W912DW24Q0024 0002 Battery Monitoring System.pdf

PDF 159 KB Posted

Attached to
Battery Monitoring System for Libby Dam
Solicitation number
W912DW24Q0024
Issued by

About this file

This document is an amendment to Solicitation W912DW24Q0024 for a Battery Monitoring System for the Libby Dam. The amendment provides answers to questions received in response to the original solicitation, including details on the maximum discharge current, the difference between "true float current" and "float current" measurements, and the Corps Hazardous Energy Control (HEC) Procedures training required for installation personnel. The amendment also provides guidance on how offerors can identify exceptions or deviations from the requirements. The overall solicitation is for a complete online battery monitoring system, including installation, start-up, and commissioning, to be delivered to the Libby Dam Project Office in Libby, MT within 90 days of contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 is to answ er questions received in response to the solicitation posted on the System for Aw ard Management (SAM) site. Please reference the Summary of Changes section for the questions and answ ers.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Apr-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DW24Q0024

X 9B. DATED (SEE ITEM 11)

15-Apr-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Apr-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24Q0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&AS

Questions and Answers

1. The Statement of Work (SOW) section 1.1 mentions the need to monitor “string current.” What is the maximum discharge current? This information is crucial for us to size the string current CT properly.

ANSWER: The maximum discharge current is 180 AMPS.

2. The Statement of Work (SOW) section 1.1 mentions the need to monitor “true float current” and “float current.”

Please elaborate on the difference (if any) between these measurements.

ANSWER: This was addressed in Amendment 0001 dated 19 April 2024.

3. The Statement of Work (SOW) section 2.2 and section 3.2 mention the need for installation personnel to complete training on Corps Hazardous Energy Control (HEC) Procedures. Is this training conducted on-site at Libby Dam or online? How many hours should be set aside for this training?

ANSWER: Libby Dam can provid the training materials via e-mail including the test. The test will need to be graded by Libby Dam personnel. On average, training takes about 2 hours.

4. If we cannot comply with specific sections of the RFQ or have an alternate approach, how do we identify exceptions, deviations, or clarifications from the RFQ?

ANSWER: Quoters may identify exceptions or deviations via written documentation submitted with their quotes clearly outlining the exceptions or deviations. Quoters may present alternative terms and conditions, or alternative commercial products or commercial services for satisfying the requirements of this solicitation. Acceptance of any exceptions or deviations is a decision made solely by the Government.

(End of Summary of Changes)