This document is a virtual Industry Day presentation for the Willapa Harbor Maintenance Dredging project by the U.S. Army Corps of Engineers (USACE) Seattle District. The project seeks to restore three Federal Navigation features in Willapa Bay to their authorized depths, involving dredging up to 180,000 cubic yards from Bay Center Entrance Channel, Nahcotta Entrance Channel, and Tokeland Entrance Channel. Dredging will occur during specific environmental in-water work windows in 2026-2027, with authorized depths ranging from -10 to -15 feet (MLLW) and +1 to +2 feet overdepth allowance.

The solicitation (W912DW26BA001) is planned for award in January/February 2026, with construction spanning fiscal years 2026-2027. USACE is considering an Invitation for Bids to open competition to both large and small businesses. The project presents significant challenges, including difficult mobilization, dangerous access, exposed Pacific Ocean entrance, and unmaintained channels with shifting shoals. The Small Business Office encourages early engagement, relationship building, and understanding of subcontracting requirements. Potential bidders are invited to provide feedback on project site conditions, option items, and information sufficiency for competitive bidding.

View the file

Other files

File Type Posted
FY26 Willapa Bay Dredging Industry Day Followup.pdf PDF
USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS.pptx PPTX presentation
Willapa Industry Day Slides_2025XXXX.pptx PPTX presentation

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WILLAPA HARBOR

MAINTENANCE DREDGING

INDUSTRY DAY (VIRTUAL)

Seattle District Navigation Section

Solicitation #: W912DW26BA001

• Remain muted

• Raise hand if you have a comment or question

MEETING ETIQUETTE

• This maintenance dredging project seeks to return three Federal Navigation features of Willapa Bay back to their authorized depths.

• Dredging of up to 180,000 CY from 3 features:

o Bay Center Entrance Channel & Mooring Basin Access Lane o Nahcotta Entrance Channel & Mooring Basin Access Lane o Tokeland Entrance Channel

• Additional dredging will occur in the Palix River/Bay

Center Access Lane to provide dredge access to the Bay Center Federal feature

• Dredging will occur during the environmental in-water work windows, which are:

o Bay Center/Palix River, 16 July – 30 September 2026 o Nahcotta, 16 July 2026 – 01 February 2027 o Tokeland, 16 July 2026 – 14 February 2027

PROJECT OVERVIEW

FY26 dredging event:

• -10ft authorized depth

(MLLW)

• +2ft overdepth

• No advanced maintenance is allowed

BAY CENTER

• -9ft dredging depth (MLLW)

• +1ft overdepth

• No advanced maintenance is authorized or allowed

BAY CENTER/PALIX RIVER ACCESS LANE

June 2023 April 2024

• -10ft authorized depth

(MLLW)

• +2ft overdepth

• No advanced maintenance is allowed

NAHCOTTA

• -15ft authorized depth

(MLLW)

• +2ft overdepth

• No advanced maintenance is allowed

TOKELAND

Photo courtesy of WA Ecology

• Last known USACE maintenance dredging:

o Bay Center and Tokeland – 2002 o Nahcotta – 1987

• Contractors should expect difficult mobilization and dredging operations throughout the project area o Challenging and dangerous access considerations o Exposed Pacific Ocean entrance o Unmaintained channels, shifting shoals, unpredictable weather (especially during work windows)

WILLAPA MAINT. DREDGING – CHALLENGES

• Environmental documents are complete

• Plans and Specifications are in progress

• Anticipated award of January/February 2026

• Construction would be in FY26 – FY27, within the in-water work windows

WILLAPA MAINT. DREDGING – STATUS

General Advice

• Get engaged, EARLY o Understand anticipated SB involvement

• Small Business Commitment Document

• Subcontracting Plan – USACE goals are based on historical data, market info o Utilize SAM.gov and FPDS for subcontracting opportunities

• Build relationships, NOW o SBA SubNet – https://subnet.sba.gov/client/dsp_Landing.cfm o FPDS - https://www.fpds.gov/fpdsng_cms/index.php/en/ o Request agency info on recent awards with a subcontracting plan o Request assistance to source SBs (utilize your APEX Accelerators)

• Understand other than small contractor responsibilities under FAR 52.219-9 o Good Faith Efforts (FAR 19.705-7) o eSRS reporting requirements

USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS

https://subnet.sba.gov/client/dsp_Landing.cfm https://www.fpds.gov/fpdsng_cms/index.php/en/

Enshané Nomoto

Small Business Professional

Enshane.Nomoto@usace.army.mil

(best initial contact method)

Tel: 253-316-3990

General Email: cenws-sb@usace.army.mil

USACE NWS SB Homepage:

https://www.nws.usace.army.mil/Business-With-Us/Small-Business/

USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS

mailto:Enshane.Nomoto@usace.army.mil mailto:cenws-sb@usace.army.mil https://www.nws.usace.army.mil/Business-With-Us/Small-Business/

We want your feedback on the following items:

1. Concerns and considerations regarding project site conditions.

2. A large amount of the work may be classified as Option Items.

3. Considering soliciting as Invitation for Bids, intent is to open competition to both large and small business.

4. Is there enough information provided to provide a competitive bid? If not, what information can the

Government provide to reduce these risks?

WILLAPA MAINT. DREDGING – FEEDBACK ITEMS

Future questions should be emailed to the contracting team:

Contracting Officer:

Scott Britt scott.w.britt@usace.army.mil

Contracting Specialist:

Geraldine Kemp geraldine.l.kemp@usace.army.mil

QUESTIONS?

mailto:scott.w.britt@usace.army.mil mailto:geraldine.l.kemp@usace.army.mil

Slide 1: Willapa HARBOR maintenance Dredging Industry Day (Virtual)
Slide 2: Meeting Etiquette
Slide 3: Project Overview
Slide 4: Bay Center
Slide 5: Bay Center/Palix River Access Lane
Slide 6: Nahcotta
Slide 7: Tokeland
Slide 8: Willapa Maint. Dredging – Challenges
Slide 9: Willapa Maint. Dredging – Status
Slide 10: USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS
Slide 11: USACE NWS OFFICE OF SMALL BUSINESS PROGRAMS
Slide 12: Willapa Maint. dredging – feedback items
Slide 13: Questions?

File details come from the government source that posted it. Updated .