W912DW24Q0024 0003 Battery Monitoring System.pdf
PDF 159 KB Posted
- Attached to
- Battery Monitoring System for Libby Dam
- Solicitation number
- W912DW24Q0024
About this file
This document is an Amendment to a Solicitation for a Battery Monitoring System for the Libby Dam Station. The amendment answers questions received in response to the original solicitation posted on the System for Award Management (SAM) site. Key details include:
The solicitation requires an online battery monitoring system for the Libby Dam Station service batteries, with delivery to the Libby Dam Project Office in Libby, MT. The system must monitor cell voltage, ground faults, connection resistance, and cell negative post temperature. The amendment clarifies that measuring up to a 12V voltage limit is acceptable, the battery charger does not have ground fault detection, and only one connection and negative post per battery need to be measured. The contract requires complete installation, startup, and commissioning within 90 days of award. The solicitation number is W912DW24Q0024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0003 is to answ er questions received in response to the solicitation posted on the System for Aw ard Management (SAM) site. Please reference the Summary of Changes section for the questions and answ ers.
All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Apr-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW24Q0024
X 9B. DATED (SEE ITEM 11)
15-Apr-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Apr-2024
CODE
USA ENGINEER DISTRICT, SEATTLE
ATTN: CENWS-CT
4735 EAST MARGINAL WAY SOUTH, BLDG. 1202
SEATTLE WA 98134-2388
W912DW 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DW24Q0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Q&AS AMENDMENT 0003
Questions and Answers
1. The Statement of Work (SOW) section 1.1 mentions the need to monitor Cell voltage (up to 18.5V nominal).
However, the Hoppecke 14-GroE-1400 battery at the site is a 2.0V nominal jar/cell. The data collection module we have designed for 2.0V jars/cells has an upper voltage limit of 12V. Can you confirm that the 18.5V nominal requirement applies to battery systems comprised of 2.0V jars/cells?
ANSWER: Monitoring up to the 12V. limit is acceptable.
2. The Statement of Work (SOW) section 1.1 mentions the need to monitor Ground faults. In our experience, systems like this one typically have ground fault detection in the battery charger or the battery monitor, but not both.
Ground fault detection in both devices often results in spurious alarms. Can you confirm that the battery charger does not feature ground fault detection?
ANSWER: Our current battery charger does not feature ground fault detection, but we are in the process of installing a new system that will have ground fault detection.
3. The Statement of Work (SOW) section 1.1 mentions the need to monitor connection resistance. The Hoppecke 14-GroE-1400 battery has three connections between each battery. Is the intention of the requirement to measure one connection for each battery or all three?
ANSWER: Measure one connection for each battery.
4. The Statement of Work (SOW) section 1.1 mentions the need to monitor cell negative post temperature. Each Hoppecke 14-GroE-1400 battery has three negative posts. Is it required to measure the temperature of all three negative posts, or will one negative post per battery satisfy the requirement?
ANSWER: Measure one negative post per battery.
5. The Statement of Work (SOW) does not mention the need to monitor the connection resistance of the cables connecting the battery to the battery charger. Many of our NERC-compliant customers require this feature. Is charger cable connection resistance a desired monitoring point?
ANSWER: No
(End of Summary of Changes)