This document is the Attachment A: Past Performance Project Relevancy Information Summary Form for a federal contract opportunity. The key details are:
The contract opportunity is for the renovation of three warehouses (2274, 2275, and 2276) at the Letterkenny Army Depot in Pennsylvania. The work includes removing and reinstalling racks, guardrails, and column protectors, repositioning light fixtures, diamond polishing concrete floors, installing electrical and IT infrastructure, constructing a bathroom, installing high-bay warehouse doors, and building a three-sided structure with two dock doors and loading ramps. The offeror is required to provide information on past performance projects, including the project name, location, owner/client contact, contract details, offeror's role, percentage of work performed, project dates, award and final amounts, cost growth and schedule delays, and narrative descriptions of the project scope and any performance issues encountered. The offeror must also highlight how the past projects meet the specific criteria outlined in Section 01 11 00 of the RFP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 00 22 00
PROPOSAL EVALUATION CRITERIA
Attachment A:
Past Performance Project Relevancy Information Summary Form
Project Name:
Project Location: Address:
Installation Name (if applicable) Owners/Client Point of Contract (POC): POC Name:
POC Phone Number: POC E-mail:
| Contract Number: |
| Task Order Number (if applicable): |
Was the project terminated early, were cure/show-cause letters issued or were Liquidated Damages assessed? Yes or No (if yes, explain)
Offeror’s Role: (Prime or Subcontractor) [What specific items of work did you perform as the prime or subcontractor]
Percentage of total value of contract performed by the Offeror: (If the Offeror was the Prime, what percentage was subcontracted; if the Offeror was the subcontractor, what dollar amount and percentage of the total project amount, as well as the total contract amount, was awarded to the subcontractor?)
| Date Contract and/or Award began: |
| Original Completion Date: |
Actual Completion Date (or ongoing, if applicable):
| Initial Award Amount: |
| Final Contract Amount: |
| Amount added by modification(s): |
| Percentage the project is physically complete to date: |
Explanation (reason) of any cost growth:
Explanation of any late finish or time extensions:
General Project Narrative: [General scope. Provide a description of the project. Be sure to include features of this project that make it comparable in type or nature to the proposed project described in this request for proposal.]
Performance Issues Encountered: [Describe any performance issues encountered. This could include technical, cost/schedule, health and safety issues, regulatory/stakeholder issues, and other performance issues, as well as what was implemented to overcome these issues and the results.]
Applicable Section 01 11 00 Criteria: [highlight specific elements from the Section 01 11 00. of this RFP that encompasses each submitted past performance project]
Major Project Accomplishments:
END OF ATTACHMENT A