This document provides an attachment for a solicitation seeking offers for the repair of a fuel hydrant system at Fairchild Air Force Base in Spokane, Washington. The solicitation requires offerors to complete a relevant experience matrix to demonstrate experience with construction, repair, and commissioning of pressurized hydrant fueling systems designed in accordance with UFC 3-460-01 and Standard Design AW 078-24-28 to support concurrent fueling and defueling of multiple large airframe aircraft. Offerors must also show experience with 12-inch diameter lined carbon steel fuel circulation piping, hydrant fuels system hydrants, low point drains and high point vents, and impressed current cathodic protection systems. Additional requirements include experience constructing airfield pavements for large military aircraft, Portland cement and asphalt concrete airfield pavements, and removal and disposal of petroleum contaminated soils. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Seattle.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 - OFFEROR’S RELEVANT EXPERIENCE SUMMARY MATRIX

Offeror must complete the project summary matrix as noted below

The Offeror shall complete the Relevant Experience Matrix to clearly identify the relevancy attributes represented by a project example the Offeror is proposing for Relevant Project Experience under Factor A. See the following Relevant Experience Matrix example.

RELEVANCY ATTRIBUTES
Example Project
1
2
3
4
5
6
5.2.5.1 At least three (3) project examples shall demonstrate experience with construction (or repair), and commissioning of pressurized hydrant fueling systems designed in accordance with UFC 3-460-01 “Design: Petroleum Fuel Facilities” and Standard Design AW 078-24-28, “DOD Pressurized Hydrant Fueling System Type III” (DoD Type III Hydrant Fueling Systems) to support concurrent fueling and/or defueling of multiple large airframe aircraft.
X
X
X
5.2.5.2 At least one (1) project example shall demonstrate experience with installation of 12” diameter lined carbon steel fuel circulation piping for DoD Type III Hydrant Fueling Systems.
X

5.2.5.3 At least one (1) project example shall demonstrate experience with construction of hydrant fuels system hydrants, low point drains and high point vents for DoD Type III Hydrant Fueling Systems

X

5.2.5.4 At least one (1) project example shall demonstrate experience with installation of impressed current cathodic protection systems for DoD Type III Hydrant Fueling Systems

X

5.2.5.5 At least two (2) project examples shall demonstrate experience with the construction of airfield pavements to support large airframe military aircraft (e.g., KC-135 or C-17).

X
X

5.2.5.6 At least one (1) project example shall demonstrate experience with construction of Portland cement airfield pavements in sections similar to those required under this solicitation.

X

5.2.5.7 At least one (1) project example shall demonstrate experience with construction of asphalt concrete airfield pavements in sections similar to those required under this solicitation.

X

5.2.5.8 At least one (1) project example shall demonstrate experience with removal and disposal of petroleum contaminated soils.

X

5.2.5.9 At least one (1) project example shall demonstrate experience with installation or repair of buried line sensor intrusion detection systems for military airfields.

X