC holders. The decision matrix will consider complexity, size, risk, and any special circumstances (e.g. limited timeframe to do the work or to quickly mobilize). Size, to include dollar amount, alone is not a practical determination, as some projects that are large in size may not be technically complex, and may be considered more suitable for Small Businesses.

A.8 Minimum Guarantee. The minimum guarantee order for each awardee shall be $2,000.00 for the life of the contract. The minimum guarantee may be met by awarding a task order or multiple task orders, the sum of which is at least $2,000, at any time during the base period or option years.

A.9 Contract On-Ramps/Off-Ramps. In an effort to increase competition, the CEHNC Contracting Officer may evaluate the market every 12 - 18 months throughout the life of the MATOC to determine if it is in the Government’s best interest to open a contract “On-Ramp” or “Off-Ramp”. During a contract “On-Ramp” the

Government will accept and evaluate new proposals with the intention of adding additional contractors to the MATOC pool, to refresh the pool’s competition. These proposals shall be subject to the same proposal instructions and evaluation procedures as contained in the original solicitation. During a contract “Off-Ramp”, the Contracting Officer may not exercise an option. The file should be documented to show the Contracting Officer decision not to exercise an option. Alternatively, Contractors can request to be placed in a dormant status if they are knowingly unable to propose for a period of time. A contractor who is in dormant status cannot be “Off-Ramped”.

Dormant Status. Due to extenuating circumstances (not related to performance), contractors that do not propose can request to be placed in a dormant status. Contractors in dormant status cannot compete in new task order solicitations; however, they may continue to work on awarded task orders. Dormant status is granted for a defined finite time period, after which it will lift and the contractor will be expected to compete.

Competition for inclusion in the MATOC pool will be sought, promoted, and sustained by querying the System of Award Management (SAM), synopsizing proposed actions, and posting the solicitation in the Government-wide point of entry website (FedBizOpps).

A.10 Outside the Contiguous United States Task Orders. For any work outside the contiguous United States location, the contractor will be required to submit documentation demonstrating compliance with the outside contiguous United States clauses and host-nation laws referenced in this contract with proposal submissions for task orders. Special instructions for contracting outside contiguous United States locations are included in Section H.

Additional clauses applicable to each outside contiguous United States location will be included as required per task order.

A.11 Defense Base Act Insurance (DBA). For locations that may fall outside the United States and its territories after identified by customer and the Contracting Officer has made a scope determination, the contractor will be required to acquire DBA insurance as applicable and provide policy documentation that pertains to such coverage for locations that fall outside of the United States and its territories. Subsequent task orders shall include the requirement for DBA insurance as applicable, and in accordance with FAR 52.228-3, DBA must flow-down to all subcontracts to which DBA applies. The contractor procuring DBA insurance for this contract shall purchase such insurance through the DOL, www.dol.gov/owcp/dlhwc/lscarrier.htm unless otherwise specified in accordance with FAR 28.305(b) order.

A.12 Questions. All questions must be submitted in writing no later than 1400 Central Standard Time (CST) on 22 July 2019 and sent to www.projnet.org/projnet. Key Number: J54ZDA-GXMNBM

A.13 Proposal Due Date. Proposal submission shall arrive no later than Friday, 16 August 2019 at 1400 CST.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The unit of issue has changed from Unit to Job.

CLIN 0002

CLIN 0003

CLIN 0004

CLIN 0005

CLIN 0006

CLIN 0007

CLIN 0008

CLIN 0010

The unit of issue has changed from Unit to Each.

CLIN 1001

CLIN 1002

CLIN 1003

CLIN 1004

CLIN 1005

CLIN 1006

CLIN 1007

CLIN 1008

CLIN 2001

CLIN 2002

CLIN 2003

CLIN 2004

CLIN 2005

CLIN 2006

CLIN 2007

CLIN 2008

CLIN 3001

CLIN 3002

CLIN 3003

CLIN 3004

CLIN 3005

CLIN 3006

CLIN 3007

CLIN 3008

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

Utility Monitoring and Control Systems (UMCS) Fifth Generation (V)

(Revision Date: 29 July 2019)

1.0 GENERAL INFORMATION

1.1 Description of Services. The contractor shall provide all personnel, equipment tools, materials supervision, and other items and non-personal services necessary to provide the Procurement and Installation (P&I) of and/or the Maintenance and Service (M&S) of Industrial Control Systems (ICS) including but not limited to: Utility Monitoring and Control Systems (UMCS), Heating, Ventilation and Air Conditioning (HVAC) systems to include chiller/boiler systems installation and/or integration, Supervisory Control and Data Acquisition (SCADA) Systems, Fire Alarm Systems (FAS), life safety systems, other automated control systems including chemical / biological / radiological contaminant detection / filtration / response, utilities (electric/ gas/ water/ steam) metering, Electronic Security Systems (ESS), and security and/or force protection measures such as, but not limited to, barriers, fencing, gates, window treatments, hardening, and lighting.

1.2 Background. The U. S. Army Corps of Engineers Engineering & Support Center, Huntsville (CEHNC) maintains Centers of Expertise in UMCS and ESS. As Centers of Expertise, CEHNC provides direct support to Government agencies for the P&I and M&S of UMCS and related systems as described above.

1.3 Objectives. The Contractor shall provide technical support, procurement, installation, monitoring, and M&S for UMCS, HVAC, ESS, FAS, SCADA and related systems. These services include those actions required to preserve and maintain the systems in such a condition that they may be effectively used for their designated functional purpose.

1.4 Scope. This contract will require the Contractor to have the capability to respond to multiple requests simultaneously and to work at diverse locations. The Contractor shall provide all engineering and services necessary for the P&I of new and/or upgrades to Direct Digital Control (DDC) systems, existing HVAC systems, Fire Alarm System (FAS), SCADA systems, or other automated control systems on Government facilities. This contract will require monitoring and control and M&S of control systems at Government facilities, municipalities and educational institutions to meet specific installation requirements. The Multiple Award Task Order Contract (MATOC) will predominantly be services contracts, but some task orders may have construction and supply elements. The task orders will include the necessary clauses, terms, conditions, instructions, and references for each of these three unique contract styles as applicable (services, construction, and supply).

1.4.1 These services also include Preventive Maintenance (PM), Corrective Maintenance (CM), repair/ replacement/modernization, equipment inventories, condition assessments, identification and/or validation of problems and deficiencies, preparation of work plans describing method of correction/repair, actual execution of work plan to repair failed or failing systems and associated equipment, facility management support, project management, central monitoring services, minor construction work within or exterior to a facility, development of PM plans, development of recommended spare parts lists, and other activities associated with operation, maintenance, and repair. Facility maintenance/repair/renovation shall conform to the requirements of the Unified Facilities Guide Specifications (UFGS) and Unified Facilities Criteria (UFC) as per the Performance Work Statement (PWS) issued with each Task Order (TO) award, and/or other applicable codes and standards.

1.4.2 Services will include, but are not limited to, developing of equipment installation engineering plans, providing hardware and software, providing system cybersecurity engineering and implementation, system testing and check-out, performing facility modification and minor construction required to support equipment installation, providing technical solutions that incorporate applicable force protection measures, interfacing with and installing new data transmission equipment, determining compatibility of new equipment with existing systems and integrating them, preparing system and component documentation, providing operation and maintenance manuals, providing training, warranting systems, maintaining and servicing systems, retro-commissioning systems, operating and monitoring systems, preparing after action and other reports, providing as-built installation drawings, system evaluations, configuring/programming systems, system administration systems, provide inspections/functional tests/recommendations on control systems, and other technical and programmatic support services.

1.5 Ordering Period. This effort will be accomplished via individual TOs awarded under multiple Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts that have an ordering period of seven years (four-year base period and three one-year option periods). The Period of Performance (PoP) will be specified in each TO award. The shared capacity of the MATOC is estimated at $2,100,000,000.00.

1.6 Service Contract Labor Standards and Construction Wage Rate Requirements. TOs from this contract may be issued which are subject to Service Contract Labor Standards (See Federal Acquisition Regulation (FAR) 52.222-41), Construction Wage Rate Requirements (See FAR 52.222-6) or both. The latest version of the wage determination for the geographical area in which the work is to be performed will be incorporated with the issuance of the TO solicitation.

Wage determinations may also be found at www.wdol.gov. TOs with performance in foreign countries will not be subject to either Service Contract Labor Standards or Construction Wage Rate Requirements. However, Defense Base Act (DBA) insurance requirements will be included in TOs performed overseas, when required.

1.7 General Requirements

1.7.1 Quality Control Program (QCP). The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s QCP is the means by which he assures himself that his work complies with the requirements of the contract. At a minimum, the contractor shall develop quality control procedures that address the areas identified in Appendix A, Performance Requirements Summary (PRS).

1.7.1.1 Corporate Quality Control and Surveillance Plan. Contractor shall develop, document, and implement an effective quality control and surveillance program for this contract and document in a plan. The QC Plan shall be submitted within thirty (30) calendar days after MATOC award and shall include at a minimum the following documents: Corporate QC Manager appointment letter, QC organizational structure (organization chart), inspection procedures, recordkeeping procedures, report templates, and any other information as required to describe the QC program. At a minimum, the Contractor shall follow an inspection process (e.g.

three phase inspection process (preparatory, initial, and follow-up) or other Government approved inspection methodology) and include sample forms to be filled out for each definable feature at the TO level. After acceptance of the QC Plan, the Contractor shall submit any proposed changes to the Government, tracked through Resident Management System (RMS)/Quality Control System (QCS) for approval by the UMCS Program Manager or COR on the MATOC.

1.7.1.2 Site Specific Quality Control Plan and Surveillance Plan. A task/site specific quality control plan shall be developed/adapted to the services specified in individual TOs, and submitted as required per TO. The site specific QC Plan shall include the following documents at a minimum: The QC Manager appointment letter (include duties and authorities at a minimum), brief summary of inspection procedures to be followed, sample inspection forms (preparatory, initial, follow-up) or other Government approved inspection methodology forms, and the list of definable features of work that the inspections will be based off of. The Government shall be provided a minimum of 48 hour notification (based on work days), unless otherwise specified at the TO level, of any inspection meetings. The Government is not required to be present, but must be notified and given the opportunity to attend. It is the responsibility of the Contractor to maintain the inspection reports and to submit them to the Government via email within 5 days of completion. Additional details may be included at the TO level. After acceptance of the QC Plan, the Contractor shall submit any proposed changes to the Government, tracked through RMS/QCS for approval by the COR on the TO.

1.7.2 Quality Assurance (QA). The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP), and will include an evaluation of the Contractor’s performance. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government may conduct QA inspections at any time on all phases and types of work performed. If any Government QA review identifies a process/work product failure or identifies noncompliance with safety practices, the Contractor will be issued a Corrective Action Request (CAR). Each CAR will be annotated as a critical nonconformance, major nonconformance, or minor nonconformance.

Definitions and required contractor response times are:

* Critical Nonconformance: a nonconformance that is likely to result in hazardous or unsafe conditions for individuals using, maintaining, or depending upon the supplies or services, or is likely to prevent performance of a vital agency mission. Contractor is provided 24 hours (one business day) to provide written response to the CAR.

* Major Nonconformance: a nonconformance, other than critical, that is likely to result in failure of the supplies or services, or to materially reduce the usability of the supplies or services for their intended purpose. Contractor is provided 72 hours (three business days) to provide written response to the CAR.

* Minor Nonconformance: a nonconformance that is not likely to materially reduce the usability of the supplies or services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the supplies or services. Contractor is provided up to 15 business days to provide written response to the CAR.

1.7.3 Government Remedies. The KO shall follow 52.246-4, “Inspection of Services-Fixed Price” for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.

1.7.4 Place of Performance. The Contractor is responsible for performing the services required under this contract at the location as specified in the individual TOs. These UMCS services are required to support Department of Defense (DoD) installations or other Government facilities throughout the Continental United States, Alaska, Hawaii, and US Territories and possessions, as well as Afghanistan, Belgium, Germany, Italy, Iraq, Japan, Kuwait, Malaysia, Poland, Qatar, Romania, South Korea, and United Kingdom where controls systems are installed. The requirements for performing work in other countries not already listed may be added at the TO level as the need arises.

Work performed by the Contractor may be subject to other requirements or restrictions such as those issued by a U.S. Department of Defense theater-level Unified Combatant Commander (COCOM), e.g., CENTCOM Clauses, which are provided under this contract with revisions provided under separate task orders, as applicable.

Entry and exit requirements to countries within the CENTCOM AOR, including Iraq and Afghanistan, are contained within CENTCOM Clauses, specifically, 252.225-7995 Contractor Personnel Performing in the United States Central Command Area of Responsibility, Class Deviation (Deviation 2017-O0004). Additional entry and exit requirements as well as requirements for other countries can be found at: https://www.fcg.pentagon.mil/fcg.cfm.

Predeployment training requirements for Contractor personnel deploying to Iraq and Afghanistan (and other countries as applicable) can be found at:

https://www.bliss.army.mil/crc/contractors.html.

Access to bases and installations within Iraq and Afghanistan (and other countries as applicable) will be subject to varying operational, security, and force protection conditions. The Contractor shall coordinate with the CENTCOM (or other COCOM as applicable) Liaison Officer (LNO) for the current status of such conditions for the bases and installations of interest. Granting access to bases and installations within Iraq and Afghanistan may take up to 30 calendar days following request or notification of intent to enter.

1.7.5 Type of Contract. Task Orders will be Firm-Fixed Price (FFP).

1.7.6 Security Requirements. This contract may require the handling and generation of classified information. Security requirements appropriate for each TO will be delineated in the individual TOs. Some TOs issued may require a security level of SECRET and some may require a higher level than SECRET. The Contractor shall meet the Industrial Security requirements of the

National Industrial Security Program Operating Manual (NISPOM) for Safeguarding Classified Information (DoD 5220.22M). The clearance level will be determined by the User Agency. A DD Form 254, Contract Security Classification Specification, shall be provided. No classified work is authorized without an approved DD 254 and the appropriate personnel and facility security clearance. Personnel security clearances will be obtained by the contractor in accordance with the NISPOM. Facility security clearances will be obtained by the User Agency Security Office.

1.7.6.1 Physical Security. The Contractor shall be responsible for safeguarding all Government property provided for contractor use.

1.7.6.2 Information Security. The Contractor shall provide adequate security for all unclassified DoD information passing through non-DoD information systems including all subcontractor information systems utilized on contract. Unclassified DoD information shall only be disseminated within the scope of assigned duties and with a clear expectation that confidentiality will be preserved. Examples of such information include the following; non-public information provided to the Contractor, information developed during the course of the contract, and privileged contract information (for ex: program schedules, contract-related tracking). Below are safeguards the Contractor, and all subcontractors, shall abide by to protect Government information.

a) Do not process DoD information on public computers (e.g., those available for use by the general public in kiosks or hotel business centers) or computers that do not have access control.

b) Protect information by at least one physical or electronic barrier (e.g., locked room, login and password) when not under direct individual control.

c) Sanitize media (e.g., overwrite) before external release or disposal.

d) Encrypt all information that has been identified as controlled unclassified information (CUI) when it is stored on mobile computing devices such as laptops and personal digital assistants, or removable storage media such as thumb drives and compact disks, using the best available encryption technology.

e) Limit information transfer to subcontractors or teaming partners with a need to know and commitment to at least the same level of protection.

f) Transmit email and similar communications using technology and processes that provide the best level of privacy available, given facilities, conditions, and environment.

g) Do not post DoD information to Web site pages that are publicly available or have access limited only by domain or Internet protocol restriction.

h) Provide protection against computer network intrusions and data exfiltration, minimally including the following: updated malware protection devices, prompt application of security-relevant software patches/service packs/hot fixes, and monitoring and control of inbound and outbound network traffic as appropriate.

i) Report loss or unauthorized disclosure of information in accordance with contract or agreement requirements and mechanisms.

j) The Contractor shall not release any information to the public without prior approval by the CEHNC Office of Public Affairs (i.e. trade publications and marketing information).

1.7.6.3 Site Specific Security Requirements. When Contractor personnel are at any Government site, installation or facility, they shall follow all security procedures and processes of the installation as stated and directed by the Government personnel at the site. The Contractor’s security requirements for work in foreign countries will be based on the requirements set by the combatant commander of the particular Area of Responsibility (AOR) in which the work will be performed. The items that will be covered on a TO basis will include but are not limited to:

transportation into and out of the operating area, required clothing and equipment, transportation security while moving in the operating area, specific employee training prior to entering the operating area, etc. All security requirements will be further detailed at the time of TO awards.

1.7.6.4 Information Technology Systems. For TOs requiring access to Government Information Technology (IT) Systems, but not to classified information, the following requirements apply:

1.7.6.4.1 All contractor employees who are U.S. citizens working under this contract who require access to IT systems (stand-alone computers, network computers/systems, e-mail, etc.)

shall, at a minimum, be designated into an IT I, II or III position in accordance with Army Regulation (AR) 25-2, Information Assurance. The investigative requirement for an IT I position is a favorable Single Scope Background Investigation (SSBI); IT II and IT III positions require a favorable National Agency Check with Law and Credit (NACLC).

1.7.6.4.2 A Common Access Card (CAC) is also required for access to Government IT systems.

Proof of the appropriate investigative requirement/background check will be verified through the Joint Personnel Adjudication System (JPAS) by the CEHNC security personnel.

1.7.6.4.3 Non-U.S. Citizens. Foreign nationals who work on a Corps of Engineers' contract or TO in the United States shall be approved by the Headquarters U.S. Army Corps of Engineers (HQUSACE) Foreign Disclosure Officer before beginning work on the contract or TO. This approval requirement also includes subcontractor employees. The Contractor shall submit to the KO the names of all foreign nationals proposed for performance under this contract or individual TOs, along with documentation to verify that he or she is legally admitted into the United States and has authority to work. This information will be forwarded to the CEHNC Security Officer for approval.

1.7.7 In accordance with FAR 52.236-13, Alt I, Accident Prevention, the Contractor shall comply with the latest version of U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Engineering Manual (EM) 385-1-1 (EM 385-1-1), including any interim revisions in effect at the time of the solicitation, as well as any current state, federal, and local regulations.

EM 385-1-1 and its changes are available at: http://www.publications.usace.army.mil/USACE- Publications/Engineer-Manuals/

1.7.7.1 Corporate Safety and Health Program. The Contractor is required by regulation to develop and maintain a written Corporate Safety and Health Program (SHP) in compliance with the requirements of the Occupational Safety and Health Administration (OSHA), EM 385-1-1, 29 CFR 1910, 29 CFR 1926, 29 CFR 1960, and FAR 52.236-13.

1.7.7.2 Submittals

1.7.7.2.1 Site Visit Abbreviated Accident Prevention Plan (SVAAPP). The Contractor will be required to submit an SVAAPP prior to commencement of any site visit which are not covered under an Accident Prevention Plan. The Contractor shall prepare a “fill-in-the-blank” template SVAAPP to be used for all site visits. The SVAAPP shall be adapted to sites specified in the individual task/delivery orders and shall be prepared prior to each site visit. SVAAPP’s shall be submitted electronically to the CEHNC Safety Office and Project Manager (Adobe PDF format) for review and acceptance. Upon acceptance, by the CEHNC Safety Office, the Contractor shall submit final SVAAPP via e-mail, including tracking submittal via Form 4025 through QCS/RMS. Final acceptance threshold is an approved transmittal of the SVAAPP via QCS/RMS (note: an e-mail from the CEHNC Safety Office of approval does not constitute full acceptance of an SVAAPP) - in accordance with each task order. The SVAAPP shall be submitted to the CEHNC Safety Office for acceptance before any work under this contract is awarded. An example of an SVAAPP can be obtained by contacting the CEHNC Safety Office.

The SVAAPP shall be approved prior to the Contractor performing any surveys on-site.

Submission or approval requirements may be updated at the TO level.

1.7.7.2.2 Site Specific - Accident Prevention Plan (APP). The Contractor shall submit an APP prior to any installation/maintenance activities beginning at the site. APP’s shall address applicable items listed in Appendix A (Minimum Basic Outline for Accident Prevention Plans) of EM 385-1-1 in addition to the other applicable requirements of EM 385-1-1 and OSHA requirements. The plan shall be site specific and shall also address any unusual or unique aspects of the project or activity for which it is written. The Contractor shall coordinate with the facility representatives or facility contractor, on first aid, emergency phone numbers & response plans, site evacuation plans, lock out tag out procedures, any permit required procedures, obtaining a list of previously identified confined spaces, evacuation drills, hazardous/toxic environments/agents etc. This information shall be included in the APP. The APP shall also include site specific Activity Hazard Analysis (AHAs) for the project. The APP is the document that details how the safety and health requirements of OSHA; other regulatory codes and documents; and EM 385-1-1 are to be accomplished. Accident Prevention Plans (APP, IAW EM 385-1-1, Appendix A) shall be submitted in accordance with each task order. The APP shall be approved prior to the Contractor mobilizing on-site to perform work. Submission or approval requirements may be updated at the TO level.

1.7.7.2.3 Addendums to the APP - The Contractor is responsible to verify that any Proposals, Service Orders, Change Orders, and Contract Modifications are covered under the current accepted APP. If the pending work effort is NOT covered under the initial task order APP, the contractor shall submit, for Government review and acceptance, an addendum to the APP.

1.7.7.2.4 Activity Hazard Analysis (AHA) - Before beginning each activity, task or Definable Feature of Work (DFOW) involving a type of work presenting hazards not experienced in previous project operations, or where a new work crew or subcontractor is to perform the work, the Contractor(s) performing that work activity must prepare an AHA. AHAs must be developed by the Prime Contractor. If the Prime Contractor requires a subcontractor or any sub tier-contractor or supplier performing the work, to develop an AHA, it shall be provided to the Prime Contractor SSHO for review and approval before submitting to the Huntsville Center Safety Office for review and acceptance. The Prime Contractor shall review the AHA list periodically

(at least annually in conjunction with an APP review) and update as necessary when procedures, scheduling, or hazards change.

1.7.7.3 Site and Safety Health Officer (SSHO). The Contractor must employ a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO).

The SSHO shall be a direct hire employee of the prime Contractor. Alternate SSHOs may be approved at the discretion of the CEHNC Safety Office and are not required to be a direct hire employee of the prime. Contractor shall declare on the APP and demonstrate, through training documentation maintained at the site, that the SSHO meets the requirements of EM 385-1-1, 01.A.17. The SSHO is required to be onsite at all times during the performance of work. The duties of the SSHO may be fulfilled as an additional job site responsibility (dual hat) by another Competent Person who is not the Supervisor; however, these collateral duties shall not overcome, inhibit or restrict the effective administration of the Safety and Health Program.

Moreover, the functions and roles of the SSHO shall be a singular, full-time responsibility (no other collateral duties) during high hazard activities to include, but not limited to: crane operations, excavations greater than 5-feet, confined space entry, and electrical work to include Lock-out-Tag-out (LOTO) in accordance with the Activity Hazard Analysis (AHA) as prepared per the accepted APP. The Contractor must demonstrate that this employee’s non-safety duties are transferred to another employee when full-time SSHO responsibilities are warranted per the risk activities. The SSHO must be at the location of the high hazard activities while they are being conducted.

1.7.7.4 Exposure Hour and Mishap Reporting

1.7.7.4.1 Exposure Hour Reporting (Monthly Man-hour reporting) - In accordance with EM 385- 1-1, the Contractor shall complete a monthly summary report of accident experience, exposure, Restricted Duty (RD) and Lost Work Days (LWD). The report shall be on the electronic data collection tool provided by the CEHNC Safety described as total hours associated where workers are exposed to the activity hazards and forwarded to the Government Designated Authority (GDA) no later than close of business (COB) the 7th day of the following month.

a) The Contractor shall submit a monthly report to the GDA, no later than close of business (COB) the 7th day of the following month, that includes a summary by month and year to date of exposure hours per base contract number and per program. (i.e. UMCS, Metering, and ESS shall have separate monthly summary reports). Government may change the form or submission method as necessary.

b) The Contractor shall submit a monthly exposure hour report in RMS/QCS at the TO level no later than the COB the 7th day of the following month, if required at the TO level.

The information cut-off date will be the last day of each month. The monthly submission must include the title of the report, i.e., Accident Exposure Data Report, contract number, TO number, project site, month and year for which the report is made, a point of contact listing both email address and telephone number, and number of lost workday accidents to include total days lost.

If no hours are worked on the project/task, a report showing "zero (0)" is required.

1.7.7.4.2 Mishap Reporting – Mishaps shall be reported in accordance with the EM 385-1-1 paragraph 01.D. The Contracting Officer and Huntsville Center Safety Office shall be notified as soon as practical, but no more than twenty-four hours, after any mishaps, including recordable accidents, incidents, and near misses. All mishap notifications will be submitted in accordance with the task order.

1.7.7.5 Preparatory and Initial Control Phase Meetings (Kick-off Meetings) – Per the EM-385-1- 1 Section 01.A.14.c & Appendix A; Understanding that the APP is submitted prior to work starting and that some project-specific information is not yet known (e.g., subcontractors to be used, type of fall protection to be used at a certain point in time, specific cranes or other load handling equipment (LHE) to be brought on site, etc.), the known information shall be provided and additional information added at each preparatory phase/meeting along with the appropriate Activity Hazard Analyses (AHAs). Work shall not begin until the AHA with RAC for the work activity has been accepted by the GDA and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings. Notification of these meetings shall be extended to the USACE PM, KO, Engineers and Safety Representative for the given task order.

1.7.8 Post Award Conference/Periodic Progress Meetings. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The KO, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Government will apprise the Contractor of how the Government views the contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.7.9 Program Manager. The Contractor shall provide a program manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The program manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

1.7.10 Identification of Contractor Employees. All contract personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.7.11 Travel

1.7.11.1 Locations: In support of various tasks and specified on TOs, the Contractor shall be required to travel to DoD facilities located worldwide. Travel will be evaluated in accordance with FAR 31.205-46.

1.7.11.2 Travel Outside the Continental United States Immunization Requirements: As specified in each TO, the Contractor shall be required to travel to locations both shore and afloat.

Contractor employees who deploy to locations that require immunizations shall do so in accordance with DoD Foreign Clearance Guide or other agreements that the United States may have with the country.

1.7.11.3 Letter of Authorization. Some travel shall require a Letter of Authorization (LOA). As noted in Defense Federal Acquisition Regulation Supplement (DFARS) 225.371-3(e), a LOA is necessary to enable a Contractor employee to process through a deployment processing center; to travel to, from, and within a theater of operations; and to identify any additional authorizations and privileges. As required by TO, the Contractor shall initiate a LOA for each prospective traveler. If required at the TO level, the Contractor shall use the Synchronized Pre-deployment & Operational Tracker (SPOT) web-based system, at http://www.dod.mil/bta/products/spot.html, to enter and maintain data with respect to traveling/deployed personnel, and to generate LOAs.

1.7.11.4 If it is in the Government’s interest, the Contractor may also initiate a LOA request to provide an official traveler access to Government facilities and to take advantage of travel discount rates in accordance with Government contracts and/or agreements. All privileges, services, and travel rate discount access are subject to availability and vendor acceptance. LOAs shall be signed/approved by the Contracting Officer for the TO who is registered in the SPOT system.

1.7.12 Sustainability. The following clauses will be included in Section I of the solicitation and resultant contract(s):

a) 52.204-4, Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

b) 52.211-5, Material Requirements

c) 52.223-3, Hazardous Material Identification and Material safety Data

d) 52.223-5, Pollution Prevention and Right-to-Know Information

e) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving

f) 52.223-21, Foams

1.8 Base Contract Submittals. The Contractor shall submit the following documents (following format in the table below), tracked through RMS/QCS within thirty (30) days of base contract award to the UMCS Program Manager. The documents shall be submitted under TO #0001, minimum obligation. After approval, all proposed changes by the Contractor shall be submitted under TO #0001

Submittals

Tracked in

RMS/Q

CS

Form

Requir ed

CD/DV

D

E-mail

PgM Safety Office

Corporate Safety and Health Program Yes Yes √ √ √ Corporate Quality Control and Surveillance Plan

Yes Yes √

Corporate Management Plan Yes Yes √ Unless otherwise specified, all report format shall be Microsoft Office (Word and Excel) and /or Adobe PDF

2.0 GOVERNMENT PROPERTY AND SERVICES

2.1 General: The Government will make the determination at the individual TO level whether or not Government Property, will be used in the performance of this contract. Until such time, the Contractor shall furnish all property and materials to perform the work as required in the PWS.

If, at any time, it is in the Government's best interest to provide any property or materials, at the individual task order level, justification to do so will be addressed IAW FAR 45.102 and DFARS PGI 245.103-70.