Dehydrator_Pricing_Spreadsheet_1.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Food Waste Dehydrators - Contract Award Federal contract opportunity
- Solicitation number
- W912DY-15-P-0118
About this file
Dehydrator Pricing Spreadsheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Dehydrator_Pricing_Spreadsheet_Rev03.xlsx | XLSX spreadsheet | |
| Amendment_05_-_RFP_Food_Waste_Dehydrators_.docx | DOCX document | |
| Questions_ _Answers_RFQ_-_Food_Waste_Dehydrator_Acquisition_(W912DY-15-P-0118_).docx | DOCX document | |
| Amendment_04_-_RFP_Food_Waste_Dehydrators_.docx | DOCX document | |
| Dehydrator_Pricing_Spreadsheet_Rev02.xlsx | XLSX spreadsheet | |
| Amendment_03_-_RFP_Food_Waste_Dehydrators_.docx | DOCX document | |
| Amendment_03_-_RFP_Food_Waste_Dehydrators_.docx | DOCX document | |
| Rev01_Dehydrators_SOW.docx | DOCX document | |
| FAR_Clauses_(Full_Description)_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Spreadsheet
| Large Capacity Units - Base Period (Projected Order) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| West Point, NY | 2 | |||||||
| Natick, MA | 1 | |||||||
| Ft Campbell, KY | 8 | |||||||
| Ft Hood, TX | 8 | |||||||
| Fort Leonard Wood, MO | 11 | |||||||
| Fort Benning, GA | 14 | |||||||
| Total | Totals | $0 | $0 | $0 | $0 | |||
| Important: The intial order quantity for the testing and acceptance requirement will taken from the projected order quantity of the award. The remaining quantities are to be ordered after successful testing of the food waste dehydrators in the initial order. | Contingency | $0 | ||||||
| Total Hardware | $0 |
| Large Capacity Units - Base Period (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| Ft Campbell, Kentucky | 4 | |||||||
| Fort Hood, Texas | 4 | |||||||
| Fort Jackson, South Carolina | 1 | |||||||
| Fort Benning, Georgia | 6 | |||||||
| Total | 15 | |||||||
| Total | Totals | $0 | $0 | $0 | $0 | |||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Small Capacity Units - Base Period (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| To Be Determined | 10 | |||||||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Note: Offeror must provide an estimated cost for installation and delivery in the Continental United States. |
| Large Capacity Units - Option Period I (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| To Be Determined | 15 | |||||||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Note: Offeror must provide an estimated cost for installation and delivery in the Continental United States. |
| Small Capacity Units - Option Period I (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| To Be Determined | 5 | |||||||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Note: Offeror must provide an estimated cost for installation and delivery in the Continental United States. |
| Large Capacity Units - Option Period 2 (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| To Be Determined | 15 | |||||||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Note: Offeror must provide an estimated cost for installation and delivery in the Continental United States. |
| Small Capacity Units - Option Period 2 (Optional) | ||||||||
| Site Location | Number of Units | Cost (Per Unit) | Installation Cost (Per Unit) | Shipping Cost (Per Unit) | Total Cost (All Units) | Installation Cost (All Units) | Shipping Costs (All Units) | Total Cost |
| To Be Determined | 5 | |||||||
| Contingency | $0 | |||||||
| Total Hardware | $0 | |||||||
| Note: Offeror must provide an estimated cost for installation and delivery in the Continental United States. |
Important Advisory: The contract will include terms and conditions that will allow the Government to switch model types (large or small), adjust the quantities of each type, and the change the delivery locations. This will be done by modification under the contract.
Sheet2
Sheet3
File details come from the government source that posted it. Updated .