The provided documents are detailed architectural and engineering design plans for the U.S. Army Corps of Engineers Seattle Emergency Operations Center (EOC) audiovisual system installation. The plans specify comprehensive wall-by-wall infrastructure layouts for a complex audiovisual setup, including a 136" Planar video wall, multiple Planar monitors (65" and 85" sizes) mounted with Chief wall mounts, QSC surface-mounted speakers, electrical boxes, network connections, and required backing support specifications.

The technical drawings cover North, West, South, and East wall configurations, detailing precise mounting requirements, electrical infrastructure, conduit placement, and cable routing. Specific equipment includes Crestron TS-1070-GV-B-S touchpanel, Planar URX85 and URP65 monitors, and an Atlantic SR-40-28 rack location, with meticulous attention to electrical box placement, network connections, and structural mounting specifications. The plans are marked as preliminary and dated between February and March 2025, indicating an upcoming installation project for the Seattle EOC audiovisual system.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRESTRON TS-1070-GV-B-S

TOUCHPANEL, WALL MOUNTED

PLANAR UHD136 136" VIDEO WALL

5'-63 4"

9'-10 7 16"

CL VIDEOWALL

MON1 MON2 MON3 MON4 MON5

MON6MON7MON8MON9MON10

MON11

MON16

MON25 MON24

MON17

MON12 MON13

MON18

MON23 MON22

MON19

MON14 MON15

MON20

MON21

MINIMUM GAP BETWEEN VIDEOWALL AND

CEILING REQUIRED FOR AIRFLOW

ADD FLAT WALL TO ACCOMMODATE THE

VIDEOWALL

VERIFY THIS WALL MOUNTED STRUCTURE WILL

NOT INTERFERE WITH VIDEOWALL

48 (1) 4" SQ ELECTRICAL BOX

w/ 2-GANG MUD RING

4" PLYWOOD BACKING. PLUMB AND FLAT WITHIN 18"

ACROSS ENTIRE MOUNTING SURFACE. FIREPROOF

RATED PER LOCAL BUILDING CODES (BY OTHERS)

BACKING REQUIRED TO SUPPORT A MIN OF 2100lbs

EXACT VIDEOWALL INFRASTRUCTURE

REQUIREMENTS BY PLANAR SEE

THEIR DOCUMENTATION

(1) 1-1/4" CONDUIT

STUB OUT TO ACCESSIBLE

SPACE BELOW FLOOR

CL VIDEOWALL

(1) POWER CABLE

(1) NETWORK CABLE

(1) 1-GANG ELECTRICAL BOX, MOUNTED HORIZONTALLY

TYPICAL OF 7 BOXES BEHIND VIDEO WALL

(1) NETWORK CABLE

(1) POWER CABLE

(1) POWER CABLE

(1) POWER

CABLE

(2) NETWORK

CABLES

(1) NETWORK CABLE

DRAFTER:

DWG NUMBER:

CHECKED BY:

SCALE:

SHEET TITLE:

CLIENT:

PROJECT #:

ISSUE:

ENGINEER:

AS BUILT

OTHER:

REVISIONS

NO DESCRIPTIONDATE

PRELIMINARY

PROPOSAL

SUBMITTAL

INTEGRATION

A/V SYSTEM DESIGNED & ENGINEERED FOR:

THIS DRAWING AND ITS CONTENTS ARE

THE ORIGINAL AND UNPUBLISHED WORK

OF AVI SYSTEMS. AND MAY NOT BE

DUPLICATED, COPIED OR REPRODUCED IN

ANY MANNER OR USED FOR THE

INSTALLATION, SERVICE OR SUPERVISION

OF THE SYSTEM OR EQUIPMENT WITHOUT

PRIOR WRITTEN CONSENT. IF THE

PROPOSED SYSTEM IS NOT PURCHASED

THIS DRAWING MUST BE RETURNED TO AVI

SYSTEMS.

SYSTEM ID #:

PROJECT NAME:

FILE SAVE AS:

0 02/11/25 PRELIMINARY

AVI PM:

PRELIMINARY

U.S. ARMY CORPS

OF ENGINEERS

4735 EAST MARGINAL WAY SOUTH

SEATTLE, WA, 98134

USACE

3325665412

K. BURGOYNE

R. DELANEY

M OKANE

SEATTLE EOC

DALLAS

1201 LAKESIDE PKWY, STE 160

FLOWER MOUND, TX 75028

PHONE: 469-359-4100

www.avisystems.com

1 02/26/25 PRELIMINARY

2 03/04/25 PRELIMINARY

AS MARKED

USACE_SEATTLE_PLANS

NORTH WALL

AV401.3

NORTH WALL

ELEVATION EQUIPMENT LAYOUT4 SCALE: 1/2" = 1'

NORTH WALL

ELEVATION INFRASTRUCTURE LAYOUT3 SCALE: 1/2" = 1'

QSC AD-S402T-WH

SURFACE MOUNTED SPEAKER

QTY. 4

CL WALL

PLANAR URP65

65" MONITOR MOUNTED w/ CHIEF

LTM1U-G WALL MOUNT

PLANAR URP65

65" MONITOR MOUNTED w/ CHIEF

LTM1U-G WALL MOUNT

(1) 1-GANG ELECTRICAL BOX

(1) 1-GANG

ELECTRICAL

BOX

(1) 1-GANG ELECTRICAL BOX

(1) 1-GANG

ELECTRICAL BOX

(1) 1-1/4" CONDUIT

STUB OUT TO ACCESSIBLE

SPACE BELOW FLOOR

CL WALL

(1) 1-GANG

ELECTRICAL BOX

BACKING REQUIRED TO SUPPORT A

MIN OF 525LBS. BACKING TO SPAN A

MIN OF 3 STUDS.

BACKING REQUIRED TO SUPPORT A

MIN OF 525LBS. BACKING TO SPAN A

MIN OF 3 STUDS.

(1) 4" SQ ELECTRICAL BOX

w/ 2-GANG MUD RING

(1) 120 VOLT DUPLEX

RECEPTACLE

(1) NETWORK CONNECTION

REQUIRED

(1) 4" SQ ELECTRICAL BOX

w/ 2-GANG MUD RING

(1) 120 VOLT DUPLEX

RECEPTACLE

(1) NETWORK CONNECTION

REQUIRED

DRAFTER:

DWG NUMBER:

CHECKED BY:

SCALE:

SHEET TITLE:

CLIENT:

PROJECT #:

ISSUE:

ENGINEER:

AS BUILT

OTHER:

REVISIONS

NO DESCRIPTIONDATE

PRELIMINARY

PROPOSAL

SUBMITTAL

INTEGRATION

A/V SYSTEM DESIGNED & ENGINEERED FOR:

THIS DRAWING AND ITS CONTENTS ARE

THE ORIGINAL AND UNPUBLISHED WORK

OF AVI SYSTEMS. AND MAY NOT BE

DUPLICATED, COPIED OR REPRODUCED IN

ANY MANNER OR USED FOR THE

INSTALLATION, SERVICE OR SUPERVISION

OF THE SYSTEM OR EQUIPMENT WITHOUT

PRIOR WRITTEN CONSENT. IF THE

PROPOSED SYSTEM IS NOT PURCHASED

THIS DRAWING MUST BE RETURNED TO AVI

SYSTEMS.

SYSTEM ID #:

PROJECT NAME:

FILE SAVE AS:

0 02/11/25 PRELIMINARY

AVI PM:

PRELIMINARY

U.S. ARMY CORPS

OF ENGINEERS

4735 EAST MARGINAL WAY SOUTH

SEATTLE, WA, 98134

USACE

3325665412

K. BURGOYNE

R. DELANEY

M OKANE

SEATTLE EOC

DALLAS

1201 LAKESIDE PKWY, STE 160

FLOWER MOUND, TX 75028

PHONE: 469-359-4100

www.avisystems.com

1 02/26/25 PRELIMINARY

2 03/04/25 PRELIMINARY

AS MARKED

USACE_SEATTLE_PLANS

WEST WALL

AV401.4

WEST WALL

ELEVATION EQUIPMENT LAYOUT4 SCALE: 1/2" = 1'

WEST WALL

PLANAR URX85

85" MONITOR MOUNTED w/

CHIEF XTM1U-G WALL MOUNT

BACKING REQUIRED TO SUPPORT A

MIN OF 525LBS. BACKING TO SPAN A

MIN OF 3 STUDS.

(1) 4" SQ ELECTRICAL BOX

w/ 2-GANG MUD RING

(1) 120 VOLT DUPLEX

RECEPTACLE

(1) NETWORK CONNECTION

REQUIRED

(1) 1-1/4" CONDUIT

STUB OUT TO ACCESSIBLE

SPACE BELOW FLOOR

DRAFTER:

DWG NUMBER:

CHECKED BY:

SCALE:

SHEET TITLE:

CLIENT:

PROJECT #:

ISSUE:

ENGINEER:

AS BUILT

OTHER:

REVISIONS

NO DESCRIPTIONDATE

PRELIMINARY

PROPOSAL

SUBMITTAL

INTEGRATION

A/V SYSTEM DESIGNED & ENGINEERED FOR:

THIS DRAWING AND ITS CONTENTS ARE

THE ORIGINAL AND UNPUBLISHED WORK

OF AVI SYSTEMS. AND MAY NOT BE

DUPLICATED, COPIED OR REPRODUCED IN

ANY MANNER OR USED FOR THE

INSTALLATION, SERVICE OR SUPERVISION

OF THE SYSTEM OR EQUIPMENT WITHOUT

PRIOR WRITTEN CONSENT. IF THE

PROPOSED SYSTEM IS NOT PURCHASED

THIS DRAWING MUST BE RETURNED TO AVI

SYSTEMS.

SYSTEM ID #:

PROJECT NAME:

FILE SAVE AS:

0 02/11/25 PRELIMINARY

AVI PM:

PRELIMINARY

U.S. ARMY CORPS

OF ENGINEERS

4735 EAST MARGINAL WAY SOUTH

SEATTLE, WA, 98134

USACE

3325665412

K. BURGOYNE

R. DELANEY

M OKANE

SEATTLE EOC

DALLAS

1201 LAKESIDE PKWY, STE 160

FLOWER MOUND, TX 75028

PHONE: 469-359-4100

www.avisystems.com

1 02/26/25 PRELIMINARY

2 03/04/25 PRELIMINARY

AS MARKED

USACE_SEATTLE_PLANS

SOUTH WALL

AV401.5

SOUTH WALL

ELEVATION EQUIPMENT LAYOUT4 SCALE: 1/2" = 1'

SOUTH WALL

PLANAR URX85

85" MONITOR MOUNTED w/ CHIEF

XTM1U-G WALL MOUNT

QSC AD-S402T-WH

SURFACE MOUNTED SPEAKER

QTY. 480

BACKING REQUIRED TO SUPPORT A

MIN OF 525LBS. BACKING TO SPAN A

MIN OF 3 STUDS.

(1) 4" SQ ELECTRICAL BOX

w/ 2-GANG MUD RING

(1) 120 VOLT DUPLEX

RECEPTACLE

(1) NETWORK CONNECTION

REQUIRED

(1) 1-GANG

ELECTRICAL

BOX

(1) 1-GANG

ELECTRICAL

BOX

(1) 1-GANG

ELECTRICAL

BOX

(1) 1-GANG

ELECTRICAL

BOX

(1) 1-1/4" CONDUIT

STUB OUT TO ACCESSIBLE

SPACE BELOW FLOOR

DRAFTER:

DWG NUMBER:

CHECKED BY:

SCALE:

SHEET TITLE:

CLIENT:

PROJECT #:

ISSUE:

ENGINEER:

AS BUILT

OTHER:

REVISIONS

NO DESCRIPTIONDATE

PRELIMINARY

PROPOSAL

SUBMITTAL

INTEGRATION

A/V SYSTEM DESIGNED & ENGINEERED FOR:

THIS DRAWING AND ITS CONTENTS ARE

THE ORIGINAL AND UNPUBLISHED WORK

OF AVI SYSTEMS. AND MAY NOT BE

DUPLICATED, COPIED OR REPRODUCED IN

ANY MANNER OR USED FOR THE

INSTALLATION, SERVICE OR SUPERVISION

OF THE SYSTEM OR EQUIPMENT WITHOUT

PRIOR WRITTEN CONSENT. IF THE

PROPOSED SYSTEM IS NOT PURCHASED

THIS DRAWING MUST BE RETURNED TO AVI

SYSTEMS.

SYSTEM ID #:

PROJECT NAME:

FILE SAVE AS:

0 02/11/25 PRELIMINARY

AVI PM:

PRELIMINARY

U.S. ARMY CORPS

OF ENGINEERS

4735 EAST MARGINAL WAY SOUTH

SEATTLE, WA, 98134

USACE

3325665412

K. BURGOYNE

R. DELANEY

M OKANE

SEATTLE EOC

DALLAS

1201 LAKESIDE PKWY, STE 160

FLOWER MOUND, TX 75028

PHONE: 469-359-4100

www.avisystems.com

1 02/26/25 PRELIMINARY

2 03/04/25 PRELIMINARY

AS MARKED

USACE_SEATTLE_PLANS

EAST WALL

AV401.6

EAST WALL

ELEVATION EQUIPMENT LAYOUT4 SCALE: 1/2" = 1'

EAST WALL

LEVEL 2

31' - 6 1/2" (31' - 6 1/2")

EXISTING RACK LOCATION

VERIFY LOCATION

NEW MIDDLE ATLANTIC SR-40-28

PIVOTING WALL RACK

LEVEL 2

31' - 6 1/2" (31' - 6 1/2")

EXISTING RACK LOCATION, NEED

CONDUITS FROM RACK LOCATION

TO ACCIBLE CEILING SPACE AND

FLOORSPACE BELOW ROOM.

DRAFTER:

DWG NUMBER:

CHECKED BY:

SCALE:

SHEET TITLE:

CLIENT:

PROJECT #:

ISSUE:

ENGINEER:

AS BUILT

OTHER:

REVISIONS

NO DESCRIPTIONDATE

PRELIMINARY

PROPOSAL

SUBMITTAL

INTEGRATION

A/V SYSTEM DESIGNED & ENGINEERED FOR:

THIS DRAWING AND ITS CONTENTS ARE

THE ORIGINAL AND UNPUBLISHED WORK

OF AVI SYSTEMS. AND MAY NOT BE

DUPLICATED, COPIED OR REPRODUCED IN

ANY MANNER OR USED FOR THE

INSTALLATION, SERVICE OR SUPERVISION

OF THE SYSTEM OR EQUIPMENT WITHOUT

PRIOR WRITTEN CONSENT. IF THE

PROPOSED SYSTEM IS NOT PURCHASED

THIS DRAWING MUST BE RETURNED TO AVI

SYSTEMS.

SYSTEM ID #:

PROJECT NAME:

FILE SAVE AS:

0 02/11/25 PRELIMINARY

AVI PM:

PRELIMINARY

U.S. ARMY CORPS

OF ENGINEERS

4735 EAST MARGINAL WAY SOUTH

SEATTLE, WA, 98134

USACE

3325665412

K. BURGOYNE

R. DELANEY

M OKANE

SEATTLE EOC

DALLAS

1201 LAKESIDE PKWY, STE 160

FLOWER MOUND, TX 75028

PHONE: 469-359-4100

www.avisystems.com

1 02/26/25 PRELIMINARY

2 03/04/25 PRELIMINARY

AS MARKED

USACE_SEATTLE_PLANS

RACK WALL

AV401.7

RACK WALL

ELEVATION EQUIPMENT LAYOUT4 SCALE: 1/2" = 1'