Airforce_8_Amendment_2.pdf
PDF 671 KB Posted
- Attached to
- DLA-Energy Petroleum Facilities Maintenance and Minor/Emergency Repairs Air Force Phase 8
- Solicitation number
- W912DY-17-R-0002
About this file
Amendment 2
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIRECTORATE OF CONTRACTING - HNC
ATTN: ADAM HUMPHREY
256-895-1326
HUNTSVILLE AL 35816
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Airforce Phase 8:
The purpose of this Amendment is to add Attachments 4 (Pricing Worksheet) and Attachment 5 (Past Performance Questionaire).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DY-17-R-0002
X 9B. DATED (SEE ITEM 11)
24-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Mar-2017
CODE
US ARMY ENGINEERING & SUPPORT CENTER
HUNTSVILLE ENGINEERING & SUPPORT CENTER
P.O. BOX 1600
HUNTSVILLE AL 35807-4301
W912DY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912DY
FACILITY CODECODE
EMAIL:TEL:
W912DY-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
Prime Contractor SO Fee -$ -$ -$ -$ -$ -$ Prime Contractor Emergency Fee -$ -$ -$ -$ -$ -$ Subcontractor Fee/Markup -$ -$ -$ -$ -$ -$
FEES
TOTALS:
TOTALS:
CLIN 0001 - QUARTERLY RECURRING MAINTENANCE
CLIN 0002 - SEMI ANNUAL RECURRING MAINTENANCE
TOTALS:
TOTALS:
CLIN 0003 - ANNUAL RECURRING MAINTENANCE
CLIN 0004 - MINOR REPAIRS
NO PRICING NECESSARY AT PROPOSAL TIME
CLIN 0005 CONTRACT DATA REQUIREMENTS LISTS (CDRSs)
CLIN 0006 CONTRACTOR MANPOWER REPORTING (CMR)
CLIN 0007 - SITE MAP AND PETROLEUM SYSTEM SCHEMATIC
TOTALS:
TOTALS:
Site BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0001 - QUARTERLY RECURRING MAINTENANCE
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0002 - SEMI ANNUAL RECURRING MAINTENANCE
TOTALS: -$ -$ -$ -$ -$ -$
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
BASE YR OPT 1 OPT 2 OPT 3 OPT 4 6 Month Extension
CLIN 0003 - ANNUAL RECURRING MAINTENANCE
CLIN 0005 CONTRACT DATA REQUIREMENTS LISTS (CDRSs)
CLIN 0006 CONTRACTOR MANPOWER REPORTING (CMR)
CLIN 0006 TOTAL:
CLIN 0005 TOTAL:
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0007 - SITE MAP AND PETROLEUM SYSTEM SCHEMATIC
Burdened Unburdened Burdened Unburdened Burdened Unburdened Burdened Unburdened Burdened Unburdened Burdened Unburdened Program Manager -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Manager -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Manager - Jr -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ QC/Safety Manager -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Service Order Manager -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Engineer -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Engineer - Jr -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Scheduler -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Project Coordinator -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Contract Admin Specialist -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Estimator -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Drafter - CAD -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Site Safety and Health Officer -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Safety Competent/Qualified person -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Superintendent -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Foreman -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Team Leader -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Fuel Maintenance Technician -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Electrician - Journeyman -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Electrician - Master -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Laborer -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Mechanic -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Painter -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Pipe fitter -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Pipe Fitter Journeyman -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ NACE Inspector -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Welder -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Rigger -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Quality Control Inspector -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Site Manager -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$
6 Month ExtensionAward year Option 1 Option 2 Option 3
LABOR RATES
Option 4
ALL LABOR CATEGORIES PLANNED TO BE UTILIZED
SHALL BE INPUT HERE.
ATTACH MORE SHEETS IF NECESSARY
SITE NAME PRIME LABOR SUB LABOR TRAVEL MATERIAL EQUIPMENT Total
CLIN 0001 - QUARTERLY RECURRING MAINTENANCE
Provide one sheet for base and one for each option year:
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0002 - QUARTERLY RECURRING MAINTENANCE
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0003 - ANNUAL RECURRING MAINTENANCE
TOTALS: -$ -$ -$ -$ -$ -$
TOTALS: -$ -$ -$ -$ -$ -$
CLIN 0007 - SITE MAP AND PETROLEUM SYSTEM SCHEMATIC
PAST PERFORMANCE RISK ASSESSMENT QUESTIONNAIRE (PPQ)
W912DY-17-R-0002 RFP – Airforce Phase 7 RM&MR
RFP NO: W912DY-17-R-0002
DESCRIPTION: DLA-Energy Petroleum Facilities Recurring Maintenance and Minor/Emergency Repairs for Airforce Phase 7
NOTE: Offeror shall incorporate into the past performance section of the proposal, page one (1) of each PPQ sent to evaluators. In the event that an evaluator does not return a completed PPQ, the Government will call to verify information provided on page one. The government does not anticipate calling evaluators that have returned a completed PPQ.
Evaluator, Please provide your candid responses. The information that you provide will be used in the awarding of a federal contract. Therefore, it is important that your information be as factual, accurate and complete as possible to preclude the need for follow-up by the evaluators.
PART I. (To be completed by the Offeror)
(1) Contractor Name:
(2) Contractor Address (Street, City and State):
(3) Contract Number:
Type of Contract: “C” Contract, ID/IQ task order, GSA order, Other (Specify):
Type of Pricing Arrangement: Fixed Price Cost Reimbursement Other (Specify):
(4) Prime Contractor (if different from the contractor name cited above):
(5) Title of Project:
(6) Description of Work:
(8) Location of Work:
(9) Date of Award: (mm/dd/yyyy)
(10) Status: Active Complete, Completion Date:
(11) Name, telephone number, and email address of Technical Representative:
PART II. EVALUATION (To be completed by the technical representative identified on line 11 – If unavailable, to be completed by a technical representative knowledgeable of the contractor’s responsibilities and performance.
(1) Please evaluate the contractor's performance regarding compliance with the statement of work:
Excellent
Good
Satisfactory
Marginal
Unsatisfactory
Remarks:
(2) Please evaluate the contractor's performance regarding overall technical expertise demonstrated.
Excellent
Good
Satisfactory
Marginal
Unsatisfactory
Remarks:
(3) COMPLIANCE WITH ADMINISTRATIVE CONTRACTUAL REQUIREMENTS
Please evaluate the contractor's performance regarding items such reporting, deliverables, etc.
Excellent
Good
Satisfactory
Marginal
Unsatisfactory
Remarks:
If given the opportunity, would you work with this contractor again? Yes No Not Sure
OTHER REMARKS:
(1) Please use the space below to provide other information related to the contractor's performance.
PART III. RETURN INSTRUCTIONS
Please return this completed Questionnaire via e-mail to the following email addresses: Adam.T.Humphrey@usace.army.mil and Lisa.M.Hendrix@usace.army.mil
Thank you for your assistance.
mailto:Aquiller.Cole@usace.army.mil mailto:Frederick.Cartes@usace.army.mil
| Airforce 8 Amendment 2 |
| AF8 - Attachment 4 - Pricing Worksheet |
| SUMMARY |
| CLIN ROLL UP |
| Svs Ordr Labor Rates and Markup |
| CLIN 1 Qtr RM |
| CLIN 2 SemiAnl RM |
| CLIN 3 Annual RM |
| CLIN 7 MAP and Syst. Schematic |
| AF8 - Atachment 5 - PPQ Fillable blank |
| RFP NO: W912DY-15-R-0003 |
| PART I. (To be completed by the Offeror) |
| PART II. EVALUATION (To be completed by the technical representative identified on line 11 – If unavailable, to be completed by a technical representative knowledgeable of the contractor’s responsibilities and performance. |
| Remarks: (Insert additional comments here) |
| (2) Please evaluate the contractor's performance regarding overall technical expertise demonstrated. |
| Remarks: (Insert additional comments here) |
| Remarks: (Insert additional comments here) |
| If given the opportunity, would you work with this contractor again? Yes No Not Sure |
| OTHER REMARKS: |
| PART III. RETURN INSTRUCTIONS |
| Contractor Name: |
| Contractor Address: |
| Contract Number: |
| C Contract: Off |
| IDIQ task order: Off |
| GSA order: Off |
| Other: Off |
| Specify 1: |
| 0: |
| 1: |
| Fixed Price: Off |
| Cost Reimbursement: Off |
| Other_2: Off |
| Prime Contractor: |
| Project Title: |
| Description of Work: |
| Location of Work: |
| Date of Award: |
| Active: Off |
| Complete Completion Date: Off |
| Completion Date:: |
| Technical Representative Contact: |
| Check Box1: |
| 0: |
| 0: Off |
| 1: Off |
| 1: |
| 0: Off |
| 1: Off |
| 2: |
| 0: Off |
| 1: Off |
| 3: |
| 0: Off |
| 1: Off |
| 4: |
| 0: Off |
| 1: Off |
| Remarks 1: (Insert additional comments here) |
| Remarks 2: (Insert additional comments here) |
| Remarks 3: (Insert additional comments here) |
| If given the opportunity would you work with this contractor again: Off |
| Remarks 4: (Insert additional remarks here) |
File details come from the government source that posted it. Updated .